CN216342195U - Quick locating rack for mounting secondary lining reinforcing steel bars of tunnel - Google Patents
Quick locating rack for mounting secondary lining reinforcing steel bars of tunnel Download PDFInfo
- Publication number
- CN216342195U CN216342195U CN202122959112.8U CN202122959112U CN216342195U CN 216342195 U CN216342195 U CN 216342195U CN 202122959112 U CN202122959112 U CN 202122959112U CN 216342195 U CN216342195 U CN 216342195U
- Authority
- CN
- China
- Prior art keywords
- adjusting
- angle steel
- secondary lining
- steel
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a tunnel secondary lining reinforcing steel bar installation rapid positioning frame, which belongs to the technical field of tunnel construction and comprises a pair of angle steels which are arranged in parallel relatively, wherein the opposite surfaces of the two angle steels are provided with adjusting holes, an adjusting screw rod is arranged between the adjusting holes, adjusting nuts are arranged on the two sides of the adjusting holes, the adjusting nuts are in threaded connection with the adjusting screw rods, a plurality of positioning holes which are distributed at intervals are formed in the angle steels along the length direction, and reinforcing steel bars are installed in the positioning holes. According to the reinforcing bar interval preparation locating hole, according to the demand, through rotatory adjusting nut, flexible adjusting screw to adjustable double reinforcing bar interval, thereby guarantee reinforcing bar interval and protective layer thickness.
Description
Technical Field
The utility model relates to the technical field of tunnel construction, in particular to a rapid positioning frame for mounting secondary lining reinforcing steel bars of a tunnel.
Background
In tunnel construction, for the durability of reinforcing concrete lining, need set up the tunnel protective layer, prevent that structural reinforcement from taking place the corrosion in design basic period, the protective layer thickness is thin can produce and leak the muscle, protective layer thickness is too big and seriously influences secondary lining structure atress again, consequently, must control the protective layer thickness according to the design requirement, in the work progress, because structural reinforcement interval is difficult to control, when concrete placement, the reinforcing bar is very easily out of shape after the pressurized and is shifted and push down the waterproof layer, lead to protective layer thickness unqualified.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model aims to provide a rapid positioning frame for mounting a tunnel secondary lining reinforcing steel bar.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a tunnel secondary lining reinforcing steel bar installation rapid positioning frame which comprises a pair of angle steels which are arranged in parallel relatively, wherein the opposite surfaces of the two angle steels are provided with adjusting holes, an adjusting screw rod is arranged between the adjusting holes, adjusting nuts are arranged on the two sides of the adjusting holes, the adjusting nuts are in threaded connection with the adjusting screw rod, a plurality of positioning holes which are distributed at intervals are formed in the angle steels along the length direction, and reinforcing steel bars are installed in the positioning holes. The positioning holes are manufactured according to the steel bar spacing, and the double rows of steel bar spacing can be adjusted through the adjusting screw rods, so that the steel bar spacing and the thickness of the protective layer are guaranteed.
The angle steel is L-shaped, the adjusting holes are formed in the vertical edges of the angle steel, and the positioning holes are formed in the horizontal edges of the angle steel. The angle steel of L type intensity is high, and non-deformable avoids when concrete placement, takes place to warp after the pressurized, leads to protective layer thickness nonconforming.
The utility model preferably adopts the technical scheme that the adjusting screw is perpendicular to the angle steel. The angle steels on the two sides are ensured to be kept parallel.
The utility model has the preferable technical scheme that a plurality of adjusting screws are arranged, and the spacing distance between the adjusting screws is equal to 2 m. The angle steel is ensured to have the same spacing distance along the length direction.
The utility model has the preferable technical scheme that a plurality of pairs of angle steels are arranged at intervals along the length direction of the steel bars. Through a plurality of angle steel positioning reinforcing bars, the interval distance from top to bottom of the reinforcing bar can be adjusted according to the requirements.
The utility model has the preferable technical scheme that the size of the opening of the positioning hole is equal to the diameter of the reinforcing steel bar. The reinforcing bar is directly blocked in the locating hole, and the reinforcing bar is conveniently fixed by an operator.
The utility model has the beneficial effects that:
the utility model provides a tunnel secondary lining reinforcing steel bar installation rapid positioning frame which comprises a pair of angle steels which are arranged in parallel relatively, wherein the opposite surfaces of the two angle steels are provided with adjusting holes, an adjusting screw rod is arranged between the adjusting holes, adjusting nuts are arranged on the two sides of the adjusting holes, the adjusting nuts are in threaded connection with the adjusting screw rod, a plurality of positioning holes which are distributed at intervals are formed in the angle steels along the length direction, and reinforcing steel bars are installed in the positioning holes. According to the reinforcing bar interval preparation locating hole, according to the demand, through rotatory adjusting nut, flexible adjusting screw to adjustable double reinforcing bar interval, thereby guarantee reinforcing bar interval and protective layer thickness.
Drawings
FIG. 1 is a front view of a rapid positioning frame for installing secondary lining reinforcing steel bars of a tunnel according to an embodiment of the present invention;
FIG. 2 is a top view of a rapid positioning frame for installing secondary lining reinforcing steel bars in a tunnel according to an embodiment of the present invention;
fig. 3 is a partial structure view of a tunnel secondary lining reinforcing steel bar installation rapid positioning frame a according to an embodiment of the present invention;
in the figure:
1. angle steel; 2. an adjustment hole; 3. adjusting the screw rod; 4. adjusting the nut; 5. positioning holes; 6. and (5) reinforcing steel bars.
Detailed Description
The technical scheme of the utility model is further explained by the specific implementation mode in combination with the attached drawings.
As shown in the figure, this embodiment provides a quick locating rack of tunnel secondary lining steel bar installation, including a pair of angle steel 1 that is relative parallel arrangement, two be equipped with regulation hole 2 on the opposite face of angle steel 1, be equipped with adjusting screw 3 between the regulation hole 2, 2 both sides in regulation hole are equipped with adjusting nut 4, 4 threaded connection of adjusting nut in on the adjusting screw 3, set up a plurality of intervals locating hole 5 of arranging along length direction on the angle steel 1, the reinforcing bar 6 is installed in locating hole 5. According to 6 intervals of reinforcing bar preparation locating hole 5, according to the demand, through rotatory adjusting nut 4, flexible adjusting screw 3 to 6 intervals of adjustable double reinforcing bar, thereby guarantee 6 intervals of reinforcing bar and protective layer thickness.
The angle steel 1 is L-shaped, the adjusting hole 2 is formed in the vertical edge of the angle steel 1, and the positioning hole 5 is formed in the horizontal edge of the angle steel 1. The L-shaped angle steel 1 is high in strength and not easy to deform, and deformation caused after compression when concrete is poured is avoided, so that the thickness of a protective layer is unqualified.
The adjusting screw 3 is perpendicular to the angle steel 1. The angle steel 1 on the two sides is ensured to be parallel, so that the thickness of the protective layer is ensured to be the same.
The adjusting screws 3 are multiple, and the spacing distance between the adjusting screws 3 is equal to 2 m. Guarantee angle steel 1 along length direction interval distance all the same, and set up interval distance and be 2m, can guarantee that interval distance between angle steel 1 can not be because of taking place to warp when concrete placement, lead to interval distance to change.
The angle steel 1 is provided with a plurality of pairs and is arranged at intervals along the length direction of the steel bar 6. Through a plurality of angle steel 1 spacer bars 6, guarantee that the spacing distance from top to bottom of reinforcing bar 6 can all make the adjustment as required, and can guarantee that upper and lower reinforcing bar 6 all keeps the same spacing distance.
The size of the opening of the positioning hole 5 is equal to the diameter of the reinforcing steel bar 6. The reinforcing bar 6 is directly blocked in locating hole 5, need not alone to hold up reinforcing bar 6, has another alone to go fixed binding reinforcing bar 6 again, reduces the manpower.
While the utility model has been described with reference to a preferred embodiment, it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof without departing from the spirit and scope of the utility model. The present invention is not to be limited by the specific embodiments disclosed herein, and other embodiments that fall within the scope of the claims of the present application are intended to be within the scope of the present invention.
Claims (6)
1. The utility model provides a quick locating rack of tunnel secondary lining reinforcing bar installation which characterized in that:
including a pair of angle steel (1) that are relative parallel arrangement, two be equipped with regulation hole (2) on the opposite face of angle steel (1), be equipped with adjusting screw (3) between regulation hole (2), regulation hole (2) both sides are equipped with adjusting nut (4), adjusting nut (4) threaded connection in on adjusting screw (3), set up a plurality of intervals locating hole (5) of arranging, reinforcing bar (6) perpendicular to on angle steel (1) along length direction angle steel (1) and install in locating hole (5).
2. The tunnel secondary lining steel bar installation quick positioning frame of claim 1, which is characterized in that:
the angle steel (1) is L-shaped, the adjusting holes (2) are formed in the vertical edges of the angle steel (1), and the positioning holes (5) are formed in the horizontal edges of the angle steel (1).
3. The tunnel secondary lining steel bar installation quick positioning frame of claim 2, which is characterized in that:
the adjusting screw (3) is perpendicular to the angle steel (1).
4. The rapid positioning frame for installing the secondary lining reinforcing steel bars of the tunnel according to claim 3, wherein:
the adjusting screws (3) are multiple, and the spacing distance between the adjusting screws (3) is equal to 2 m.
5. The tunnel secondary lining steel bar installation quick positioning frame of claim 1, which is characterized in that:
the angle steel (1) is provided with a plurality of pairs and is arranged at intervals along the length direction of the steel bar (6).
6. The tunnel secondary lining steel bar installation quick positioning frame of claim 1, which is characterized in that:
the size of the opening of the positioning hole (5) is equal to the diameter of the reinforcing steel bar (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122959112.8U CN216342195U (en) | 2021-11-29 | 2021-11-29 | Quick locating rack for mounting secondary lining reinforcing steel bars of tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122959112.8U CN216342195U (en) | 2021-11-29 | 2021-11-29 | Quick locating rack for mounting secondary lining reinforcing steel bars of tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216342195U true CN216342195U (en) | 2022-04-19 |
Family
ID=81155250
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122959112.8U Active CN216342195U (en) | 2021-11-29 | 2021-11-29 | Quick locating rack for mounting secondary lining reinforcing steel bars of tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216342195U (en) |
-
2021
- 2021-11-29 CN CN202122959112.8U patent/CN216342195U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202577336U (en) | Positioner for square column foundation bolts | |
CN202645026U (en) | Post foot correcting device for steel structure steel post | |
CN216342195U (en) | Quick locating rack for mounting secondary lining reinforcing steel bars of tunnel | |
CN211037923U (en) | Steel construction opposite sex frame bearing structure | |
CN219992453U (en) | Lattice column correction fixing device | |
CN110629782B (en) | Adjusting method of anchor bolt offline assembly device | |
CN209927176U (en) | Solar farmland environment monitoring device | |
CN104153501A (en) | Energy-saving metal curtain wall | |
CN202278657U (en) | Binding mould for reinforcing steel bars and movable positioning clamps thereof | |
CN216766839U (en) | Adjustable positioning tool used in installation process of concrete prefabricated wall panel | |
CN207098996U (en) | A kind of photovoltaic bracket | |
CN216690432U (en) | Steel column installation straightness's that hangs down rectifies fixture | |
CN214392263U (en) | Positioning device for continuous casting secondary cooling water ring distributor | |
CN210530059U (en) | Building facade grid structure | |
CN211369540U (en) | Constructional engineering frame roof beam reinforcing apparatus | |
CN206865860U (en) | A kind of mounting structure of the waterproof box body of LED display | |
CN202227548U (en) | Tension type curtain wall with metal boards | |
CN213691866U (en) | Novel switch base on 10kV post | |
CN210013540U (en) | Tower column maintenance system | |
CN211572721U (en) | Steel structure temporary support convenient to disassemble | |
CN218116531U (en) | Adjustable foot bolt fixer device | |
CN218759238U (en) | Quick positioner of guardrail base ring flange | |
CN217234639U (en) | Comprehensive pipeline anti-seismic support suitable for different pipeline shapes | |
CN212063905U (en) | Fixing support capable of accurately adjusting installation angle of solar cell panel | |
CN219794197U (en) | Steel construction for factory building with anticorrosion function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |