CN216379180U - Strutting arrangement is used in bridge construction convenient to equipment - Google Patents

Strutting arrangement is used in bridge construction convenient to equipment Download PDF

Info

Publication number
CN216379180U
CN216379180U CN202122972076.9U CN202122972076U CN216379180U CN 216379180 U CN216379180 U CN 216379180U CN 202122972076 U CN202122972076 U CN 202122972076U CN 216379180 U CN216379180 U CN 216379180U
Authority
CN
China
Prior art keywords
auxiliary rod
groove
bridge construction
bracing piece
supporting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122972076.9U
Other languages
Chinese (zh)
Inventor
张贝贝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122972076.9U priority Critical patent/CN216379180U/en
Application granted granted Critical
Publication of CN216379180U publication Critical patent/CN216379180U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a supporting device for bridge construction, which is convenient to assemble and solves the problem that the working efficiency is reduced because the supporting device is inconvenient to move and adjust in the prior art. The utility model provides a strutting arrangement is used in bridge construction convenient to equipment, includes the base, and a plurality of adjustment groove has been seted up at the top of base, and the inside sliding connection in one of them adjustment groove has the bracing piece, and the fixed slot has been seted up on the surface of bracing piece, and the auxiliary rod is worn to be equipped with in the inside of fixed slot, and the one end of auxiliary rod is located inside another adjustment groove, and the surface of auxiliary rod has cup jointed and has supported the board, and the bracing piece is equipped with the backup pad through fixed establishment with the top of auxiliary rod. The base is moved before assembly, and the support device is rapidly assembled and adjusted, so that the working efficiency is improved.

Description

Strutting arrangement is used in bridge construction convenient to equipment
Technical Field
The utility model relates to the technical field of supporting devices for construction, in particular to a supporting device convenient to assemble and used for bridge construction.
Background
The bridge construction is a process of constructing a bridge and constructing parts such as guardrails and the like on the top of the bridge, and during construction, a large machine and the like are needed to be used for constructing a bridge body first, and then workers go to the bridge body to construct other parts.
In the prior art, when a bridge needs to be built, a supporting device needs to be used for supporting parts or articles, but the existing supporting device is an assembled device and is inconvenient to move and adjust the position, so that more time is wasted in moving and adjusting, and the working efficiency is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a supporting device for bridge construction, which is convenient to assemble and solves the problem that the working efficiency is reduced because the supporting device is inconvenient to move and adjust in the prior art.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a strutting arrangement is used in bridge construction convenient to equipment, includes the base, and a plurality of adjustment groove has been seted up at the top of base, and the inside sliding connection in one of them adjustment groove has the bracing piece, and the fixed slot has been seted up on the surface of bracing piece, and the auxiliary rod is worn to be equipped with in the inside of fixed slot, and the one end of auxiliary rod is located inside another adjustment groove, and the surface of auxiliary rod has cup jointed and has supported the board, and the bracing piece is equipped with the backup pad through fixed establishment with the top of auxiliary rod.
Preferably, fixed establishment includes that a plurality of sets up the holding tank in the backup pad bottom, the bracing piece and the equal fixedly connected with fixed block in top of auxiliary rod, and the fixed block is located inside the adjacent holding tank.
Preferably, the both sides of fixed block are all rotated and are connected with the cylinder, and the restriction groove has been seted up to cylindrical one side, and the inside in restriction groove has the restriction piece through extrusion spring elastic connection, and the draw-in groove has all been seted up to the both sides of holding tank, and the restriction piece is worn to locate inside the adjacent draw-in groove.
Preferably, the cross section of the limiting groove is T-shaped, the cross section of the limiting block is T-shaped, and two reinforcing strips are fixedly connected to two sides of the supporting plate.
Preferably, the top of the base is provided with insertion grooves at two sides of the adjusting groove, and the inside of the insertion grooves is slidably connected with a limiting plate.
Preferably, the connecting grooves are formed in the two sides of the supporting rod and the two sides of the auxiliary rod, and the reinforcing rod is connected between the two connecting grooves in the same side in a sliding mode.
The utility model has at least the following beneficial effects:
when needs use strutting arrangement, can make things convenient for quick equipment bracing piece and auxiliary rod to use fixed establishment to fix the backup pad, can be convenient remove the base before the equipment, can be quick after removing to the position assemble and adjust strutting arrangement, save physical power and time, thereby improve work efficiency.
The utility model also has the following beneficial effects:
when bracing piece and auxiliary rod when needs equipment, can be through inside inserting the spread groove with the restriction board to can make when using bracing piece and auxiliary rod, prevent that bracing piece and auxiliary rod slope from collapsing.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a side cross-sectional view of the support plate of FIG. 1;
fig. 3 is a side view of fig. 1.
In the figure: 1. a base; 2. an adjustment groove; 3. a support bar; 4. fixing grooves; 5. an auxiliary lever; 6. a resisting plate; 7. a fixing mechanism; 8. a support plate; 9. inserting the groove; 10. a limiting plate; 11. connecting grooves; 12. a reinforcing bar; 701. accommodating grooves; 702. a fixed block; 703. a cylinder; 704. a limiting groove; 705. a compression spring; 706. a limiting block; 707. a card slot; 708. a reinforcing strip.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
Referring to fig. 1-3, a strutting arrangement is used in bridge construction convenient to equipment, including base 1, a plurality of adjustment groove 2 has been seted up at base 1's top, the inside sliding connection in one of them adjustment groove 2 has bracing piece 3, fixed slot 4 has been seted up on the surface of bracing piece 3, auxiliary rod 5 is worn to be equipped with in the inside of fixed slot 4, the one end of auxiliary rod 5 is located inside another adjustment groove 2, the surface of auxiliary rod 5 has been cup jointed and has been supported board 6, bracing piece 3 is equipped with backup pad 8 through fixed establishment 7 with auxiliary rod 5's top, and is concrete, fixed establishment 7 conveniently pulls down backup pad 8, and it is convenient fixed with backup pad 8.
The scheme has the following working processes:
when needs are under bridge construction, when needing to prop up part or article, put base 1 on ground, then put into one of them adjustment groove 2 inside with bracing piece 3, later insert the inside of fixed slot 4 with auxiliary rod 5, put into another adjustment groove 2 inside with the other end of auxiliary rod 5, auxiliary rod 5 does not pass fixed slot 4 completely through propping the pole, then fix the top to bracing piece 3 and auxiliary rod 5 with backup pad 8 through fixed establishment 7 to make bracing piece 3 prop up certain height with part or article and conveniently carry out the construction.
According to the working process, the following steps are known:
when carrying out bridge construction, can put subaerial with base 1, then install bracing piece 3 and auxiliary rod 5 inside adjustment tank 2, later install bracing piece 3 and auxiliary rod 5's top with backup pad 8 through fixed establishment 7, can be quick prop up convenient article with backup pad 8.
Further, fixed establishment 7 includes that the holding tank 701 in backup pad 8 bottom is seted up to a plurality of, and the bracing piece 3 is with the equal fixedly connected with fixed block 702 in auxiliary rod 5's top, and fixed block 702 is located inside adjacent holding tank 701, and is concrete, when needs erection bracing board 8, aims at adjacent holding tank 701 with fixed block 702, then descends backup pad 8 to make fixed block 702 enter into inside adjacent holding tank 701.
Further, the both sides of fixed block 702 are all rotated and are connected with cylinder 703, restriction groove 704 has been seted up to one side of cylinder 703, restriction groove 704's inside has restriction piece 706 through extrusion spring 705 elastic connection, draw-in groove 707 has all been seted up to the both sides of holding tank 701, restriction piece 706 wears to locate inside adjacent draw-in groove 707, it is specific, before fixed block 702 gets into holding tank 701, can drive cylinder 703 through rotating restriction piece 706 and rotate, thereby make the position of restriction piece 706 parallel with draw-in groove 707, it is convenient inside with restriction piece 706 inserts draw-in groove 707 at the angle of difference, thereby make fixed block 702 position fixed.
Furthermore, the cross-section of the limiting groove 704 is T-shaped, the cross-section of the limiting block 706 is T-shaped, two reinforcing bars 708 are fixedly connected to two sides of the supporting plate 8, specifically, the limiting block 706 is prevented from being completely separated from the limiting groove 704, so that the position of the fixing block 702 cannot be fixed, the stress area of the limiting block 706 can be increased through the reinforcing bars 708, and the strength of the limiting block 706 is improved.
Further, the top of the base 1 is provided with insertion grooves 9 at both sides of the adjustment groove 2, and the inside of the insertion grooves 9 is slidably connected with a limiting plate 10, specifically, before the support rod 3 and the auxiliary rod 5 are assembled, the limiting plate 10 needs to be inserted into the insertion grooves 9, so as to prevent the support rod 3 and the auxiliary rod 5 from tilting to cause the support plate 8 to be unable to be supported.
Further, the connecting groove 11 has all been seted up with the both sides of auxiliary rod 5 to bracing piece 3, and sliding connection has stiffener 12 between two connecting grooves 11 with one side, and is concrete, can make the distance between bracing piece 3 and the auxiliary rod 5 by the restriction through stiffener 12, need change the stiffener 12 of different length when the adjustment tank 2 of better difference for it is more firm between bracing piece 3 and the auxiliary rod 5.
As described above, when it is necessary to support an object or a part, the support rod 3 can be easily assembled with the auxiliary rod 5, and then the support plate 8 is fixed to the top of the support rod 3 and the auxiliary rod 5, so that the assembly and use can be rapidly performed, and the restriction plate 10 can be inserted into the insertion groove 9 to prevent the inclination.
The foregoing shows and describes the general principles, essential features, and advantages of the utility model. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are merely illustrative of the principles of the utility model, but that various changes and modifications may be made without departing from the spirit and scope of the utility model, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a strutting arrangement is used in bridge construction convenient to equipment, includes base (1), its characterized in that, a plurality of adjustment groove (2) have been seted up at the top of base (1), one of them the inside sliding connection in adjustment groove (2) has bracing piece (3), fixed slot (4) have been seted up on the surface of bracing piece (3), auxiliary rod (5) are worn to be equipped with in the inside of fixed slot (4), the one end of auxiliary rod (5) is located another inside adjustment groove (2), the surface of auxiliary rod (5) has cup jointed and has supported board (6), bracing piece (3) with the top of auxiliary rod (5) is equipped with backup pad (8) through fixed establishment (7).
2. The supporting device convenient to assemble for bridge construction of claim 1, wherein the fixing mechanism (7) comprises a plurality of accommodating grooves (701) formed in the bottom of the supporting plate (8), fixing blocks (702) are fixedly connected to the top of the supporting rod (3) and the top of the auxiliary rod (5), and the fixing blocks (702) are located in the adjacent accommodating grooves (701).
3. The supporting device convenient to assemble for bridge construction as claimed in claim 2, wherein both sides of the fixing block (702) are rotatably connected with a cylinder (703), one side of the cylinder (703) is provided with a limiting groove (704), the limiting groove (704) is elastically connected with a limiting block (706) through an extrusion spring (705), both sides of the accommodating groove (701) are provided with clamping grooves (707), and the limiting block (706) is arranged in the adjacent clamping groove (707) in a penetrating manner.
4. The easy-to-assemble supporting device for bridge construction as claimed in claim 3, wherein the limiting groove (704) is T-shaped in cross section, the limiting block (706) is T-shaped in cross section, and two reinforcing bars (708) are fixedly connected to both sides of the supporting plate (8).
5. The supporting device convenient to assemble for bridge construction according to claim 1, wherein the top of the base (1) is provided with insertion grooves (9) positioned at two sides of the adjusting groove (2), and a limiting plate (10) is slidably connected inside the insertion grooves (9).
6. The supporting device convenient to assemble for bridge construction as claimed in claim 1, wherein the supporting rod (3) and the auxiliary rod (5) are provided with connecting grooves (11) on both sides, and a reinforcing rod (12) is slidably connected between the two connecting grooves (11) on the same side.
CN202122972076.9U 2021-11-30 2021-11-30 Strutting arrangement is used in bridge construction convenient to equipment Expired - Fee Related CN216379180U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122972076.9U CN216379180U (en) 2021-11-30 2021-11-30 Strutting arrangement is used in bridge construction convenient to equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122972076.9U CN216379180U (en) 2021-11-30 2021-11-30 Strutting arrangement is used in bridge construction convenient to equipment

Publications (1)

Publication Number Publication Date
CN216379180U true CN216379180U (en) 2022-04-26

Family

ID=81220653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122972076.9U Expired - Fee Related CN216379180U (en) 2021-11-30 2021-11-30 Strutting arrangement is used in bridge construction convenient to equipment

Country Status (1)

Country Link
CN (1) CN216379180U (en)

Similar Documents

Publication Publication Date Title
CN112696007B (en) Building template system and rapid template installation and positioning construction method
CN216379180U (en) Strutting arrangement is used in bridge construction convenient to equipment
CN212804551U (en) Municipal pipeline laying device of easily being under construction
CN214119537U (en) Novel mining machinery supporting platform
CN211816949U (en) Wood frame module for archaizing building construction
CN214944279U (en) A excavation construction rack construction for tunnel engineering
CN213448511U (en) Foundation pit supporting device
CN219858339U (en) Box for engineering machinery
CN218264885U (en) Attached type lifting scaffold protective net
CN218814487U (en) Building antidetonation masonry structure
CN220847120U (en) Auxiliary tool for positioning construction of anti-collision guardrail steel bars
CN214832488U (en) Channel for high-standard farmland convenient to install and position
CN217053456U (en) Soil and water that stability is strong keeps with keeping off native board device
CN215368871U (en) Shear force wall reinforced structure
CN215564370U (en) Building construction reinforcing apparatus
CN217557920U (en) Guardrail for construction worker
CN218322808U (en) Expansive soil slope structure
CN213840229U (en) Functional support is used in mining machinery installation
CN214302926U (en) Binding and rolling positioning device for processing reinforcing steel bars
CN210764091U (en) High-rise building construction is with playing gallows convenient to stable concatenation is used
CN218970565U (en) Multifunctional scaffold
CN220378310U (en) Filling coal mining supporting equipment
CN220790498U (en) Building construction support
CN209873744U (en) Water conservancy water and electricity construction fastening processing apparatus
CN216341446U (en) Connection structure of fence wallboard for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee