CN216446518U - Template anchor clamps of building engineering construction usefulness - Google Patents

Template anchor clamps of building engineering construction usefulness Download PDF

Info

Publication number
CN216446518U
CN216446518U CN202122957801.5U CN202122957801U CN216446518U CN 216446518 U CN216446518 U CN 216446518U CN 202122957801 U CN202122957801 U CN 202122957801U CN 216446518 U CN216446518 U CN 216446518U
Authority
CN
China
Prior art keywords
plate
rod
template
plate body
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122957801.5U
Other languages
Chinese (zh)
Inventor
艾阳洋
刘建
王龙
穆彦彦
马玉贺
王翔宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction No7 Bureau No1 Construction Co ltd
Original Assignee
China Construction No7 Bureau No1 Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction No7 Bureau No1 Construction Co ltd filed Critical China Construction No7 Bureau No1 Construction Co ltd
Priority to CN202122957801.5U priority Critical patent/CN216446518U/en
Application granted granted Critical
Publication of CN216446518U publication Critical patent/CN216446518U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a template clamp for constructional engineering construction, and relates to the technical field of constructional engineering construction equipment. The template comprises a plurality of plate bodies which are sequentially connected end to end, wherein every two adjacent plate bodies are detachably fixed through a fixing piece, a mounting plate is fixed at the bottom of each plate body, two clamping plates which can move close to each other are mounted on the mounting plate, a template body is arranged between the two clamping plates, and the template also comprises a supporting plate which is mounted on the clamping plates and can move close to the mounting plate on the clamping plates. According to the utility model, the plurality of plate bodies are fixed in sequence through the fixing piece, the two clamping plates are controlled to move close to each other to clamp the template body from two sides, and the supporting plate is controlled to move to clamp the template body from the bottom.

Description

Template anchor clamps of building engineering construction usefulness
Technical Field
The utility model relates to the technical field of constructional engineering construction equipment, in particular to a template clamp for constructional engineering construction.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The house building is characterized by comprising a top cover, a beam column, a wall, a foundation and a project which can form an internal space and meet the requirements of people on production, living, study and public activities.
Various templates are frequently used in the construction of building engineering, wherein the use of the wooden templates is frequent, the wooden templates need to be processed before being used, so that a plurality of wooden templates need to be hoisted to a processing area from a placing area, no clamp specially used for hoisting the wooden templates exists at present, the templates are generally tied up by using ropes, and the templates are hoisted by using a crane, the hoisting mode has great defects, firstly, the toughness of the ropes is low, the ropes are easy to break by using a single rope for hoisting, so that accidents occur, if a plurality of ropes are used for fixing the wooden templates simultaneously, the hoisting stability can be ensured, but the tying of the plurality of ropes is time-consuming and labor-consuming, and the plurality of ropes need to be connected together, how to connect the plurality of ropes together becomes a problem of hoisting, in order to make up the defects, a template clamp for constructional engineering construction is designed to solve the problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims to: the utility model provides a template clamp for building engineering construction, and aims to solve the problems that a rope is easy to break when a single rope is used for hoisting a wooden template, time and labor are wasted when a plurality of ropes are hoisted, and the plurality of ropes are difficult to connect together.
The utility model specifically adopts the following technical scheme for realizing the purpose:
the utility model provides a template anchor clamps of building engineering construction usefulness, includes a plurality of plate bodies that end to end connects gradually, adjacent two through the detachable fixed of mounting between the plate body, the plate body bottom is fixed with the mounting panel, install two splint that can be close to the motion each other on the mounting panel, two be provided with the template body between the splint, still including installing on the splint and can be close to on the splint the layer board of mounting panel motion, the template body is located the layer board with between the mounting panel.
Furthermore, a hanging ring is installed at the top of the plate body.
Furthermore, the mounting is including fixing the inserted block of plate body one end, the other end structure of plate body has the confession the inserted slot of inserted block, be provided with on the plate body and run through the body of rod of plate body, seted up on the inserted block and supplied the body of rod male jack, still including fixing the arm-tie on the body of rod, the arm-tie with pass through spring coupling between the plate body.
Furthermore, the mounting plate is provided with a first sliding groove for the clamping plates to slide, a bidirectional threaded screw rod is installed in the first sliding groove in a rotating mode, one end of the bidirectional threaded screw rod penetrates through the mounting plate, and the two clamping plates are symmetrically sleeved with the bidirectional threaded screw rod.
Furthermore, a second sliding groove for the support plate to slide is formed in the clamping plate, a threaded rod is installed in the second sliding groove in a rotating mode, one end of the threaded rod penetrates through the clamping plate, and the support plate is sleeved on the threaded rod in a threaded mode.
Furthermore, hexagonal knobs are fixed on the bidirectional threaded screw rod and the threaded rod.
The utility model has the following beneficial effects:
according to the utility model, the plurality of plate bodies are fixed in sequence through the fixing piece, the two clamping plates are controlled to move close to each other to clamp the template body from two sides, and the supporting plate is controlled to move to clamp the template body from the bottom.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a top view of the present invention;
fig. 3 is a cross-sectional view taken along the line a-a of fig. 2 in accordance with the present invention.
Reference numerals: 1. a plate body; 101. a slot; 2. a fixing member; 201. inserting a block; 202. a rod body; 203. pulling a plate; 204. a spring; 3. mounting a plate; 4. a splint; 5. a template body; 6. a support plate; 7. a hoisting ring; 8. a jack; 9. a bidirectional threaded screw rod; 10. a threaded rod; 11. a hexagonal knob.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention.
As shown in fig. 1, an embodiment of the present invention provides a formwork clamp for construction of constructional engineering, comprising a plurality of plate bodies 1 connected end to end in sequence, wherein the plate bodies 1 are configured as a rectangle and are arranged in a horizontal direction, and two adjacent plate bodies 1 are detachably fixed by a fixing member 2, while a mounting plate 3 is fixed at the bottom of the plate bodies 1, and the mounting plate 3 is configured as a rectangle and is arranged in a horizontal direction, wherein two clamping plates 4 capable of moving close to each other are mounted on the mounting plate 3, and the clamping plates 4 are configured as a rectangle and are arranged in a vertical direction, wherein a formwork body 5 is arranged between the two clamping plates 4, and the formwork body 5 is simultaneously contacted with the two clamping plates 4, and the present invention further comprises a supporting plate 6 mounted on the clamping plates 4 and capable of moving close to the mounting plate 3, wherein the formwork body 5 is located between the supporting plate 6 and the mounting plate 3, and the supporting plate 6 is rectangular and is arranged horizontally, when in specific use, the fixing part 2 is firstly used for fixing a plurality of plate bodies 1 in sequence, then a plurality of mounting plates 3 are placed at the top of the template body 5, then the two clamping plates 4 are controlled to move close to each other to clamp the two sides of the template body 5, then the supporting plate 6 on each clamping plate 4 is controlled to move upwards to ensure that the supporting plate 6 is abutted against the bottom of the template body 5, thus the clamping and fixing of the clamping plates 4 and the supporting plates 6 on the plurality of plate bodies 1 on the template body 5 are completed, so that the template body 5 can be hoisted, wherein the materials are all made of steel materials and have strong toughness, and when the template body 5 is placed in a placing area, a cushion block is generally placed at the bottom of the template body 5, the utility model fixes the plurality of plate bodies 1 together through the fixing part 2, splint 4 and layer board 6 on the different plate bodies 1 simultaneously all can fix template body 5 to when hoist and mount template body 5, the weight of template body 5 is shared on a plurality of plate bodies 1, the stability and the security of the device hoist and mount have been guaranteed, such design has solved the easy fracture of rope when using single rope to hoist wooden template, the many ropes are time-consuming and energy-consuming and difficult problem in the many ropes link together when hoist simultaneously.
As shown in fig. 1, in the hoisting process, in order to connect the device with a lifting hook on a crane, a lifting ring 7 is installed on the top of the plate body 1, and in the specific use process, a steel wire rope can simultaneously penetrate through a plurality of lifting rings 7, then the steel wire rope is connected with the lifting hook, and finally the lifting process is carried out, wherein the steel wire rope has strong toughness and can sufficiently bear the weight of the hoisted formwork body 5.
As shown in fig. 1, 2 and 3, preferably, the fixing member 2 includes an insertion block 201 fixed at one end of the plate body 1, where the insertion block 201 is rectangular, and the other end of the plate body 1 is configured with a slot 101 for inserting the insertion block 201, and the plate body 1 is provided with a rod body 202 penetrating the plate body 1, and the rod body 202 is cylindrical, where the insertion block 201 is provided with a socket 8 for inserting the rod body 202, and the fixing member 2 further includes a pulling plate 203 fixed on the rod body 202, where the pulling plate 203 is fixed at the end of the rod body 202, and the pulling plate 203 and the plate body 1 are connected through a spring 204, when two adjacent plate bodies 1 need to be fixed, the pulling plate 203 is pulled to drive the spring 204 to extend, so that the rod body 202 is drawn out of the slot 101, then the insertion block 201 on one plate body 1 is inserted into the slot 101 in the other plate body 1, and finally the pulling force on the pulling plate 203 is removed, at this time, the spring 204 will contract to drive the rod 202 to return to its original position and insert into the insertion hole 8 of the insert block 201, and finally the fixation between the two plate bodies 1 is achieved.
As shown in fig. 1 and fig. 2, specifically, the movement mode of the clamp plate 4 on the mounting plate 3 is that a first sliding groove for the clamp plate 4 to slide is formed on the mounting plate 3, and the first sliding groove is internally and rotatably provided with a two-way threaded screw rod 9, and one end of the two-way threaded screw rod 9 penetrates through the mounting plate 3, wherein the two-way threaded screw rod 9 is fixed in the first sliding groove through a bearing, and meanwhile, two symmetrical threaded sleeves of the clamp plate 4 are sleeved on the two-way threaded screw rod 9, when the two clamp plate 4 need to be controlled to be close to the movable clamping template body 5, the two-way threaded screw rod 9 can be rotated, because the two symmetrical threaded sleeves of the clamp plate 4 are sleeved outside the two-way threaded screw rod 9, and the clamp plate 4 can only slide in the first sliding groove and cannot rotate, so that the two clamp plates 4 can be close to each other in the first sliding groove along with the rotation of the two-way threaded screw rod 9.
As shown in fig. 1, in an embodiment of the present invention, a second sliding groove for sliding the supporting plate 6 is formed on the clamping plate 4, a threaded rod 10 is rotatably installed in the second sliding groove, one end of the threaded rod 10 penetrates through the clamping plate 4, the threaded rod 10 is fixed in the second sliding groove through a bearing, and the supporting plate 6 is threadedly sleeved on the threaded rod 10, because the supporting plate 6 is threadedly engaged with the threaded rod 10 and the supporting plate 6 can only slide in the second sliding groove, the supporting plate 6 is driven to move in the second sliding groove when the threaded rod 10 is rotated, so that the supporting plate 6 is close to the mounting plate 3, and finally the supporting plate 6 is abutted against the bottom of the template body 5.
As shown in fig. 1, it is preferable that the two-way screw rod 9 and the threaded rod 10 are fixed with a hexagonal knob 11, so that a hexagonal wrench can be used to rotate the hexagonal knob 11, and the two-way screw rod 9 and the threaded rod 10 can be rotated more easily and more easily.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the utility model. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (6)

1. The utility model provides a template anchor clamps that building engineering construction used, its characterized in that includes plate body (1) that a plurality of head and the tail connected gradually, adjacent two through mounting (2) detachable fixed between plate body (1), plate body (1) bottom is fixed with mounting panel (3), install on mounting panel (3) two splint (4) that can be close to the motion each other, two be provided with template body (5) between splint (4), still including installing on splint (4) and can be close to on splint (4) layer board (6) of mounting panel (3) motion, template body (5) are located layer board (6) with between mounting panel (3).
2. A formwork clamp for constructional engineering as defined in claim 1 wherein a lifting ring (7) is mounted on top of said plate body (1).
3. The form clamp for the construction of the building engineering as recited in claim 2, wherein the fixing member (2) comprises an insert block (201) fixed at one end of the plate body (1), the other end of the plate body (1) is configured with a slot (101) for inserting the insert block (201), the plate body (1) is provided with a rod body (202) penetrating through the plate body (1), the insert block (201) is provided with an insertion hole (8) for inserting the rod body (202), the form clamp further comprises a pulling plate (203) fixed on the rod body (202), and the pulling plate (203) is connected with the plate body (1) through a spring (204).
4. The formwork clamp for building engineering construction according to claim 1, wherein a first sliding groove for sliding the clamping plates (4) is formed in the mounting plate (3), a bidirectional threaded screw rod (9) is rotatably mounted in the first sliding groove, one end of the bidirectional threaded screw rod (9) penetrates through the mounting plate (3), and the two clamping plates (4) are symmetrically sleeved on the bidirectional threaded screw rod (9) in a threaded manner.
5. The formwork clamp for building engineering construction according to claim 4, wherein the clamping plate (4) is provided with a second sliding groove for the supporting plate (6) to slide, a threaded rod (10) is rotatably mounted in the second sliding groove, one end of the threaded rod (10) penetrates through the clamping plate (4), and the supporting plate (6) is sleeved on the threaded rod (10) in a threaded manner.
6. A formwork clamp for constructional engineering work as claimed in claim 5, wherein said two-way threaded screw (9) and said threaded rod (10) are each fixed with a hexagonal knob (11).
CN202122957801.5U 2021-11-29 2021-11-29 Template anchor clamps of building engineering construction usefulness Active CN216446518U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122957801.5U CN216446518U (en) 2021-11-29 2021-11-29 Template anchor clamps of building engineering construction usefulness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122957801.5U CN216446518U (en) 2021-11-29 2021-11-29 Template anchor clamps of building engineering construction usefulness

Publications (1)

Publication Number Publication Date
CN216446518U true CN216446518U (en) 2022-05-06

Family

ID=81355144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122957801.5U Active CN216446518U (en) 2021-11-29 2021-11-29 Template anchor clamps of building engineering construction usefulness

Country Status (1)

Country Link
CN (1) CN216446518U (en)

Similar Documents

Publication Publication Date Title
CN211366692U (en) Municipal works construction lifts by crane transport anchor clamps
CN112811299A (en) Municipal works construction lifts by crane transport anchor clamps
CN216446518U (en) Template anchor clamps of building engineering construction usefulness
CN215287701U (en) Special lifting appliance for prefabricated wall
CN113526327B (en) Assembled concrete laminated slab floor slab hoisting structure and construction process
CN213834251U (en) Gallows structure is used in building engineering construction
CN215516349U (en) Light wallboard lifting device
CN213738307U (en) Hoisting tool
CN211305451U (en) Special external member is dismantled to deep-well pump threaded connection pipe
CN212078409U (en) Suspended ceiling component
CN210914951U (en) Stable hoisting accessory
CN212740410U (en) Assembled building hoist device
RU69049U1 (en) CRANE FOR LIFTING AND DELIVERY OF GOODS TO A WINDOW OPENING, ON LOGGIA AND BALCONIES OF CONSTRUCTING AND REPAIRED BUILDINGS
CN212450358U (en) Mechanical equipment that lifts by crane that construction was used
CN111056422B (en) Lifting appliance for mounting large flywheel and using method thereof
CN109095388B (en) A lift by crane equipment for building engineering
CN221031536U (en) Prefabricated component erection equipment of assembled building
CN217925755U (en) Convenient combined oil pipe elevator
CN214527721U (en) Electric hoist
CN216279746U (en) Building engineering strutting arrangement
CN104291225A (en) Non-dragging independent mast device for hoisting rigid steel pile
CN218371495U (en) Steel pipe hoist and mount hoist for construction
CN210710489U (en) AAC panel auxiliary mounting tool
CN203411256U (en) Non-dragging independent mast device for hoisting rigid steel pile
CN220578703U (en) Top hoist

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant