CN216542918U - Graphitizing furnace filling clamp for electrode processing - Google Patents

Graphitizing furnace filling clamp for electrode processing Download PDF

Info

Publication number
CN216542918U
CN216542918U CN202123284406.1U CN202123284406U CN216542918U CN 216542918 U CN216542918 U CN 216542918U CN 202123284406 U CN202123284406 U CN 202123284406U CN 216542918 U CN216542918 U CN 216542918U
Authority
CN
China
Prior art keywords
clamping plate
splint
hole
electrode processing
connecting screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123284406.1U
Other languages
Chinese (zh)
Inventor
秦双喜
白银瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongliao Dawei Carbon Material Co ltd
Original Assignee
Tongliao Dawei Carbon Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongliao Dawei Carbon Material Co ltd filed Critical Tongliao Dawei Carbon Material Co ltd
Priority to CN202123284406.1U priority Critical patent/CN216542918U/en
Application granted granted Critical
Publication of CN216542918U publication Critical patent/CN216542918U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model discloses a graphitizing furnace packing clamp for electrode processing, which comprises a first clamping plate and a second clamping plate, wherein a connecting structure is arranged between the first clamping plate and the second clamping plate, the first clamping plate and the second clamping plate are fixed together through the connecting structure, the connecting structure comprises a splicing frame and a cushion block, one end of the splicing frame is connected onto the first clamping plate, the cushion block is arranged at the tail end of the splicing frame, and the cushion block is in contact with the second clamping plate. The graphitizing furnace packing clamp for electrode processing disclosed by the utility model belongs to the technical field of graphite manufacturing, and is characterized in that the connecting structure is arranged, so that the connecting structure is used for connecting two clamping plates, the clamping plates are detachably arranged, the splicing frame is matched with the cushion block for use, the distance between the two clamping plates can be adjusted as required, the use flexibility is improved, and the lifting frame is adopted, can be detached and is convenient to detach for carrying out corresponding operation, and is simple in structure and convenient and rapid to use.

Description

Graphitizing furnace filling clamp for electrode processing
Technical Field
The utility model relates to the technical field of graphite manufacturing, in particular to a graphitizing furnace filler clamp for electrode processing.
Background
Graphite is the negative electrode material in the battery and is formed by sintering carbon crystals at high temperature, a graphite crucible bears the raw material of the carbon powder block, the carbon powder block is placed in the graphitization furnace and is filled with the resistance material, so that the electrode arranged on the furnace wall of the graphitization furnace, the resistance material and the graphite crucible are connected in series to form a loop. When the power is switched on to generate heat, the carbon powder block raw material is sintered into graphite in a high-temperature environment of 2800 ℃. The existing graphitizing furnace structure is difficult to obviously layer different fillers, so that the graphite at different positions in the graphite crucible has different environments during sintering, and the quality of the graphite is unstable. In order to improve the quality of graphite, a high-filler clamp is required. The Chinese patent numbers are: CN203486909U discloses a "graphitizing furnace filler clamp", in which the purpose of layering the filler is achieved by arranging parallel steel plates, but in the above patent, the steel plates are welded together by steel bars, the distance cannot be adjusted, the flexibility in use is general, and the lifting lugs on the clamp and the steel plates are welded and fixed, cannot be detached, and have certain limitations in use.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims to provide a graphitizing furnace filling clamp for electrode processing, which can effectively solve the problems in the background technology.
In order to achieve the purpose, the utility model adopts the technical scheme that:
the utility model provides an electrode processing is with graphitizing stove anchor clamps, includes first splint and second splint, be provided with connection structure between first splint and the second splint, and first splint, second splint pass through connection structure and fix together, connection structure includes concatenation frame and cushion, the one end of concatenation frame is connected on first splint, the cushion sets up in the end of concatenation frame, and the cushion contacts with the second splint, first splint all are provided with the gallows with the top of second splint, it includes mounting panel and activity handle to play the gallows, fixed connection, two between mounting panel and the activity handle the mounting panel is installed respectively in the top intermediate position department of first splint and second splint.
Preferably, the first clamping plate is provided with a connecting screw hole, the second clamping plate is provided with a through hole, and the second through hole is aligned with the connecting screw hole.
Preferably, a threaded column is arranged in the middle of the top ends of the first clamping plate and the second clamping plate, the threaded column is welded with the first clamping plate and the second clamping plate, and the threaded column is connected with the lifting frame.
Preferably, the connecting structure further comprises a rotating block and a connecting screw rod, the rotating block is fixedly connected with the connecting screw rod, the connecting screw rod penetrates through the through hole in the second clamping plate, the tail end of the connecting screw rod penetrates through the cushion block, and the tail end of the connecting screw rod is in threaded connection with the splicing frame.
Preferably, the splicing frame comprises a supporting rod, a threaded joint and a threaded hole, the threaded joint is fixed at one end of the supporting rod, the threaded joint is in threaded connection with a connecting screw hole in the first clamping plate, and the threaded hole is formed in the other end of the supporting rod.
Preferably, the lifting frame further comprises a mounting nut, a protective baffle and a yielding hole, the mounting nut is connected to the threaded column, the mounting plate is fixed through the mounting nut, the yielding hole is formed in the protective baffle, and the protective baffle is fixedly mounted on the movable handle.
Compared with the prior art, the utility model has the following beneficial effects: this graphitizing furnace filler anchor clamps for electrode machining through the connection structure who sets up, utilizes connection structure to carry out the joint work of two splint for can dismantle the setting between the splint, the splice holder cooperation cushion is using, can adjust the interval of two splint as required, has improved the use flexibility, adopts the gallows, and it can dismantle to play the gallows, and convenient to detach gets off and carries out corresponding operation, simple structure, and the use is got up convenient and fast.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the connection structure of the present invention;
FIG. 3 is a schematic structural view of the splice holder of the present invention;
fig. 4 is a schematic structural view of the lifting frame of the utility model.
In the figure: 1. a first splint; 2. a second splint; 3. a connecting structure; 301. splicing frames; 3011. a support bar; 3012. a threaded joint; 3013. a threaded hole; 302. cushion blocks; 303. rotating the block; 304. connecting a screw rod; 4. lifting the hanger; 401. mounting a plate; 402. mounting a nut; 403. a movable handle; 404. a protective baffle; 405. a hole of abdication; 5. a connecting screw hole; 6. a through hole; 7. a threaded post.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the utility model easy to understand, the utility model is further described with the specific embodiments.
As shown in fig. 1-4, a graphitizing furnace filler fixture for electrode processing, including first splint 1 and second splint 2, be provided with connection structure 3 between first splint 1 and the second splint 2, and first splint 1, second splint 2 passes through connection structure 3 to be fixed together, connection structure 3 includes splice holder 301 and cushion 302, splice holder 301's one end is connected on first splint 1, cushion 302 sets up in splice holder 301's end, and cushion 302 and second splint 2 are to the contact, first splint 1 all is provided with out gallows 4 with the top of second splint 2, it includes mounting panel 401 and activity handle 403 to go up gallows 4, fixed connection between mounting panel 401 and the activity handle 403, two mounting panels 401 are installed respectively in the top intermediate position department of first splint 1 and second splint 2.
Through above-mentioned embodiment, seted up on the first splint 1 and connected screw 5, seted up through-hole 6 on the second splint 2, and second through-hole 6 with connect between the screw 5 and align, the top intermediate position department of first splint 1 and second splint 2 is provided with screw post 7, and the connected mode between screw post 7 and first splint 1, the second splint 2 is the welding, screw post 7 with play gallows 4 and be connected.
With the above-mentioned embodiment, the connection structure 3 further comprises the rotation block 303 and the connection screw 304, the rotation block 303 and the connection screw 304 are fixedly connected, and the connecting screw 304 penetrates through the through hole 6 on the second clamping plate 2, the end of the connecting screw 304 penetrates through the cushion block 302, the tail end of the connecting screw 304 is in threaded connection with the splicing frame 301, the splicing frame 301 comprises a supporting rod 3011, a threaded connector 3012 and a threaded hole 3013, the threaded connector 3012 is fixed at one end of the supporting rod 3011, the threaded joint 3012 is in threaded connection with a connecting screw hole 5 on the first splint 1, a threaded hole 3013 is arranged at the other end of the support rod 3011, through the connection structure 3 who sets up, utilize connection structure 3 to carry out the connection work of two splint for can dismantle the setting between the splint, splice holder 301 is cooperating cushion 302 and is using, can adjust the interval of two splint as required, has improved and has used the flexibility.
Through above-mentioned embodiment, the gallows 4 still includes mounting nut 402, guard flap 404 and the hole of stepping down 405, and mounting nut 402 is connected on threaded post 7, and mounting panel 401 is fixed through mounting nut 402, and the hole of stepping down 405 is seted up on guard flap 404, and guard flap 404 fixed mounting is on movable handle 403, adopts gallows 4, and gallows 4 can dismantle, and convenient to detach gets off and carries out corresponding operation, and simple structure uses convenient and fast.
It should be noted that, the present invention is a graphitizing furnace filling fixture for electrode processing, when in use, firstly, the first clamping plate 1 and the second clamping plate 2 are assembled, when assembling, a required number of splicing frames 301 are selected, the threaded joint 3012 at the end of the supporting rod 3011 in the first splicing frame 301 is screwed into the connecting screw hole 5, so that the first supporting rod 3011 is fixedly connected with the first clamping plate 1, then the threaded joint 3012 at the end of the second supporting rod 3011 is screwed into the threaded hole 3013 at the end of the first supporting rod 3011, so as to ensure that the two supporting rods 3011 are stably connected together, then the subsequent supporting rods 3011 are spliced in sequence according to the above process, after the splicing frames 301 are spliced, the second clamping plate 2 is attached to the end of the supporting rod 3011 at the farthest position from the first clamping plate 1, so as to ensure that the through hole 6 is aligned with the threaded hole 3013 on the supporting rod 3011, inserting the connecting screw 304 on the rotating block 303 into the through hole 6 on the second splint 2, making the connecting screw 304 contact with the threaded hole 3013, rotating the rotating block 303 by using a tool, the rotating block 303 driving the connecting screw 304 to rotate, thereby making the connecting screw 304 rotate and displace in the threaded hole 3013 until the rotating block 303 closely contacts with the second splint 2, at this time, under the action of the rotating block 303 and the connecting screw 304, the second splint 2 and the support rod 3011 are fixedly connected together, thus completing the assembly work of the two splints, in the process of installing the second splint 2, according to the need, a corresponding number of cushion blocks 302 can be added, in the operation, after the connecting screw 304 passes through the through hole 6, the corresponding number of cushion blocks 302 are sleeved on the connecting screw 304, then screwing the connecting screw 304 into the threaded hole 3013 at the end of the support rod 3011 until the second splint 2 closely contacts with the cushion blocks 302, when the two clamping plates are assembled, the mounting operation of the lifting bracket 4 is started, the mounting plate 401 at the lower end of the movable handle 403 is sleeved on the threaded column 7, the mounting nut 402 passes through the abdicating hole 405 on the protective baffle 404, so that the mounting nut 402 contacts the threaded column 7, then the mounting nut 402 is rotated until the mounting plate 401 is fixed by the mounting nut 402, and then the fixing operation of the whole lifting bracket 4 is completed, the whole clamp can be used after the lifting bracket 4 is fixed, when the clamp is used, the graphite crucible is firstly placed into the graphitization furnace, the first clamping plate 1 and the second clamping plate 2 are lifted by the structures of the movable handle 403 and the like, the clamp is placed at the corresponding position in the graphitization furnace, the graphitization furnace is divided into different spaces by the clamp, then different fillers are added into the different spaces, after the fillers are filled, the clamp is taken out by the lifting bracket 4, and the layers of the fillers are clearly distinguished, can guarantee to produce the quality of electrode, at the in-process that uses the gallows 4, guard flap 404 plays the effect of protection to screw post 7, can avoid screw post 7 to be collided such as couple, and then guarantees the integrity of screw post 7, can not receive the influence when guaranteeing mounting nut 402 and dismantling, simple structure, convenient to use is swift.
The foregoing has described the principles of use, features and advantages of the utility model. The above embodiments and the description of the utility model are provided to illustrate the basic principles and features of the utility model and, within the scope of the utility model concept, to be understood by those skilled in the art from the foregoing description, various modifications may be made to the utility model and these modifications are within the scope of the utility model as claimed.

Claims (6)

1. The utility model provides an electrode processing is with graphitizing stove anchor clamps that packs, includes first splint (1) and second splint (2), its characterized in that: a connecting structure (3) is arranged between the first clamping plate (1) and the second clamping plate (2), and the first splint (1) and the second splint (2) are fixed together through a connecting structure (3), the connecting structure (3) comprises a splicing frame (301) and a cushion block (302), one end of the splicing frame (301) is connected to the first clamping plate (1), the cushion block (302) is arranged at the tail end of the splicing frame (301), the cushion block (302) is contacted with the second clamping plate (2), the top ends of the first clamping plate (1) and the second clamping plate (2) are provided with lifting frames (4), the lifting frame (4) comprises a mounting plate (401) and a movable handle (403), the mounting plate (401) and the movable handle (403) are fixedly connected, and the mounting plate (401) is respectively mounted at the middle position of the top ends of the first clamping plate (1) and the second clamping plate (2).
2. The graphitizing furnace filler jig for electrode processing as set forth in claim 1, wherein: the connecting screw hole (5) is formed in the first clamping plate (1), the through hole (6) is formed in the second clamping plate (2), and the second through hole (6) is aligned with the connecting screw hole (5).
3. The graphitizing furnace packing jig for electrode processing as set forth in claim 2, wherein: the clamping device is characterized in that a threaded column (7) is arranged in the middle position of the top end of the first clamping plate (1) and the second clamping plate (2), the threaded column (7) is welded with the first clamping plate (1) and the second clamping plate (2), and the threaded column (7) is connected with the lifting frame (4).
4. The graphitizing furnace packing jig for electrode processing as set forth in claim 3, wherein: the connecting structure (3) further comprises a rotating block (303) and a connecting screw rod (304), the rotating block (303) is fixedly connected with the connecting screw rod (304), the connecting screw rod (304) penetrates through a through hole (6) in the second clamping plate (2), the tail end of the connecting screw rod (304) penetrates through the cushion block (302), and the tail end of the connecting screw rod (304) is in threaded connection with the splicing frame (301).
5. The graphitizing furnace packing jig for electrode processing as set forth in claim 4, wherein: splice frame (301) include bracing piece (3011), screwed joint (3012) and screw hole (3013), screwed joint (3012) are fixed in the one end of bracing piece (3011), and threaded connection between screwed joint (3012) and the connection screw (5) on first splint (1), the other end of bracing piece (3011) is seted up in screw hole (3013).
6. The graphitizing furnace packing jig for electrode processing as set forth in claim 5, wherein: the lifting frame (4) further comprises a mounting nut (402), a protective baffle (404) and a yielding hole (405), the mounting nut (402) is connected to the threaded column (7), the mounting plate (401) is fixed through the mounting nut (402), the yielding hole (405) is arranged on the protective baffle (404), and the protective baffle (404) is fixedly mounted on the movable handle (403).
CN202123284406.1U 2021-12-24 2021-12-24 Graphitizing furnace filling clamp for electrode processing Active CN216542918U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123284406.1U CN216542918U (en) 2021-12-24 2021-12-24 Graphitizing furnace filling clamp for electrode processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123284406.1U CN216542918U (en) 2021-12-24 2021-12-24 Graphitizing furnace filling clamp for electrode processing

Publications (1)

Publication Number Publication Date
CN216542918U true CN216542918U (en) 2022-05-17

Family

ID=81557455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123284406.1U Active CN216542918U (en) 2021-12-24 2021-12-24 Graphitizing furnace filling clamp for electrode processing

Country Status (1)

Country Link
CN (1) CN216542918U (en)

Similar Documents

Publication Publication Date Title
CN106602128A (en) Clamping device for processing of cylindrical batteries
CN216542918U (en) Graphitizing furnace filling clamp for electrode processing
CN110355515A (en) A kind of H-type large-scale steel structure submerged automatic arc welding tool
CN210125789U (en) Hot press of high-efficient hot pressing
CN209811668U (en) Semi-automatic overturning and attaching jig
CN213449562U (en) Double-steel-plate shear wall component field installation anti-toppling device
CN211516769U (en) Quick clamping device for machine manufacturing
CN209578578U (en) Wheelchair armrest assembly robot welding auxiliary device
CN213795281U (en) Auxiliary supporting device for production of long anchor bolts
CN218746336U (en) Auxiliary clamp for machining parts
CN220896549U (en) Photovoltaic board mounting bracket convenient to dismantle
CN105789515A (en) Fixture and method for assembling lithium battery into metal framework
CN216706531U (en) A arrange formula and weld frame for processing cable support built-in fitting
CN212239962U (en) Tower section of thick bamboo flange combines quick auxiliary device that is geared to needs of job
CN217654304U (en) Furnace door of smelting furnace
CN214392736U (en) Side wall fixture device that brazes
CN211743683U (en) Special copper bar connecting clamp for dry-type transformer test
CN220718288U (en) Automobile battery mounting frame splice welding tool
CN215034970U (en) Positioning device convenient for pipeline welding
CN216039933U (en) Split type graphite heater for thermal field of monocrystalline silicon CZ furnace
CN218487422U (en) Arc striking device of electric welding machine
CN221466620U (en) Quick-change jig mechanism compatible with bundling of battery modules of different sizes
CN217419991U (en) Temporary fixing device for steel structure installation
CN210147880U (en) Metal holds carrier clamping device that burns
CN220750818U (en) Blanking clamp of sintering furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant