CN216558965U - Install at job site fixed survey observation device - Google Patents

Install at job site fixed survey observation device Download PDF

Info

Publication number
CN216558965U
CN216558965U CN202122367610.3U CN202122367610U CN216558965U CN 216558965 U CN216558965 U CN 216558965U CN 202122367610 U CN202122367610 U CN 202122367610U CN 216558965 U CN216558965 U CN 216558965U
Authority
CN
China
Prior art keywords
ring
reinforcing
rod
fixedly connected
observation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122367610.3U
Other languages
Chinese (zh)
Inventor
顾羽
吴江
陈燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Civil Engineering Group Co Ltd
Original Assignee
China Construction Second Engineering Bureau Civil Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Civil Engineering Group Co Ltd filed Critical China Construction Second Engineering Bureau Civil Engineering Group Co Ltd
Priority to CN202122367610.3U priority Critical patent/CN216558965U/en
Application granted granted Critical
Publication of CN216558965U publication Critical patent/CN216558965U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a fixed measurement observation device installed on a construction site, which comprises a device shell, wherein concrete is poured inside the device shell, a baffle ring is fixedly connected to the upper side of an inner cavity of the device shell, a limiting ring is inserted at the upper end of the baffle ring through threads, the inner side wall of the limiting ring is fixedly connected with a fixing ring through a connecting rod, an observation marking rod is fixedly inserted in the middle of the fixing ring, a first reinforcing rod is fixedly connected to the middle of the lower end of the observation marking rod, and a reinforcing ring, a second reinforcing rod and a third reinforcing rod are arranged on the inner side of the device shell. Through the overall structure of equipment for the observation device position is not influenced by weather variation and seasonal variation, simultaneously, also is difficult for being influenced by the site operation process, can acquire comparatively accurate observation data. Through the structure that is equipped with spacing ring, connecting rod and solid fixed ring, the increase that can reach observes the stability that the marker pole is connected to and guarantee its vertical characteristic.

Description

Install at job site fixed survey observation device
Technical Field
The utility model relates to the technical field of construction, in particular to a fixed measurement observation device arranged on a construction site.
Background
The engineering monitoring means that in the construction process of a building structure, a monitoring instrument is adopted to monitor various control indexes of key parts, so that the safety and the reasonability of engineering construction can be checked and ensured; when the engineering monitoring is carried out at the monitoring value close to the control value, necessary control measures are taken to prevent safety accidents or engineering quality accidents in advance, so that the safety of a large number of workers and people is ensured, and the rationality of the construction engineering is ensured.
In the engineering monitoring process, due to the fact that monitoring point positions are unreasonable in arrangement, monitoring errors of different degrees exist due to factors such as position selection of an observation device, and the like, the fixed measurement observation device installed on a construction site is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a fixed measurement observation device arranged on a construction site, so that the observation device is not influenced by weather change and seasonal change, is not easily influenced by the site construction process, and can acquire more accurate observation data.
The technical scheme includes that the fixed measurement observation device arranged on the construction site comprises a device shell, concrete is poured into the device shell, a baffle ring is fixedly connected to the upper side of an inner cavity of the device shell, a limiting ring is inserted into the upper end of the baffle ring through threads, a fixing ring is fixedly connected to the inner side wall of the limiting ring through a connecting rod, an observation mark rod is fixedly inserted into the middle of the fixing ring, a first reinforcing rod is fixedly connected to the middle of the lower end of the observation mark rod, and a reinforcing ring, a second reinforcing rod and a third reinforcing rod are arranged on the inner side of the device shell.
Preferably, the reinforcing ring is provided with a plurality of reinforcing rods, the inner side of the reinforcing ring is fixedly connected with six second reinforcing rods in an annular array mode, and a third reinforcing rod is fixedly connected between each second reinforcing rod and the corresponding first reinforcing rod.
Preferably, the third reinforcing bars are provided in plurality, and the third reinforcing bars are arranged at equal intervals between the respective second reinforcing bars and the first reinforcing bars.
Preferably, the reinforcing ring, the second reinforcing rod, the third reinforcing rod and the first reinforcing rod are all poured in the concrete, so that the strength of the poured concrete is increased.
Preferably, the lower parts of the limiting ring, the connecting rod and the fixing ring are poured in concrete.
Preferably, the device shell is a PVC pipe.
The utility model discloses a fixed measurement observation device installed on a construction site, which has the beneficial effects that:
through the overall structure of equipment for the observation device position is not influenced by weather variation and seasonal variation, simultaneously, also is difficult for being influenced by the site operation process, can acquire comparatively accurate observation data.
Through the structure that is equipped with spacing ring, connecting rod and solid fixed ring, the increase that can reach observes the stability that the marker pole is connected to and guarantee its vertical characteristic.
Through the structure that is equipped with beaded finish, second stiffener, third stiffener and first stiffener, can be so that the concrete intensity of the inside concreting of casing of device is higher, and increase equipment's life and intensity.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a cross-sectional view of the present invention;
FIG. 3 is an enlarged view of the utility model at A.
In the figure: 1 device casing, 2 spacing rings, 3 connecting rods, 4 solid fixed ring, 5 observation mark pole, 6 beaded finish, 7 second stiffener, 8 third stiffeners, 9 first stiffeners, 10 fender ring.
Detailed Description
The utility model will be further elucidated and described with reference to the embodiments and drawings of the specification:
referring to fig. 1-3, the present invention: a fixed measurement observation device installed on a construction site comprises a device shell 1, wherein the device shell 1 can enable poured concrete to be formed more conveniently, concrete is poured in the device shell 1, a baffle ring 10 is fixedly connected to the upper side of an inner cavity of the device shell 1, the baffle ring 10 can limit the depth of a limiting ring 2 inserted in the device shell 1, the upper end of the baffle ring 10 is inserted with the limiting ring 2 through threads, the limiting ring 2 and a connecting rod 3 are fixedly connected with a fixing ring 4, the fixing ring 4 is fixedly connected with an observation marking rod 5, the inner side wall of the limiting ring 2 is fixedly connected with a fixing ring 4 through the connecting rod 3, the fixing ring 4 can enable the observation marking rod 5 to be vertically arranged, the middle part of the fixing ring 4 is fixedly inserted with the observation marking rod 5, the observation marking rod 5 is vertically arranged, and is an observation device position of equipment, the lower extreme middle part fixedly connected with first stiffener 9 of observation mark pole 5, the inboard of device casing 1 is equipped with beaded finish 6, second stiffener 7 and third stiffener 8 beaded finish 6, second stiffener 7, third stiffener 8 and first stiffener 9 are all pour inside the concrete, and increase the concrete intensity of pouring.
As shown in fig. 2:
the beaded finish 6 is equipped with a plurality ofly, the inboard of beaded finish 6 is six second stiffeners 7 of annular array fixedly connected with, fixedly connected with third stiffener 8 between second stiffener 7 and the first stiffener 9. The first reinforcing bar 9 can increase the strength of the observation marking bar 5 when concrete is poured.
As shown in fig. 2:
the third reinforcing rods 8 are provided in plurality, and the third reinforcing rods 8 are arranged at equal intervals between the respective second reinforcing rods 7 and the first reinforcing rods 9. The connection of the reinforcing ring 6, the second reinforcing rod 7, the third reinforcing rod 8 and the first reinforcing rod 9 can increase the overall strength of the connected reinforcing steel bars, so that the strength of the cast concrete is increased.
As shown in fig. 2:
the reinforcing ring 6, the second reinforcing rod 7, the third reinforcing rod 8 and the first reinforcing rod 9 are all poured inside concrete, so that the strength of the poured concrete is increased.
As shown in fig. 1 and 2:
and the lower parts of the limiting ring 2, the connecting rod 3 and the fixing ring 4 are poured in concrete. The connection strength of the limiting ring 2, the connecting rod 3 and the fixing ring 4 can be increased by pouring the concrete.
As shown in fig. 1 and 2:
the device housing 1 is a PVC pipe. The PVC pipe adopts the existing pipeline on the market.
The principle is as follows: when the device is used, the observation device position is directly arranged on a foundation pit supporting crown beam to be monitored, the specific method is to intercept a PVC pipe with the normal service of 1500mm and the diameter of 200 mm, arrange 6C10@100 steel bars in the pipe in a circular shape and anchor the steel bars into the crown beam for 100mm, pour C30 concrete into the PVC pipe and embed the metal observation device position at the top, perform the protection work of the observation device position on site, and use the observation device after solidification.
The connection of the post-pouring reinforcing ring 6, the second reinforcing rod 7, the third reinforcing rod 8 and the first reinforcing rod 9 can increase the overall strength of the connected reinforcing steel bars, so that the strength of the poured concrete is increased, and the strength of the observation marking rod 5 can be increased when the concrete is poured by the first reinforcing rod 9.
Finally, it should be noted that the above embodiments are only used for illustrating the technical solutions of the present invention, and not for limiting the protection scope of the present invention, although the present invention is described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications or equivalent substitutions can be made on the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention.

Claims (6)

1. The utility model provides an install at job site fixed survey observation device, includes device casing (1), the inside pouring of device casing (1) has concrete, its characterized in that: the device is characterized in that a baffle ring (10) is fixedly connected to the upper side of an inner cavity of a shell (1), a limiting ring (2) is inserted into the upper end of the baffle ring (10) through threads, the inner side wall of the limiting ring (2) is fixedly connected with a fixing ring (4) through a connecting rod (3), an observation marking rod (5) is fixedly inserted into the middle of the fixing ring (4), a first reinforcing rod (9) is fixedly connected to the middle of the lower end of the observation marking rod (5), and a reinforcing ring (6), a second reinforcing rod (7) and a third reinforcing rod (8) are arranged on the inner side of the shell (1).
2. The fixed measurement observation device installed on a construction site according to claim 1, wherein: the reinforcing ring (6) is equipped with a plurality ofly, the inboard of reinforcing ring (6) is six second stiffeners (7) of annular array fixedly connected with, fixedly connected with third stiffener (8) between second stiffener (7) and first stiffener (9).
3. The fixed measurement observation device installed on a construction site according to claim 2, wherein: the third reinforcing rods (8) are arranged in plurality, and the third reinforcing rods (8) are arranged between the second reinforcing rods (7) and the first reinforcing rods (9) at equal intervals.
4. A fixed survey observation device installed at a construction site according to claim 1, 2 or 3, wherein: the reinforcing ring (6), the second reinforcing rod (7), the third reinforcing rod (8) and the first reinforcing rod (9) are all poured inside concrete, and the strength of the poured concrete is increased.
5. The fixed measurement observation device installed on a construction site according to claim 1, wherein: and the lower parts of the limiting ring (2), the connecting rod (3) and the fixing ring (4) are poured in the concrete.
6. The fixed measurement observation device installed at a construction site according to claim 5, wherein: the device shell (1) is a PVC pipe.
CN202122367610.3U 2021-09-28 2021-09-28 Install at job site fixed survey observation device Active CN216558965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122367610.3U CN216558965U (en) 2021-09-28 2021-09-28 Install at job site fixed survey observation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122367610.3U CN216558965U (en) 2021-09-28 2021-09-28 Install at job site fixed survey observation device

Publications (1)

Publication Number Publication Date
CN216558965U true CN216558965U (en) 2022-05-17

Family

ID=81567000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122367610.3U Active CN216558965U (en) 2021-09-28 2021-09-28 Install at job site fixed survey observation device

Country Status (1)

Country Link
CN (1) CN216558965U (en)

Similar Documents

Publication Publication Date Title
CN102493471B (en) Suspending installation construction process method of structural foot margin anchor bolt
CN110629744B (en) Construction process of steel pipe concrete pile of subway station
CN108643192A (en) Brace in Deep Footing Groove supporting ultralong steel tube column pile construction method
CN106245654A (en) Deposited reinforced concrete pile exempts from inter-pile soil excavation construction method
CN209877824U (en) Measuring device for vertical displacement of beam bridge superstructure
CN216558965U (en) Install at job site fixed survey observation device
CN111395323A (en) Pressure sensor-based super-irrigation prevention control device and application method thereof
CN109095351B (en) Recoverable steel reinforcement cage hanging rib hoisting method
CN114215048A (en) Large-diameter pile foundation reinforcement cage centering device
CN109056808A (en) Stake and steel pipe column construction method in a kind of subway station
CN112284362A (en) Measuring device and method for verticality of steel casing in deep water area
CN217303964U (en) A levelling point device that is used for linear measurement during cantilever to pour bridge construction
CN210263929U (en) A preformed hole template for building civil engineering
CN108396734B (en) Device for controlling pile top concrete pouring elevation of punched bored pile
CN109211464B (en) Osmometer embedding device and method
CN217811023U (en) Guide frame for positioning construction of foundation pit support structure upright post pile and lattice post
CN210827573U (en) A template device for reverse construction method construction heavy-calibre well
CN215857713U (en) Long auger drilling fills steel reinforcement cage control auxiliary device
CN112431193B (en) Pile foundation steel reinforcement cage top centering location frock
CN206189607U (en) Rag bolt location structure
CN209399990U (en) A kind of field surface observation pier structure
CN209799529U (en) communication tower prefabricated base convenient for wiring
CN108411794B (en) Precise positioning device and positioning method for positioning framework of spherical hinge under swivel bridge
CN215367277U (en) Formula of sinking steel reinforcement cage positioner
CN210827441U (en) Rotary drilling cast-in-place pile structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant