CN216442816U - Timing feeding device for concrete processing - Google Patents

Timing feeding device for concrete processing Download PDF

Info

Publication number
CN216442816U
CN216442816U CN202120775819.0U CN202120775819U CN216442816U CN 216442816 U CN216442816 U CN 216442816U CN 202120775819 U CN202120775819 U CN 202120775819U CN 216442816 U CN216442816 U CN 216442816U
Authority
CN
China
Prior art keywords
bin
base
feed bin
controller
feeding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120775819.0U
Other languages
Chinese (zh)
Inventor
张雪冬
张春芽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningdu Xingye Machinery Manufacturing Co ltd
Original Assignee
Ningdu Xingye Machinery Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningdu Xingye Machinery Manufacturing Co ltd filed Critical Ningdu Xingye Machinery Manufacturing Co ltd
Priority to CN202120775819.0U priority Critical patent/CN216442816U/en
Application granted granted Critical
Publication of CN216442816U publication Critical patent/CN216442816U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Abstract

The application discloses concrete processing is with timing material feeding unit, which comprises a base, a plurality of bracing pieces are installed at the base top, the feed bin is installed jointly at a plurality of bracing piece tops, the feed bin is provided with first feed bin, second feed bin and third feed bin, first feed bin, the blanking mouth has all been seted up to second feed bin and third feed bin bottom, the plummer is installed jointly to a plurality of bracing piece lateral walls, two transmission bands are installed to plummer top symmetry, the equal electric connection of motor of two transmission bands has the controller, the second blanking mouth has been seted up to the plummer lateral wall, the aggregate is installed at the base top, the churn is installed at the base top, churn and controller electric connection, pay-off spare is installed at the base top, aggregate title and pay-off spare all link to each other with the controller electrical property. This scheme effectively avoids needing the workman to look at the condition that causes to increase workman's work load constantly and takes place, and the effectual concrete raw materials of having avoided takes place because of the narrow and small inhomogeneous condition of mixing that causes in space in the churn.

Description

Timing feeding device for concrete processing
Technical Field
The application relates to the technical field of concrete production, in particular to a timing feeding device for concrete processing.
Background
The concrete is artificial stone which is prepared by taking cement as a main cementing material, adding water, sand, stones and chemical additives and mineral admixtures if necessary, mixing the materials according to a proper proportion, uniformly stirring, densely molding, curing and hardening. Concrete is mainly divided into two stages and states: plastic state before setting and hardening, namely fresh concrete or concrete mixture; hardened, i.e. hardened concrete or concrete. When mixing raw materials such as water, sand and stones, etc., it is necessary to have a certain ratio.
However, the existing concrete mixing device needs a worker to look at all the time to avoid the situation that the concrete which is not mixed can be used, so that the workload of the worker is increased, and the existing concrete mixing device puts the sand, the stones and other raw materials into the mixing drum firstly to be mixed by the mixing drum, and the situation of uneven mixing is very easy to cause due to the narrow space in the mixing drum.
SUMMERY OF THE UTILITY MODEL
The main objective of this application is to provide a concrete processing is with regularly material feeding unit to improve the problem in the correlation technique.
In order to achieve the purpose, the application provides a timing feeding device for concrete processing, which comprises a base, wherein a plurality of supporting rods are arranged at the top of the base, a plurality of bins are jointly arranged at the tops of the supporting rods, each bin is provided with a first bin, a second bin and a third bin, blanking ports are formed in the bottoms of the first bin, the second bin and the third bin, a plurality of supporting rod side walls are jointly provided with a bearing platform, two conveying belts are symmetrically arranged at the top of the bearing platform, the two conveying belts are respectively opposite to the bottoms of the first bin and the third bin, motors of the two conveying belts are electrically connected with a controller, a second blanking port is formed in the side wall of the bearing platform, the second blanking port is positioned at the bottom of the second bin, and the end parts of the two conveying belts are adjacent to the second blanking port, the aggregate scale is installed at the top of the base, a feeding hole of the aggregate scale and the second blanking hole are oppositely arranged from top to bottom, a mixing drum is installed at the top of the base, the mixing drum is electrically connected with the controller, a feeding piece is installed at the top of the base, one end of the feeding piece is adjacent to a feeding end of the mixing drum, the other end of the feeding piece is abutted to a discharging end of the aggregate scale, and the aggregate scale and the feeding piece are electrically connected with the controller.
In an embodiment of this application, the plummer with install a plurality of bracing between the base, the plummer with install a plurality of bracing between the feed bin.
In one embodiment of the present application, the base is bottom-mounted with wheels.
In one embodiment of the present application, the first silo, the second silo, and the third silo are all arranged in funnel shapes.
In an embodiment of this application, the pay-off piece includes conveyer belt and motor, the motor with the live-rollers of conveyer belt links to each other, the motor with controller electrical property links to each other, the conveyer belt install in the base top.
In one embodiment of the present application, one end of the conveyor belt is adjacent to the mixing drum feed end and the other end of the conveyor belt is adjacent to the aggregate weigh out end.
Compared with the prior art, the beneficial effects of this application are: through the concrete processing of above-mentioned design is with regularly material feeding unit, during the use, at first put into the feed bin with the concrete raw materials, operating time has been set up through the controller, after every to the uniform time, controller control transmission band this moment, the aggregate is called, churn and pay-off piece operation, and then with the concrete raw materials timing quantitative churn of being sent to, make the concrete with the concrete raw materials by the churn operation again, effectively avoid needing the workman to look at the condition that causes to increase workman's work load constantly and take place, and the concrete raw materials is when passing through first feed bin, second feed bin and third feed bin get into the aggregate and call, can carry out preliminary mixing, when sending the concrete raw materials in the aggregate is called to the churn by the pay-off piece again, can further mix, the effectual concrete raw materials of having avoided taking place because of the narrow and small inhomogeneous condition of causing of space in the churn.
Drawings
Fig. 1 is a schematic front view of a timing feeding device for concrete processing according to an embodiment of the present application;
FIG. 2 is a schematic top view of a timing feeding device for concrete processing according to an embodiment of the present disclosure;
fig. 3 is a schematic top view of a part of a structure of a bearing table of a timing feeding device for concrete processing according to an embodiment of the present application.
In the figure: 1. a base; 2. a support bar; 3. a storage bin; 4. a first storage bin; 5. a second storage bin; 6. a third storage bin; 7. a blanking port; 8. a bearing table; 9. a conveyor belt; 10. a controller; 11. a second blanking port; 12. weighing aggregate; 13. a mixing drum; 14. a feeding member; 15. bracing; 16. a wheel; 17. a conveyor belt; 18. an electric motor.
Detailed Description
In order to make the technical solutions better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only partial embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
It should be noted that the terms "first," "second," and the like in the description and claims of this application and in the accompanying drawings are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It should be understood that the data so used may be interchanged under appropriate circumstances such that embodiments of the application described herein may be used. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
In this application, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings. These terms are used primarily to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to a particular orientation or to be constructed and operated in a particular orientation.
Moreover, some of the above terms may be used to indicate other meanings besides the orientation or positional relationship, for example, the term "on" may also be used to indicate some kind of attachment or connection relationship in some cases. The specific meaning of these terms in this application will be understood by those of ordinary skill in the art as appropriate.
In addition, the term "plurality" shall mean two as well as more than two.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
Example 1
Referring to fig. 1-3, the present application provides a timing feeding device for concrete processing, which includes a base 1, a plurality of support rods 2 are installed on the top of the base 1 by screws, a bin 3 is installed on the top of the support rods 2 by screws, the bin 3 is used for containing concrete raw materials, the bin 3 is provided with a first bin 4, a second bin 5 and a third bin 6, in specific implementation, the first bin 4, the second bin 5 and the third bin 6 are used for containing different concrete raw materials, for example, the first bin 4 contains cement, the second bin 5 contains sand and the third bin 6 contains stones, blanking ports 7 are respectively arranged at the bottoms of the first bin 4, the second bin 5 and the third bin 6, in specific implementation, a blanking port 7 of the second bin 5 is hinged with a material blocking door, so that the concrete raw materials in the second bin 5 cannot be dropped when not used, when the device is used, the material blocking door is opened, the blanking port 7 is used for falling of concrete raw materials, the side walls of the plurality of support rods 2 are jointly provided with the bearing table 8 by screws, the top of the bearing table 8 is symmetrically provided with two transmission belts 9 by screws, the two transmission belts 9 are respectively opposite to the bottoms of the first bin 4 and the third bin 6, motors of the two transmission belts 9 are electrically connected with the controller 10, in the specific implementation, the controller 10 is set to be a microcomputer time-space switch and a contactor, the main controls the motors, the microcomputer time-control switch controls the on-off of coils, the microcomputer time-control switch can adjust any time, further the effect of timing feeding is achieved, the side wall of the bearing table 8 is provided with the second blanking port 11, the second blanking port 11 is arranged at the bottom of the second bin 5, the end parts of the two transmission belts 9 are both adjacent to the second blanking port 11, and the top of the base 1 is provided with the aggregate scale 12 by screws, the feeding port of the aggregate scale 12 and the second blanking port 11 are arranged in a vertical opposite manner, when the concrete mixing device is implemented, concrete raw materials in the first bin 4 and the third bin 6 firstly fall to the tops of the two conveying belts 9, and then are conveyed to the second blanking port 11 through the conveying belts 9, and further fall into the aggregate scale 12, the concrete raw materials in the second bin 5 can directly fall into the aggregate scale 12, and the concrete raw materials in the first bin 4, the second bin 5 and the third bin 6 can fall into the aggregate scale 12 again, and can be primarily mixed, the top of the base 1 is provided with a mixing drum 13 through screws, the mixing drum 13 is used for mixing the concrete raw materials, the mixing drum 13 is electrically connected with the controller 10, the controller 10 controls the mixing drum 13 to operate, the top of the base 1 is provided with a feeding piece 14 through screws, one end of the feeding piece 14 is adjacent to the feeding end of the mixing drum 13, and the other end of the feeding piece 14 is abutted to the discharging end of the aggregate scale 12, the feeding piece 14 is used for feeding concrete raw materials in the aggregate scale 12 into the mixing drum 13, the aggregate scale 12 and the feeding piece 14 are both electrically connected with the controller 10, and the controller 10 controls the aggregate scale 12 and the feeding piece 14 to operate at a specified time.
In order to strengthen the fixing strength of the bearing platform 8, a plurality of inclined struts 15 are installed between the bearing platform 8 and the base 1 through screws, and a plurality of inclined struts 15 are installed between the bearing platform 8 and the storage bin 3.
In order to facilitate the movement of the base 1, wheels 16 are installed at the bottom of the base 1, thereby facilitating the movement of the base 1 to a desired place.
In order to make the concrete raw materials fall down concentratedly, the first bin 4, the second bin 5 and the third bin 6 are all arranged in a funnel shape.
In this embodiment, the feeding member 14 includes a conveyer belt 17 and a motor 18, an output end of the motor 18 is in transmission connection with a rotating roller of the conveyer belt 17, the motor 18 is electrically connected with the controller 10, so that the controller 10 can control the motor 18 to operate, and further control the conveyer belt 17 to feed at a specified time, the conveyer belt 17 is mounted on the top of the base 1 by using screws, in specific implementation, one end of the conveyer belt 17 is adjacent to a feeding end of the mixing drum 13, and the other end of the conveyer belt 17 is adjacent to a discharging end of the aggregate scale 12, and first, the concrete raw material transmitted by the aggregate scale 12 is relayed and further sent into the mixing drum 13.
Specifically, this concrete processing is with regularly material feeding unit's theory of operation: when the device is used, firstly, the controller 10 is set for a period of time, for example, 60 minutes, then different concrete raw materials are put into the first bin 4, the second bin 5 and the third bin 6 of the bin 3, after 60 minutes, the controller 10 controls the conveying belt 9, the stirring drum 13 and the feeding piece 14 to operate, at the moment, the concrete raw materials in the first bin 4 and the third bin 6 fall into the second blanking port 11 along with the operation of the conveying belt 9 and then fall into the aggregate scale 12, the concrete raw materials in the second bin 5 can directly fall into the aggregate scale 12 and can be primarily mixed in the falling process, when the concrete raw materials in the aggregate scale 12 reach a certain weight, a sensor in the aggregate scale 12 is triggered, the sensor feeds back a signal to the controller, so that the aggregate scale 12 operates, the aggregate scale 12 operates to send the concrete raw materials to the conveying belt 17, send to churn 13 by conveyer belt 17 again, and then accomplish the stirring to the concrete raw materials, effectively avoid needing the workman to look at the condition that causes to increase workman's work load constantly and take place, and the concrete raw materials is when being carried by conveyer belt 17, can further mix, the effectual concrete raw materials of having avoided piling up put into churn 13 inside, because the narrow and small inhomogeneous condition that can lead to mixing of churn 13 inner space takes place, and when setting up, also can set up controller 10 to the concrete raw materials of different feed bins of different time transport, say, send the concrete raw materials in first feed bin 4 to churn 13 after 60 minutes, send the concrete raw materials in third feed bin 6 to churn 13 after 70 minutes, and then be applicable to the concrete raw materials that need the specific time to add.
It should be noted that: the model specifications of the conveying belt 9, the controller 10, the aggregate scale 12, the mixing drum 13, the conveying belt 17 and the motor 18 need to be determined by type selection according to the actual specification of the device and the like, and the specific type selection calculation method adopts the prior art, so detailed description is omitted.
The power supply and the principle of the conveyor belt 9, the controller 10, the aggregate scale 12, the mixing drum 13, the conveyor belt 17 and the motor 18 are clear to a person skilled in the art and will not be described in detail here.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims (6)

1. The timing feeding device for concrete processing comprises a base (1) and is characterized in that a plurality of supporting rods (2) are installed at the top of the base (1), a plurality of bins (3) are installed at the tops of the supporting rods (2) jointly, each bin (3) is provided with a first bin (4), a second bin (5) and a third bin (6), blanking ports (7) are formed in the bottoms of the first bin (4), the second bin (5) and the third bin (6), a bearing table (8) is installed on the side wall of each supporting rod (2) jointly, two conveying belts (9) are symmetrically installed at the top of the bearing table (8), the two conveying belts (9) are opposite to the bottoms of the first bin (4) and the third bin (6) respectively, and motors of the two conveying belts (9) are electrically connected with a controller (10), a second blanking port (11) is formed in the side wall of the bearing table (8), the second blanking port (11) is located at the bottom of the second storage bin (5), the end parts of the two conveying belts (9) are adjacent to the second blanking port (11), an aggregate scale (12) is arranged at the top of the base (1), a feed inlet of the aggregate scale (12) and the second blanking port (11) are arranged in a vertically opposite manner, a mixing drum (13) is arranged at the top of the base (1), the mixing drum (13) is electrically connected with the controller (10), a feeding piece (14) is arranged at the top of the base (1), one end of the feeding piece (14) is adjacent to the feeding end of the stirring cylinder (13), the other end of the feeding piece (14) is pressed against the discharge end of the aggregate scale (12), the aggregate scale (12) and the feeding piece (14) are electrically connected with the controller (10).
2. The timed feeding device for concrete processing according to claim 1, characterized in that a plurality of inclined struts (15) are installed between the bearing platform (8) and the base (1), and a plurality of inclined struts (15) are installed between the bearing platform (8) and the storage bin (3).
3. A timed feeding device for concrete working according to claim 1, characterised in that wheels (16) are mounted on the bottom of said base (1).
4. The timed feeding device for concrete processing according to claim 1, characterized in that said first silo (4), said second silo (5) and said third silo (6) are all arranged in funnel shape.
5. The timed feeding device for concrete processing according to claim 1, characterized in that said feeding member (14) comprises a conveyor belt (17) and a motor (18), said motor (18) is connected with the rotating roller of said conveyor belt (17), said motor (18) is electrically connected with said controller (10), and said conveyor belt (17) is mounted on the top of said base (1).
6. The timed feeding device for concrete processing according to claim 5, characterized in that one end of said conveyor belt (17) is adjacent to the feeding end of said mixing drum (13), and the other end of said conveyor belt (17) is adjacent to the discharging end of said aggregate scale (12).
CN202120775819.0U 2021-04-16 2021-04-16 Timing feeding device for concrete processing Active CN216442816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120775819.0U CN216442816U (en) 2021-04-16 2021-04-16 Timing feeding device for concrete processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120775819.0U CN216442816U (en) 2021-04-16 2021-04-16 Timing feeding device for concrete processing

Publications (1)

Publication Number Publication Date
CN216442816U true CN216442816U (en) 2022-05-06

Family

ID=81347943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120775819.0U Active CN216442816U (en) 2021-04-16 2021-04-16 Timing feeding device for concrete processing

Country Status (1)

Country Link
CN (1) CN216442816U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116587431A (en) * 2023-06-13 2023-08-15 浙江京创商品混凝土有限公司 Machine-made sand natural sand mixing preparation high-strength concrete

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116587431A (en) * 2023-06-13 2023-08-15 浙江京创商品混凝土有限公司 Machine-made sand natural sand mixing preparation high-strength concrete
CN116587431B (en) * 2023-06-13 2024-01-26 浙江京创商品混凝土有限公司 Machine-made sand natural sand mixing preparation high-strength concrete

Similar Documents

Publication Publication Date Title
KR102292173B1 (en) Concrete batching plant with reduced cycle times and reduced installation and dismantling times
CN202053383U (en) Concrete mixing plant
CN208179962U (en) Cement products aggregate automatic batching and mixing plant
CN100532045C (en) Full automatic block production line
CN208179960U (en) A kind of concrete batching and mixing tower
CN109910173A (en) A kind of making coal gangue brick mixing equipment with automatic sieving function
CN105922438A (en) Concrete integral production system
CN216442816U (en) Timing feeding device for concrete processing
CN201645663U (en) Movable concrete mixing plant
CN111941657A (en) Production device and use method of high-performance concrete premixed material
CN213352928U (en) A dosing unit for concrete production line
CN204398156U (en) A kind of construction site cement mixing equipment
CN204398146U (en) The automatic matching device of a kind of construction site cement mixing equipment
CN101352892A (en) Rolling type technique and production line for molding assembly large plate
CN209737994U (en) Energy-conserving batching machine for ready-mixed concrete
CN206170350U (en) Compact stabilized soil stirring station
CN201643999U (en) Seed mixing machine
CN205347245U (en) Lime kiln batching device
CN209812787U (en) Concrete production system
CN210453263U (en) Movable mixing station
CN210589937U (en) Concrete raw material loading attachment
CN204183726U (en) A kind of automatic feeding of concrete mixer
CN207915761U (en) The feeding intelligence control system of reinforced concrete sewer pipe production line
CN2292653Y (en) Automatic charging and metering feeding device for concrete
CN220162829U (en) Proportioning equipment for concrete production materials

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A timed feeding device for concrete processing

Granted publication date: 20220506

Pledgee: Ganzhou Bank Co.,Ltd. Ningdu Branch

Pledgor: Ningdu Xingye Machinery Manufacturing Co.,Ltd.

Registration number: Y2024980001819

PE01 Entry into force of the registration of the contract for pledge of patent right