CN216360184U - Municipal administration road pipeline transportation device - Google Patents

Municipal administration road pipeline transportation device Download PDF

Info

Publication number
CN216360184U
CN216360184U CN202122642999.8U CN202122642999U CN216360184U CN 216360184 U CN216360184 U CN 216360184U CN 202122642999 U CN202122642999 U CN 202122642999U CN 216360184 U CN216360184 U CN 216360184U
Authority
CN
China
Prior art keywords
rod
support frame
arched support
pull rod
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122642999.8U
Other languages
Chinese (zh)
Inventor
吕德坤
吕国跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heng Ji Construction Group Co ltd
Original Assignee
Heng Ji Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heng Ji Construction Group Co ltd filed Critical Heng Ji Construction Group Co ltd
Priority to CN202122642999.8U priority Critical patent/CN216360184U/en
Application granted granted Critical
Publication of CN216360184U publication Critical patent/CN216360184U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The utility model relates to the technical field of road construction equipment, in particular to a municipal road pipeline transportation device which comprises an arched support frame, wherein universal wheels are arranged at the bottom of the arched support frame, a through hole is vertically and downwards formed in the middle of the upper end of the arched support frame, a pull rod is connected in the through hole in a sliding mode, external threads are arranged on the pull rod, an adjusting nut is arranged at the upper end of the through hole and is rotatably connected with the upper end of the pull rod through threads, a first clamping rod is vertically arranged on one side inside the arched support frame, the upper end of the first clamping rod is rotatably connected with the arched support frame, a first connecting rod is rotatably connected between the middle of the first clamping rod and the lower end of the pull rod, a second clamping rod is vertically arranged on the other side inside the arched support frame, the upper end of the second clamping rod is rotatably connected with the arched support frame, and a second connecting rod is rotatably connected between the middle of the second clamping rod and the lower end of the pull rod.

Description

Municipal administration road pipeline transportation device
Technical Field
The utility model relates to the technical field of road construction equipment, in particular to a municipal road pipeline transportation device.
Background
Municipal pipeline engineering is an important component of municipal engineering and is an important infrastructure of cities. The municipal pipeline engineering comprises a water supply pipeline, a drainage pipeline, a gas pipeline, a heat distribution pipeline and a power cable.
In the laying process of municipal pipeline, often need the workman to remove each way pipeline to the assigned position, however some pipeline weight are heavier, need many people to cooperate simultaneously just can remove it, waste time and energy.
SUMMERY OF THE UTILITY MODEL
The utility model provides a municipal road pipeline transportation device for solving the technical defects, which can easily lift a pipeline and move the pipeline to a specified position.
The utility model discloses a municipal road pipeline transportation device, which comprises an arched support frame, a universal wheel, a first clamping rod, a second clamping rod, a first connecting rod, a second connecting rod, a pull rod and an adjusting nut, wherein the universal wheel is arranged at the bottom of the arched support frame, a through hole is vertically and downwards formed in the middle of the upper end of the arched support frame, the pull rod is connected in the through hole in a sliding manner, an external thread is arranged on the pull rod, the adjusting nut is arranged at the upper end of the through hole and is rotatably connected with the upper end of the pull rod through threads, the first clamping rod is vertically arranged on one side inside the arched support frame, the upper end of the first clamping rod is rotatably connected with the arched support frame, a first connecting rod is arranged between the middle part of the first clamping rod and the lower end of the pull rod, two ends of the first connecting rod are respectively rotatably connected with the middle part of the first clamping rod and the lower end of the pull rod, the second clamping rod is vertically arranged on the other side in the arched support frame, the upper end of the second clamping rod is rotatably connected with the arched support frame, a second connecting rod is arranged between the middle of the second clamping rod and the lower end of the pull rod, and two ends of the second connecting rod are rotatably connected with the middle of the second clamping rod and the lower end of the pull rod respectively.
When using, place this device respectively at the both ends of pipeline, make the pipeline be in between first supporting rod, the second supporting rod, rotate adjusting nut and make the pull rod up move, first connecting rod of pull rod upwards pulling and second connecting rod, first connecting rod and second connecting rod stimulate first supporting rod, second supporting rod respectively, make first supporting rod, second supporting rod clip the pipeline and lift the pipeline liftoff, just can remove this device and pipeline to the assigned position together through the universal wheel.
Furthermore, the adjusting nut is provided with a handle, so that the adjusting nut is convenient to rotate.
Furthermore, the lower ends of the first clamping rod and the second clamping rod are arranged to be arc-shaped, so that the first clamping rod and the second clamping rod can better clamp the pipeline.
The utility model has the beneficial effects that: make the pull rod up to remove through rotating adjusting nut, the pull rod upwards stimulates first connecting rod and second connecting rod, and first connecting rod stimulates first supporting rod, second supporting rod respectively with the second connecting rod, makes first supporting rod, second supporting rod clip the pipeline and lift the pipeline liftoff, need not many people and can lift up the pipeline in the cooperation simultaneously, saves the cost of labor, and the pipeline is lifted off ground after also conveniently removing.
Drawings
Fig. 1 is a front view of the present embodiment 1.
Detailed Description
To further illustrate the technical means and effects of the present invention for achieving the intended purpose of the utility model, the following detailed description of the embodiments, structures, features and effects according to the present invention will be made with reference to the accompanying drawings and preferred embodiments.
Example 1:
as shown in figure 1, a municipal road pipeline transportation device comprises an arched support frame 2, an universal wheel 1, a first clamping rod 3, a second clamping rod 9, a first connecting rod 4, a second connecting rod 8, a pull rod 5 and an adjusting nut 6, wherein the universal wheel 1 is arranged at the bottom of the arched support frame 2, a through hole is vertically and downwards formed in the middle of the upper end of the arched support frame 2, the pull rod 5 is connected with the through hole in a sliding mode, external threads are formed in the pull rod 5, the adjusting nut 6 is arranged at the upper end of the through hole and is rotatably connected with the upper end of the pull rod 5 through threads, the first clamping rod 3 is vertically arranged on one side of the inner portion of the arched support frame 2, the upper end of the first clamping rod 3 is rotatably connected with the arched support frame 2, the first connecting rod 4 is arranged between the middle of the first clamping rod 3 and the lower end of the pull rod 5, and two ends of the first connecting rod 4 are respectively connected with the middle of the first clamping rod 3, The lower end of the pull rod 5 is rotatably connected, the second clamping rod 9 is vertically arranged on the other side inside the arched support frame 2, the upper end of the second clamping rod 9 is rotatably connected with the arched support frame 2, a second connecting rod 8 is arranged between the middle of the second clamping rod 9 and the lower end of the pull rod 5, and two ends of the second connecting rod 8 are rotatably connected with the middle of the second clamping rod and the lower end of the pull rod 5 respectively.
When using, place this device respectively at the both ends of pipeline, make the pipeline be in first supporting rod 3, between the second supporting rod 9, rotate adjusting nut 6 and make pull rod 5 up move, pull rod 5 upwards stimulates first connecting rod 4 and second connecting rod 8, first connecting rod 4 stimulates first supporting rod 3 respectively with second connecting rod 8, second supporting rod 9, make first supporting rod 3, second supporting rod 9 clip the pipeline and lift the pipeline liftoff, just can remove this device and pipeline to the assigned position together through universal wheel 1.
Furthermore, a handle 7 is arranged on the adjusting nut 6, so that the adjusting nut 6 can be conveniently rotated.
Furthermore, the lower ends of the first clamping rod 3 and the second clamping rod 9 are arranged to be arc-shaped, so that the first clamping rod 3 and the second clamping rod 9 can better clamp a pipeline.
Although the present invention has been described with reference to the preferred embodiments, it is to be understood that the utility model is not limited to the disclosed embodiments, but may be embodied or carried out in various forms without departing from the spirit and scope of the utility model.

Claims (3)

1. A municipal road pipeline transportation device is characterized by comprising an arched support frame (2), universal wheels (1), first clamping rods (3), second clamping rods (9), a first connecting rod (4), a second connecting rod (8), a pull rod (5) and an adjusting nut (6), wherein the universal wheels (1) are arranged at the bottom of the arched support frame (2), a through hole is vertically and downwards formed in the middle of the upper end of the arched support frame (2), the pull rod (5) is connected in the through hole in a sliding mode, external threads are arranged on the pull rod (5), the adjusting nut (6) is arranged at the upper end of the through hole and is rotatably connected with the upper end of the pull rod (5) through threads, the first clamping rods (3) are vertically arranged on one side inside the arched support frame (2), the upper ends of the first clamping rods (3) are rotatably connected with the arched support frame (2), first supporting rod (3) middle part with set up first connecting rod (4) between pull rod (5) lower extreme, first connecting rod (4) both ends respectively with first supporting rod (3) middle part pull rod (5) lower extreme rotates to be connected, the inside opposite side of arched support frame (2) is vertical to be provided with second supporting rod (9), second supporting rod (9) upper end with arched support frame (2) rotate to be connected, second supporting rod (9) middle part with set up second connecting rod (8) between pull rod (5) lower extreme, second connecting rod (8) both ends respectively with second supporting rod middle part pull rod (5) lower extreme rotates to be connected.
2. The town road pipeline transportation device according to claim 1, wherein the adjusting nut (6) is provided with a handle (7).
3. The town road pipeline transport device according to claim 1, wherein the lower ends of the first and second clamping bars (3, 9) are formed in a circular arc shape.
CN202122642999.8U 2021-11-01 2021-11-01 Municipal administration road pipeline transportation device Active CN216360184U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122642999.8U CN216360184U (en) 2021-11-01 2021-11-01 Municipal administration road pipeline transportation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122642999.8U CN216360184U (en) 2021-11-01 2021-11-01 Municipal administration road pipeline transportation device

Publications (1)

Publication Number Publication Date
CN216360184U true CN216360184U (en) 2022-04-22

Family

ID=81188518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122642999.8U Active CN216360184U (en) 2021-11-01 2021-11-01 Municipal administration road pipeline transportation device

Country Status (1)

Country Link
CN (1) CN216360184U (en)

Similar Documents

Publication Publication Date Title
CN206958389U (en) A kind of water supply and sewerage pipeline lays processing unit
CN204804451U (en) Wire pole hydraulic pressure centralizer
CN216360184U (en) Municipal administration road pipeline transportation device
CN212246090U (en) Hydraulic lifting device for distribution transformer
CN203660423U (en) Lifting device for overhead ground wire of power transmission line
CN211804637U (en) Fixing frame for electric vehicle welding
CN216833695U (en) Stone plate carrying tool
CN110550318A (en) Steel pipe mobile device
CN212825087U (en) Overhead pipeline installs auxiliary device
CN211475089U (en) Pipeline strutting arrangement for municipal construction
CN214456406U (en) Vertical lifting device for assembling high tower
CN205010269U (en) Large -scale equipment unwheeling
CN204825531U (en) Reversal of natural order of things formula rail installation appurtenance
CN211107581U (en) A handling device for afforestation
CN203593016U (en) Novel concrete pier carrying device
CN107386117A (en) A kind of device of double rod iron method construction bridges bent caps
CN203951100U (en) Portable down conductor lifting device
CN205555966U (en) Automatic lifting support device of galvanized steel sheet
CN202558538U (en) Well cover lifting device
CN220643762U (en) Simple and easy curb transport installation device
CN204940866U (en) Y type pier stud oblique fulcrum bar punching block removes system
CN219217043U (en) Combined support for paying off wire coil
CN213859246U (en) Movable clamp for mounting kerbstone
CN210723963U (en) Electric power overhaul frame
CN217997746U (en) Curbstone carrying and laying tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant