CN216590256U - Urban heat supply engineering comprehensive construction pipeline protection device - Google Patents

Urban heat supply engineering comprehensive construction pipeline protection device Download PDF

Info

Publication number
CN216590256U
CN216590256U CN202122516245.8U CN202122516245U CN216590256U CN 216590256 U CN216590256 U CN 216590256U CN 202122516245 U CN202122516245 U CN 202122516245U CN 216590256 U CN216590256 U CN 216590256U
Authority
CN
China
Prior art keywords
arc
plate
shaped reinforcing
pipeline
heat supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122516245.8U
Other languages
Chinese (zh)
Inventor
柴寅博
吴庆阳
王伟
由方文
何佳泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhong Engineering Co ltd Of Cccc Tunnel Bureau
CCCC Tunnel Engineering Co Ltd
Original Assignee
Huazhong Engineering Co ltd Of Cccc Tunnel Bureau
CCCC Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huazhong Engineering Co ltd Of Cccc Tunnel Bureau, CCCC Tunnel Engineering Co Ltd filed Critical Huazhong Engineering Co ltd Of Cccc Tunnel Bureau
Priority to CN202122516245.8U priority Critical patent/CN216590256U/en
Application granted granted Critical
Publication of CN216590256U publication Critical patent/CN216590256U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Thermal Insulation (AREA)

Abstract

The utility model discloses a comprehensive construction pipeline protection device for urban heat supply engineering, which comprises two arc-shaped reinforcing plates, wherein the two arc-shaped reinforcing plates are spliced into a cylinder shape, one side of each arc-shaped reinforcing plate is provided with a connecting plate, the connecting plate is provided with a mounting hole, the other side of each arc-shaped reinforcing plate is provided with a hinge, and the corresponding arc-shaped reinforcing plates are connected with bolts in the mounting holes through the hinges. According to the utility model, the two arc-shaped reinforcing plates are arranged and connected, the pipeline to be protected is arranged in the two arc-shaped reinforcing plates, so that the protection of the pipeline is improved, the damage of the pipeline is reduced, the pipeline is wrapped by the flame-retardant material, the protection of the pipeline is further improved, the base and the lifting column are arranged below the arc-shaped reinforcing plates, the arc-shaped reinforcing plates are automatically lifted, and the installation by workers is convenient.

Description

Urban heat supply engineering comprehensive construction pipeline protection device
Technical Field
The utility model belongs to the technical field of pipelines, and particularly relates to a comprehensive construction pipeline protection device for an urban heat supply project.
Background
The existing urban pipelines are mostly installed underground, and are easy to meet the pipelines in the engineering of underground construction, so that the pipelines need to be further protected during construction; the existing pipeline protection device is mainly characterized in that an inner steel truss decorating device is arranged, and a steel truss is arranged on a pipeline and used for protecting the pipeline from being damaged in the construction process; in the practical engineering, the steel truss is heavy and inconvenient to install; in addition, no protective measures are arranged in the steel truss, gaps are reserved on the steel truss, and sundries falling off in the construction process can easily hit the pipeline through the gaps on the steel truss, so that the pipeline is damaged to a certain extent.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a pipeline protection device for comprehensive construction of urban heat supply engineering, which aims to solve the problems of poor pipeline protection and inconvenient installation of the protection device in the prior art.
In order to solve the technical problems, the utility model adopts the technical scheme that: the utility model provides a city heat supply engineering is synthesized and is constructed pipeline protector, includes two arc gusset plates, two the arc gusset plate splices into the cylinder, one side of arc gusset plate is provided with the connecting plate, set up the mounting hole on the connecting plate, the opposite side of arc gusset plate is provided with the hinge, and corresponding arc gusset plate passes through the hinge and the bolted connection in the mounting hole.
The fixed plate is arranged below the arc-shaped reinforcing plate, the fixed plate is installed on the lifting column, and the lifting column is installed on the base.
The lifting column is an electric lifting column, the fixing plate is an arc-shaped plate fixing plate, the upper end face of the fixing plate is connected with the lower face of the arc-shaped reinforcing plate, and the lower end face of the fixing plate is fixedly connected with the top end of the lifting column.
And a flame-retardant material is arranged in the arc-shaped reinforcing plate, and the flame-retardant material is flame-retardant mud.
Compared with the prior art, the utility model has the following advantages:
according to the utility model, the two arc-shaped reinforcing plates are arranged and connected, the pipeline to be protected is arranged in the two arc-shaped reinforcing plates, so that the protection of the pipeline is improved, the damage of the pipeline is reduced, the pipeline is wrapped by the flame-retardant material, the protection of the pipeline is further improved, the base and the lifting column are arranged below the arc-shaped reinforcing plates, the arc-shaped reinforcing plates are automatically lifted, and the installation by workers is convenient.
Drawings
FIG. 1 is a schematic view of an apparatus of the present invention;
FIG. 2 is a schematic view of the connection of the arc-shaped reinforcing plate and the flame retardant material according to the present invention;
fig. 3 is a schematic view illustrating the connection of the lifting column of the present invention and the arc-shaped reinforcing plate.
In the figure, 1 an arc reinforcing plate, 2 a connecting plate, 3 mounting holes, 4 hinges, 5 fixing plates, 6 bases, 7 lifting columns and 8 flame-retardant materials.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Example one
As shown in figure 1, the urban heat supply engineering comprehensive construction pipeline protection device comprises two arc-shaped reinforcing plates 1, two arc-shaped reinforcing plates 1 are spliced into a cylinder, a connecting plate 2 is arranged on one side of each arc-shaped reinforcing plate 1, a mounting hole 3 is formed in each connecting plate 2, a hinge 4 is arranged on the other side of each arc-shaped reinforcing plate 1, and the corresponding arc-shaped reinforcing plates 1 are connected through the hinges 4 and bolts in the mounting holes 3.
As shown in fig. 2, in this embodiment, during actual installation, the hinge 4 is connected to the arc-shaped reinforcing plate 1 in a welding manner, and is used for movably connecting the corresponding arc-shaped reinforcing plate 1, the arc-shaped reinforcing plate 1 is connected to the connecting plate 2 in a welding manner, and is used for fixedly connecting the corresponding arc-shaped reinforcing plate 1, the flame retardant material 8 is arranged in the arc-shaped reinforcing plate 1, and the flame retardant material 8 is flame retardant mud and is used for protecting a pipeline and preventing a spark generated by field electric welding from damaging the pipeline.
The utility model is suitable for pipeline protection in a construction site, the corresponding arc-shaped reinforcing plates 1 are connected through hinges 4, the flame retardant material 8 is placed in the arc-shaped reinforcing plates 1, the arc-shaped reinforcing plates 1 are installed on a pipeline, the flame retardant material 8 is placed on the pipeline, the corresponding arc-shaped reinforcing plates 1 are covered, bolts penetrate through the installation holes 3 in the connecting plates 2 to fix the corresponding arc-shaped reinforcing plates 1, and the two ends of the arc-shaped reinforcing plates 1 are respectively fixed with the ground or fixed by fixtures and are used for pipeline protection, so that the pipeline damage caused by site construction is avoided.
Example two
As shown in fig. 3, the difference between the embodiment and the first embodiment is that a fixing plate 5 is disposed below the arc-shaped reinforcing plate 1, the fixing plate 5 is an arc-shaped fixing plate, the fixing plate 5 is detachably connected to the arc-shaped reinforcing plate 1, during installation, the arc-shaped reinforcing plate 1 is placed on the fixing plate 5 and contacts with an arc surface of the fixing plate 5, so as to stabilize the arc-shaped reinforcing plate 1, the fixing plate 5 is installed on a lifting column 7, the lifting column 7 is installed on a base 6, the lifting column 7 is an electric lifting column, the lower end surface of the fixing plate 5 is welded to the top end of the lifting column 7, so as to automatically lift the fixing plate 5 and the arc-shaped reinforcing plate 1, and facilitate installation of workers.
This embodiment is applicable to the pipeline protection in the deep basal pit and uses, at first remove base 6 and lift post 7 to the deep basal pit in through appurtenance pulley and be located the below of pipeline, place arc gusset plate 1 on fixed plate 5 again, start lift post 7, lift post 7 drives fixed plate 5 and arc gusset plate 1 and rises, and with the pipeline laminating, close lift post 7, lift post 7 provides the holding power for the pipeline, realize automatic rising fixed plate 5 and arc gusset plate 1, and the operation is simple, and is convenient for install.
According to the utility model, the two arc-shaped reinforcing plates 1 are connected, and a pipeline to be protected is arranged in the two arc-shaped reinforcing plates 1, so that the protection of the pipeline is improved, the damage of the pipeline is reduced, the pipeline is wrapped by a flame-retardant material, the protection of the pipeline is further improved, and the base 6 and the lifting column 7 are arranged below the arc-shaped reinforcing plates 1, so that the installation by workers is convenient.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and all simple modifications, changes and equivalent structural changes made to the above embodiment according to the technical spirit of the present invention still fall within the protection scope of the technical solution of the present invention.

Claims (4)

1. The utility model provides a city heat supply engineering is synthesized and is constructed pipeline protector, its characterized in that, includes two arc gusset plates (1), two arc gusset plate (1) splices into the cylinder, one side of arc gusset plate (1) is provided with connecting plate (2), set up mounting hole (3) on connecting plate (2), the opposite side of arc gusset plate (1) is provided with hinge (4), and corresponding arc gusset plate (1) passes through the bolted connection in hinge (4) and mounting hole (3).
2. The integrated construction pipeline protection device for the urban heat supply engineering according to claim 1, characterized in that: the arc reinforcing plate is characterized in that a fixing plate (5) is arranged below the arc reinforcing plate (1), the fixing plate (5) is installed on a lifting column (7), and the lifting column (7) is installed on a base (6).
3. The integrated construction pipeline protection device for the urban heat supply engineering according to claim 2, characterized in that: the lifting column (7) is an electric lifting column, the fixing plate (5) is an arc-shaped plate fixing plate, the upper end face of the fixing plate (5) is connected with the lower face of the arc-shaped reinforcing plate (1), and the lower end face of the fixing plate (5) is fixedly connected with the top end of the lifting column (7).
4. The integrated construction pipeline protection device for the urban heat supply engineering according to claim 1, characterized in that: and a flame-retardant material (8) is arranged in the arc-shaped reinforcing plate (1), and the flame-retardant material (8) is flame-retardant mud.
CN202122516245.8U 2021-10-19 2021-10-19 Urban heat supply engineering comprehensive construction pipeline protection device Expired - Fee Related CN216590256U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122516245.8U CN216590256U (en) 2021-10-19 2021-10-19 Urban heat supply engineering comprehensive construction pipeline protection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122516245.8U CN216590256U (en) 2021-10-19 2021-10-19 Urban heat supply engineering comprehensive construction pipeline protection device

Publications (1)

Publication Number Publication Date
CN216590256U true CN216590256U (en) 2022-05-24

Family

ID=81638239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122516245.8U Expired - Fee Related CN216590256U (en) 2021-10-19 2021-10-19 Urban heat supply engineering comprehensive construction pipeline protection device

Country Status (1)

Country Link
CN (1) CN216590256U (en)

Similar Documents

Publication Publication Date Title
CN103541670B (en) A kind of horizontal directional drill driver drilling rod automatic handling device
CN208292485U (en) TBM headstock turnniing over and lifting device
CN210485509U (en) Wisdom street lamp convenient to repair
CN216590256U (en) Urban heat supply engineering comprehensive construction pipeline protection device
CN210529715U (en) Detachable deep foundation pit excavation braced system
CN111155507A (en) Shock attenuation formula quartering hammer ramming device
CN210266161U (en) Vertical jacking device in horizontal steel jacking pipe
CN209853542U (en) Lifting appliance for lifting pipe gallery
CN206802477U (en) A kind of holder device for being easy to protect underground utilities
CN217027141U (en) Portable jack ditch supporting system
CN203361170U (en) Supporting upright column pile for building foundation pit support
CN212085657U (en) Vehicle-mounted power transmission line emergency mobile tower
CN221322001U (en) Assembled guardrail for hydraulic engineering
CN201933834U (en) Inclination correcting device for power transmission line iron tower
CN220078335U (en) Fixing device of water conservancy water and electricity buried pipe
CN205419583U (en) 1000kV cluster is mended condenser and is changed special lifting device
CN214614105U (en) Mounting device for inner support of row piles
CN212672558U (en) Be used for pipeline local non-excavation to restore support
CN205231576U (en) Half high -rise overall arrangement isolator's of dismouting auxiliary device
CN213951951U (en) Assembled steel case roof beam guardrail pole setting
CN204630856U (en) A kind of quick detachable drop hammer tester
CN219771666U (en) Lifting tool for plugging leakage detection hole of gas pipeline
CN214176717U (en) Protection device for be used for mine side dump formula electric forklift cable in pit
CN218471559U (en) Corrosion-resistant glass fiber reinforced plastic underground cable trend identification pile
CN212671259U (en) Movable disassembly-free type edge opening protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220524

CF01 Termination of patent right due to non-payment of annual fee