Prior art keywords
main body
heat dissipation
degassing
equipment main
degassing equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121637083.7U
Other languages
Chinese (zh)
Inventor
王明峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Lingtan Electromechanical Equipment Co ltd
Original Assignee
Guangzhou Lingtan Electromechanical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Lingtan Electromechanical Equipment Co ltd filed Critical Guangzhou Lingtan Electromechanical Equipment Co ltd
Priority to CN202121637083.7U priority Critical patent/CN216549710U/en
Application granted granted Critical
Publication of CN216549710U publication Critical patent/CN216549710U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

The utility model relates to the technical field of air conditioners, and provides degassing equipment used on a heating ventilation air conditioning system, which comprises a degassing equipment main body and radiating holes, wherein the radiating holes are formed in one side of the degassing equipment main body, a connecting block is arranged on the other side of the degassing equipment main body, a radiating mechanism is arranged on the other side of the degassing equipment main body, the radiating mechanism comprises a radiating box, an air inlet, a fan and an air outlet, the radiating box is arranged in the inner wall of the other side of the degassing equipment main body, and the fan is arranged inside the radiating box. According to the utility model, the heat dissipation mechanism is arranged, so that a large amount of heat can be generated in the degassing equipment main body during long-time work, if the heat in the degassing equipment main body is not dissipated, internal parts of the degassing equipment main body are possibly damaged due to overhigh temperature, and the heat in the degassing equipment main body is dissipated by using the fan, so that the heat dissipation effect is improved.

Description

Degassing equipment for heating ventilation air-conditioning system
Technical Field
The utility model relates to the technical field of air conditioners, in particular to a degassing device for a heating, ventilating and air conditioning system.
Background
Along with the continuous development of society and the continuous improvement of science, the air conditioner is used more and more frequently, the air conditioner inevitably has some air in the heating and refrigerating water circulation, the sources of the air conditioner are water supplement and pipe network leakage, the air in the water can bring many adverse effects to the heating and refrigerating water circulation, the accumulated air generates air resistance, causes problems of unbalanced resistance, unsmooth circulation, noise generation, cavitation and the like, and in order to solve the problem of the air in the water, a degassing device used on a heating ventilation air conditioning system is needed;
the devices on the market are various and can basically meet the use requirements of people, but certain problems still exist, a large amount of heat can be generated inside the traditional degassing equipment in the use process, if the heat is not timely dissipated, the damage to parts can be possibly caused, and therefore the practicability is weak.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model aims to provide a degassing device used on a heating, ventilating and air conditioning system, which is used for solving the defect of poor heat dissipation effect of the existing degassing device used on the heating, ventilating and air conditioning system.
(II) contents of utility model
In order to solve the technical problems, the utility model provides the following technical scheme: the degassing equipment used on the heating ventilation air conditioning system comprises a degassing equipment main body and a radiating hole, wherein the radiating hole is formed in one side of the degassing equipment main body;
the other side of the degassing device main body is provided with a connecting block, the other side of the degassing device main body is provided with a heat dissipation mechanism,
preferably, the heat dissipation mechanism comprises a heat dissipation box, an air inlet, a fan and an air outlet, the heat dissipation box is arranged in the inner wall of the other side of the degassing equipment main body, the fan is arranged inside the heat dissipation box, the air inlet is formed in the inner wall of one side of the heat dissipation box, and the air outlet is formed in the inner wall of the other side of the heat dissipation box.
Preferably, the both sides on degasification equipment main part top all are provided with protective structure, protective structure includes first guard plate, second guard plate and buffer spring, first guard plate sets up in the both sides at degasification equipment main part top, the top of first guard plate all is fixed with the second guard plate, one side that first guard plate and second guard plate are close to degasification equipment main part evenly is fixed with buffer spring.
Preferably, one end of the buffer spring is fixedly connected with the outer wall of the degassing device main body, and the first protection plate and the second protection plate form a telescopic structure through the buffer spring.
Preferably, the first protection plate is provided with two sets, and two sets of the first protection plate is symmetrical about the perpendicular axis of degasification equipment main part and distributes.
Preferably, the connecting block sets up in one side of heat dissipation case, the inside of connecting block is provided with dustproof construction, dustproof construction includes dust guard, exhaust vent, spout, baffle and fresh air inlet, the inside of connecting block is seted up to the spout, the inside of spout is inserted and is established into the dust guard, the top of dust guard is fixed with the baffle, the fresh air inlet has been seted up to the inside of connecting block one side, the exhaust vent has been seted up to the inside opposite side of connecting block.
Preferably, the cross-sectional area of the chute is larger than that of the dust guard, and an inserting structure is formed between the chute and the dust guard.
Preferably, the heat dissipation holes are provided with a plurality of heat dissipation holes which are arranged at equal intervals on one side of the degassing equipment body.
(III) advantageous effects
The degassing equipment used on the heating ventilation air conditioning system has the advantages that: through the arrangement of the heat dissipation mechanism, a large amount of heat can be generated in the degassing equipment main body during long-time work, if the heat in the degassing equipment main body is not dissipated, internal parts of the degassing equipment main body are likely to be damaged due to overhigh temperature, and the heat in the degassing equipment main body is dissipated through the use of the fan, so that the heat dissipation effect is improved;
through the arrangement of the dustproof structure, when the degassing equipment main body dissipates heat, dust enters the degassing equipment main body along with the air inlet, if a large amount of dust is contained in the degassing equipment main body, the damage of parts in the degassing equipment main body is easily caused, and the dust entering air in the degassing equipment main body can be filtered through the dustproof plate, so that the content of the dust in the air is reduced, and the dustproof effect is improved;
when the staff runs into four angles on degasification equipment main part top carelessly, the use of first guard plate and second guard plate can give buffer spring with the impact transmission, and buffer spring falls for the buffering through concertina movement, because the material of first guard plate and second guard plate is the elasticity that has of rubber, so can not cause the injury when running into to accomplish protection work yet.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic view of the front view of the partial internal structure of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic front sectional view of the heat dissipation mechanism of the present invention;
FIG. 4 is a schematic front sectional view of the dustproof structure of the present invention;
fig. 5 is a partial three-dimensional structural diagram of the dustproof structure of the present invention.
The reference numerals in the figures illustrate: 1. a degassing apparatus main body; 2. a protective structure; 201. a first guard plate; 202. a second guard plate; 203. a buffer spring; 3. a heat dissipation mechanism; 301. a heat dissipation box; 302. an air inlet; 303. a fan; 304. an air outlet; 4. connecting blocks; 5. a dust-proof structure; 501. a dust-proof plate; 502. an air outlet; 503. a chute; 504. a baffle plate; 505. an air inlet hole; 6. and (4) heat dissipation holes.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without any inventive step, are within the scope of the present invention.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, the degassing device for a heating ventilation air conditioning system provided by the utility model comprises a degassing device body 1 and heat dissipation holes 6, wherein the heat dissipation holes 6 are formed in one side of the degassing device body 1, the connection block 4 is arranged on the other side of the degassing device body 1, the heat dissipation mechanism 3 comprises a heat dissipation box 301, an air inlet 302, a fan 303 and an air outlet 304, the heat dissipation box 301 is arranged in the inner wall of the other side of the degassing device body 1, the fan 303 is arranged in the heat dissipation box 301, the air inlet 302 is formed in the inner wall of one side of the heat dissipation box 301, and the air outlet 304 is formed in the inner wall of the other side of the heat dissipation box 301;
when heat dissipation is performed, the external power supply starts the fan 303, the fan 303 generates wind power through rotation, then air is exhausted through the air inlet 302, then the air is blown into the degassing equipment main body 1 through the air outlet 304, and finally the wind entering the degassing equipment main body 1 is exhausted through the heat dissipation holes 6, so that air convection is formed to dissipate heat inside the degassing equipment main body 1, and heat dissipation work is completed;
the two sides of the top end of the degassing device main body 1 are respectively provided with a protective structure 2, each protective structure 2 comprises a first protective plate 201, a second protective plate 202 and a buffer spring 203, the first protective plates 201 are arranged on the two sides of the top of the degassing device main body 1, the top ends of the first protective plates 201 are respectively fixed with the second protective plates 202, the buffer springs 203 are respectively and uniformly fixed on one sides, close to the degassing device main body 1, of the first protective plates 201 and the second protective plates 202, one ends of the buffer springs 203 are respectively and fixedly connected with the outer wall of the degassing device main body 1, the first protective plates 201 and the second protective plates 202 form a telescopic structure through the buffer springs 203, the first protective plates 201 are provided with two groups, and the two groups of first protective plates 201 are symmetrically distributed about the vertical middle axis of the degassing device main body 1;
when workers touch the four corners at the top end of the degassing device main body 1 carelessly, the impact force is transmitted to the buffer spring 203 by using the first protection plate 201 and the second protection plate 202, the buffer spring 203 buffers the impact force through telescopic motion, and the first protection plate 201 and the second protection plate 202 are made of rubber and have elasticity, so that the damage cannot be caused when the first protection plate 201 and the second protection plate 202 touch the rubber, and the protection work is finished;
the connecting block 4 is arranged on one side of the heat dissipation box 301, the dustproof structure 5 is arranged inside the connecting block 4, the dustproof structure 5 comprises a dustproof plate 501, an air outlet 502, a sliding groove 503, a baffle 504 and an air inlet 505, the sliding groove 503 is arranged inside the connecting block 4, the dustproof plate 501 is inserted into the sliding groove 503, the baffle 504 is fixed at the top end of the dustproof plate 501, the air inlet 505 is arranged inside one side of the connecting block 4, the air outlet 502 is arranged on the other side inside the connecting block 4, the cross sectional area of the sliding groove 503 is larger than that of the dustproof plate 501, an insertion structure is formed between the sliding groove 503 and the dustproof plate 501, the heat dissipation holes 6 are provided with a plurality of heat dissipation holes 6, and the heat dissipation holes 6 are arranged at equal intervals on one side of the degassing equipment main body 1;
when dustproof, the air can enter into the inside of spout 503 through fresh air inlet 505, the dust in the air can be filtered in the use of dust guard 501, reduce the content of dust in the air, when dust guard 501 needs to be changed, only need to hold the top of dust guard 501 with the hand, then make up and just can take dust guard 501 out and change, insert new dust guard 501 into the inside of spout 503 after the change finishes, along with the insertion of dust guard 501, the bottom of baffle 504 can keep off the top at connecting block 4, thereby the inside that dust guard 501 inserted spout 503 completely has been prevented, inconvenient the change, then the air after the filtration is blown into the inside of degasification equipment main part 1 through exhaust vent 502 by fan 303, accomplish dustproof work.
The working principle is as follows: when the degassing device is used, the degassing device body 1 is started, the solubility of gas in water is related to water temperature and pressure according to Henry's law, the solubility of gas is in direct proportion to the pressure of gas at a certain temperature, and the water temperature is reduced, the solubility of gas is increased, the water temperature is increased, and the solubility of gas is reduced at a certain pressure. When the pressure of the water surface is reduced, and the gas dissolved in the water can be separated out at a lower water temperature, so as to remove the gas in the water, the degassing device main body 1 releases the free gas and the dissolved gas in the water by generating vacuum in the machine, and then the free gas and the dissolved gas are discharged out of the system through the automatic exhaust valve, the degassed water is re-injected into the system, the water with low gas content is unsaturated water, the low gas content has high absorptivity to the gas, the gas in the system is absorbed to seek gas-water balance, the cycle is repeated, all the gas in the system water is removed, the degassing work is completed, and when a worker carelessly touches the four corners at the top end of the degassing device main body 1, the use of the first protection plate 201 and the second protection plate 202 transmits impact force to the buffer spring 203, the buffer spring 203 gives the impact force to the buffer through the telescopic motion, because the material of the first protection plate 201 and the second protection plate 202 is the elasticity of rubber, so the damage can not be caused when the automobile runs into the ground, thereby the protection work is finished;
secondly, when the degassing equipment body 1 is cooled, the external power supply starts the fan 303, the fan 303 generates wind power through rotation, then air is drawn through the air inlet 302, then the air is blown into the degassing equipment body 1 through the air outlet 304, and finally the wind entering the degassing equipment body 1 is discharged through the cooling holes 6, so that air convection is formed to dissipate the heat inside the degassing equipment body 1, and the cooling work is completed;
finally, when the degassing device body 1 is subjected to dust prevention, air can enter the inside of the chute 503 through the air inlet holes 505, the dust prevention plate 501 can be used for filtering dust in the air, the content of the dust in the air is reduced, when the dust-proof plate 501 needs to be replaced, the top end of the dust-proof plate 501 only needs to be held by hands, then the dust-proof plate 501 can be drawn out for replacement as soon as the connecting block is lifted upwards, a new dust-proof plate 501 is inserted into the sliding groove 503 after the replacement is finished, along with the insertion of the dust-proof plate 501, the bottom end of the baffle 504 can be blocked at the top end of the connecting block 4, thereby preventing the dust-proof plate 501 from being completely inserted into the inside of the slide groove 503, being inconvenient to replace, the filtered air is blown into the degassing device body 1 through the air outlet 502 by the fan 303, so as to complete the dustproof work, and finally complete the use work of the degassing device used on the heating, ventilation and air conditioning system.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The above-described embodiments of the apparatus are merely illustrative, and the units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of the present embodiment. One of ordinary skill in the art can understand and implement it without inventive effort.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (4)

1. A degasification equipment for on heating ventilating air conditioning system, including degasification equipment subject (1) and louvre (6), its characterized in that: one side of the degassing equipment main body (1) is provided with a heat dissipation hole (6);
the other side of the degassing device main body (1) is provided with a connecting block (4), the other side of the degassing device main body (1) is provided with a heat dissipation mechanism (3),
the heat dissipation mechanism (3) comprises a heat dissipation box (301), an air inlet (302), a fan (303) and an air outlet (304), the heat dissipation box (301) is arranged in the inner wall of the other side of the degassing equipment main body (1), the fan (303) is arranged inside the heat dissipation box (301), the air inlet (302) is arranged in the inner wall of one side of the heat dissipation box (301), and the air outlet (304) is arranged in the inner wall of the other side of the heat dissipation box (301);
protective structures (2) are arranged on two sides of the top end of the degassing device main body (1), each protective structure (2) comprises a first protective plate (201), a second protective plate (202) and a buffer spring (203), the first protective plates (201) are arranged on two sides of the top of the degassing device main body (1), the second protective plates (202) are fixed to the top ends of the first protective plates (201), and the buffer springs (203) are uniformly fixed to one sides, close to the degassing device main body (1), of the first protective plates (201) and one sides, close to the degassing device main body (1), of the second protective plates (202);
one end of each buffer spring (203) is fixedly connected with the outer wall of the degassing equipment main body (1), and the first protection plate (201) and the second protection plate (202) form a telescopic structure through the buffer springs (203);
the first protection plate (201) is provided with two groups, and the two groups of first protection plates (201) are symmetrically distributed around the vertical central axis of the degassing equipment main body (1).
2. The degassing apparatus for use in hvac systems of claim 1, further comprising: connecting block (4) set up in one side of heat dissipation case (301), the inside of connecting block (4) is provided with dustproof construction (5), dustproof construction (5) include dust guard (501), exhaust vent (502), spout (503), baffle (504) and fresh air inlet (505), the inside of connecting block (4) is seted up in spout (503), the inside of spout (503) is inserted and is established into dust guard (501), the top of dust guard (501) is fixed with baffle (504), fresh air inlet (505) have been seted up to the inside of connecting block (4) one side, exhaust vent (502) have been seted up to the inside opposite side of connecting block (4).
3. The degassing apparatus for use in hvac systems of claim 2, further comprising: the cross-sectional area of the sliding groove (503) is larger than that of the dust-proof plate (501), and an inserting structure is formed between the sliding groove (503) and the dust-proof plate (501).
4. The degassing apparatus for use in hvac systems of claim 1, further comprising: the heat dissipation holes (6) are provided with a plurality of heat dissipation holes (6) which are arranged at equal intervals on one side of the degassing equipment main body (1).
CN202121637083.7U 2021-07-19 2021-07-19 Degassing equipment for heating ventilation air-conditioning system Active CN216549710U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121637083.7U CN216549710U (en) 2021-07-19 2021-07-19 Degassing equipment for heating ventilation air-conditioning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121637083.7U CN216549710U (en) 2021-07-19 2021-07-19 Degassing equipment for heating ventilation air-conditioning system

Publications (1)

Publication Number Publication Date
CN216549710U true CN216549710U (en) 2022-05-17

Family

ID=81536654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121637083.7U Active CN216549710U (en) 2021-07-19 2021-07-19 Degassing equipment for heating ventilation air-conditioning system

Country Status (1)

Country Link
CN (1) CN216549710U (en)

Similar Documents

Publication Publication Date Title
CN205305334U (en) Heat dissipation type regulator cubicle
CN104202945A (en) Server cabinet and data centre computer room
CN107357374A (en) A kind of movable case with quick heat radiating function
CN206489498U (en) A kind of efficient dustproof radiating counter body
CN216549710U (en) Degassing equipment for heating ventilation air-conditioning system
CN112566426A (en) Artificial intelligence edge calculation box
CN209991567U (en) Water-cooling air conditioner
CN209374985U (en) A kind of electric power electric power cabinet cooling device
CN208285725U (en) A kind of high efficiency and heat radiation server cabinet
CN215496309U (en) Oil-immersed transformer convenient to cool
CN210959297U (en) Communication device with waterproof and heat dissipation functions
CN212257497U (en) High-temperature-resistant energy-saving battery pack
CN210295001U (en) Disk array storage device
CN204678569U (en) The inner deduster air-cooler of a kind of band
CN215269026U (en) Controller for anti-leakage chlorine dioxide generator
CN209550947U (en) Welding machine case
CN215500162U (en) A high-efficient heat abstractor for rack
CN213750969U (en) Computer shock absorber
CN206317644U (en) On-board air conditioner
CN218940847U (en) Full-automatic rotor assembly equipment
CN214102011U (en) Artificial intelligence edge calculation box
CN212160588U (en) Heat dissipation dust removal machine case for computer
CN221103906U (en) Air-cooled heat dissipation system and charging equipment with same
CN210924485U (en) Server heat abstractor
CN214507133U (en) Inside cooling device for mobile phone projection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant