CN216342940U - Air blower for construction - Google Patents

Air blower for construction Download PDF

Info

Publication number
CN216342940U
CN216342940U CN202122908205.8U CN202122908205U CN216342940U CN 216342940 U CN216342940 U CN 216342940U CN 202122908205 U CN202122908205 U CN 202122908205U CN 216342940 U CN216342940 U CN 216342940U
Authority
CN
China
Prior art keywords
air
pipe
blower
fixedly connected
equipment box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202122908205.8U
Other languages
Chinese (zh)
Inventor
刘浪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Dingrun Construction Co ltd
Original Assignee
Fujian Dingrun Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Dingrun Construction Co ltd filed Critical Fujian Dingrun Construction Co ltd
Priority to CN202122908205.8U priority Critical patent/CN216342940U/en
Application granted granted Critical
Publication of CN216342940U publication Critical patent/CN216342940U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses a blower device for building construction, belonging to the technical field of building construction equipment, and the technical scheme is characterized by comprising an equipment box, wherein the inner top wall of the equipment box is fixedly connected with a blower, the left side of the blower penetrates through the equipment box and extends to the outside of the equipment box, and the left side of the blower is in threaded connection with a protective component. Is convenient for daily maintenance.

Description

Air blower for construction
Technical Field
The utility model relates to the technical field of building construction equipment, in particular to a blower device for building construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is a construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place, and comprises basic engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, wherein the construction operation place is called a building construction site or a construction site, and is also called a construction site.
The general scene air quality is relatively poor during construction, dust and powder that contain in the air are more, need carry out timely blast air to the scene and take a breath, current blower can only carry out very simple taking a breath to the scene, can't handle the dust in the air, and blower uses the long time air inlet of time and can gather a large amount of dust at the construction scene, current device dismantles trouble, can reduce the work efficiency of device after the time is long, consequently, technical personnel in the field provide a blower for construction, in order to solve the problem that proposes among the above-mentioned background art.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
Aiming at the problems in the prior art, the utility model aims to provide the air blowing device for building construction, which has the advantages of capability of reducing dust in air, better air blowing effect, simplicity in disassembly and convenience in maintenance.
2. Technical scheme
In order to solve the problems, the utility model adopts the following technical scheme: the utility model provides a blower for construction, includes the equipment box, the interior roof fixedly connected with air-blower of equipment box, the left side of air-blower runs through the equipment box and extends to the outside of equipment box, the left side threaded connection of air-blower has the protection component, the right side intercommunication of air-blower has the play tuber pipe, it runs through the equipment box and extends to the outside of equipment box to go out the tuber pipe, the inner wall fixedly connected with of going out the tuber pipe sprays the subassembly, the inner wall rotation of going out the tuber pipe is connected with the dwang, the right side fixedly connected with flabellum of dwang, the interior roof fixedly connected with motor of equipment box, the output shaft of motor runs through the tuber pipe and extends to the inside of going out the tuber pipe, the surface of dwang and the output shaft of motor all fixedly connected with conical gear, two the conical gear meshing is connected, the interior roof fixedly connected with water tank of equipment box, the inner wall fixedly connected with filter of water tank, the inner diapire of water tank is provided with the water pump, the right side intercommunication of water pump has the connecting pipe, the connecting pipe runs through the water tank in proper order and goes out the tuber pipe and be linked together with spraying assembly.
Further, the left side intercommunication of water tank has the inlet tube, the inlet tube runs through the equipment box and extends to the outside of equipment box.
Furthermore, the inner wall of the air outlet pipe is fixedly connected with a water retaining ring, the inner top wall of the water tank is fixedly connected with a collecting pipe, and the collecting pipe penetrates through the water tank and is communicated with the air outlet pipe.
Further, the spraying assembly comprises a circular pipe, the circular pipe is fixedly connected with the inner wall of the air outlet pipe, the circular pipe is communicated with the connecting pipe, and the inner wall of the circular pipe is provided with the atomizing nozzles distributed in an annular mode.
Further, the protection component includes a circular cylinder, a circular cylinder and air-blower threaded connection, the inner wall joint of a circular cylinder has the guard ring, the inner wall fixedly connected with quantity of guard ring is two metal filter screen, two the opposite side of metal filter screen is provided with the sponge.
Furthermore, the fixed surface of the guard ring is connected with two clamping blocks, the inner wall of the circular cylinder is provided with two annular clamping grooves, the inner wall of the circular cylinder is provided with two sliding grooves communicated with the annular clamping grooves, and the clamping blocks are located on the inner wall of the annular clamping grooves.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages that:
(1) according to the scheme, the spraying assembly is arranged, water is added in flowing wind while air is supplied by the device, the environment of a building construction site can be rapidly dusted, the environment of the construction site is optimized, the health of constructors is protected, dust can be blocked by arranging the protection assembly, larger garbage is prevented from entering the interior of an air blower to cause internal blockage, smaller garbage is prevented from entering the construction site, the construction environment is optimized, and the protection assembly can be rapidly disassembled and is convenient for daily maintenance through the interaction of the clamping block, the sliding groove and the annular clamping groove;
(2) through setting up the inlet tube, it is more convenient when adding water to the water tank, through setting up manger plate ring and collecting pipe, can collect the water of a tuber pipe inside, avoid the waste of water resource, and avoid water to flow backwards to the inside of air-blower.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the attachment of the blower and shield assembly of the present invention;
FIG. 3 is a schematic view of the connection between the outlet duct and the spray assembly of the present invention;
FIG. 4 is a schematic structural view of the water retaining ring of the present invention;
fig. 5 is an enlarged view of the utility model at a in fig. 1.
The reference numbers in the figures illustrate:
1. an equipment box; 2. a blower; 3. a guard assembly; 301. a circular cylinder; 302. a guard ring; 303. a metal screen; 304. a sponge; 305. a clamping block; 306. a chute; 307. an annular neck; 4. an air outlet pipe; 401. A water retaining ring; 402. a collection pipe; 5. a spray assembly; 501. a circular tube; 502. an atomizing spray head; 6. Rotating the rod; 7. a fan blade; 8. a bevel gear; 9. a water tank; 901. a water inlet pipe; 10. a water pump; 11. a connecting pipe; 12. a filter plate; 13. an electric motor.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention; it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention.
Referring to fig. 1-5, in the embodiment of the present invention, an air blower device for building construction includes an equipment box 1, an air blower 2 is fixedly connected to an inner top wall of the equipment box 1, a left side of the air blower 2 penetrates through the equipment box 1 and extends to an outside of the equipment box 1, a left side of the air blower 2 is in threaded connection with a protection component 3, a right side of the air blower 2 is in communication with an air outlet pipe 4, the air outlet pipe 4 penetrates through the equipment box 1 and extends to the outside of the equipment box 1, an inner wall of the air outlet pipe 4 is fixedly connected with a spraying component 5, an inner wall of the air outlet pipe 4 is rotatably connected with a rotating rod 6, a right side of the rotating rod 6 is fixedly connected with a fan blade 7, an inner top wall of the equipment box 1 is fixedly connected with a motor 13, an output shaft of the motor 13 penetrates through the air outlet pipe 4 and extends to the inside of the air outlet pipe 4, a surface of the rotating rod 6 and an output shaft of the motor 13 are both fixedly connected with a bevel gear 8, two bevel gear 8 meshing are connected, and the inner bottom wall fixedly connected with water tank 9 of equipment case 1, the inner wall fixedly connected with filter 12 of water tank 9, the inner bottom wall of water tank 9 are provided with water pump 10, and the right side intercommunication of water pump 10 has connecting pipe 11, and connecting pipe 11 runs through water tank 9 in proper order and goes out tuber pipe 4 and be linked together with spray assembly 5.
Referring to fig. 1, the left side of the water tank 9 is communicated with a water inlet pipe 901, the water inlet pipe 901 penetrates through the equipment tank 1 and extends to the outside of the equipment tank 1, and the water tank 9 is filled with water more conveniently by arranging the water inlet pipe 901.
Referring to fig. 1 or fig. 4, the inner wall fixedly connected with water retaining ring 401 of air-out pipe 4, the interior roof fixedly connected with collecting pipe 402 of water tank 9, collecting pipe 402 run through water tank 9 and are linked together with air-out pipe 4, through setting up water retaining ring 401 and collecting pipe 402, can collect the inside water of air-out pipe 4, avoid the waste of water resource, and avoid water to flow backwards to the inside of air-blower 2.
Referring to fig. 3, spraying assembly 5 includes circular pipe 501, circular pipe 501 and the inner wall fixed connection who goes out tuber pipe 4, and circular pipe 501 and connecting pipe 11 are linked together, and the inner wall of circular pipe 501 is provided with the atomizer 502 of annular distribution, through setting up spraying assembly 5, adds water in the wind that flows when the device air supply, can carry out quick dust fall to building construction site environment, optimizes the environment of job site, protects constructor's health.
Referring to fig. 2, the protection assembly 3 includes a circular cylinder 301, the circular cylinder 301 is in threaded connection with the air blower 2, a protection ring 302 is clamped on the inner wall of the circular cylinder 301, two metal filter screens 303 are fixedly connected to the inner wall of the protection ring 302, sponges 304 are arranged on opposite sides of the two metal filter screens 303, two fixture blocks 305 are fixedly connected to the surface of the protection ring 302, an annular clamping groove 307 is formed in the inner wall of the circular cylinder 301, two sliding grooves 306 communicated with the annular clamping groove 307 are formed in the inner wall of the circular cylinder 301, the fixture blocks 305 are located on the inner wall of the annular clamping groove 307, by arranging the protection assembly 3, dust can be blocked, larger garbage is prevented from entering the air blower 2 to cause internal blockage, meanwhile, smaller garbage is prevented from entering a construction site, a construction environment is optimized, and through interaction of the fixture blocks 305, the sliding grooves 306 and the annular clamping groove 307, so that the protection component 3 can be quickly disassembled and is convenient for daily maintenance.
The working principle of the utility model is as follows: the device is moved to a proper position, the air blower 2 is started, air enters from the protection component 3 and is discharged through the air outlet pipe 4, the motor 13 drives the two bevel gears 8 to rotate while rotating, the fan blade 7 is driven to rotate by the rotating rod 6, the flow velocity inside the air outlet pipe 4 is further increased by arranging the rotating rod 6 and the bevel gears 8, the spraying range of the spraying component 5 is enlarged, water in the water tank 9 is conveyed into the spraying component 5 through the water pump 10 and the connecting pipe 11 and is sprayed out by the atomizing spray nozzle 502, water is added into flowing air while air is conveyed by the device by arranging the spraying component 5, the environment of a construction site can be rapidly dusted, the environment of the construction site is optimized, the health of constructors is protected, the air is conveyed to the construction site, the water inside the air outlet pipe 4 can be blocked by the water retaining ring 401 and reaches the water tank 9 by the collecting pipe 402, by arranging the water retaining ring 401 and the collecting pipe 402, the water in the air outlet pipe 4 can be collected, the waste of water resources is avoided, the water is prevented from flowing back to the inside of the air blower 2, the water can be reused after being filtered by the filter plate 12, when water needs to be added into the water tank 9, the water can be directly added through the water inlet pipe 901, when the water needs to be added into the water tank 9, the protection component 3 is more convenient to maintain, the circular cylinder 301 is rotated, the circular cylinder 301 is taken down, the protection ring 302 is rotated, the fixture block 305 rotates in the annular clamping groove 307, when the positions of the fixture block 305 and the chute 306 are overlapped, the protection ring 302 is directly lifted upwards, the metal filter screen 303 and the sponge 304 can be cleaned and maintained, by arranging the protection component 3, the dust can be blocked, the larger garbage is prevented from entering the air blower 2, the internal blockage is caused, and meanwhile, the smaller garbage is prevented from entering a construction site, the construction environment is optimized, and the protection assembly 3 can be rapidly disassembled through the interaction of the clamping block 305, the sliding groove 306 and the annular clamping groove 307, so that the daily maintenance is facilitated.
It should be noted that, in the above description, the blower 2, the water pump 10, the motor 13, and the like are all devices that are mature in application of the prior art, and the specific models may be selected according to actual needs, and meanwhile, the power supply of the blower 2, the water pump 10, and the motor 13 may be supplied to the internal power supply or the commercial power, and the specific power supply mode is selected according to circumstances and is not described herein again.
The foregoing is only a preferred embodiment of the present invention; the scope of the utility model is not limited thereto. Any person skilled in the art should be able to cover the technical scope of the present invention by equivalent or modified solutions and modifications within the technical scope of the present invention.

Claims (6)

1. The utility model provides a blower for construction, includes equipment box (1), its characterized in that: the utility model discloses an air blower, including equipment box (1), interior roof fixedly connected with air-blower (2) of equipment box (1), the left side of air-blower (2) runs through equipment box (1) and extends to the outside of equipment box (1), the left side threaded connection of air-blower (2) has protective component (3), the right side intercommunication of air-blower (2) has air-out pipe (4), air-out pipe (4) runs through equipment box (1) and extends to the outside of equipment box (1), the inner wall fixedly connected with of air-out pipe (4) sprays subassembly (5), the inner wall rotation of air-out pipe (4) is connected with dwang (6), the right side fixedly connected with flabellum (7) of dwang (6), the interior roof fixedly connected with motor (13) of equipment box (1), the output shaft of motor (13) runs through air-out pipe (4) and extends to the inside of air-out pipe (4), the equal fixedly connected with conical gear (8) of output shaft, two of the surface of dwang (6) and motor (13) conical gear (8) meshing is connected, inner diapire fixedly connected with water tank (9) of equipment box (1), the inner wall fixedly connected with filter (12) of water tank (9), the inner diapire of water tank (9) is provided with water pump (10), the right side intercommunication of water pump (10) has connecting pipe (11), connecting pipe (11) run through water tank (9) in proper order and go out tuber pipe (4) and be linked together with spray assembly (5).
2. The blower device for building construction according to claim 1, wherein: the left side of the water tank (9) is communicated with a water inlet pipe (901), and the water inlet pipe (901) penetrates through the equipment box (1) and extends to the outside of the equipment box (1).
3. The blower device for building construction according to claim 1, wherein: the inner wall of the air outlet pipe (4) is fixedly connected with a water retaining ring (401), the inner top wall of the water tank (9) is fixedly connected with a collecting pipe (402), and the collecting pipe (402) penetrates through the water tank (9) and is communicated with the air outlet pipe (4).
4. The blower device for building construction according to claim 1, wherein: spray subassembly (5) including circular pipe (501), the inner wall fixed connection of circular pipe (501) and air-out pipe (4), circular pipe (501) and connecting pipe (11) are linked together, the inner wall of circular pipe (501) is provided with atomizer (502) that the annular distributes.
5. The blower device for building construction according to claim 1, wherein: protection component (3) are including a circular section of thick bamboo (301), a circular section of thick bamboo (301) and air-blower (2) threaded connection, the inner wall joint of a circular section of thick bamboo (301) has guard ring (302), the inner wall fixedly connected with quantity of guard ring (302) is metal filter screen (303) two, two the opposite side of metal filter screen (303) is provided with sponge (304).
6. The blower device for building construction according to claim 5, wherein: the surface of the protective ring (302) is fixedly connected with two clamping blocks (305), the inner wall of the circular cylinder (301) is provided with two annular clamping grooves (307), the inner wall of the circular cylinder (301) is provided with two sliding grooves (306) communicated with the annular clamping grooves (307), and the clamping blocks (305) are located on the inner wall of the annular clamping grooves (307).
CN202122908205.8U 2021-11-25 2021-11-25 Air blower for construction Withdrawn - After Issue CN216342940U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122908205.8U CN216342940U (en) 2021-11-25 2021-11-25 Air blower for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122908205.8U CN216342940U (en) 2021-11-25 2021-11-25 Air blower for construction

Publications (1)

Publication Number Publication Date
CN216342940U true CN216342940U (en) 2022-04-19

Family

ID=81154352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122908205.8U Withdrawn - After Issue CN216342940U (en) 2021-11-25 2021-11-25 Air blower for construction

Country Status (1)

Country Link
CN (1) CN216342940U (en)

Similar Documents

Publication Publication Date Title
CN211144550U (en) Coal mine ventilation device with dust filtering function
CN105689183B (en) A kind of Water Rotation Painting Booth
CN212068188U (en) Building engineering construction dust collector
CN211069512U (en) Double-stage high-pressure superfine atomization wet type dust removal fan
CN112044647B (en) Automatic paint spraying device for automobile maintenance
CN212108885U (en) Indoor fan that humidification dust fall air-purifying for construction
CN215808985U (en) Building construction working face sprays dust fall heat sink
CN112452709A (en) Grit sorting device for mechanical engineering
CN214089661U (en) Building construction working face sprays dust fall heat sink
CN216342940U (en) Air blower for construction
CN212104999U (en) Suspended ceiling spraying equipment for architectural decoration
CN113719941A (en) Mill is with dust collecting equipment that takes a breath
CN112870885A (en) Constructional engineering spray dust device
CN216537652U (en) A prevent raise dust heat sink for urban building job site
CN209490999U (en) A kind of steel plate paint-spraying device
CN215696624U (en) Environment-friendly dust removal device with purification function and used for building construction
CN204148078U (en) Seatainer accessory cascade spray-painting plant
CN214914631U (en) Dust absorbing device is used in elastomeric compound production
CN212467520U (en) Remote control timing type fog gun dust suppression machine
CN213885490U (en) Dust device for building engineering convenient to angle regulation
CN115463506A (en) Water vapor dust reduction-based environment-friendly dust removal device for building construction and use method
CN212520265U (en) Spray set for landscape design
CN209752456U (en) energy-saving efficient air-assisted fog gun machine
CN220834775U (en) Construction dust fall device
CN218421868U (en) Quick road surface dust device for energy-saving construction of civil engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20220419

Effective date of abandoning: 20230306

AV01 Patent right actively abandoned

Granted publication date: 20220419

Effective date of abandoning: 20230306

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned