CN202645026U - Post foot correcting device for steel structure steel post - Google Patents

Post foot correcting device for steel structure steel post Download PDF

Info

Publication number
CN202645026U
CN202645026U CN 201220168320 CN201220168320U CN202645026U CN 202645026 U CN202645026 U CN 202645026U CN 201220168320 CN201220168320 CN 201220168320 CN 201220168320 U CN201220168320 U CN 201220168320U CN 202645026 U CN202645026 U CN 202645026U
Authority
CN
China
Prior art keywords
steel
post
column
girder
rearmounted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220168320
Other languages
Chinese (zh)
Inventor
张凤勇
吴彦俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN 201220168320 priority Critical patent/CN202645026U/en
Application granted granted Critical
Publication of CN202645026U publication Critical patent/CN202645026U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a post foot correcting device for a steel structure steel post. The device comprises a steel post base, a prepositive steel beam, a postpositive steel beam, a channel steel top rod, a steel bracket, a hydraulic jack, a steel jack and two pull rods, wherein the prepositive steel beam and the postpositive steel beam are respectively and parallelly arranged at the two opposite sides of the steel post base at intervals, the channel steel top rod is positioned in the center position between the postpositive steel beam and the steel post base, the two pull rods are respectively arranged at the two ends of the prepositive steel beam and the postpositive steel beam and are fastened through screw nuts, the steel bracket is arranged in the center position of the top surface of the postpositive steel beam, the hydraulic jack base is butted on the steel bracket, and the two ends of the steel jack are respectively butted with the top end of a hydraulic jack piston rod and the side surface of the post foot steel plate of the steel post. The device can be used for conveniently implementing the correcting operation of the post foot of the steel post, and is particularly applicable to the corrosion of steel posts with unqualified verticality, the work intensity and the cost of post foot correcting operation of the steel post are reduced, the efficiency of the correcting operation is improved, and the installing quality of the steel structure engineering is ensured.

Description

The steel column base correction device of steel work
Technical field
The utility model relates to a kind of steel column base correction device of steel work.
Background technology
After the general steel-structure factory building installation, the situation that steel column position or verticality do not satisfy technological requirement can occur unavoidably, this situation occur and can reduce the project installation quality, affect the intensity of steel work.Therefore need steel column foot is proofreaied and correct, usually necessary calibration accuracy and in time fixing before steel column is installed, as serious problems occur and then need remove and reinstall, lack at present special-purpose steel column base correction device, cause the Steel Structure Installation cost to improve, labour intensity increases, and affects the installation quality of steel work.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of steel column base correction device of steel work, this device can conveniently be implemented the correction operation of steel column foot, labour intensity and the cost of steel column base calibrating operation have been reduced, improve the efficient of correction operation, guaranteed the installation quality of structural steelwork.
For solving the problems of the technologies described above, the steel column base correction device of the utility model steel work comprises steel-column foundation, preposition girder steel, rearmounted girder steel, the channel-section steel push rod, steel bracket, hydraulic jack, steel holder and two pull bars, described preposition girder steel and rearmounted girder steel respectively parallel interval are located at the in opposite directions both sides of described steel-column foundation, described channel-section steel push rod is centrally placed between described rearmounted girder steel and the steel-column foundation, described two pull bars are located at respectively the two ends of described preposition girder steel and rearmounted girder steel and are passed through fastening nuts, described steel bracket is located at described rearmounted girder steel end face between two parties, described jack stand is against described steel bracket, and described steel holder two ends are respectively against described piston rod of hydraulic jack top and steel column foot steel plate side.
Further, above-mentioned steel holder comprises base plate, side plate and stiffener, and described side plate is vertical at described base plate one side, and described stiffener is vertical between described base plate and the side plate.
Because the steel column base correction device of the utility model steel work has adopted technique scheme, be that this device comprises steel-column foundation, preposition girder steel, rearmounted girder steel, the channel-section steel push rod, steel bracket, hydraulic jack, steel holder and two pull bars, preposition girder steel and rearmounted girder steel respectively parallel interval are located at the in opposite directions both sides of steel-column foundation, the channel-section steel push rod is centrally placed between rearmounted girder steel and the steel-column foundation, two pull bars are located at respectively the two ends of preposition girder steel and rearmounted girder steel and are passed through fastening nuts, steel bracket is located at rearmounted girder steel end face between two parties, jack stand is against steel bracket, and steel holder two ends are respectively against piston rod of hydraulic jack top and steel column foot steel plate side.This device can conveniently be implemented the correction operation of steel column foot, is particularly useful for the underproof steel column of verticality and proofreaies and correct, and has reduced labour intensity and the cost of steel column base calibrating operation, has improved the efficient of correction operation, has guaranteed the installation quality of structural steelwork.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and embodiments:
Fig. 1 is the structural representation of the steel column base correction device of the utility model steel work;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the structural representation of steel holder in this device;
Fig. 4 is the top view of Fig. 3.
The specific embodiment
As depicted in figs. 1 and 2, the steel column base correction device of the utility model steel work comprises steel-column foundation 1, preposition girder steel 2, rearmounted girder steel 3, channel-section steel push rod 8, steel bracket 5, hydraulic jack 6, steel holder 7 and two pull bars 4, described preposition girder steel 2 and rearmounted girder steel 3 respectively parallel interval are located at the in opposite directions both sides of described steel-column foundation 1, described channel-section steel push rod 8 is centrally placed between described rearmounted girder steel 3 and the steel-column foundation 1, described two pull bars 4 are located at respectively the two ends of described preposition girder steel 2 and rearmounted girder steel 3 and pass through nut 41 fastening, described steel bracket 5 is located at described rearmounted girder steel 3 end faces between two parties, described hydraulic jack 6 bases are against described steel bracket 5, and described steel holder 7 two ends are respectively against described hydraulic jack 6 piston rod tops and steel column 11 suspension column steel plates 12 sides.
As shown in Figure 3 and Figure 4, further, above-mentioned steel holder 7 comprises base plate 71, side plate 72 and stiffener 73, and described side plate 72 is vertical at described base plate 71 1 sides, and described stiffener 73 is vertical between described base plate 71 and the side plate 72.Base plate one end of steel holder is against the suspension column steel plate, and side plate has played the transfer function of good support and jack active force against jack piston rod.
This apparatus structure is simple, and correct operation is convenient, and cost of manufacture is lower, can adopt lower cost to solve the difficult problem of steel column base calibrating.After steel building was installed, the situation for steel column position or verticality do not meet the demands adopted this device can conveniently realize the correction of steel column foot position; The preposition girder steel of this device and rearmounted girder steel can adopt rectangular steel pipe to make and enclose in steel-column foundation both sides in opposite directions by channel-section steel push rod, two pull bars, two pull bars are anchored on preposition girder steel and rearmounted girder steel on the steel-column foundation by nut, rearmounted girder steel end face arranges steel bracket, jack stand passes through the steel holder against the steel column foot steel plate against steel bracket, piston rod, the steel holder is used for transmitting the active force of jack, the reaction frame of above-mentioned formation steel column base calibrating; At first unclamp the fixedly nut of steel column foot steel plate before the adjustment, utilize in case of necessity electronic reamer to enlarge bolt hole, available electric welding is filled up after adjusting, and starts hydraulic jack and realizes proofreading and correct by the displacement of steel holder pushing tow steel column foot steel plate, makes steel column position or verticality satisfy technological requirement; In case of necessity can be in the scope of steel bracket and suspension column steel plate the move left and right hydraulic jack, to adjust the position of pushing tow suspension column steel plate, the suspension column steel plate is proofreaied and correct is put in place.Also can be fixed on the in addition both sides in opposite directions of steel-column foundation with the preposition girder steel of sample device and rearmounted girder steel, implement to proofread and correct from diverse location coupled columns pin steel plate by hydraulic jack.

Claims (2)

1. the steel column base correction device of a steel work, comprise steel-column foundation, it is characterized in that: also comprise preposition girder steel, rearmounted girder steel, the channel-section steel push rod, steel bracket, hydraulic jack, steel holder and two pull bars, described preposition girder steel and rearmounted girder steel respectively parallel interval are located at the in opposite directions both sides of described steel-column foundation, described channel-section steel push rod is centrally placed between described rearmounted girder steel and the steel-column foundation, described two pull bars are located at respectively the two ends of described preposition girder steel and rearmounted girder steel and are passed through fastening nuts, described steel bracket is located at described rearmounted girder steel end face between two parties, described jack stand is against described steel bracket, and described steel holder two ends are respectively against described piston rod of hydraulic jack top and steel column foot steel plate side.
2. the steel column base correction device of steel work according to claim 1, it is characterized in that: described steel holder comprises base plate, side plate and stiffener, and described side plate is vertical at described base plate one side, and described stiffener is vertical between described base plate and the side plate.
CN 201220168320 2012-04-19 2012-04-19 Post foot correcting device for steel structure steel post Expired - Fee Related CN202645026U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220168320 CN202645026U (en) 2012-04-19 2012-04-19 Post foot correcting device for steel structure steel post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220168320 CN202645026U (en) 2012-04-19 2012-04-19 Post foot correcting device for steel structure steel post

Publications (1)

Publication Number Publication Date
CN202645026U true CN202645026U (en) 2013-01-02

Family

ID=47414150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220168320 Expired - Fee Related CN202645026U (en) 2012-04-19 2012-04-19 Post foot correcting device for steel structure steel post

Country Status (1)

Country Link
CN (1) CN202645026U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572978A (en) * 2013-11-25 2014-02-12 宝钢钢构有限公司 Steel structure piece mounting tool
CN103924787A (en) * 2014-05-08 2014-07-16 江苏中南建筑产业集团有限责任公司 Steel column butt joint plane position correction device
CN104594647A (en) * 2014-12-27 2015-05-06 郑州市第一建筑工程集团有限公司 Steel beam locating and adjusting device
CN107327023A (en) * 2017-07-25 2017-11-07 中国化学工程第三建设有限公司 A kind of steel structure module installs installation method
CN108035440A (en) * 2017-10-27 2018-05-15 西安建筑科技大学 A kind of assembled Self-resetting Column Joint with Wedge device
CN110499701A (en) * 2018-05-18 2019-11-26 李竑靓 A kind of bridge construction ruggedized construction and its reinforcement means
CN112878709A (en) * 2021-01-29 2021-06-01 中国五冶集团有限公司 Accurate and rapid fine adjustment device for large steel column installation and fine adjustment method thereof
CN113653093A (en) * 2021-08-26 2021-11-16 江苏筑港建设集团有限公司 Height-adjustable steel structure foundation and construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572978A (en) * 2013-11-25 2014-02-12 宝钢钢构有限公司 Steel structure piece mounting tool
CN103924787A (en) * 2014-05-08 2014-07-16 江苏中南建筑产业集团有限责任公司 Steel column butt joint plane position correction device
CN104594647A (en) * 2014-12-27 2015-05-06 郑州市第一建筑工程集团有限公司 Steel beam locating and adjusting device
CN107327023A (en) * 2017-07-25 2017-11-07 中国化学工程第三建设有限公司 A kind of steel structure module installs installation method
CN108035440A (en) * 2017-10-27 2018-05-15 西安建筑科技大学 A kind of assembled Self-resetting Column Joint with Wedge device
CN110499701A (en) * 2018-05-18 2019-11-26 李竑靓 A kind of bridge construction ruggedized construction and its reinforcement means
CN112878709A (en) * 2021-01-29 2021-06-01 中国五冶集团有限公司 Accurate and rapid fine adjustment device for large steel column installation and fine adjustment method thereof
CN112878709B (en) * 2021-01-29 2022-08-19 中国五冶集团有限公司 Accurate and rapid fine adjustment device for large steel column installation and fine adjustment method thereof
CN113653093A (en) * 2021-08-26 2021-11-16 江苏筑港建设集团有限公司 Height-adjustable steel structure foundation and construction method

Similar Documents

Publication Publication Date Title
CN202645026U (en) Post foot correcting device for steel structure steel post
JP5753811B2 (en) Solar panel mount and its construction method
CN103760659B (en) A kind of cable truss type heliostat support device
CN113699887A (en) Polygonal steel arch rib assembling and positioning device and using method thereof
CN102080383B (en) Suspension type embedded part and hole reserved template fixing method
CN101929210A (en) Combination connector used for connecting beam and upright in stone curtain wall
CN201896289U (en) Anchor rod locating device with two-way gradient
CN216616848U (en) Beam plate post-cast strip supporting and mold sealing structure
CN215627567U (en) Adjustable stand column structure for glass kiln and glass kiln
CN213381395U (en) Adjustable steel structure assembling jig frame
CN212836771U (en) Assembly type assembled jig frame capable of being conveniently, movably and adjustably assembled and disassembled
CN211548063U (en) Adjustable bed-jig of toper mast preparation
CN209941512U (en) Supporting shear part for lower cross beam of inclined tower of cable-stayed bridge
CN102704696A (en) Space locator for high, big and heavy steel upright column
CN218556094U (en) Fixing device for fixing Bailey beam lower chord and I-steel bearing beam
CN205804988U (en) Prefabricated thermal insulation structural wall board installs special mould clamp
CN210395117U (en) Convenient device for adjusting position of steel plate of stable steel box girder
CN217299769U (en) Vertical rod positioning device for overhanging scaffold
CN218467167U (en) Prefabricated construction post installation positioner
CN215925680U (en) Arch rib buckle tower stand column interval adjusting device
CN113972885B (en) Photovoltaic bracket preassembling platform system and installation method
CN210659235U (en) Device for reducing temporary construction of assembled steel bar truss floor
CN219528395U (en) Truss support device and steel truss support system corresponding to same
CN219996733U (en) Simple pressure test stand
CN220043305U (en) Photovoltaic power generation device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200506

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130102

Termination date: 20200419