CN216588641U - Broken quick construction equipment of taking a hole to ram - Google Patents

Broken quick construction equipment of taking a hole to ram Download PDF

Info

Publication number
CN216588641U
CN216588641U CN202123169427.9U CN202123169427U CN216588641U CN 216588641 U CN216588641 U CN 216588641U CN 202123169427 U CN202123169427 U CN 202123169427U CN 216588641 U CN216588641 U CN 216588641U
Authority
CN
China
Prior art keywords
arch
hyperbolic
tunnel
connecting rod
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123169427.9U
Other languages
Chinese (zh)
Inventor
吴健春
聂启强
张军
董兴华
洪绍盼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Third Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Third Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd, Third Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN202123169427.9U priority Critical patent/CN216588641U/en
Application granted granted Critical
Publication of CN216588641U publication Critical patent/CN216588641U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to the technical field of branch tunnel top-lifting construction, in particular to a crushing zone branch tunnel top-lifting rapid construction device, which comprises a main tunnel arch frame, a branch tunnel arch frame and a hyperbolic arch frame, wherein the main tunnel arch frame, the branch tunnel arch frame and the hyperbolic arch frame are arranged at the intersection of a branch tunnel and a main tunnel; the arch center for supporting the tunnel comprises an arch foot and an arch beam, wherein a supporting column is arranged on the side wall of the arch foot along the circumferential direction; two ends of the hyperbolic arch are respectively connected with corresponding supporting columns, and the supporting columns are used for supporting the hyperbolic arch; an auxiliary mechanism is also arranged between the supporting arch and the hyperbolic arch; the number of the arch centering of the front tunnel is a plurality of trusses, and arch feet at one end of the arch centering of the front tunnel, which is close to the supporting tunnel, are connected with the hyperbolic arch centering; through the arrangement of the supporting columns, on one hand, the acting force of the hyperbolic arch centering directly acts on the supporting columns by fixing the hyperbolic arch centering on the supporting columns, and the hyperbolic arch centering can be better supported; on the other hand, because the end surfaces of the hyperbolic arch center and the supporting columns are in direct contact, the contact surface is increased, and the supporting strength of the hyperbolic arch center can be effectively improved.

Description

Broken quick construction equipment of taking a hole to ram
Technical Field
The utility model relates to the technical field of supporting hole top-lifting construction, in particular to a device for quickly constructing a supporting hole top-lifting in a broken belt.
Background
The branch tunnel-to-main tunnel top lifting is widely applied to building engineering such as railway tunnels and the like due to the characteristics of strong adaptability, high bearing capacity, simple and convenient construction and the like;
in the prior art, a main arch, a branch arch and a hyperbolic arch are connected to support; because the hyperbolic arch is directly welded on the branch tunnel arch in an oblique angle usually, when the pressure on the hyperbolic arch is higher or the worker is not completely welded, the welding part of the hyperbolic arch and the branch tunnel arch is unstable, and the hyperbolic arch is supported at a certain risk while the hyperbolic arch cannot be well supported.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of unstable connection and poor supporting effect between a hyperbolic arch center and a supporting arch center in the prior art, the utility model provides a broken belt supporting and jacking quick construction device. It can be connected hyperbolic bow member and branch tunnel bow member better, improves hyperbolic bow member ground stability, improves the support effect.
In order to solve the above technical problems, the present invention is solved by the following technical solutions.
The crushing zone branch tunnel top-lifting rapid construction device comprises a main tunnel arch frame, a branch tunnel arch frame and a hyperbolic arch frame which are arranged at the intersection of a branch tunnel and a main tunnel; the main arch, the branch arch and the double-curved arch are tightly connected into a whole;
the branch arch comprises an arch foot and an arch beam connected with the arch foot, and a supporting column is arranged on the side wall of the arch foot along the circumferential direction; two ends of the hyperbolic arch are respectively connected with corresponding supporting columns, and the supporting columns are used for supporting the hyperbolic arch; an auxiliary mechanism is also arranged between the branch tunnel arch frame and the hyperbolic arch frame;
the number of the front arch is multiple, and an arch foot at one end of the front arch, which is close to the branch tunnel, is connected with the hyperbolic arch.
Through the arrangement of the supporting columns, on one hand, the hyperbolic arch is fixed on the supporting columns, so that the acting force of the hyperbolic arch directly acts on the supporting columns, and the hyperbolic arch can be better supported; on the other hand, because the end surfaces of the hyperbolic arch center and the supporting columns are in direct contact, the contact surface is increased, and the supporting strength of the hyperbolic arch center can be effectively improved.
Preferably, the end face of the support column, which is in contact with the hyperbolic arch, is inwards recessed to form a connecting hole, and a connecting column which can extend into the connecting hole is arranged at the position of the hyperbolic arch, which corresponds to the connecting hole; the connecting column is used for being in clamping fit with the connecting hole so as to fix the lower part of the hyperbolic arch on the supporting column.
According to the utility model, through the arrangement of the connecting holes and the connecting columns, when the double-curved arch frame is used, the connecting columns are directly inserted into the connecting holes, so that the double-curved arch frame and the supporting columns can be connected, and the operation is convenient and fast; and through mutual extrusion between the hole wall of the connecting hole and the connecting column, the lower part of the hyperbolic arch frame is fixed on the supporting column, meanwhile, the connection stability between the hyperbolic arch frame and the supporting column can be better improved, and the stability and the strength of the support of the hyperbolic arch frame can be effectively improved.
Preferably, the auxiliary mechanism comprises a first mounting groove formed by inwards recessing the end surface of the arched beam close to the hyperbolic arch centering, and a second mounting groove is formed in the position of the hyperbolic arch centering corresponding to the first mounting groove; a fixing rod is arranged between the double-curved arch frame and the arched beam, one end of the fixing rod extends into the first mounting groove, the other end of the fixing rod extends into the second mounting groove, and the fixing rod is used for connecting the double-curved arch frame and the arched beam so as to fix the upper portion of the double-curved arch frame and the arched beam.
According to the utility model, the fixing between the upper part of the double-curved arch and the arched girder can be better realized through the arrangement of the fixing rod, and after the upper part and the lower part of the double-curved arch are respectively fixed, the stability of fixing the double-curved arch can be better improved, so that the strength of supporting the double-curved arch is further improved, and the safe construction is ensured.
Preferably, the fixing rod includes a first connecting rod and a second connecting rod; one end of the first connecting rod extends into the first mounting groove, and the other end face of the first connecting rod is recessed inwards to form a first channel; a second connecting rod is movably arranged in the first road, one end of the second connecting rod is positioned in the first road, and the other end of the second connecting rod extends into the second mounting groove; an elastic piece is arranged between one end of the second connecting rod and the inner end of the first runner and used for keeping the trend that the second connecting rod moves towards the inside of the first runner.
Preferably, the elastic member is a spring.
According to the utility model, through the arrangement of the first connecting rod, the second connecting rod and the elastic piece, when the hyperbolic arch is under pressure, the first connecting rod is firstly pulled, so that the elastic piece can be stretched under the combined action of the first connecting rod and the second connecting rod, and a buffering effect is achieved to a certain extent, so that the hyperbolic arch can be buffered under the action of the spring when suddenly under pressure, the impact force is slowly decomposed, and the damage to the hyperbolic arch is avoided; and through this kind of cushioning effect, can improve the function of strut ground betterly, further improve the security.
Preferably, a first limiting ring extends inwards from the outer port of the first road; one end of the second connecting rod is provided with a second limiting ring matched with the first limiting ring, and the second limiting ring is used for extruding with the first limiting ring to limit the stroke of the second connecting rod.
According to the utility model, through the arrangement of the first limiting ring and the second limiting ring, the separation of the first connecting rod and the second connecting rod can be better avoided, and the safety can be better improved.
Preferably, one end of the first connecting rod is connected with the first mounting groove through a bolt; the other end of the second connecting rod is connected with the second mounting groove through a bolt.
Through the structure of the utility model, the connection between the first connecting rod and the first mounting groove and the connection between the second connecting rod and the second mounting groove can be better realized.
Drawings
FIG. 1 is a schematic view of a construction apparatus in example 1;
FIG. 2 is a schematic view of the arch of the branch tunnel according to embodiment 1;
FIG. 3 is a schematic view of the hyperbolic arch in embodiment 1;
FIG. 4 is a schematic view of a first connecting rod in embodiment 1;
fig. 5 is a schematic view of the second connecting rod and the elastic member in embodiment 1.
The names of the parts indicated by the numerical references in the drawings are as follows:
110. a main arch frame; 120. supporting a tunnel arch center; 121. an arch springing; 122. an arched beam; 130. a hyperbolic arch frame; 140. a support pillar; 150. fixing the rod; 151. a first connecting rod; 152. a second connecting rod; 210. connecting holes; 220. a first mounting groove; 310. connecting columns; 320. a second mounting groove; 410. a first lane; 420. a first limit ring; 510. a second stop collar; 520. an elastic member.
Detailed Description
For a further understanding of the utility model, reference should be made to the following detailed description taken in conjunction with the accompanying drawings and examples. It is to be understood that the examples are illustrative of the utility model and not limiting.
Example 1
As shown in fig. 1 to 5, the present embodiment provides a broken zone branch tunnel topping rapid construction device, which includes a main tunnel arch 110, a branch tunnel arch 120 and a hyperbolic arch 130, which are disposed at an intersection of a branch tunnel and a main tunnel; the main arch 110, the branch arch 120 and the hyperbolic arch 130 are tightly connected into a whole;
the branch arch 120 comprises an arch foot 121 and an arch beam 122 connected with the arch foot 121, and supporting columns 140 are arranged on the side wall of the arch foot 121 along the circumferential direction; two ends of the hyperbolic arch 130 are respectively connected with corresponding supporting columns 140, and the supporting columns 140 are used for supporting the hyperbolic arch 130; an auxiliary mechanism is also arranged between the branch arch 120 and the hyperbolic arch 130;
the number of the front arch 110 is multiple, and an arch foot at one end of the front arch 110 close to the branch tunnel is connected with the hyperbolic arch 130;
the end face of the support column 140 contacting with the hyperbolic arc frame 130 is recessed inwards to form a connecting hole 210, and a connecting column 310 which can extend into the connecting hole 210 is arranged at the position of the hyperbolic arc frame 130 corresponding to the connecting hole 210; the connecting column 310 is used for clamping and matching with the connecting hole 210 to realize the fixation of the lower part of the hyperbolic arch center 130 on the supporting column 140;
the auxiliary mechanism comprises a first mounting groove 220 formed by inwards recessing the end surface of the arched beam 122 close to the hyperbolic arch 130, and a second mounting groove 320 is arranged at the position of the hyperbolic arch 130 corresponding to the first mounting groove 220; a fixing rod 150 is arranged between the double curved arch 130 and the arched beam 122, one end of the fixing rod 150 extends into the first mounting groove 220, the other end extends into the second mounting groove 320, and the fixing rod 150 is used for connecting the double curved arch 130 and the arched beam 122 so as to fix the upper part of the double curved arch 130 and the arched beam 122.
In this embodiment, the hyperbolic arch 130 is fixed on the supporting column 140, so that the acting force of the hyperbolic arch 130 directly acts on the supporting column 140, and the hyperbolic arch 130 can be supported better; because the end surfaces of the hyperbolic arch 130 and the supporting columns 140 are in direct contact, the contact surface is increased, and the supporting strength of the hyperbolic arch 130 can be effectively improved;
through the arrangement of the connecting holes 210 and the connecting columns 310, when the hyperbolic arch 130 and the supporting columns 140 are connected, the connecting columns 310 are directly inserted into the connecting holes 210, and the operation is convenient and fast; by mutual extrusion between the hole wall of the connecting hole 210 and the connecting column 310, the lower part of the hyperbolic arch 130 is fixed on the supporting column 140, meanwhile, the stability of connection between the hyperbolic arch 130 and the supporting column 140 can be improved better, and the stability and strength of support of the hyperbolic arch 130 can be effectively improved;
by the arrangement of the fixing rod 150, the upper part of the double-curved arch 130 can be preferably fixed with the arched beam 122, and after the upper part and the lower part of the double-curved arch 130 are respectively fixed, the stability of fixing the double-curved arch 130 can be preferably improved, so that the supporting strength of the double-curved arch 130 is further improved, and the safe construction is ensured; the fixing rod 150, the hyperbolic arch 130 and the branch arch 120 form a supporting whole at the same time, so that a better supporting effect can be achieved; because the hyperbolic arc 130 is connected to the supporting column 140 in an angle, when the hyperbolic arc 130 is pressed, the fixing rod 150 can also play a role in pulling, so that the stability and strength of the support of the hyperbolic arc 130 can be better improved; through the combined action of the fixing rod 150 and the supporting column 140, the stability and the supporting strength of the hyperbolic arch center 130 can be greatly improved, and the safe and efficient construction is ensured.
In this embodiment, the fixing rod 150 includes a first connecting rod 151 and a second connecting rod 152; one end of the first connecting rod 151 extends into the first mounting groove 220, and the other end is recessed inwards to form a first channel 410; the second connecting rod 152 is movably arranged in the first runner 410, one end of the second connecting rod 152 is positioned in the first runner 410, and the other end extends into the second mounting groove 320; an elastic member 520 is arranged between one end of the second connecting rod 152 and the inner end of the first track 410, and the elastic member 520 is used for maintaining the tendency of the second connecting rod 152 to move towards the first track 410; the elastic member 520 is a spring; a first limiting ring 420 extends inwards from the outer port of the first road 410; a second limit ring 510 matched with the first limit ring 420 is arranged at one end of the second connecting rod 152, and the second limit ring 510 is used for extruding with the first limit ring 420 to limit the stroke of the second connecting rod 152; one end of the first connecting rod 151 is connected with the first mounting groove 220 through a bolt; the other end of the second connecting rod 152 is connected to the second mounting groove 320 by a bolt.
In this embodiment, through the arrangement of the first connecting rod 151, the second connecting rod 152 and the elastic element 520, when the hyperbolic arch 130 is under pressure, the first connecting rod 151 is pulled first, so that the elastic element 520 is stretched under the combined action of the first connecting rod 151 and the second connecting rod 152, and thus plays a role in buffering to a certain extent, so that the hyperbolic arch 130 is buffered under the action of a spring when suddenly under pressure, and thus the impact force is slowly dissolved, and the damage to the hyperbolic arch 130 is avoided; by the buffer action, the function of the support can be better improved, and the safety is further improved;
through the arrangement of the first and second position-limiting rings 420 and 510, the first and second connecting rods 151 and 152 can be prevented from being separated, and the safety can be improved.
In summary, the above-mentioned embodiments are only preferred embodiments of the present invention, and all equivalent changes and modifications made in the claims of the present invention should be covered by the claims of the present invention.

Claims (7)

1. Broken area tunnel is chosen a top and is constructed device fast, its characterized in that: comprises a main tunnel arch (110), a branch tunnel arch (120) and a hyperbolic arch (130) which are arranged at the intersection of a branch tunnel and a main tunnel; the main arch (110), the branch arch (120) and the hyperbolic arch (130) are tightly connected into a whole;
the branch arch center (120) comprises an arch foot (121) and an arch beam (122) connected with the arch foot (121), and supporting columns (140) are arranged on the side wall of the arch foot (121) along the circumferential direction; two ends of the hyperbolic arch centering (130) are respectively connected with corresponding supporting columns (140), and the supporting columns (140) are used for supporting the hyperbolic arch centering (130); an auxiliary mechanism is also arranged between the branch tunnel arch frame (120) and the hyperbolic arch frame (130);
the number of the front arch centering (110) is multiple, and an arch foot at one end of the front arch centering (110) close to the branch tunnel is connected with the hyperbolic arch centering (130).
2. The broken belt branch tunnel top-lifting rapid construction device of claim 1, characterized in that: the end face of the support column (140) contacting with the hyperbolic arc frame (130) is inwards recessed to form a connecting hole (210), and a connecting column (310) which can extend into the connecting hole (210) is arranged at the position of the hyperbolic arc frame (130) corresponding to the connecting hole (210); the connecting column (310) is used for being in clamping fit with the connecting hole (210) so as to fix the lower part of the hyperbolic arch center (130) on the supporting column (140).
3. The broken belt branch tunnel top-lifting rapid construction device of claim 1, characterized in that: the auxiliary mechanism comprises an arch beam (122), a first mounting groove (220) is formed by inwards sinking the end face of the arch beam (122) close to the hyperbolic arch center (130), and a second mounting groove (320) is formed in the position of the hyperbolic arch center (130) corresponding to the first mounting groove (220); a fixing rod (150) is arranged between the double-curved arch frame (130) and the arched beam (122), one end of the fixing rod (150) extends into the first mounting groove (220), the other end of the fixing rod extends into the second mounting groove (320), and the fixing rod (150) is used for connecting the double-curved arch frame (130) and the arched beam (122) so as to fix the upper portion of the double-curved arch frame (130) and the arched beam (122).
4. The broken quick construction device of taking a tunnel to ram of claim 3, characterized by: the fixing rod (150) comprises a first connecting rod (151) and a second connecting rod (152); one end of the first connecting rod (151) extends into the first mounting groove (220), and the other end surface of the first connecting rod is inwards recessed to form a first channel (410); a second connecting rod (152) is movably arranged in the first channel (410), one end of the second connecting rod (152) is positioned in the first channel (410), and the other end of the second connecting rod extends into the second mounting groove (320); an elastic piece (520) is arranged between one end of the second connecting rod (152) and the inner end of the first moving channel (410), and the elastic piece (520) is used for keeping the tendency that the second connecting rod (152) moves towards the inside of the first moving channel (410).
5. The broken quick construction device of taking a tunnel to ram of claim 4, characterized by: the elastic member (520) is a spring.
6. The broken quick construction device of taking a tunnel to ram of claim 4, characterized by: a first limiting ring (420) extends inwards from the outer port of the first road (410); one end of the second connecting rod (152) is provided with a second limiting ring (510) matched with the first limiting ring (420), and the second limiting ring (510) is used for being extruded with the first limiting ring (420) to limit the stroke of the second connecting rod (152).
7. The broken quick construction device of taking a tunnel to ram of claim 4, characterized by: one end of the first connecting rod (151) is connected with the first mounting groove (220) through a bolt; the other end of the second connecting rod (152) is connected with the second mounting groove (320) through a bolt.
CN202123169427.9U 2021-12-16 2021-12-16 Broken quick construction equipment of taking a hole to ram Active CN216588641U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123169427.9U CN216588641U (en) 2021-12-16 2021-12-16 Broken quick construction equipment of taking a hole to ram

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123169427.9U CN216588641U (en) 2021-12-16 2021-12-16 Broken quick construction equipment of taking a hole to ram

Publications (1)

Publication Number Publication Date
CN216588641U true CN216588641U (en) 2022-05-24

Family

ID=81613140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123169427.9U Active CN216588641U (en) 2021-12-16 2021-12-16 Broken quick construction equipment of taking a hole to ram

Country Status (1)

Country Link
CN (1) CN216588641U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114320378A (en) * 2021-12-16 2022-04-12 中铁十局集团第三建设有限公司 Broken belt supporting tunnel top-lifting rapid construction device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114320378A (en) * 2021-12-16 2022-04-12 中铁十局集团第三建设有限公司 Broken belt supporting tunnel top-lifting rapid construction device and method
CN114320378B (en) * 2021-12-16 2024-06-18 中铁十局集团第三建设有限公司 Broken belt support hole roof-picking rapid construction device and method

Similar Documents

Publication Publication Date Title
AU2012377963B2 (en) Self-moving tunnel support canopy
CN216588641U (en) Broken quick construction equipment of taking a hole to ram
CN110847937B (en) U-shaped steel support and method for controlling surrounding rock of roadway through graded active loading
CN114320378B (en) Broken belt support hole roof-picking rapid construction device and method
CN113803090B (en) Tunnel lets presses supporting device
CN207647536U (en) The multidirectional adjustable driving frame of tunnelling gib
CN108374683A (en) A kind of suspension device for main tunnel
CN105332718A (en) Trolley for construction of large-span multi-section tunnel
CN211500664U (en) Temporary supporting structure of shield communication channel
CN215860237U (en) Multistage tunnel supporting device that lets pressure
CN213540446U (en) Buffering lets pressure type stock tray
CN215484501U (en) Withstand voltage type construction platform
CN111579265B (en) Static test device for researching collapse resistance of space steel frame composite beam column structure
CN213418284U (en) Vertical stand bottom fixed knot of building engineering stair railing constructs
CN110952434A (en) Variable-span double-support large-displacement front end support transverse moving device and transverse moving method for trestle
CN212563297U (en) Isolation hydraulic support for filling and mining paste in coal mine
CN114193386A (en) Track mounting and adjusting mechanism
CN207944960U (en) The roadway support structure of truss and metallic support cooperation
CN216405117U (en) Auxiliary supporting leg of movable bridge girder erection machine
CN215368865U (en) Prefabricated assembled building wall and girder steel auxiliary reinforcement
CN111519550A (en) Central cable-side concrete cable-stayed bridge hanging basket suspension casting system
CN220487207U (en) Portable protection canopy
CN219061708U (en) I-steel for supporting coal mine tunnel
CN213510499U (en) Automatic advancing device of hand-held drilling machine
CN212003235U (en) Scalable fender waste rock board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant