Prior art keywords
plate
constructional engineering
screw
fixed plate
lag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123416694.1U
Other languages
Chinese (zh)
Inventor
董淑月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123416694.1U priority Critical patent/CN216551947U/en
Application granted granted Critical
Publication of CN216551947U publication Critical patent/CN216551947U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the technical field of constructional engineering, in particular to a concrete pipe pile digging device for constructional engineering. The technical scheme comprises the following steps: fixed plate, protection component and clearance subassembly, its characterized in that: the backup pad is installed at the fixed plate top, and the clearance subassembly is installed at the backup pad top, and two sets of suction cleaners are installed to clearance incasement portion both sides, and the right side board is installed to fixed plate one side, and right side inboard portion installs the threaded rod, and flexible cover is installed to the lag bottom, and the lag both sides are equipped with two sets of through-holes, and lag internally mounted has the screw. According to the utility model, the screw can be protected by the telescopic sleeve in the protection assembly, the screw is prevented from being damaged due to the influence of external force in the storage process, and meanwhile, potential safety hazards caused when nearby workers touch the sharp surface of the screw by mistake are prevented, so that the maintenance burden of the device is reduced, and the safety of the device in the storage process is improved.

Description

Pile digging device for concrete pipe piles in constructional engineering
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a concrete pipe pile digging device for constructional engineering.
Background
In the building construction, need for concrete perfusion carry out the pile, and draw the stake and need bury the tubular column in the soil, consequently bury the in-process at the tubular column and need punch the hole to the soil, consequently need a large amount of manpower and materials at the in-process of punching, for reduce staff's work burden, propose a building engineering concrete tubular pile and draw a device for this reason.
Through retrieval, patent publication No. CN214573951U discloses a pile digging device for a concrete pipe pile in constructional engineering, which comprises a bottom plate, wherein the center of the top of the bottom plate is provided with an upright post; a main body is arranged on one side of the bottom plate; the upper part of the upright post is provided with a screw hole, a matched threaded rod is arranged in the screw hole, and two ends of the threaded rod are respectively provided with a rotating rod and a threaded cylinder; a third connecting block is arranged on one side of the lower part of the main body, which is far away from the upright post; through setting up bull stick and third connecting block, rotate the bull stick, adjust the distance between main part and the stand, make third connecting block one side support the tubular pile surface, the spiral post aims at the tubular pile mouth of pipe.
The existing tubular pile digging device has the following defects:
1. the existing tubular pile digging device cannot protect the propeller, so that the propeller is damaged due to the influence of external force in the storage process of the device, potential safety hazards are caused when nearby workers touch the sharp surface of the propeller by mistake, the maintenance burden of the device is increased, and the safety of the device in the storage process is reduced;
2. the soil bits that produce when current tubular pile is drawn a device and can't be under construction the device are cleared up, consequently need the artifical soil bits to the construction place of staff to clear up, increased the cost of labor in the construction, can cause environmental pollution when the soil bits that produce in the device course of working splashes to the device outside simultaneously, has reduced the clean and tidy nature in the device work progress.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a pile digging device for a concrete pipe pile in constructional engineering, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a building engineering concrete tubular pile draws a device, includes fixed plate, protection component and clearance subassembly, its characterized in that: the utility model discloses a cleaning assembly, including fixed plate, dust catcher, right side board internally mounted has a threaded rod, protection component is installed to the fixed plate, the backup pad is installed at the fixed plate top, the clearance subassembly is installed including clearance case, dust catcher, bin, guard plate at the backup pad top, two sets of dust catchers are installed to the inside both sides of clearance case, the right side board is installed to fixed plate one side, right side board internally mounted has the threaded rod, protection component is installed to the fixed plate bottom, protection component includes lag, flexible cover, through-hole, screw, flexible cover is installed to the lag bottom, the lag both sides are equipped with two sets of through-holes, and lag internally mounted has the screw.
Can drive the threaded rod through the motor circular telegram after, can drive the fixed plate through the threaded rod rotation and carry out the activity of going up and down, the device of being convenient for uses, the soil bits that produce when can be under construction to the device through the dust catcher in the clearance subassembly are cleared up, thereby do not need the artifical soil bits to the construction site of staff to clear up, the cost of labor in the construction has been practiced thrift, prevent simultaneously that the soil bits that produce from splashing to the device outside in the device course of working from causing environmental pollution, can protect the screw through the telescope tube among the protection component, avoid the device screw to receive external force influence in the storage process and lead to damaging, prevent near staff's mistake simultaneously and bump the screw and lead to the potential safety hazard, the maintenance burden of device has been reduced, the security in the device storage process has been improved simultaneously.
Preferably, the bottom of the fixing plate is provided with a transmission pipe, and the transmission pipe is connected with the protective sleeve. The transmission pipe can transmit the suction force generated by the dust collector, and is convenient for the device to use.
Preferably, a left side plate is installed on one side of the fixing plate, and a limiting rod is installed inside the left side plate. The left side board can provide the mounted position to the gag lever post, and the gag lever post can carry on spacingly to the fixed plate.
Preferably, the motor is installed at right side board top, and the motor output is connected with the threaded rod. The motor can drive the threaded rod after the circular telegram and rotate, and the device of being convenient for uses, and the install bin can provide mounted position to the motor.
Preferably, the top of the fixing plate is provided with an installation box, and the installation box is internally provided with a motor. The motor can drive the propeller to rotate after being electrified, and the device is convenient to use.
Preferably, the cleaning box is internally provided with a storage box, and the front surface of the cleaning box is provided with a protection plate. The bin can be collected the soil bits of dust catcher clearance, and the guard plate can be protected clearance incasement portion.
Compared with the prior art, the utility model has the beneficial effects that:
1. can protect the screw through the flexible cover among the protective assembly, avoid the device screw to receive external force influence and lead to damaging in storage process, prevent simultaneously that near staff from missing and causing the potential safety hazard when bumping the sharp face of screw, not only reduced the maintenance burden of device, improved the security of device storage process simultaneously.
2. Can clear up the soil bits that produce when the device is under construction through the dust catcher in the clearance subassembly to do not need the staff manual work to clear up the soil bits in construction place, practiced thrift the cost of labor in the construction, prevent simultaneously that the soil bits that produce from splashing to the device outside in the device course of working from causing environmental pollution, improved the clean and tidy nature in the device work progress.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is an elevational, cross-sectional view of the present invention;
FIG. 3 is a front view of the present invention;
FIG. 4 is a partial block diagram of the shield assembly of the present invention;
FIG. 5 is a partial block diagram of the cleaning assembly of the present invention.
In the figure: 1. a fixing plate; 101. a conveying pipe; 102. a support plate; 2. a left side plate; 201. a limiting rod; 3. a guard assembly; 301. a protective sleeve; 302. a telescopic sleeve; 303. a through hole; 304. a propeller; 4. a right side plate; 401. a threaded rod; 402. a motor; 5. installing a box; 501. an electric motor; 6. cleaning the assembly; 601. cleaning the box; 602. a dust collector; 603. a storage tank; 604. and (4) a protective plate.
Detailed Description
The technical solution of the present invention is further explained with reference to the accompanying drawings and specific embodiments.
Example one
As shown in fig. 1-5, the pile digging device for the concrete pipe pile in the building engineering provided by the utility model comprises a fixing plate 1, a protection component 3 and a cleaning component 6, wherein a supporting plate 102 is installed at the top of the fixing plate 1, the cleaning component 6 is installed at the top of the supporting plate 102, the cleaning component 6 comprises a cleaning box 601, a dust collector 602, a storage box 603 and a protection plate 604, two groups of dust collectors 602 are installed at two sides inside the cleaning box 601, a right side plate 4 is installed at one side of the fixing plate 1, a threaded rod 401 is installed inside the right side plate 4, the protection component 3 is installed at the bottom of the fixing plate 1, the protection component 3 comprises a protection sleeve 301, a telescopic sleeve 302, a through hole 303 and a propeller 304, the telescopic sleeve 302 is installed at the bottom of the protection sleeve 301, two groups of through holes 303 are arranged at two sides of the protection sleeve 301, and the propeller 304 is installed inside the protection sleeve 301.
The working principle of the pile digging device for the concrete pipe piles in the building engineering based on the first embodiment is as follows: after the device is transported to a designated position by workers, the screw 304 can be driven to rotate after the motor 501 is electrified, so that construction can be carried out, the threaded rod 401 can be driven to rotate after the motor 402 is electrified, the fixed plate 1 can be driven to move up and down through the rotation of the threaded rod 401, the device is convenient to use, soil scraps generated in the device construction process can be cleaned through the dust collector 602 in the cleaning assembly 6, so that the soil scraps in a construction site do not need to be cleaned manually by the workers, the labor cost in the construction process is saved, meanwhile, the soil scraps generated in the device processing process are prevented from splashing to the outer side of the device to cause environmental pollution, the screw 304 can be protected through the telescopic sleeve 302 in the protection assembly 3, the screw 304 is prevented from being damaged due to the influence of external force in the storage process, and meanwhile, potential safety hazards caused by mistaken collision of the screw 304 by nearby workers are prevented, the maintenance burden of the device is reduced, and meanwhile, the safety of the device in the storage process is improved.
Example two
As shown in fig. 2-5, compared with the first embodiment, the present invention provides a concrete pipe pile digging device for construction engineering, which further includes: transmission pipe 101 is installed to fixed plate 1 bottom, and transmission pipe 101 is connected with lag 301, left side board 2 is installed to fixed plate 1 one side, and 2 internally mounted of left side board have gag lever post 201, motor 402 is installed at 4 tops of right side board, and the motor 402 output is connected with threaded rod 401, install bin 5 is installed at fixed plate 1 top, and install bin 5 internally mounted has motor 501, cleaning bin 601 internally mounted has bin 603, and cleaning bin 601 openly installs guard plate 604.
In this embodiment, transmission pipe 101 can transmit the suction that dust catcher 602 produced, the device of being convenient for uses, left side plate 2 can provide the mounted position to gag lever post 201, gag lever post 201 can carry on spacingly to fixed plate 1, motor 402 can drive threaded rod 401 after the circular telegram and rotate, the device of being convenient for uses, install bin 5 can provide the mounted position to motor 501, motor 501 can drive screw 304 after the circular telegram and rotate, the device of being convenient for uses, bin 603 can collect the soil bits of dust catcher 602 clearance, guard plate 604 can protect the inside of clearance case 601.
The above embodiments are merely some preferred embodiments of the present invention, and those skilled in the art can make various alternative modifications and combinations of the above embodiments based on the technical solution of the present invention and the related teaching of the above embodiments.

Claims (6)

1. The utility model provides a building engineering concrete tubular pile draws a device, includes fixed plate (1), protection component (3) and clearance subassembly (6), its characterized in that: a supporting plate (102) is arranged at the top of the fixing plate (1), a cleaning component (6) is arranged at the top of the supporting plate (102), the cleaning component (6) comprises a cleaning box (601), a dust collector (602), a storage box (603) and a protection plate (604), two groups of dust collectors (602) are arranged on two sides in the cleaning box (601), a right side plate (4) is arranged on one side of the fixed plate (1), a threaded rod (401) is arranged in the right side plate (4), a protection component (3) is arranged at the bottom of the fixing plate (1), the protective component (3) comprises a protective sleeve (301), a telescopic sleeve (302), a through hole (303) and a propeller (304), the utility model discloses a safety protection cover, including lag (301), lag (301) both sides are equipped with two sets of through-holes (303), and lag (301) internally mounted has screw (304).
2. The constructional engineering concrete tubular pile digging device according to claim 1, characterized in that: the bottom of the fixing plate (1) is provided with a transmission pipe (101), and the transmission pipe (101) is connected with the protective sleeve (301).
3. The constructional engineering concrete tubular pile digging device according to claim 1, characterized in that: the left side board (2) is installed to fixed plate (1) one side, and left side board (2) internally mounted has gag lever post (201).
4. The constructional engineering concrete tubular pile digging device according to claim 1, characterized in that: and a motor (402) is installed at the top of the right side plate (4), and the output end of the motor (402) is connected with the threaded rod (401).
5. The constructional engineering concrete tubular pile digging device according to claim 1, characterized in that: an installation box (5) is installed at the top of the fixing plate (1), and an electric motor (501) is installed inside the installation box (5).
6. The constructional engineering concrete tubular pile digging device according to claim 1, characterized in that: the cleaning box (601) is internally provided with a storage box (603), and the front surface of the cleaning box (601) is provided with a protection plate (604).
CN202123416694.1U 2021-12-31 2021-12-31 Pile digging device for concrete pipe piles in constructional engineering Active CN216551947U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123416694.1U CN216551947U (en) 2021-12-31 2021-12-31 Pile digging device for concrete pipe piles in constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123416694.1U CN216551947U (en) 2021-12-31 2021-12-31 Pile digging device for concrete pipe piles in constructional engineering

Publications (1)

Publication Number Publication Date
CN216551947U true CN216551947U (en) 2022-05-17

Family

ID=81560682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123416694.1U Active CN216551947U (en) 2021-12-31 2021-12-31 Pile digging device for concrete pipe piles in constructional engineering

Country Status (1)

Country Link
CN (1) CN216551947U (en)

Similar Documents

Publication Publication Date Title
CN207130660U (en) Suction sweeping type bridge expanssion joint clears up car
CN105133515A (en) Route inspection maintenance equipment for sound barrier
CN216551947U (en) Pile digging device for concrete pipe piles in constructional engineering
CN110847519A (en) Automatic box-type substation of snow removing
CN205092503U (en) Circuit ware of removing obstacles
CN213741075U (en) Pile digging device for concrete pipe piles in constructional engineering
CN216076963U (en) Drilling equipment for municipal construction
CN210264508U (en) Punching device for coal mining
CN212855104U (en) Spray set for dust fall
CN210151543U (en) Road removing device for road repair
CN111634640A (en) Coal mine conveying transportation device capable of preventing blockage based on self potential energy
CN210113381U (en) Tunnel dust removal trolley
CN208105144U (en) A kind of civil engineering slag cleaning device
CN220815730U (en) Dust removal integrated device for coal mine tunneling roadway
CN218133959U (en) Electric power engineering dust collecting equipment
CN219692743U (en) Height-adjustable carbon sink monitoring equipment
CN216446840U (en) Drilling device that punches that highway maintenance was used
CN211459176U (en) Movable beam slab bottom rubbish clearance instrument
CN214035658U (en) Spraying device for underground coal mining machine
CN215549865U (en) Waste collecting device for roof drilling
CN214498911U (en) Drilling equipment for construction
CN219888007U (en) Down-the-hole drill dust removal and monitoring device
CN214022372U (en) Equipment cleaning device for underground coal mine
CN212867631U (en) Mechanical arm
CN212635152U (en) Clamping table for special-shaped bearing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant