CN216520281U - Carbon steel pipeline plugging device for chemical cleaning - Google Patents

Carbon steel pipeline plugging device for chemical cleaning Download PDF

Info

Publication number
CN216520281U
CN216520281U CN202123303878.7U CN202123303878U CN216520281U CN 216520281 U CN216520281 U CN 216520281U CN 202123303878 U CN202123303878 U CN 202123303878U CN 216520281 U CN216520281 U CN 216520281U
Authority
CN
China
Prior art keywords
annular
carbon steel
steel pipeline
plate
cover cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123303878.7U
Other languages
Chinese (zh)
Inventor
张星
王原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Quancheng Huanjin Environmental Protection Technology Co ltd
Original Assignee
Tianjin Quancheng Huanjin Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Quancheng Huanjin Environmental Protection Technology Co ltd filed Critical Tianjin Quancheng Huanjin Environmental Protection Technology Co ltd
Priority to CN202123303878.7U priority Critical patent/CN216520281U/en
Application granted granted Critical
Publication of CN216520281U publication Critical patent/CN216520281U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a carbon steel pipeline plugging device for chemical cleaning. The sealing device comprises a cover cap and an annular welding plate, wherein the cover cap is fixedly connected with the annular welding plate by adopting a plurality of assembling screws, and an annular sealing ring is arranged between the cover cap and the annular welding plate; the cover comprises a circular cover plate, wherein an annular convex edge is arranged on the edge of the outer surface of the cover plate, a plurality of radial convex edge rib plates are arranged on the annular convex edge, a central boss is arranged at the center of the outer surface of the cover plate, and a plurality of radial rib plates which are circumferentially arranged at equal angular intervals are arranged between the central boss and the annular convex edge; the support component is detachably arranged at the center of the inner surface of the cover cap, can be unfolded and retracted, is placed into the carbon steel pipeline after being unfolded, and supports the cover cap and the annular welding plate. The carbon steel pipeline plugging device for chemical cleaning, which is reasonable in structural design, improves the standardization level, ensures the pipe plugging effect, reduces the material waste and reduces the manpower consumption.

Description

Carbon steel pipeline plugging device for chemical cleaning
Technical Field
The utility model belongs to the technical field of industrial cleaning, and particularly relates to a carbon steel pipeline plugging device for chemical cleaning.
Background
In the industrial production field, like the electricity generation field etc, the medium in the pipeline is used for thermal transmission, and system operation is after certain cycle, can produce the dirt in the heat exchanger, in the pipeline and in the valve usually, and the dirt in the heat exchanger can lead to heat exchange efficiency to descend, and the dirt in the pipeline can lead to the pipeline internal diameter to reduce and then lead to the medium flow to reduce, and the dirt in the valve can lead to the valve to open smoothly usually or close, leads to the decline to medium pipeline on-off control ability or even inefficacy. Therefore, it is often necessary in the aforementioned field to periodically clean the heat exchanger equipment, the media lines and the valves. The chemical cleaning is a cleaning operation method of injecting chemical agents into a container for soaking and spraying cleaning. The metal container cleaning method has the advantages that the cleaning effect on various dirt can be achieved by selecting the proper cleaning agent and adopting the proper cleaning process, the overlooking effect of the cleaning operation on the metal container can be relieved by controlling the type selection of the cleaning agent and the parameters of the cleaning process, and the chemical cleaning is one of the main modes of the existing cleaning operation.
When the container is subjected to chemical cleaning operation, the interior of the container is usually required to be soaked by a chemical agent, dirt can be loosened in the step of soaking by the chemical agent, and the falling of the dirt from the wall surface of the container is accelerated in the subsequent high-pressure washing operation, so that a better cleaning effect is achieved. Because the container is usually connected with a medium pipeline, the preposed step of soaking the chemical agent in the container is to perform pipe blocking treatment on the connecting pipeline, a space for containing the chemical agent is formed in the container after pipe blocking, the chemical agent is ensured to be stored in the space for a proper time so as to ensure a sufficient cleaning effect, and the problem of leakage of the chemical agent is avoided as much as possible. For carbon steel pipelines, in the prior art, a method of welding a plugging plate is generally adopted for plugging the pipe, and the operation method is as follows: and buckling a metal plate with a proper size on the port of the carbon steel pipeline, and then carrying out circumferential continuous seal welding.
The aforementioned way of welding the closure plate has the following disadvantages: firstly, after the arbitrarily selected metal plate is welded on the port of the carbon steel pipeline, the metal plate can not bear the water pressure of a cleaning agent in a container under certain conditions, so that the problems of falling and damage are caused, the cleaning agent is leaked, the pipeline plugging operation can not be standardized by the arbitrarily selected metal plate, and the operation quality is difficult to ensure; moreover, after the cleaning operation is finished, the metal plate needs to be cut from the port of the carbon steel pipeline, and the whole metal plate after cutting cannot be welded for use again, so that the material waste is caused; further, when welding a metal plate to a carbon steel pipe port, since an operator needs to operate a welding machine, it is impossible to simultaneously perform an operation of pressing and holding the metal plate to the pipe port, and two-person operation is usually required.
Therefore, need develop a novel stifled pipe device of carbon steel pipeline according to the demand, replace the current metal sheet welded operation mode of choosing wantonly, promote standardized level, guarantee stifled effect of pipe and reduce the waste of material, reduce the consumption to the manpower.
SUMMERY OF THE UTILITY MODEL
The utility model provides a carbon steel pipeline pipe plugging device for chemical cleaning, which aims to solve the technical problems in the prior art, improve the standardization level, ensure the pipe plugging effect, reduce the material waste and reduce the labor consumption.
The technical scheme adopted by the utility model for solving the technical problems in the prior art is as follows: a carbon steel pipeline pipe plugging device for chemical cleaning comprises a cover cap and an annular welding plate, wherein the cover cap is fixedly connected with the annular welding plate through a plurality of assembling screws, and an annular sealing ring is arranged between the cover cap and the annular welding plate; the cover cap comprises a circular cover plate, an annular convex edge is arranged on the edge of the outer surface of the cover plate, a plurality of radial convex edge rib plates are arranged on the annular convex edge, a central boss is arranged at the center of the outer surface of the cover plate, and a plurality of radial rib plates which are circumferentially arranged at equal angular intervals are arranged between the central boss and the annular convex edge; the support component is detachably arranged at the center of the inner surface of the cover cap and can be unfolded and retracted, and the support component is unfolded and then placed into the carbon steel pipeline and supports the cover cap and the annular welding plate.
The utility model has the advantages and positive effects that:
compared with the existing mode of randomly adopting metal plate welding, the carbon steel pipeline pipe plugging device with reasonable structural design is provided, is carried to a site for use by pipe plugging operators, and solves the problem of uncontrollable operation quality caused by inconsistent specifications, thicknesses and the like of the metal plates randomly adopted by the operators in the existing operation mode. Constitute by shroud and annular welded plate etc. through setting up stifled pipe device, and annular welded plate and carbon steel pipeline port welded fastening and from carbon steel pipeline port cutting, abandon as the waste material behind the annular welded plate cutting, the shroud can used repeatedly, has consequently avoided the waste to the material.
Through set up additional strengthening such as annular bead, bead gusset, central boss and radial gusset on the shroud, promoted the structural strength of shroud, consequently this stifled pipe device's structural strength is high, and this stifled pipe device can resist the water pressure of the inside washing medicament of bigger container behind the stifled pipe operation, is difficult for appearing the medicament leakage problem, has guaranteed the effect of stifled pipe. Through the inside central point at the shroud put detachably installation support subassembly, make the support subassembly expand the inside of back support at carbon steel pipeline, reach the technical effect that supports shroud and annular welding board, this supporting role can reduce stifled pipe operation personnel's operation burden to a certain extent, makes it need not other personnel's auxiliary operation at the in-process of carrying out stifled pipe welding operation, consequently has reduced the consumption to the manpower.
Preferably: the bracket component comprises a first fixed base and a second fixed base, a guide rod and a moving base moving along the guide rod are arranged between the first fixed base and the second fixed base, a screw and nut component is arranged on the first fixed base and the second fixed base, and the moving base is fixedly connected with a nut of the moving base; a plurality of support arms with rollers at the outer ends are hinged on the first fixed base, and a support connecting rod is arranged between the middle part of each support arm and the movable base.
Preferably: the center of the inner surface of the cover plate is provided with a middle mounting hole with internal threads, and the middle mounting hole extends into the central boss; and a connecting pillar with external threads is arranged on a first fixed base of the bracket component and is screwed into the middle mounting hole.
Preferably: the edge of the inner surface of the cover plate is provided with a sealing ring groove, and the sealing ring groove extends into the annular convex edge; the annular sealing ring is positioned in the sealing ring groove.
Preferably: a plurality of connecting bosses are arranged between the outer side edge of the annular convex edge and the cover plate, connecting holes are formed in the connecting bosses, and non-through threaded connecting holes are formed in corresponding positions on the annular welding plate.
Preferably: the cover cap is an integral casting, and the annular welding plate is made by cutting a metal plate.
Preferably: the support arm is provided with three groups with the gyro wheel on the bracket component, and the equal angle interval of circumference sets up.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of the cover of FIG. 1, from an exterior perspective;
FIG. 3 is a schematic view of the construction of the cover of FIG. 1, from an interior perspective;
fig. 4 is a schematic structural view of the bracket assembly of fig. 1.
In the figure:
1. a cover; 1-1, a cover plate; 1-2, connecting a boss; 1-3, annular convex ribs; 1-4, rib plates of the ribs; 1-5, radial rib plates; 1-6, a central boss; 1-7, connecting holes; 1-8, sealing ring groove; 1-9, a middle mounting hole; 2. assembling screws; 3. a ring-shaped welding plate; 4. a carbon steel pipeline; 5. a bracket assembly; 5-1, rolling wheels; 5-2, a support arm; 5-3, supporting connecting rods; 5-4, moving the base; 5-5, a guide rod; 5-6, a second fixed base; 5-7, a screw rod and nut assembly; 5-8, a first fixed base; 5-9, connecting the table column.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are described in detail.
Referring to fig. 1, the carbon steel pipe plugging device for chemical cleaning of the present invention includes a cover cap 1 and an annular welding plate 3, wherein the cover cap 1 and the annular welding plate 3 are fixedly connected by a plurality of assembling screws 2, and an annular sealing ring is disposed between the cover cap 1 and the annular welding plate 3.
During pipe plugging operation, the annular welding plate 3 and the carbon steel pipeline 4 are directly welded and fixed, and pipe plugging sealing is achieved. The main body part of the pipe blocking device is composed of the cover cap 1 and the annular welding plate 3, after the pipe blocking device is cut from the carbon steel pipeline 4 after cleaning operation is finished, the annular welding plate 3 forms waste materials to be discarded, the cover cap 1 and the annular sealing ring are recycled, and therefore waste of materials is reduced. In addition, annular welding board 3 can adopt the waste material that produces in the production process as raw materials for production with the metal sheet to process, can also realize the reuse to the metal sheet waste material, has promoted the utilization ratio of metal sheet material to a certain extent.
Through set up the reinforcing structure on shroud 1, can show the structural strength who promotes this stifled pipe device, promote the hydraulic bearing capacity of washing medicament in to the container, promote the effect of stifled pipe, avoid the washing medicament in the container to take place to leak.
Referring to fig. 2 and 3, it can be seen that:
the cover cap 1 comprises a circular cover plate 1-1, the edge of the outer surface of the cover plate 1-1 is provided with an annular convex edge 1-3, and the annular convex edge 1-3 is provided with a plurality of radial convex edge rib plates 1-4. The center of the outer surface of the cover plate 1-1 is provided with a central boss 1-6, and a plurality of radial rib plates 1-5 which are circumferentially arranged at equal angle intervals are arranged between the central boss 1-6 and the annular convex rib 1-3. The annular convex edges 1-3, the convex edge rib plates 1-4, the central bosses 1-6 and the radial rib plates 1-5 form reinforcing structures of the cover cap 1, and the reinforcing structures can obviously improve the structural strength of the cover cap 1.
As shown in the figure, a plurality of rib plates 1-4 are arranged at equal angular intervals in the circumferential direction, and each rib plate 1-4 spans from the inner side to the outer side of the annular rib 1-3. As shown in the figure, the central boss 1-6 is in a trapezoidal boss structure, three radial rib plates 1-6 are arranged, and are circumferentially arranged at equal angular intervals.
In the embodiment, the center of the inner surface of the cover plate 1-1 is provided with a middle mounting hole 1-9 with internal threads, and the middle mounting hole 1-9 extends into the central boss 1-6.
In the embodiment, the edge of the inner surface of the cover plate 1-1 is provided with a sealing ring groove 1-8, and the sealing ring groove 1-8 extends into the annular convex rib 1-3; the ring-shaped sealing ring is positioned in the sealing ring grooves 1-8.
The center of the inner surface of the cover cap 1 is detachably provided with a support component 5 which can be expanded and contracted, and the support component 5 is arranged in the carbon steel pipeline 4 after being expanded and supports the cover cap 1 and the annular welding plate 3. Because of the supporting function of the bracket component 5, the combined body formed by the cover cap 1 and the annular welding plate 3 can be more stably abutted against the port of the carbon steel pipeline 4, so that the operation intensity of pipe plugging operation personnel is reduced, the main body part of the pipe plugging device is not required to be righted and pressed by more personnel when the pipe plugging welding operation is performed, and the labor consumption is reduced.
In the embodiment, a plurality of connecting bosses 1-2 are arranged between the outer edges of the annular convex ridges 1-3 and the cover plate 1-1, connecting holes 1-7 are formed in the connecting bosses 1-2, non-through threaded connecting holes are formed in corresponding positions on the annular welding plate 3, and the cover cap 1 and the annular welding plate 3 are fixedly connected through a plurality of assembling screws 2 located in the connecting holes 1-7.
In this embodiment, the cover 1 is an integral casting, and the annular welding plate 3 is made by cutting a metal plate.
In terms of dimensions, the cover cap 1 is of fixed dimensions and constitutes a standard part of the present plugging tube device. The annular welding plate 3 is circular, and the outer diameter of the annular welding plate is larger than the outer diameter of the port of the carbon steel pipeline 4 to be plugged. The size of the window in the middle of the annular weld plate 3 should be smaller than the outer diameter of the cover 1. Accordingly, the positions of the plurality of coupling holes 1 to 7 on the cover 1 are fixed, and thus the positions of the screw coupling holes on the circular welded plate 3 are relatively fixed.
Referring to fig. 4, it can be seen that:
the bracket component 5 comprises a first fixed base 5-8 and a second fixed base 5-6, a guide rod 5-5 and a moving base 5-4 moving along the guide rod 5-5 are arranged between the first fixed base 5-8 and the second fixed base 5-6, a screw nut component 5-7 is arranged on the first fixed base 5-8 and the second fixed base 5-6, and the moving base 5-4 is fixedly connected with a screw nut. When the lead screw of the lead screw and nut assembly 5-7 rotates, the nut drives the movable base 5-4 to move along the guide rod 5-5. In order to facilitate the driving rotation of the screw rod, a hand wheel (not shown in the figure) may be installed at the end of the screw rod.
A plurality of support arms 5-2 with rollers 5-1 at the outer ends are hinged on the first fixed base 5-8, and a support connecting rod 5-3 is arranged between the middle part of each support arm 5-2 and the movable base 5-4. As shown in the figure, the outer end of the support link 5-3 is hingedly connected to the middle of the arm 5-2 and the inner end of the support link 5-3 is hingedly connected to the outer edge of the motion base 5-4. When the moving base 5-4 moves toward the first fixed base 5-8, each arm 5-2 is expanded, whereas when the moving base 5-4 moves toward the second fixed base 5-6, each arm 5-2 is contracted.
In this embodiment, the first fixing base 5-8 of the bracket assembly 5 is provided with the connecting columns 5-9 with external threads, and the connecting columns 5-9 are screwed into the middle mounting holes 1-9, so that the bracket assembly 5 is an optional assembly, and the pipe plugging operator can selectively mount or dismount the bracket assembly 5 according to the operation requirement of the field pipe plugging operation.
In this embodiment, three sets of arms 5-2 and rollers 5-1 are provided on the bracket assembly 5, and are circumferentially arranged at equal angular intervals.
The using method comprises the following steps:
a pipe plugging operator selects an adaptive annular welding plate 3 according to the size of a carbon steel pipeline 4 to be subjected to pipe plugging operation, places rubber sealing rings in sealing ring grooves 1-8 of a cover cap 1, then overlaps the cover cap 1 and the annular welding plate 3, and fixedly connects the cover cap 1 and the annular welding plate 3 together by adopting a plurality of assembling screws 2; the operator can carry the bracket assembly 5 or not according to the requirement;
after the pipe plugging device arrives at a pipe plugging operation site, an operator supports the annular welding plate 3 of the pipe plugging device against the port of the carbon steel pipeline 4, when carrying the support component 5, the support component 5 and the cover cap 1 are assembled, then the support component 5 is adjusted to be expanded until each roller 5-1 is contacted with the inner wall of the carbon steel pipeline 4, and then the pipe plugging device is pushed into the carbon steel pipeline 4 until the annular welding plate 3 supports against the port of the carbon steel pipeline 4;
after stabilization, pipe plugging operators perform continuous annular sealing welding on the ports of the annular welding plate 3 and the carbon steel pipeline 4 (if necessary, the pipeline ports need to be polished to be flat, welding quality is guaranteed), and the pipe plugging operation is completed; then, putting a cleaning agent into the container, soaking the interior of the container with the agent, and pumping out all the agent in the container by using an agent pump and the like after soaking for a certain time;
then, a cutting machine is adopted to cut the pipe plugging device, and the end part of the carbon steel pipeline 4 is generally required to be cut annularly (a small part of the end part of the carbon steel pipeline 4 is cut off); after the completion cutting, through dismantling each equipment screw 2 with shroud 1 and the split of annular weld board 3, abandon annular weld board 3 as the waste material, retrieve shroud 1 and ring type seal circle, clean the back and prepare to drop into stifled pipe use next time.

Claims (7)

1. The utility model provides a stifled pipe device of carbon steel pipeline for chemical cleaning which characterized by: the sealing device comprises a cover cap (1) and an annular welding plate (3), wherein the cover cap (1) is fixedly connected with the annular welding plate (3) through a plurality of assembling screws (2), and an annular sealing ring is arranged between the cover cap (1) and the annular welding plate (3); the cover (1) comprises a circular cover plate (1-1), an annular convex rib (1-3) is arranged on the edge of the outer surface of the cover plate (1-1), a plurality of radial convex rib plates (1-4) are arranged on the annular convex rib (1-3), a central boss (1-6) is arranged in the center of the outer surface of the cover plate (1-1), and a plurality of radial rib plates (1-5) which are circumferentially arranged at equal angular intervals are arranged between the central boss (1-6) and the annular convex rib (1-3); the support component (5) capable of being expanded and contracted is detachably mounted at the center of the inner surface of the cover cap (1), and the support component (5) is placed into the carbon steel pipeline (4) after being expanded and supports the cover cap (1) and the annular welding plate (3).
2. A carbon steel pipeline plugging device for chemical cleaning as claimed in claim 1, wherein: the bracket component (5) comprises a first fixed base (5-8) and a second fixed base (5-6), a guide rod (5-5) and a movable base (5-4) moving along the guide rod (5-5) are arranged between the first fixed base and the second fixed base, a screw and nut component (5-7) is arranged on the first fixed base (5-8) and the second fixed base (5-6), and the movable base (5-4) is fixedly connected with a nut; a plurality of support arms (5-2) with outer ends provided with rollers (5-1) are hinged on the first fixed base (5-8), and a support connecting rod (5-3) is arranged between the middle part of each support arm (5-2) and the movable base (5-4).
3. A carbon steel pipeline plugging device for chemical cleaning as claimed in claim 2, wherein: a middle mounting hole (1-9) with internal threads is formed in the center of the inner surface of the cover plate (1-1), and the middle mounting hole (1-9) extends into the central boss (1-6); a connecting pillar (5-9) with external threads is arranged on a first fixed base (5-8) of the bracket component (5), and the connecting pillar (5-9) is screwed into the middle mounting hole (1-9).
4. A carbon steel pipeline plugging device for chemical cleaning as claimed in claim 3, wherein: the edge of the inner surface of the cover plate (1-1) is provided with a sealing ring groove (1-8), and the sealing ring groove (1-8) extends into the annular convex rib (1-3); the annular sealing ring is positioned in the sealing ring groove (1-8).
5. A carbon steel pipeline plugging device for chemical cleaning as claimed in claim 4, wherein: a plurality of connecting bosses (1-2) are arranged between the outer side edges of the annular convex ribs (1-3) and the cover plate (1-1), connecting holes (1-7) are arranged on the connecting bosses (1-2), and non-through threaded connecting holes are arranged at corresponding positions on the annular welding plate (3).
6. A carbon steel pipeline plugging device for chemical cleaning as claimed in claim 5, wherein: the cover cap (1) is an integral casting, and the annular welding plate (3) is made by cutting a metal plate.
7. A carbon steel pipeline plugging device for chemical cleaning as claimed in claim 6, wherein: three groups of upper support arms (5-2) and rollers (5-1) of the bracket assembly (5) are arranged at equal angular intervals in the circumferential direction.
CN202123303878.7U 2021-12-25 2021-12-25 Carbon steel pipeline plugging device for chemical cleaning Active CN216520281U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123303878.7U CN216520281U (en) 2021-12-25 2021-12-25 Carbon steel pipeline plugging device for chemical cleaning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123303878.7U CN216520281U (en) 2021-12-25 2021-12-25 Carbon steel pipeline plugging device for chemical cleaning

Publications (1)

Publication Number Publication Date
CN216520281U true CN216520281U (en) 2022-05-13

Family

ID=81505114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123303878.7U Active CN216520281U (en) 2021-12-25 2021-12-25 Carbon steel pipeline plugging device for chemical cleaning

Country Status (1)

Country Link
CN (1) CN216520281U (en)

Similar Documents

Publication Publication Date Title
CN104439875A (en) Clamping device for gas cylinder inner and outer ring weld joint welding
CN208743985U (en) A kind of Telescopic pipeline welder
CN216520281U (en) Carbon steel pipeline plugging device for chemical cleaning
CN112692005A (en) Steel pipe hydraulic press
CN215201071U (en) Polishing equipment for inner ring at end part of seamless steel pipe
CN215785296U (en) Belt cleaning device for bolt
CN108188637B (en) Spherical head open hole welding anti-deformation tool
CN212191810U (en) Steel pipe sizing cooling device for steel pipe production
CN213013011U (en) High-speed steel roll heat treatment device
CN208451248U (en) A kind of rotary extension device
CN211594636U (en) Novel water pipe coiling and stretching machine
CN112246805A (en) Nuclear industry fuel transport container washing device
CN214108857U (en) Drilling equipment is used in intelligence house manufacturing
CN209936703U (en) Titanium alloy material sand blasting unit
CN110757023A (en) Welding repair method and device for cartridge receiver parts
CN210357749U (en) Anticorrosive construction platform of large-scale steel pipe
CN210547251U (en) Manual stainless steel pipe convex ring rolling machine
CN218625930U (en) Be applied to tee bend structure on heavy truck type coolant liquid pipeline
CN210279584U (en) Paint spraying apparatus is used in tuber pipe processing
CN220867056U (en) Cover plate dismantling device for inspection well repairing construction
CN213856176U (en) Nuclear industry fuel transport container washing device
CN216395493U (en) Filter back-flushing device
CN117415422B (en) Automatic cleaning device integrated machine for arc welding gun
CN215462909U (en) Dust removal fog gun device
CN219150919U (en) Automobile plate cleaning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant