CN216475896U - Novel bury PVC pipe reinforced concrete construction mounting structure - Google Patents

Novel bury PVC pipe reinforced concrete construction mounting structure Download PDF

Info

Publication number
CN216475896U
CN216475896U CN202123145589.9U CN202123145589U CN216475896U CN 216475896 U CN216475896 U CN 216475896U CN 202123145589 U CN202123145589 U CN 202123145589U CN 216475896 U CN216475896 U CN 216475896U
Authority
CN
China
Prior art keywords
concrete
pvc pipe
steel bar
plate
die
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123145589.9U
Other languages
Chinese (zh)
Inventor
顾柱平
牛云峰
李红平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anning Zhuping Construction Engineering Co ltd
Original Assignee
Anning Zhuping Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anning Zhuping Construction Engineering Co ltd filed Critical Anning Zhuping Construction Engineering Co ltd
Priority to CN202123145589.9U priority Critical patent/CN216475896U/en
Application granted granted Critical
Publication of CN216475896U publication Critical patent/CN216475896U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a novel bury PVC pipe reinforced concrete construction mounting structure. The novel embedded PVC pipe reinforced concrete construction and installation structure comprises a PVC pipe body; the concrete lower die is arranged at the bottom of the PVC pipe body, and a plurality of pin grooves are formed in the top of the concrete lower die; the concrete bottom plate is arranged at the bottom of the concrete lower die, and two connecting grooves are formed in the top of the concrete bottom plate; the concrete upper die is arranged at the top of the PVC pipe body; the concrete top plate is arranged at the top of the concrete upper die, and two through holes are formed in the concrete top plate. The utility model provides a novel bury PVC pipe reinforced concrete construction mounting structure has the installation and dismantles comparatively simple, comparatively labour saving and time saving, changes the lower advantage of cost of PVC pipe.

Description

Novel bury PVC pipe reinforced concrete construction mounting structure
Technical Field
The utility model relates to a pipeline buries technical field underground, especially relates to a novel bury PVC pipe reinforced concrete construction mounting structure in.
Background
The existing PVC pipe is often used as a tap water delivery pipe or a sewage pipe in the field of building engineering, has the advantages of corrosion resistance, long service life and the like, but the PVC pipe needs to be buried in concrete because the PVC pipe is poorer in heat resistance and pressure resistance compared with an iron pipe.
The existing embedding method is usually to directly pour concrete on the PVC pipe, but the method has two problems, namely after the concrete is poured, the concrete needs to be waited for drying and forming, and when the PVC pipe needs to be replaced, the concrete needs to be completely broken, so that the method is time-consuming and labor-consuming, and has high cost.
Therefore, it is necessary to provide a new installation structure for embedded PVC pipe reinforced concrete construction to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem provide an installation with dismantle comparatively simple, comparatively labour saving and time saving, the lower novel buried PVC pipe reinforced concrete construction mounting structure of cost of changing the PVC pipe.
In order to solve the technical problem, the utility model provides a novel bury PVC pipe reinforced concrete construction mounting structure includes: a PVC pipe body; the concrete lower die is arranged at the bottom of the PVC pipe body, and a plurality of pin grooves are formed in the top of the concrete lower die; the concrete bottom plate is arranged at the bottom of the concrete lower die, and two connecting grooves are formed in the top of the concrete bottom plate; the concrete upper die is arranged at the top of the PVC pipe body; the concrete top plate is arranged at the top of the concrete upper die, and two through holes are formed in the concrete top plate; the two connecting mechanisms are respectively arranged on two sides of the concrete lower die; and the four oblique connecting mechanisms are respectively arranged on two sides of the lower concrete die and the upper concrete die.
Preferably, be provided with first horizontal reinforcing bar on the concrete bottom plate, the equal fixed mounting in both ends of first horizontal reinforcing bar has the screw thread lagging, two the screw thread lagging respectively with two the inner wall fixed connection of spread groove.
Preferably, the concrete roof is provided with a second transverse steel bar, sliding sleeve plates are fixedly mounted at two ends of the second transverse steel bar, and the sliding sleeve plates are fixedly connected with the through holes respectively.
Preferably, coupling mechanism includes vertical reinforcing bar, lower double-screw bolt, goes up double-screw bolt and nut, vertical reinforcing bar sets up one side of concrete lower mould, double-screw bolt fixed mounting down the bottom of vertical reinforcing bar, down the double-screw bolt with screw thread lagging threaded connection, it is in to go up double-screw bolt fixed mounting the top of vertical reinforcing bar, go up the double-screw bolt with slip lagging sliding connection, nut threaded sleeve is established go up on the double-screw bolt.
Preferably, slant coupling mechanism includes slant reinforcing bar, connecting plate and screw, slant reinforcing bar fixed mounting be in on the first transverse reinforcement, connecting plate fixed mounting be in the one end of slant reinforcing bar, two screw slidable mounting be in one side of longitudinal reinforcement, two the screw all with connecting plate fixed connection.
Preferably, the bottom fixed mounting of mould has a plurality of pin poles on the concrete, and is a plurality of the pin pole extends to a plurality of respectively in the cotter way, the cover is equipped with the scratch-resistant membrane on the PVC pipe body, the arc wall, two have all been seted up to the top of concrete lower mould and the bottom of mould on the concrete the arc wall all with PVC pipe body looks adaptation.
Compared with the prior art, the utility model provides a novel bury PVC pipe reinforced concrete construction mounting structure has following beneficial effect:
the utility model provides a novel bury PVC pipe reinforced concrete construction mounting structure, through the concrete lower mould, the concrete bottom plate, mould and concrete roof can play the effect of protection PVC pipe body on the concrete, can increase the intensity of concrete bottom plate through first transverse reinforcement, can increase the intensity of concrete roof through the second transverse reinforcement, not only can increase the longitudinal strength of the device through coupling mechanism, it is more convenient to also make the device's installation and dismantlement, can increase the intensity of mould on concrete lower mould and the concrete through a plurality of slant coupling mechanisms, can prevent that PVC pipe body from being scratched through preventing scraping the membrane.
Drawings
Fig. 1 is a schematic structural view of a preferred embodiment of the novel embedded PVC pipe reinforced concrete construction installation structure provided by the present invention;
FIG. 2 is an enlarged view of portion A shown in FIG. 1;
fig. 3 is an enlarged schematic view of a portion B shown in fig. 1.
Reference numbers in the figures: 1. a PVC pipe body; 2. a concrete lower die; 3. a concrete floor; 4. concrete upper die; 5. a concrete top plate; 6. a first transverse reinforcement bar; 7. a threaded bushing plate; 8. a second transverse reinforcement bar; 9. a sliding sleeve plate; 10. longitudinal reinforcing steel bars; 11. a lower stud; 12. an upper stud; 13. a nut; 14. oblique reinforcing steel bars; 15. a connecting plate; 16. a screw; 17. a pin rod; 18. and (4) preventing a film from being scratched.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1-3, wherein fig. 1 is a schematic structural diagram of a preferred embodiment of the novel embedded PVC pipe reinforced concrete construction installation structure provided by the present invention; FIG. 2 is an enlarged view of portion A shown in FIG. 1; fig. 3 is an enlarged schematic view of a portion B shown in fig. 1. Novel buried PVC pipe reinforced concrete construction mounting structure includes: a PVC pipe body 1; the concrete lower die 2 is arranged at the bottom of the PVC pipe body 1, and a plurality of pin grooves are formed in the top of the concrete lower die 2; the concrete bottom plate 3 is arranged at the bottom of the concrete lower die 2, and two connecting grooves are formed in the top of the concrete bottom plate 3; the concrete upper die 4 is arranged at the top of the PVC pipe body 1; the concrete top plate 5 is arranged at the top of the concrete upper die 4, and two through holes are formed in the concrete top plate 5; the two connecting mechanisms are respectively arranged on two sides of the concrete lower die 2; and the four oblique connecting mechanisms are respectively arranged on two sides of the lower concrete mold 2 and the upper concrete mold 4.
Be provided with first horizontal reinforcing bar 6 on concrete bottom plate 3, the equal fixed mounting in both ends of first horizontal reinforcing bar 6 has screw thread lagging 7, two screw thread lagging 7 respectively with two the inner wall fixed connection of spread groove can increase concrete bottom plate 3's intensity through first horizontal reinforcing bar 6.
Be provided with second transverse reinforcement 8 on the concrete roof 5, the equal fixed mounting in both ends of second transverse reinforcement 8 has slip lagging 9, two slip lagging 9 respectively with two through hole fixed connection can increase the intensity of concrete roof 5 through second transverse reinforcement 8.
Coupling mechanism includes vertical reinforcing bar 10, lower double-screw bolt 11, goes up double-screw bolt 12 and nut 13, vertical reinforcing bar 10 sets up one side of concrete lower mould 2, double-screw bolt 11 fixed mounting is in down the bottom of vertical reinforcing bar 10, down double-screw bolt 11 with 7 threaded connection of screw sleeve board, go up double-screw bolt 12 fixed mounting in the top of vertical reinforcing bar 10, go up double-screw bolt 12 with slip sleeve board 9 sliding connection, nut 13 threaded sleeve is established go up on the double-screw bolt 12, not only can increase the device's longitudinal strength through coupling mechanism, can also make the device's installation and dismantlement more convenient.
Slant coupling mechanism includes slant reinforcing bar 14, connecting plate 15 and screw 16, slant reinforcing bar 14 fixed mounting be in on the first transverse reinforcement 6, connecting plate 15 fixed mounting be in the one end of slant reinforcing bar 14, two 16 slidable mounting of screw are in one side of longitudinal reinforcement 10, two screw 16 all with connecting plate 15 fixed connection can increase the intensity of mould 4 on concrete lower mould 2 and the concrete through a plurality of slant coupling mechanism.
The bottom fixed mounting who goes up mould 4 on the concrete has a plurality of round pin poles 17, and is a plurality of round pin pole 17 extends to a plurality ofly respectively in the round pin groove, the cover is equipped with on PVC pipe body 1 and prevents knifing 18, the arc wall has all been seted up, two in the top of mould 4 on the concrete lower mould 2 and the concrete the arc wall all with PVC pipe body 1 looks adaptation can prevent PVC pipe body 1 by the scratch through preventing knifing 18.
The utility model provides a novel bury PVC pipe reinforced concrete construction mounting structure's theory of operation as follows:
during installation, the scratch-resistant film 18 is sleeved on the PVC pipe body 1, the PVC pipe body 1 is placed in an arc-shaped groove on the concrete lower die 2, the lower studs 11 are installed on the two threaded sleeve plates 7 in a threaded manner, the concrete top plate 5 is sleeved on the two upper studs 12, the plurality of pin rods 17 are inserted into the plurality of pin grooves, the two nuts 13 are respectively sleeved on the two upper studs 12 in a threaded manner, so that the device is fixed, and the plurality of screws 16 are respectively in threaded connection with the plurality of connecting plates 15;
can increase the intensity of concrete bottom plate 3 and concrete roof 5 through first horizontal reinforcing bar 6 and second horizontal reinforcing bar 8, can increase the longitudinal strength of the device through two longitudinal reinforcement 10, can make the device's dismantlement and installation more convenient through last double-screw bolt 12 and nut 13, can increase the intensity of mould 4 on concrete lower mould 2 and the concrete through a plurality of slant reinforcing bars 14.
Compared with the prior art, the utility model provides a novel bury PVC pipe reinforced concrete construction mounting structure has following beneficial effect:
the utility model provides a novel bury PVC pipe reinforced concrete construction mounting structure, through concrete lower mould 2, concrete bottom plate 3, mould 4 and concrete roof 5 can play the effect of protection PVC pipe body 1 on the concrete, can increase concrete bottom plate 3's intensity through first transverse reinforcement 6, can increase concrete roof 5's intensity through second transverse reinforcement 8, not only can increase the longitudinal strength of the device through coupling mechanism, it is more convenient with the dismantlement to also make the device's installation, can increase mould 4's intensity on concrete lower mould 2 and the concrete through a plurality of slant coupling mechanisms, can prevent PVC pipe body 1 by the scratch through preventing scraping membrane 18.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a novel bury PVC pipe reinforced concrete construction mounting structure which characterized in that, include:
a PVC pipe body;
the concrete lower die is arranged at the bottom of the PVC pipe body, and a plurality of pin grooves are formed in the top of the concrete lower die;
the concrete bottom plate is arranged at the bottom of the concrete lower die, and two connecting grooves are formed in the top of the concrete bottom plate;
the concrete upper die is arranged at the top of the PVC pipe body;
the concrete top plate is arranged at the top of the concrete upper die, and two through holes are formed in the concrete top plate;
the two connecting mechanisms are respectively arranged on two sides of the concrete lower die;
and the four oblique connecting mechanisms are respectively arranged on two sides of the lower concrete die and the upper concrete die.
2. The new embedded PVC pipe reinforced concrete construction installation structure of claim 1, wherein the concrete bottom plate is provided with a first transverse steel bar, both ends of the first transverse steel bar are fixedly provided with a threaded sleeve plate, and two threaded sleeve plates are respectively and fixedly connected with the inner walls of two connecting grooves.
3. The novel construction and installation structure for the embedded PVC pipe reinforced concrete as claimed in claim 2, wherein a second transverse steel bar is arranged on the concrete top plate, sliding sleeve plates are fixedly installed at both ends of the second transverse steel bar, and the two sliding sleeve plates are respectively and fixedly connected with the two through holes.
4. The novel embedded PVC pipe reinforced concrete construction installation structure of claim 3, wherein the connecting mechanism comprises a longitudinal steel bar, a lower stud, an upper stud and a nut, the longitudinal steel bar is arranged on one side of the concrete lower die, the lower stud is fixedly arranged at the bottom end of the longitudinal steel bar, the lower stud is in threaded connection with the threaded sleeve plate, the upper stud is fixedly arranged at the top end of the longitudinal steel bar, the upper stud is in sliding connection with the sliding sleeve plate, and the nut is sleeved on the upper stud in a threaded manner.
5. The new embedded PVC pipe reinforced concrete construction installation structure of claim 4, wherein the oblique connection mechanism comprises an oblique steel bar, a connection plate and screws, the oblique steel bar is fixedly installed on the first transverse steel bar, the connection plate is fixedly installed at one end of the oblique steel bar, two screws are slidably installed at one side of the longitudinal steel bar, and both screws are fixedly connected with the connection plate.
6. The novel embedded PVC pipe reinforced concrete construction installation structure of claim 1, wherein a plurality of pin rods are fixedly installed at the bottom of the concrete upper die, the pin rods extend into the pin grooves respectively, a scratch-resistant film is sleeved on the PVC pipe body, arc-shaped grooves are formed in the top of the concrete lower die and the bottom of the concrete upper die, and the two arc-shaped grooves are matched with the PVC pipe body.
CN202123145589.9U 2021-12-15 2021-12-15 Novel bury PVC pipe reinforced concrete construction mounting structure Active CN216475896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123145589.9U CN216475896U (en) 2021-12-15 2021-12-15 Novel bury PVC pipe reinforced concrete construction mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123145589.9U CN216475896U (en) 2021-12-15 2021-12-15 Novel bury PVC pipe reinforced concrete construction mounting structure

Publications (1)

Publication Number Publication Date
CN216475896U true CN216475896U (en) 2022-05-10

Family

ID=81423411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123145589.9U Active CN216475896U (en) 2021-12-15 2021-12-15 Novel bury PVC pipe reinforced concrete construction mounting structure

Country Status (1)

Country Link
CN (1) CN216475896U (en)

Similar Documents

Publication Publication Date Title
CN201411899Y (en) Template structure for tower-silo reinforcement construction
CN216475896U (en) Novel bury PVC pipe reinforced concrete construction mounting structure
CN203889454U (en) Integrated moving device of construction formwork of culvert wall
CN203654710U (en) Instrumental connecting tube for external wall scaffold shearing wall portion
CN210396112U (en) Integrated cast-in-place concrete waterproof bank for kitchen and toilet
CN110616737A (en) Method for improving positioning qualification rate of pipe gallery embedded part
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN213062942U (en) Close rib roof beam mould shell fixing device for construction
CN211421839U (en) Hoop type concrete pouring template system for plugging through floor slab pipeline hole gap
CN210127578U (en) Plugging device for sleeve grouting hole
CN210622270U (en) Scaffold suitable for shear force wall
CN210086553U (en) Dry-type connected precast concrete wall and foundation connection node
CN208717762U (en) A kind of assembling type steel corrugated plating Combined concrete arch culvert
CN208763436U (en) A kind of PC component supporting apparatus
CN208487274U (en) A kind of ground pump standpipe bracing means being used in turn
CN203097291U (en) Reinforcing and counter-pulling device of building construction formwork
CN212534677U (en) Strong and weak current box direct-buried device for shear wall
CN201280816Y (en) Template reinforcement screw for concrete wall
CN203626215U (en) Floor-type scaffold
CN220394755U (en) Durable construction engineering drain pipe convenient to replace
CN204626952U (en) A kind of furred ceiling of pre-buried working of plastics
CN209742090U (en) Building water supply and drainage pipe embedded part
CN220285161U (en) Concrete prefabricated component convenient to installation
CN209568710U (en) A kind of screw rod wall bushing with inner support effect
CN211690800U (en) Vertical electric power support connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant