CN216408431U - Monitoring device for building construction management - Google Patents

Monitoring device for building construction management Download PDF

Info

Publication number
CN216408431U
CN216408431U CN202122826103.1U CN202122826103U CN216408431U CN 216408431 U CN216408431 U CN 216408431U CN 202122826103 U CN202122826103 U CN 202122826103U CN 216408431 U CN216408431 U CN 216408431U
Authority
CN
China
Prior art keywords
base
monitoring device
ring
water
glass shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122826103.1U
Other languages
Chinese (zh)
Inventor
刘晓娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122826103.1U priority Critical patent/CN216408431U/en
Application granted granted Critical
Publication of CN216408431U publication Critical patent/CN216408431U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a monitoring device for building construction management, which comprises a base, wherein fixing mechanisms are arranged at two ends of the base, an outer pipe is arranged at the upper end of the base, an inner column is arranged in the outer pipe, an ejector rod is rotatably arranged at one end of the inner column, a glass shell is arranged at one end of the ejector rod, a glass cover is arranged at one end of the glass shell, a camera is arranged in the glass shell, a water supply mechanism is arranged at the upper end of the base, the outer pipe and the inner column which can relatively stretch out and draw back are arranged, the camera is pre-installed at the top end of the inner column, the monitoring device can be quickly put into use at a construction site, the monitoring device is not required to be installed on a building at the construction site, the installation and maintenance are convenient, and meanwhile, the camera is arranged in the glass shell by arranging the water supply mechanism and the glass shell, so that dust attached to the surface of the glass shell can be conveniently washed away without influencing the camera.

Description

Monitoring device for building construction management
Technical Field
The utility model belongs to the technical field of building construction management, and particularly relates to a monitoring device for building construction management.
Background
In the building construction process, the monitoring equipment is used for monitoring the construction site in real time, so that the construction personnel can better monitor the site, record the construction condition, manage the site by the management personnel, improve the engineering efficiency and improve the safety performance.
At present, current construction project is surveillance camera head for management, the structure relatively fixed, mainly installs the eminence at the building, and installation and maintenance are comparatively inconvenient, and the construction site has a large amount of dusts moreover, easily adheres to on the camera surface, influences monitoring effect, and because the camera height is higher, it is also comparatively inconvenient to clear up the dust.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a monitoring device for building construction management, which solves the problems of inconvenient installation and maintenance and inconvenient dust cleaning in the prior art.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a monitoring device for construction management, includes the base, the base both ends all are provided with fixed establishment, the base upper end is provided with the outer tube, be provided with the inner prop in the outer tube, inner prop one end is rotated and is provided with the ejector pin, ejector pin one end is provided with the glass shell, glass shell one end is provided with the glass lid, be provided with the camera in the glass shell, the base upper end is provided with water supply mechanism.
Preferably, the fixing mechanism comprises an anchor rod, a through hole is formed in the upper end of the base, the anchor rod is inserted into the through hole, a convex plate is arranged at one end of the anchor rod and installed on the base, and a pull ring is arranged at the top of the anchor rod.
Preferably, the water supply mechanism includes the water tank, the case lid is installed to water tank upper end screw thread, be provided with the immersible pump in the water tank, the play water end threaded connection of immersible pump has the water pipe, the lateral wall of water tank is run through to the water pipe, be provided with the water valve on the water pipe, the shower nozzle is installed to water pipe one end screw thread.
Preferably, the bottom of the base is provided with a caster.
Preferably, a fixing ring is installed at one end of the outer pipe, a restraining ring is arranged at one end of the fixing ring, the water pipe is inserted into the restraining ring, a restraining semi-ring is installed at the upper end of the ejector rod, and the upper end of the water pipe is inserted into the restraining semi-ring.
Preferably, an adjusting ring is installed on the inner column, one end of the adjusting ring is rotatably connected with a connecting rod, and one end of the connecting rod is rotatably connected with one end of the ejector rod.
Compared with the prior art, the utility model has the beneficial effects that: through setting up flexible outer tube and inner prop relatively to with the camera install in advance at inner prop top, can put into use fast at the job site, need not to install on the building to the job site, it is comparatively convenient to install and maintain, simultaneously through setting up water supply mechanism and glass shell, with the camera setting in the glass shell, can be convenient will adhere to the dust on glass shell surface and wash, and can not lead to the fact the influence to the camera.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged view of A of FIG. 1 according to the present invention;
FIG. 3 is an enlarged view of B of FIG. 1 according to the present invention.
In the figure: 1. the water supply device comprises a base, 2. a fixing mechanism, 3. an outer pipe, 4. an inner column, 5. a push rod, 6. a glass shell, 7. a glass cover, 8. a camera, 9. a water supply mechanism, 10. a caster, 11. a fixing ring, 12. a restraint ring, 13. a restraint semi-ring, 14. an adjusting ring, 15. a connecting rod, 101. a through hole, 201. an anchor rod, 202. a convex plate, 203. a pull ring, 901. a water tank, 902. a tank cover, 903. a submersible pump, 904. a water pipe, 905. a water valve and 906. a spray head.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1, 2 and 3, an embodiment of the utility model provides a monitoring device for building construction management, which includes a base 1, fixing mechanisms 2 are mounted at two ends of the base 1 through screws, an outer tube 3 is mounted at the upper end of the base 1 through a bolt, an inner column 4 is mounted in the outer tube 3 through a bolt, an ejector rod 5 is rotatably mounted at the upper end of the inner column 4 through a pin shaft, a glass shell 6 is mounted at the right end of the ejector rod 5 through a screw, a glass cover 7 is mounted at the lower end of the glass shell 6 through a screw, a camera 8 is mounted in the glass shell 6 through a screw, and a water supply mechanism 9 is mounted at the upper end of the base 1 through a bolt and used for washing dust on the surface of the glass shell 6.
Referring to fig. 1, 2 and 3, the fixing mechanism 2 includes an anchor rod 201 for being inserted into the ground for fixing, the upper end of the base 1 is provided with a through hole 101, the anchor rod 201 is inserted into the through hole 101, the upper end of the anchor rod 201 is welded with a convex plate 202, the convex plate 202 is installed on the base 1 through a screw, and the top of the anchor rod 201 is welded with a pull ring 203, so that the anchor rod 201 is convenient to assemble and disassemble. The water supply mechanism 9 comprises a water tank 901, a tank cover 902 is installed on the upper end of the water tank 901 in a threaded mode, a submersible pump 903 is arranged in the water tank 901, the model of the submersible pump 903 is SGP-1000L, the water outlet end of the submersible pump 903 is connected with a water pipe 904 in a threaded mode, the water pipe 904 penetrates through the side wall of the water tank 901, a water valve 905 is installed on the water pipe 904 in a threaded mode and used for adjusting the water supply flow rate, and a spray head 906 is installed on the upper end of the water pipe 904 in a threaded mode and used for discharging water to wash the surface of the glass shell 6. The bottom of the base 1 is provided with a caster 10 through a screw, so that the base is convenient to move. The solid fixed ring 11 is installed through the screw in the 3 upper ends of outer tube, and the welding of the 11 left ends of solid fixed ring has restraint ring 12, and water pipe 904 is inserted and is established in restraint ring 12 for carry out spacing fixed to water pipe 904, the restraint semi-ring is installed through the screw in the 5 upper ends of ejector pin, and the upper end of water pipe 904 is inserted and is established in the restraint semi-ring, is used for carrying out spacing fixed to water pipe 904 upper end. The upper end of the inner column 4 is provided with an adjusting ring 14 through a screw, the left end of the adjusting ring 14 is rotatably connected with a connecting rod 15 through a pin shaft, and the upper end of the connecting rod 15 is rotatably connected with the left end of the ejector rod 5 through a pin shaft for adjusting the angle of the ejector rod 5 and further adjusting the angles of the glass shell 6 and the camera 8.
The working principle of the embodiment is as follows: when the device is used, the device is pushed to a building construction site through the caster 10, then the anchor rod 201 penetrates through the through hole 101 to be inserted into the ground, the base 1 is fixed, then the convex plate 202 is connected with the base 1 through the screw, and then the box cover 902 is opened to inject clean water into the water tank 901 for later use. When a large amount of dust adheres to the surface of the glass shell 6 after long-term use, water in the water tank 901 is pumped into the water pipe 904 by the submersible pump 903, and the water is sprayed out from the spray head 906 through the water pipe 904, so that the dust on the surface of the glass shell 6 is washed away. When the camera 8 needs to be maintained and adjusted, the bolt and the nut which are used for connecting the outer pipe 3 and the inner column 4 are firstly taken down, then the inner column 4 is downwards inserted into the outer pipe 3, so that the height of the camera 8 is reduced, and then the camera 8 is maintained.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention.

Claims (6)

1. The utility model provides a monitoring device for construction management which characterized in that: the automatic water supply device is characterized by comprising a base (1), fixing mechanisms (2) are arranged at two ends of the base (1), an outer tube (3) is arranged at the upper end of the base (1), an inner column (4) is arranged in the outer tube (3), an ejector rod (5) is arranged at one end of the inner column (4) in a rotating mode, a glass shell (6) is arranged at one end of the ejector rod (5), a glass cover (7) is arranged at one end of the glass shell (6), a camera (8) is arranged in the glass shell (6), and a water supply mechanism (9) is arranged at the upper end of the base (1).
2. The monitoring device for construction management according to claim 1, wherein: the fixing mechanism (2) comprises an anchor rod (201), a through hole (101) is formed in the upper end of the base (1), the anchor rod (201) is inserted into the through hole (101), a convex plate (202) is arranged at one end of the anchor rod (201), the convex plate (202) is installed on the base (1), and a pull ring (203) is arranged at the top of the anchor rod (201).
3. The monitoring device for construction management according to claim 1, wherein: the water supply mechanism (9) comprises a water tank (901), a tank cover (902) is installed on the upper end of the water tank (901) in a threaded mode, a submersible pump (903) is arranged in the water tank (901), a water outlet end of the submersible pump (903) is connected with a water pipe (904) in a threaded mode, the water pipe (904) penetrates through the side wall of the water tank (901), a water valve (905) is arranged on the water pipe (904), and a spray head (906) is installed on one end of the water pipe (904) in a threaded mode.
4. The monitoring device for construction management according to claim 1, wherein: the bottom of the base (1) is provided with a caster (10).
5. The monitoring device for construction management according to claim 3, wherein: the water pipe is characterized in that a fixing ring (11) is installed at one end of the outer pipe (3), a restraining ring (12) is arranged at one end of the fixing ring (11), the water pipe (904) is inserted into the restraining ring (12), a restraining semi-ring (13) is installed at the upper end of the ejector rod (5), and the upper end of the water pipe (904) is inserted into the restraining semi-ring (13).
6. The monitoring device for construction management according to claim 1, wherein: install adjusting ring (14) on inner prop (4), adjusting ring (14) one end is rotated and is connected with connecting rod (15), connecting rod (15) one end is rotated with the one end of ejector pin (5) and is connected.
CN202122826103.1U 2021-11-17 2021-11-17 Monitoring device for building construction management Active CN216408431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122826103.1U CN216408431U (en) 2021-11-17 2021-11-17 Monitoring device for building construction management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122826103.1U CN216408431U (en) 2021-11-17 2021-11-17 Monitoring device for building construction management

Publications (1)

Publication Number Publication Date
CN216408431U true CN216408431U (en) 2022-04-29

Family

ID=81300249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122826103.1U Active CN216408431U (en) 2021-11-17 2021-11-17 Monitoring device for building construction management

Country Status (1)

Country Link
CN (1) CN216408431U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115854190A (en) * 2022-11-22 2023-03-28 领先科技(东台)有限公司 Camera structure based on linear motor power

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115854190A (en) * 2022-11-22 2023-03-28 领先科技(东台)有限公司 Camera structure based on linear motor power

Similar Documents

Publication Publication Date Title
CN211274028U (en) Spraying dust-settling device for building construction
CN216408431U (en) Monitoring device for building construction management
CN112012321A (en) Three-dimensional intelligent rotary ejector for sludge in pump station or storage tank
CN210874309U (en) Wastewater treatment device for lithium battery production
CN218532166U (en) Diversified belt cleaning device
CN212582564U (en) Energy-saving water spraying device for rural highway maintenance
CN215332968U (en) Dust removal and reduction spraying device for coal mining
CN214658881U (en) Concrete curing means for construction
CN212381285U (en) Prevent security protection camera that shelters from
CN210302949U (en) Intelligent building construction dust device
CN216098097U (en) Hardware grinding device is used in screen production
CN215907916U (en) Underground water spraying, collecting and guiding device
CN219711203U (en) Dustproof fence convenient to wash
CN215236233U (en) Wind-powered electricity generation blade belt cleaning device
CN219836275U (en) Spraying dust collector for building construction process
CN217616284U (en) Building engineering environment monitoring device
CN220901333U (en) Shower nozzle and lift belt cleaning device
CN219840285U (en) Rainwater drainage structure
CN219124259U (en) Clear safety monitoring device
CN107956504A (en) One kind moves liftable high pressure and catches dirt spraying device
CN215715258U (en) A supporting body for recoverable anchor rope that spouts soon
CN213792362U (en) Machining device capable of being stably fixed and used for gear box of extruder
CN214010782U (en) Hydraulic and hydroelectric construction engineering quality detects uses device that breaks ground
CN220215470U (en) Solar floating fountain
CN220125806U (en) Dust fall device for civil engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant