CN216477362U - Visual observation structure of two lining platform trucks in tunnel - Google Patents

Visual observation structure of two lining platform trucks in tunnel Download PDF

Info

Publication number
CN216477362U
CN216477362U CN202122214008.6U CN202122214008U CN216477362U CN 216477362 U CN216477362 U CN 216477362U CN 202122214008 U CN202122214008 U CN 202122214008U CN 216477362 U CN216477362 U CN 216477362U
Authority
CN
China
Prior art keywords
visual observation
tunnel
lining trolley
window frame
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122214008.6U
Other languages
Chinese (zh)
Inventor
郑海乐
薛燕飞
苗永平
沈辉
高付才
郭才荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 17th Bureau Group Co Ltd
Original Assignee
China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 17th Bureau Group Co Ltd filed Critical China Railway 17th Bureau Group Co Ltd
Priority to CN202122214008.6U priority Critical patent/CN216477362U/en
Application granted granted Critical
Publication of CN216477362U publication Critical patent/CN216477362U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to an auxiliary observation device for concrete pouring of a two-lining trolley, in particular to a visual observation structure for a tunnel two-lining trolley, which solves the technical problem in the background technology. The visual observation window can realize the overall process observation of the two-lining concrete construction, and can pertinently guide the operator to adjust the two-lining concrete cloth and the vibrating window in time, thereby having remarkable effect on improving the two-lining concrete construction operation quality.

Description

Visual observation structure of two lining platform trucks in tunnel
Technical Field
The utility model belongs to an auxiliary observation device for concrete pouring of a two-lining trolley, and particularly relates to a visual observation structure for a tunnel two-lining trolley.
Background
At present, the panels of the two-lining trolley widely applied to the market are all made of steel plates, working windows are arranged on the panels at certain intervals, although a certain observation effect is achieved, most of the casting conditions of the two-lining concrete cannot be observed, the casting and vibration of the two-lining concrete cannot be guided in time, the casting and vibration of the two-lining concrete have to depend on construction experience, artificial influence factors are large, and pitted surfaces or incompact local parts of the two-lining concrete after form removal due to insufficient distribution or vibration, so that the solid quality of the two-lining concrete is influenced. In order to overcome the construction defects of the current two-lining pouring, open a blind box for pouring the two-lining concrete and realize the visual operation of the two-lining concrete pouring, a visual device with simple structure and stable working performance is needed to be invented to guide the two-lining pouring and vibrating so as to further improve the construction quality of the two-lining concrete.
Disclosure of Invention
The utility model aims to solve the technical problem that most of secondary lining concrete pouring conditions cannot be observed through a working window on a panel of the existing secondary lining trolley, and provides a visual observation structure of a tunnel secondary lining trolley.
The technical means for solving the technical problems of the utility model is as follows: a visual observation structure of a tunnel secondary lining trolley comprises a plurality of visual observation windows arranged on a panel of the secondary lining trolley; the visual observation bed comprises a window frame, wherein double-layer laminated toughened glass is arranged on the window frame, and a sealing rubber ring is arranged between the window frame and the double-layer laminated toughened glass and provides buffering and sealing effects for the double-layer laminated toughened glass; the window frame is a round-corner rectangular window frame. The window frame is made of angle steel, and the angle steel is welded with the panel; the outer side of the window frame and the panel are polished to be smooth. The panel is a rigid plate at the outer edge of the two-lining trolley and provides an inner membrane for casting of two-lining concrete. The outer side of the double-layer laminated toughened glass is flush with the panel. The visual observation windows are arranged on the panel at equal intervals.
The utility model has the beneficial effects that: the visual observation window can realize the overall process observation of the two-lining concrete construction, and can pertinently guide the operator to adjust the two-lining concrete cloth and the vibrating window in time, thereby having remarkable effect on improving the quality of the two-lining concrete construction operation.
Drawings
Fig. 1 is a schematic view of the overall structure of a two-lining trolley after the visual observation structure of the tunnel two-lining trolley is installed on the two-lining trolley.
Fig. 2 is a partial structural view of the panel of fig. 1.
Fig. 3 is a schematic structural diagram of a visual observation structure of a tunnel secondary lining trolley according to the present invention.
In the figure: 1. a panel; 2. a visual observation window; 3. a window frame; 4. double-layer laminated toughened glass; 5. sealing the rubber ring; 6. and (6) a working window.
Detailed Description
A detailed description will be given of a visual observation structure of a tunnel two-lining trolley according to the present invention with reference to fig. 1, 2 and 3.
A visual observation structure of a tunnel secondary lining trolley comprises a plurality of visual observation windows 2 which are arranged on a panel 1 of the secondary lining trolley, wherein the visual observation windows 2 are arranged on the panel 1 at equal intervals, and the arrangement form is that the annular interval is 2m, and the longitudinal interval is 1.5 m; the number of the visual observation windows 2 is equal to that of the working windows 6 on the table top, the visual observation windows 2 correspond to the working windows 6 one by one and are positioned below the working windows 6, and the working windows 6 are windows arranged on the trolley panel 1 at a certain distance and provide working windows 6 for the distribution and vibration of the secondary lining concrete; the panel 1 is a rigid plate at the outer edge of the secondary lining trolley and provides an inner membrane for secondary lining concrete pouring; as shown in fig. 3, the visual observation bed comprises a window frame 3, a double-layer laminated toughened glass 4 is mounted on the window frame 3, a sealing rubber ring 5 is arranged between the window frame 3 and the double-layer laminated toughened glass 4, and the sealing rubber ring 5 provides buffering and sealing effects for the double-layer laminated toughened glass 4; the window frame 3 is fillet rectangle window frame 3, and window frame 3 is made by the angle steel, and the angle steel welds with panel 1 mutually, and 3 outsides of window frame are polished smoothly with panel 1, and visual observation window 2's size is 1.0 m 0.8m, and chamfer R is 0.4m, and the outside of double-deck doubling toughened glass 4 flushes with panel 1.
During the concrete use, during two lining concrete pouring, operation personnel accessible visual observation window 2 clearly observes two lining concrete along vertical, circumferential cloth and the condition of vibrating, in time guides operation personnel to change cloth window and the window of vibrating, ensures that two lining concrete construction quality is up to standard.
While the preferred embodiments of the present invention have been illustrated and described, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the utility model as defined by the appended claims.

Claims (9)

1. A visual observation structure of a tunnel secondary lining trolley is characterized by comprising a plurality of visual observation windows (2) arranged on a panel (1) of the secondary lining trolley; the visual observation window comprises a window frame (3), double-layer laminated toughened glass (4) is installed on the window frame (3), and a sealing rubber ring (5) is arranged between the window frame (3) and the double-layer laminated toughened glass (4).
2. The visual observation structure of a tunnel lining trolley according to claim 1, characterized in that the window frame (3) is a rounded rectangular window frame (3).
3. The visual observation structure of a tunnel secondary lining trolley according to claim 2, characterized in that the window frame (3) is made of angle steel, and the angle steel is welded with the panel (1).
4. A visual observation structure of a tunnel lining trolley according to claim 3, characterized in that the outside of the window frame (3) is flush with the panel (1).
5. The visual observation structure of the tunnel two-lining trolley according to any one of claims 2, 3 and 4, characterized in that the face plate (1) is a rigid outer edge plate of the two-lining trolley, which provides an inner film for the casting of the two-lining concrete.
6. The visual observation structure of a tunnel secondary lining trolley according to claim 5, characterized in that the outer side of the double-layer laminated toughened glass (4) is flush with the panel (1).
7. The visual observation structure of the tunnel lining trolley according to claim 6, characterized in that the visual observation windows (2) are arranged on the panel (1) at equal intervals, and the arrangement form is that the annular interval is 2m, and the longitudinal interval is 1.5 m.
8. The visual observation structure of the tunnel lining trolley according to claim 7, characterized in that the number of the visual observation windows (2) is equal to the number of the working windows (6) on the platform surface, and the visual observation windows (2) are in one-to-one correspondence with the working windows (6) and are located below the working windows (6).
9. The visual observation structure of a tunnel lining trolley according to claim 8, characterized in that the size of the visual observation window (2) is 1.0 m x 0.8m, and the chamfer R is 0.4 m.
CN202122214008.6U 2021-09-14 2021-09-14 Visual observation structure of two lining platform trucks in tunnel Active CN216477362U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122214008.6U CN216477362U (en) 2021-09-14 2021-09-14 Visual observation structure of two lining platform trucks in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122214008.6U CN216477362U (en) 2021-09-14 2021-09-14 Visual observation structure of two lining platform trucks in tunnel

Publications (1)

Publication Number Publication Date
CN216477362U true CN216477362U (en) 2022-05-10

Family

ID=81436767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122214008.6U Active CN216477362U (en) 2021-09-14 2021-09-14 Visual observation structure of two lining platform trucks in tunnel

Country Status (1)

Country Link
CN (1) CN216477362U (en)

Similar Documents

Publication Publication Date Title
CN216477362U (en) Visual observation structure of two lining platform trucks in tunnel
CN101857067B (en) Special support tooling for installing translational hatch cover of bulk carrier and installation method thereof
CN103835191A (en) Monolithic track bed track structure capable of being rapidly assembled
CN203359755U (en) Assembly and lifting integrated device for anode plate
CN206732692U (en) A kind of numerical control sheet material cutting machine
CN101906872A (en) Slip form device and construction process
CN205701935U (en) Subway shield door square tube trimmer
CN205309245U (en) Continuous casting slab off -line flame corner cut device
CN207226410U (en) A kind of gasket quality inspection conveying device
CN206174228U (en) Component formula curtain based on mounting technology
CN209836955U (en) Water seal device of tail water cooler overhaul gate
CN213857439U (en) Auxiliary positioning mechanism of special numerical control cutting machine for steel grating
CN108326173A (en) A kind of door closure rolling positioning gripping apparatus
CN107606311A (en) A kind of hydraulic engineering pipeline fixing device
CN210046837U (en) Concrete distributing equipment for manufacturing sleepers
CN209723075U (en) A kind of double-deck driver's cabin pedestal for land leveller
CN215716332U (en) Building curtain wall with strong wind resistance level capability
US11717906B1 (en) Method for cutting side plates and end plates of scrapped railway boxcar
CN210315748U (en) Sealing structure for cab and floor frame of bulldozer
CN105436449A (en) Off-line flame chamfering device for continuous cast slab
CN205637586U (en) A early tear formwork support frame connecting device open for building building
CN219370564U (en) Seamlessly spliced LED combined screen
CN204311914U (en) A kind of novel access protection airtight plugging plate
CN203307411U (en) Walking device applied on sinking roll scraper
CN205077866U (en) Handle cuticula subassembly of concrete form seam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant