CN206174228U - A Component Curtain Wall Based on Assembly Technology - Google Patents

A Component Curtain Wall Based on Assembly Technology Download PDF

Info

Publication number
CN206174228U
CN206174228U CN201621214878.6U CN201621214878U CN206174228U CN 206174228 U CN206174228 U CN 206174228U CN 201621214878 U CN201621214878 U CN 201621214878U CN 206174228 U CN206174228 U CN 206174228U
Authority
CN
China
Prior art keywords
glass
skeleton
vertical
horizontal
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621214878.6U
Other languages
Chinese (zh)
Inventor
李金鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Wisdom Cloud Construction Technology Co Ltd
Original Assignee
Beijing Wisdom Cloud Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Wisdom Cloud Construction Technology Co Ltd filed Critical Beijing Wisdom Cloud Construction Technology Co Ltd
Priority to CN201621214878.6U priority Critical patent/CN206174228U/en
Application granted granted Critical
Publication of CN206174228U publication Critical patent/CN206174228U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model provides a component formula curtain based on mounting technology, it includes entablature and bottom end rail, be equipped with a plurality of horizontal skeletons and a plurality of vertical skeleton between entablature and the bottom end rail, connect through first connecting block between vertical skeleton and the horizontal skeleton, vertical skeleton is connected with the glass wall with horizontal skeleton one side, the glass wall includes the glass panel that is become by a plurality of glass block groups and sets up at the peripheral vice frame of glass of glass piece, the storage tank has been seted up in the glass auxiliary frame, be equipped with first briquetting between glass auxiliary frame and the horizontal skeleton, all be equipped with the second briquetting between glass auxiliary frame and the vertical skeleton, first briquetting one end and horizontal skeleton swing joint, the other end is placed in the storage tank, second briquetting middle part and vertical skeleton swing joint, place in the storage tank at both ends, all be connected through the second connecting block between vertical skeleton and entablature and the bottom end rail.

Description

一种基于装配技术的构件式幕墙A Component Curtain Wall Based on Assembly Technology

技术领域technical field

本实用新型属于建筑领域,特别涉及一种基于装配技术的构件式幕墙。The utility model belongs to the construction field, in particular to a component curtain wall based on assembly technology.

背景技术Background technique

随着我国新型城镇化的逐步推进,建筑市场的发展和建筑产品的刚性需要,人们对建筑产品品质的要求越来越高,建筑业迎来了全新的变革时期。目前,我国传统幕墙生产方式普遍存在着安装周期长,建筑资源能耗高、生产效率低下、工程质量和安全堪忧、劳动力成本逐步升高等问题。这要求建筑业企业必须改变传统安装方式,满足未来建筑产业化发展的要求,现有技术的缺陷和不足预埋件安装位置、标高、前后偏差大,造成多数埋件不能使用或不能正常使用,影响支座受力和幕墙的安全使用性能;安装要在楼房土建施工完毕后开始施工,需较长的安装时间,并且一定要借助于脚手架或吊笼安装;容易产生安装误差,造成构件不直,幕墙不平整等外观缺陷;增加现场幕墙工程安装量大、注胶工作量大,胶缝受环境、温度、湿度等环境影响,质量难以保证;由于工地受特殊天气等多种条件影响,很难保证建筑幕墙的施工工期按预期计划工期完成。With the gradual advancement of my country's new urbanization, the development of the construction market and the rigid demand for construction products, people's requirements for the quality of construction products are getting higher and higher, and the construction industry has ushered in a new period of change. At present, my country's traditional curtain wall production methods generally have problems such as long installation period, high energy consumption of building resources, low production efficiency, worrying project quality and safety, and gradually rising labor costs. This requires construction enterprises to change the traditional installation method to meet the requirements of future construction industrialization development. The defects and insufficiencies of the existing technology The installation position, elevation, and large deviation of the embedded parts cause most of the embedded parts to be unusable or cannot be used normally. Affect the force of the support and the safe performance of the curtain wall; the installation should start after the civil construction of the building is completed, which requires a long installation time, and must be installed with the help of scaffolding or hanging cages; it is easy to cause installation errors, resulting in misalignment of components , uneven curtain wall and other appearance defects; adding on-site curtain wall engineering requires a lot of installation and glue injection workload, and the glue joints are affected by the environment, temperature, humidity and other environments, so the quality is difficult to guarantee; due to the special weather and other conditions on the construction site, it is very difficult It is difficult to guarantee that the construction period of the building curtain wall will be completed as expected.

实用新型内容Utility model content

为了解决上述技术问题,本实用新型提供一种装配式模块幕墙,该装配式模块幕墙在工厂进行板块式生产缩短施工周期,利于精细化管理,同时促进了建筑工业化、产业化程度,减少现场作业量,减少噪声污染,减少安全隐患,大量注胶工作在加工厂内完成,能够有效的解决幕墙漏水问题。In order to solve the above technical problems, the utility model provides a prefabricated modular curtain wall. The prefabricated modular curtain wall is produced in the factory to shorten the construction period, which is beneficial to refined management, and at the same time promotes the industrialization and industrialization of buildings and reduces on-site operations. Quantity, reduce noise pollution, reduce potential safety hazards, a large amount of glue injection work is completed in the processing plant, which can effectively solve the problem of water leakage on the curtain wall.

本实用新型具体技术方案如下:The concrete technical scheme of the utility model is as follows:

本实用新型提供一种装配式模块幕墙,其包括上横梁和下横梁,上横梁和下横梁之间设有若干横向骨架和若干竖向骨架,竖向骨架和横向骨架之间通过第一连接块连接,竖向骨架和横向骨架一侧连接有玻璃墙,玻璃墙包括由若干玻璃块组成的玻璃面板和设置在玻璃块周边的玻璃副框,玻璃副框内开设有容置槽,玻璃副框与横向骨架之间设有第一压块,玻璃副框与竖向骨架之间均设有第二压块,第一压块一端与横向骨架活动连接,另一端放置在容置槽内,第二压块中部与竖向骨架活动连接,两端放置在容置槽内,竖向骨架与上横梁和下横梁之间均通过第二连接块连接。The utility model provides an assembled modular curtain wall, which comprises an upper crossbeam and a lower crossbeam, a plurality of transverse skeletons and a plurality of vertical skeletons are arranged between the upper crossbeam and the lower crossbeam, and a first connecting block is passed between the vertical skeleton and the transverse skeleton. Connection, one side of the vertical frame and the horizontal frame is connected with a glass wall. The glass wall includes a glass panel composed of several glass blocks and a glass sub-frame arranged around the glass block. There are accommodating grooves in the glass sub-frame. There is a first pressing block between the glass sub-frame and the vertical skeleton, and a second pressing block is provided between the glass sub-frame and the vertical skeleton. The middle part of the second pressing block is flexibly connected with the vertical frame, and the two ends are placed in the accommodation groove, and the vertical frame is connected with the upper beam and the lower beam through the second connecting block.

进一步的改进,玻璃副框与竖向骨架、横向骨架之间均设有垫块。As a further improvement, pads are provided between the glass sub-frame and the vertical frame and the horizontal frame.

进一步的改进,第一连接块与第二连接块均为角钢块。As a further improvement, both the first connecting block and the second connecting block are angle steel blocks.

进一步的改进,第一连接块与竖向骨架、横向骨架之间设有柔性垫片。As a further improvement, flexible gaskets are provided between the first connecting block and the vertical framework and the transverse framework.

进一步的改进,第一连接块与竖向骨架、横向骨架均通过螺钉连接;第二连接块与竖向骨架、横向骨架、上横梁和下横梁均通过螺钉连接。As a further improvement, the first connecting block is connected to the vertical framework and the transverse framework by screws; the second connecting block is connected to the vertical framework, the transverse framework, the upper beam and the lower beam by screws.

进一步的改进,玻璃块下缘设有若干托块,托快包括一体成型的水平端和竖直端,托块的水面端与玻璃块下缘无缝接触,托块的竖直端与横向骨架通过螺钉连接。As a further improvement, there are several supporting blocks on the lower edge of the glass block. The supporting block includes an integrally formed horizontal end and a vertical end. The water surface end of the supporting block is in seamless contact with the lower edge of the glass block. Connection by screws.

本实用新型的有益效果是:本实用新型提供的装配式模块幕墙结构简单,使用方便,面板、龙骨及上下横梁的拼接工程全部在工厂加工完成,运至施工现场利用塔吊等机械设备吊装至相应位置通过连接件与主体结构进行连接,完成幕墙的安装工作,减少现场作业量,减少噪声污染,减少安全隐患。The beneficial effects of the utility model are: the assembled modular curtain wall provided by the utility model has a simple structure and is easy to use. The location is connected with the main structure through connectors to complete the installation of the curtain wall, reduce the workload on site, reduce noise pollution, and reduce safety hazards.

附图说明Description of drawings

图1为实施例1装配式模块幕墙的结构示意图;Fig. 1 is the structural schematic diagram of the assembled modular curtain wall of embodiment 1;

图2为图1的俯视图;Fig. 2 is the top view of Fig. 1;

图3为图1的侧视图;Fig. 3 is a side view of Fig. 1;

图4为实施例2中两个模块幕墙的连接示意图。Fig. 4 is a schematic diagram of the connection of two modular curtain walls in Embodiment 2.

具体实施方式detailed description

实施例1Example 1

一种装配式模块幕墙,如图1-3所示,该装配式模块幕墙包括上横梁1和下横梁3,,上横梁1和下横梁3之间设有若干横向骨架2和若干竖向骨架4,竖向骨架4和横向骨架2之间通过第一连接块11连接,竖向骨架4和横向骨架2一侧连接有玻璃墙,玻璃墙包括由若干玻璃块组成的玻璃面板5和设置在玻璃块周边的玻璃副框6,玻璃副框6内开设有容置槽13,玻璃副框6与横向骨架2之间设有第一压块7,玻璃副框6与竖向骨架4之间均设有第二压块14,第一压块7一端与横向骨架2通过螺钉连接,另一端放置在容置槽13内,第二压块14中部与竖向骨架4通过螺钉连接,两端放置在容置槽13内,竖向骨架4与上横梁1和下横梁3之间均通过第二连接块10连接,本实用新型所阐述的第一连接快11和第二连接块10均为角钢块,第一连接块11与竖向骨架4、横向骨架2之间设有柔性垫片,增加了结构韧性,防止在安装或搬用过程中各部件之间的碰撞而损坏部件。A prefabricated modular curtain wall, as shown in Figure 1-3, the prefabricated modular curtain wall includes an upper beam 1 and a lower beam 3, and several transverse frameworks 2 and several vertical frameworks are arranged between the upper beam 1 and the lower beam 3 4. The vertical framework 4 and the transverse framework 2 are connected through the first connecting block 11, and a glass wall is connected to one side of the vertical framework 4 and the transverse framework 2, and the glass wall includes a glass panel 5 composed of several glass blocks and arranged on The glass sub-frame 6 around the glass block has an accommodating groove 13 inside the glass sub-frame 6 . Both are provided with a second pressing block 14, one end of the first pressing block 7 is connected to the transverse frame 2 by screws, and the other end is placed in the accommodating groove 13, the middle part of the second pressing block 14 is connected to the vertical frame 4 by screws, and the two ends Placed in the accommodating groove 13, the vertical frame 4 is connected with the upper beam 1 and the lower beam 3 through the second connecting block 10, and the first connecting block 11 and the second connecting block 10 described in the utility model are both The angle steel block, the first connecting block 11, the vertical frame 4, and the transverse frame 2 are provided with flexible gaskets, which increase the structural toughness and prevent the parts from being damaged due to collisions between the parts during installation or handling.

进一步的改进,本实用新型所阐述的阐述的玻璃副框与竖向骨架、横向骨架之间均设有垫块,垫块与第一压块、第二压块配合使用压紧玻璃副框的作用,第二连接块与竖向骨架、上横梁和下横梁均通过螺钉连接。As a further improvement, spacers are provided between the glass sub-frame and the vertical frame and the transverse frame described in the utility model, and the spacers are used in conjunction with the first pressing block and the second pressing block to compress the glass sub-frame. function, the second connecting block is connected with the vertical frame, the upper beam and the lower beam through screws.

实施例2Example 2

一种装配式模块幕墙,该装配式模块幕墙与实施例1不同的是,如图4所示,装配式模块幕墙在施工过程中可进行多个模块的组装,单个模块中上横梁1与另一模块中的下横梁3连接在一起,上横梁1、下横梁3通过与建筑中的主体结构进行连接,且每块玻璃块下缘设有若干托块15,托快15包括一体成型的水平端和竖直端,托块15的水面端与玻璃块下缘无缝接触,托块15的竖直端与横向骨架2通过螺栓连接,保证结构稳定性。A prefabricated modular curtain wall. The difference between the prefabricated modular curtain wall and Embodiment 1 is that, as shown in Figure 4, the prefabricated modular curtain wall can be assembled with multiple modules during the construction process. The lower beam 3 in one module is connected together, the upper beam 1 and the lower beam 3 are connected with the main structure in the building, and the lower edge of each glass block is provided with several brackets 15, and the bracket 15 includes an integrally formed horizontal End and vertical end, the water surface end of bracket block 15 is in seamless contact with glass block lower edge, and the vertical end of bracket block 15 is connected with transverse skeleton 2 by bolts, guarantees structural stability.

以上实施例仅表达了本实用新型的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对本实用新型专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。因此,本实用新型专利的保护范围应以所附权利要求为准。The above examples only express several implementations of the utility model, and the description thereof is relatively specific and detailed, but it should not be construed as limiting the patent scope of the utility model. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the utility model, and these all belong to the protection scope of the utility model. Therefore, the scope of protection of the utility model patent should be based on the appended claims.

Claims (6)

1. a kind of assembled module curtain wall, including entablature (1) and sill (3), it is characterised in that the entablature (1) and Some horizontal skeletons (2) and some vertical skeletons (4), the vertical skeleton (4) and the horizontal bone are provided between sill (3) Connected by the first contiguous block (11) between frame (2), the vertical skeleton (4) and the horizontal skeleton (2) side are connected with glass Glass wall, the glass wall includes the face glass (5) being made up of some glass blocks and the glass for being arranged on the glass blocks periphery Secondary frame (6), offers storage tank (13) in glass pair frame (6), glass pair frame (6) and the horizontal skeleton (2) it Between be provided with the first briquetting (7), be equipped with the second briquetting (14) between glass pair frame (6) and the vertical skeleton (4), it is described First briquetting (7) one end is flexibly connected with the horizontal skeleton (2), and the other end is placed in the storage tank (13), and described the Two briquettings (14) middle part is flexibly connected with the vertical skeleton (4), and two ends are placed in the storage tank (13), the vertical bone It is connected by the second contiguous block (10) between frame (4) and the entablature (1) and sill (3).
2. assembled module curtain wall as claimed in claim 1, it is characterised in that glass pair frame (6) and the vertical bone Cushion block (9) is equipped between frame (4), horizontal skeleton (2).
3. assembled module curtain wall as claimed in claim 1, it is characterised in that first contiguous block (11) and described second Contiguous block (10) is angle steel block.
4. assembled module curtain wall as claimed in claim 1, it is characterised in that first contiguous block (11) is vertical with described Skeleton (4), horizontal skeleton are provided with flexible gasket between (2).
5. assembled module curtain wall as claimed in claim 1, it is characterised in that first contiguous block (11) is vertical with described Skeleton (4) and horizontal skeleton (2) are connected by screw;Second contiguous block (10) and the vertical skeleton (4), horizontal bone Frame (2), entablature (1) and sill (3) are connected by screw.
6. assembled module curtain wall as claimed in claim 1, it is characterised in that if being provided with dry care per glass blocks lower edge described in block Block (15), the tray (15) includes integrally formed horizontal ends and vertical end, the surface end and the glass of the tray (15) Contact that glass block lower edge is seamless, vertical end and the horizontal skeleton (2) of the tray (15) are connected by screw.
CN201621214878.6U 2016-11-08 2016-11-08 A Component Curtain Wall Based on Assembly Technology Expired - Fee Related CN206174228U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621214878.6U CN206174228U (en) 2016-11-08 2016-11-08 A Component Curtain Wall Based on Assembly Technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621214878.6U CN206174228U (en) 2016-11-08 2016-11-08 A Component Curtain Wall Based on Assembly Technology

Publications (1)

Publication Number Publication Date
CN206174228U true CN206174228U (en) 2017-05-17

Family

ID=58683493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621214878.6U Expired - Fee Related CN206174228U (en) 2016-11-08 2016-11-08 A Component Curtain Wall Based on Assembly Technology

Country Status (1)

Country Link
CN (1) CN206174228U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130551A (en) * 2019-05-10 2019-08-16 中建八局第二建设有限公司 A kind of bolt method cell cube GRC curtain wall construction and its construction method
CN114809770A (en) * 2022-05-26 2022-07-29 中铁二十四局集团上海建设投资有限公司 Damping assembly type full-exposed frame glass curtain wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130551A (en) * 2019-05-10 2019-08-16 中建八局第二建设有限公司 A kind of bolt method cell cube GRC curtain wall construction and its construction method
CN114809770A (en) * 2022-05-26 2022-07-29 中铁二十四局集团上海建设投资有限公司 Damping assembly type full-exposed frame glass curtain wall
CN114809770B (en) * 2022-05-26 2023-10-27 中铁二十四局集团上海建设投资有限公司 A shock-absorbing assembled fully exposed frame glass curtain wall

Similar Documents

Publication Publication Date Title
CN205637106U (en) Building structure system of completely assembling formula steel construction
CN209817088U (en) A prefabricated balcony
CN204511159U (en) A kind of integrated overall plastic door and window auxiliary frame
CN103850373B (en) Combined curtain wall system
CN206174228U (en) A Component Curtain Wall Based on Assembly Technology
CN204040257U (en) An integral external corner unit curtain wall
CN207660144U (en) A kind of frame-type stone material window curtain wall construction
CN205475677U (en) Steel house room unit
CN205276504U (en) Beam -column connecting joint of activity board house
CN201738538U (en) Wall connecting piece of plug-in type low-carbon heat-insulation energy-saving plate
CN204877034U (en) Concatenation door frame structure of fixing a position suitable for reading
CN204983139U (en) Whole prefabricated window that wafts
CN215907523U (en) Courtyard type temporary building box unit
CN102146707A (en) Building curtain wall structure
CN207419732U (en) Modular keel shoe CCA slates cotton outer heat preservation system
CN205530690U (en) Load and unload convenient wallboard and floor connection structure
CN207363322U (en) A kind of Modularized micro fire station
CN205329996U (en) Square steel post for building combined
CN209854970U (en) Cross-shaped connecting structure of light steel keel composite wall
CN206267470U (en) A kind of assembled stone material external decoration exterior-protecting wall panel template
CN223075090U (en) Keel structure of integral combined type framework for interior decoration
CN221193879U (en) Bearing device for building curtain wall engineering components
CN204753924U (en) Adopt sealed unitized curtain wall system of dry process
CN205134641U (en) Have water -proof component side fascia
CN220353168U (en) Dry-hanging stone curtain wall deformation joint structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517