CN214658881U - Concrete curing means for construction - Google Patents

Concrete curing means for construction Download PDF

Info

Publication number
CN214658881U
CN214658881U CN202120354155.0U CN202120354155U CN214658881U CN 214658881 U CN214658881 U CN 214658881U CN 202120354155 U CN202120354155 U CN 202120354155U CN 214658881 U CN214658881 U CN 214658881U
Authority
CN
China
Prior art keywords
storage tank
water
frame
water storage
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120354155.0U
Other languages
Chinese (zh)
Inventor
蔺庆凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120354155.0U priority Critical patent/CN214658881U/en
Application granted granted Critical
Publication of CN214658881U publication Critical patent/CN214658881U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a construction technical field specifically is a concrete curing means for construction, including the curing means main part, the surface of curing means main part is provided with adjusts the structure, it includes the storage water tank to adjust the structure, the surface mounting of curing means main part has the storage water tank, and the inside of storage water tank inserts and establish the water pump, the output of water pump is inserted and is established in the inside of sump, and the first fixed frame of top fixed surface of sump, the fixed frame of fixed surface of first fixed frame is connected with the second, and the inner wall welding of the fixed frame of second has the spring. The utility model discloses a be provided with sump pit and gag lever post, through rotating fixed bull stick, can make two sets of gag lever posts receive the extrusion, at this moment the gag lever post can receive the inside of the fixed frame of second, can make fixed bull stick drive the baffle and rotate in the inside of sump pit to through the rotation of baffle, can effectually conveniently adjust the size of rivers.

Description

Concrete curing means for construction
Technical Field
The utility model relates to a construction technical field specifically is a concrete curing means for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place, and a large amount of concrete is used in the construction.
When the concrete is when the maintenance, need carry out the watering to the concrete, present general directness sprays water on the concrete through the water pipe, but the rivers of water pipe can't be adjusted to can't control the water yield according to the size in place, can cause the maintenance effect poor, the water pipe can cause a large amount of water droplets to leak extravagantly when spraying simultaneously, consequently needs a concrete curing means for construction to solve above-mentioned problem urgently.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete curing means for construction to solve the rivers of the water pipe that provide in the above-mentioned background art and can't adjust, thereby can't control the water yield according to the size in place and water pipe when spraying, can cause a large amount of water droplets to leak extravagant problem.
In order to achieve the above object, the utility model provides a following technical scheme: a concrete curing device for building construction comprises a curing device main body, wherein an adjusting structure is arranged on the surface of the curing device main body, the adjusting structure comprises a water storage tank, the surface of the curing device main body is provided with the water storage tank, the water pump is inserted into the water storage tank, the output end of the water pump is inserted into the water collecting bin, the top end surface of the water collecting bin is fixedly connected with a first fixing frame, the surface of the first fixing frame is fixedly connected with a second fixing frame, the inner wall of the second fixing frame is welded with a spring, one end of the spring, far away from the second fixing frame, is welded with a limiting rod, one end of the limiting rod, far away from the spring, is inserted into the fixing rotating rod, one end of the fixing rotating rod, far away from the first fixing frame, is fixedly connected with a partition plate, the surface of the water collecting bin, far away from the first fixing frame, is fixedly connected with a support rod, and one end of the water collecting bin, far away from the water pump, is provided with a water spray head, the surface of storage water tank is provided with collects the mechanism, collect the mechanism including collecting the frame, the side fixedly connected with of storage water tank collects the frame, and the inner wall of collecting the frame is inconsistent with the surface of closing plate, one side fixedly connected with movable block that the closing plate is close to the storage water tank, the top fixedly connected with pull rod of closing plate.
Preferably, one side of the water storage tank, which is close to the collecting frame, is provided with a rectangular through hole, the sealing plate is rectangular, and the size of the inner wall of the rectangular through hole formed in one side of the water storage tank is smaller than the surface size of the sealing plate.
Preferably, the water collecting bin is cylindrical, the partition board is circular, and the size of the inner wall of the water collecting bin is matched with the size of the surface of the partition board.
Preferably, the surface of the fixed rotating rod is provided with a groove, the limiting rod is cylindrical, one end of the limiting rod, which is close to the fixed rotating rod, is arc-shaped, and the surface size of the limiting rod is matched with the size of the inner wall of the groove formed in the surface of the fixed rotating rod.
Preferably, the collection frame is set to be rectangular, and the bottom end of the collection frame is set to be an inclined plane.
Preferably, the movable blocks are rectangular, two groups of the movable blocks are symmetrically arranged on the surface of the sealing plate, a sliding groove is formed in the side face of the water storage tank, and the water storage tank and the two groups of the movable blocks form sliding connection.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a be provided with sump pit and gag lever post, through rotating fixed bull stick, can make two sets of gag lever posts receive the extrusion, at this moment the gag lever post can receive the inside of the fixed frame of second, can make fixed bull stick drive the baffle and rotate in the inside of sump pit to through the rotation of baffle, can effectually conveniently adjust the size of rivers.
2. The utility model discloses a be provided with collection frame and closing plate, when the sprinkler bead was leaking drippage, can collect the water of drippage through collecting the frame to through the pulling pull rod, can make the closing plate remove, at this moment collect the inside water of frame and can flow in the inside of storage water tank, effectually avoid the sprinkler bead when using, cause a large amount of water waste.
Description of the drawings:
in order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic sectional view of the front view of the structure of the present invention;
FIG. 2 is a schematic top view of the structure of the present invention;
FIG. 3 is a schematic side view of the adjusting structure of the present invention;
fig. 4 is a schematic top sectional view of the structure of the adjusting structure of the present invention;
fig. 5 is an enlarged schematic view of the structure a in fig. 1 according to the present invention.
In the figure: 1. a maintenance device main body; 2. an adjustment structure; 21. a water storage tank; 22. a water pump; 23. a water collecting bin; 24. a first fixed frame; 25. a second fixed frame; 26. a spring; 27. a limiting rod; 28. fixing the rotating rod; 29. a partition plate; 210. a support bar; 3. a sprinkler head; 4. a collection mechanism; 41. a collection frame; 42. a sealing plate; 43. a moving block; 44. a pull rod.
The specific implementation mode is as follows:
the technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment: a concrete curing device for building construction comprises a curing device main body 1, an adjusting structure 2 is arranged on the surface of the curing device main body 1, the adjusting structure 2 comprises a water storage tank 21, the surface of the curing device main body 1 is provided with the water storage tank 21, a water pump 22 is inserted in the water storage tank 21, the output end of the water pump 22 is inserted in a water collecting bin 23, the top end surface of the water collecting bin 23 is fixedly connected with a first fixing frame 24, the surface of the first fixing frame 24 is fixedly connected with a second fixing frame 25, the inner wall of the second fixing frame 25 is welded with a spring 26, one end of the spring 26 far away from the second fixing frame 25 is welded with a limiting rod 27, one end of the limiting rod 27 far away from the spring 26 is inserted in a fixing rotating rod 28, one end of the fixing rotating rod 28 far away from the first fixing frame 24 is fixedly connected with a partition plate 29, one end surface of the water collecting bin 23 far away from the first fixing frame 24 is fixedly connected with a support rod 210, the sprinkler bead 3 is installed to the one end that sump 23 kept away from water pump 22, and the surface of storage water tank 21 is provided with collects mechanism 4, and collection mechanism 4 is including collecting frame 41, and storage water tank 21's side fixedly connected with collects frame 41, and collects the inner wall of frame 41 and the surperficial inconsistent of closing plate 42, and closing plate 42 is close to one side fixedly connected with movable block 43 of storage water tank 21, and closing plate 42's top fixedly connected with pull rod 44.
Further, one side of the water storage tank 21 close to the collecting frame 41 is provided with a rectangular through hole, the sealing plate 42 is arranged to be rectangular, the size of the inner wall of the rectangular through hole formed in one side of the water storage tank 21 is smaller than the surface size of the sealing plate 42, the rectangular through hole formed in one side of the water storage tank 21 enables water inside the collecting frame 41 to fall into the maintenance device main body 1 through the through hole, and the effect of sealing the inside of the water storage tank 21 can be achieved through the sealing plate 42.
Further, collecting sump 23 sets up to cylindrically, and baffle 29 sets up to circularly, and collecting sump 23's inner wall size of a dimension and baffle 29's surface dimension looks adaptation sets up to circularly through baffle 29, can make baffle 29 rotate in collecting sump 23's inside to can play the size of adjusting rivers.
Further, the surface of fixed bull stick 28 is seted up flutedly, gag lever post 27 sets up to cylindrical, and the one end that gag lever post 27 is close to fixed bull stick 28 sets up to the arc, the recess inner wall size looks adaptation that gag lever post 27's surface size and fixed bull stick 28 surface were seted up, set up to the arc through gag lever post 27 one end, can be when fixed bull stick 28 rotates, can make gag lever post 27 receive the inside that the extrusion was received and is retracted the fixed frame 25 of second, play the effect of conveniently rotating fixed bull stick 28, and insert the inside of establishing at fixed bull stick 28 through gag lever post 27, can play the effect of spacing fixed bull stick 28.
Further, collect frame 41 and set up to the rectangle, and the bottom of collecting frame 41 sets up to the inclined plane, sets up to the inclined plane through collecting frame 41 bottom, can play the effect of collecting water.
Further, the moving block 43 is rectangular, two sets of moving blocks 43 are symmetrically arranged on the surface of the sealing plate 42, a sliding groove is formed in the side face of the water storage tank 21, the water storage tank 21 and the two sets of moving blocks 43 form sliding connection, and the two sets of moving blocks 43 symmetrically arranged on the surface of the sealing plate 42 enable the moving blocks 43 to drive the sealing plate 42 to move when the pull rod 44 is pulled.
The working principle is as follows: when the concrete is required to be maintained, according to the attached drawings 1, 2, 3, 4 and 5, water in the water storage tank 21 can be injected into the water collecting bin 23 through the water pump 22 and can be sprayed through the water spraying head 3, at this time, the fixed rotating rod 28 can extrude the limiting rod 27 by rotating the fixed rotating rod 28, when the limiting rod 27 is extruded, the limiting rod 27 can be retracted into the second fixed frame 25, at this time, the baffle 29 can be driven to rotate through the rotation of the fixed rotating rod 28, so that the size of water flow can be conveniently adjusted, when the proper position is adjusted, the limiting rod 27 can be reset through the self elasticity of the spring 26, so that the limiting rod 27 can be inserted into the fixed rotating rod 28 to play a role of limiting the fixed rotating rod 28, when the water spraying head 3 is used, according to the attached drawings 1 and 2, when the water spraying head 3 leaks, can collect water through collecting frame 41, when collecting more, through pulling pull rod 44, can make closing plate 42 remove, collect the inside water of frame 41 at this moment and can fall into the inside of storage water tank 21, do above the utility model discloses a whole theory of operation.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a concrete curing means for construction, includes curing means main part (1), its characterized in that: the surface of the maintenance device main body (1) is provided with an adjusting structure (2), the adjusting structure (2) comprises a water storage tank (21), the surface of the maintenance device main body (1) is provided with the water storage tank (21), the water pump (22) is inserted into the water storage tank (21), the output end of the water pump (22) is inserted into the water collecting bin (23), the top end surface of the water collecting bin (23) is fixedly connected with a first fixing frame (24), the surface of the first fixing frame (24) is fixedly connected with a second fixing frame (25), the inner wall of the second fixing frame (25) is welded with a spring (26), one end of the spring (26), which is far away from the second fixing frame (25), is welded with a limiting rod (27), one end of the limiting rod (27), which is far away from the spring (26), is inserted into the fixed rotating rod (28), one end of the fixed rotating rod (28), which is far away from the first fixing frame (24), is fixedly connected with a partition plate (29), the utility model discloses a water pump, including collecting sump (23), water pump (22), collection bin (23), water storage tank (21), the one end fixed surface who keeps away from first fixed frame (24) of collection sump (23) is connected with bracing piece (210), the one end that water pump (22) were kept away from in collection sump (23) is installed sprinkler bead (3), the surface of storage tank (21) is provided with collects mechanism (4), collect mechanism (4) including collecting frame (41), the side fixedly connected with of storage tank (21) collects frame (41), and the inner wall of collecting frame (41) is inconsistent with the surface of closing plate (42), one side fixedly connected with movable block (43) that closing plate (42) are close to storage tank (21), the top fixedly connected with pull rod (44) of closing plate (42).
2. The concrete curing device for building construction according to claim 1, characterized in that: one side of the water storage tank (21) close to the collecting frame (41) is provided with a rectangular through hole, the sealing plate (42) is arranged to be rectangular, and the size of the inner wall of the rectangular through hole formed in one side of the water storage tank (21) is smaller than the surface size of the sealing plate (42).
3. The concrete curing device for building construction according to claim 1, characterized in that: the water collecting bin (23) is cylindrical, the partition plate (29) is circular, and the size of the inner wall of the water collecting bin (23) is matched with the size of the surface of the partition plate (29).
4. The concrete curing device for building construction according to claim 1, characterized in that: the surface of the fixed rotating rod (28) is provided with a groove, the limiting rod (27) is cylindrical, one end, close to the fixed rotating rod (28), of the limiting rod (27) is arc-shaped, and the surface size of the limiting rod (27) is matched with the size of the inner wall of the groove formed in the surface of the fixed rotating rod (28).
5. The concrete curing device for building construction according to claim 1, characterized in that: the collection frame (41) is set to be rectangular, and the bottom end of the collection frame (41) is set to be an inclined plane.
6. The concrete curing device for building construction according to claim 1, characterized in that: the moving blocks (43) are rectangular, two groups of moving blocks (43) are symmetrically arranged on the surface of the sealing plate (42), a sliding groove is formed in the side face of the water storage tank (21), and the water storage tank (21) is connected with the two groups of moving blocks (43) in a sliding mode.
CN202120354155.0U 2021-02-08 2021-02-08 Concrete curing means for construction Active CN214658881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120354155.0U CN214658881U (en) 2021-02-08 2021-02-08 Concrete curing means for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120354155.0U CN214658881U (en) 2021-02-08 2021-02-08 Concrete curing means for construction

Publications (1)

Publication Number Publication Date
CN214658881U true CN214658881U (en) 2021-11-09

Family

ID=78447306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120354155.0U Active CN214658881U (en) 2021-02-08 2021-02-08 Concrete curing means for construction

Country Status (1)

Country Link
CN (1) CN214658881U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114164737A (en) * 2021-11-16 2022-03-11 贾月坤 Concrete curing means is used in highway engineering construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114164737A (en) * 2021-11-16 2022-03-11 贾月坤 Concrete curing means is used in highway engineering construction

Similar Documents

Publication Publication Date Title
CN214658881U (en) Concrete curing means for construction
CN211268000U (en) A high-efficient sprinkling irrigation equipment for wisdom agricultural
CN218794840U (en) Water-saving dust removal device
CN209824698U (en) Irrigation equipment for landscape construction
CN209643497U (en) A kind of ecological garden water circulation utilization system
CN216408431U (en) Monitoring device for building construction management
CN215542160U (en) Dust fall spraying apparatus is used in municipal administration
CN215736235U (en) Agricultural high-efficiency energy-saving water sprayer convenient to move
CN115885822A (en) Buried irrigation machine for agricultural planting
CN211745920U (en) Assembled hydraulic engineering uses multi-functional irrigation equipment
CN112832095A (en) Municipal administration is with ground cooling maintenance watering equipment
CN211267979U (en) Water-saving irrigation equipment
CN208462627U (en) A kind of energy saving and environment friendly treegarden irrigation device
CN207531550U (en) A kind of Internet of Things automatic watering device of vertical planting
CN220072039U (en) Spraying maintenance device in continuous box girder box
CN219808470U (en) Integrated pump station with self-cleaning function
CN219352642U (en) Water conservation equipment for hydraulic engineering
CN212573772U (en) Leguminous water-saving agricultural irrigation device with anti-blocking function
CN213756076U (en) Greening maintenance device convenient to install
CN218417757U (en) Irrigation equipment for afforestation
CN217184204U (en) Agricultural irrigation is with irrigation equipment who has multi-angle adjustment mechanism
CN217591723U (en) Afforestation-used spraying device convenient to adjust
CN220123609U (en) Intelligent sprinkler irrigation system for urban road
CN210421249U (en) Environment-friendly water conservancy facility
CN216261584U (en) Paint spraying equipment for waterproof coating

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant