CN216341312U - 5G communication launching tower with optimized structure - Google Patents

5G communication launching tower with optimized structure Download PDF

Info

Publication number
CN216341312U
CN216341312U CN202121386310.3U CN202121386310U CN216341312U CN 216341312 U CN216341312 U CN 216341312U CN 202121386310 U CN202121386310 U CN 202121386310U CN 216341312 U CN216341312 U CN 216341312U
Authority
CN
China
Prior art keywords
communication
launching tower
tower
solar cell
cell panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121386310.3U
Other languages
Chinese (zh)
Inventor
蔡建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Qirong Electronic Information Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121386310.3U priority Critical patent/CN216341312U/en
Application granted granted Critical
Publication of CN216341312U publication Critical patent/CN216341312U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The utility model discloses a 5G communication launching tower with an optimized structure, which comprises a launching tower main body and a power grid, wherein the launching tower main body is hollow, communication equipment, an inverter and a storage battery are arranged in the launching tower main body, an installation box is installed at the top of the launching tower main body, a signal transmitter is installed at the top of the installation box and connected with the communication equipment, and a solar cell panel is installed on the outer surface of the launching tower main body. This configuration optimization's 5G communication launching tower, at the surface mounting solar cell panel of launching tower main part, solar cell panel is connected with the dc-to-ac converter, the rational utilization space, avoid only using the extravagant land resource of 5G communication launching tower, be connected with the battery through the dc-to-ac converter, the battery is connected with communication equipment, use solar cell panel to change light energy into electric energy, store and supply communication equipment to use in the battery through the dc-to-ac converter, reduce the energy consumption of 5G communication launching tower, disposable input, permanent income.

Description

5G communication launching tower with optimized structure
Technical Field
The utility model relates to the technical field of 5G communication launching towers, in particular to a structure-optimized 5G communication launching tower.
Background
With the maturity of 5G technology, 5G will open a new era of wide-range interconnection of everything and deep man-machine interaction. Currently, 5G standardization and business processes are accelerating. Under the unified organization of the Ministry of industry and communications, China has taken the lead to complete two-stage 5G technology research and development tests, verifies the key capability of the system, tests the outdoor coverage performance, and strongly promotes the 5G research and development and industrial development, and the current technology research and development tests enter the third stage. In order to prepare the supporting facilities of the 5G network and support 5G scale networking tests and subsequent large-scale commercial use in 2018 of three operators, the design principle, the design scheme and the principle of the 5G communication transmitting tower are provided.
Some 5G communication towers currently on the market:
(1) in the construction of the 5G communication transmitting tower, the 5G communication transmitting tower occupies a large area, and land resources are wasted only when the 5G communication transmitting tower is used;
(2) the 5G communication transmission tower needs to consume electric quantity in the using process, and the electric quantity consumption of the 5G communication transmission tower is large.
We propose a structurally optimized 5G communication tower in order to solve the problems set forth above.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In view of the defects of the prior art in the background art, the present invention aims to provide a structurally optimized 5G communication tower, so as to solve the problems that some structurally optimized 5G communication towers in the current market proposed in the background art have a large occupied area of the 5G communication tower in the construction of the 5G communication tower, land resources are wasted only as the 5G communication tower, and a large amount of electricity is consumed in the use process of the 5G communication tower, and the electricity consumption of the 5G communication tower is large.
(II) technical scheme
In order to achieve the purpose, the utility model is realized by the following technical scheme:
the utility model provides a 5G communication launching tower of institutional advancement, includes launching tower main part and electric wire netting, the launching tower main part is cavity form, be provided with communication equipment, dc-to-ac converter and battery in the launching tower main part, the install bin is installed at the top of launching tower main part, signal transmitter is installed at the top of install bin, signal transmitter is connected with communication equipment, the surface mounting of launching tower main part has solar cell panel, solar cell panel is connected with the dc-to-ac converter, the dc-to-ac converter is connected with the battery, the battery is connected with communication equipment.
Preferably, a wind generating set is installed in the installation box, a wind wheel is installed on one side of the installation box and connected with the wind generating set, and the wind generating set is connected with the inverter.
Preferably, the wind generating set comprises a generator, and the generator is connected with the wind wheel.
Preferably, the inverter is connected with a transformer, and the transformer is electrically connected with a power grid.
Furthermore, the solar cell panel is a tough solar cell panel, and a plurality of solar cell panels are uniformly arranged on the outer surface of the launching tower main body.
(III) advantageous effects
Compared with the prior art, the utility model has the beneficial effects that: this 5G communication launching tower that structure is optimized:
(1) at the surface mounting solar cell panel of launching tower main part, solar cell panel is connected with the dc-to-ac converter, the rational utilization space, avoid only using the extravagant land resource of 5G communication launching tower, be connected with the battery through the dc-to-ac converter, the battery is connected with communication equipment, use solar cell panel to convert light energy into electric energy, store through the dc-to-ac converter and supply communication equipment to use in the battery, reduce the energy consumption of 5G communication launching tower, disposable input, permanent income.
(2) Install wind generating set in this install bin, the wind wheel is installed to one side of install bin, the wind wheel is connected with wind generating set, wind generating set is connected with the dc-to-ac converter, use wind power generation to supply power for communications facilities, reduce the energy consumption of 5G communication launching tower, include the generator through wind generating set, the generator is connected with the wind wheel, make the wind wheel rotate and produce mechanical energy, change into the electric energy through the generator and use, there is the transformer through the dc-to-ac converter connection, transformer and electric wire netting electric connection, solar energy and wind power generation are full of the battery to the electric wire netting transmission, economic benefits is increased, be toughness solar cell panel through solar cell panel, the surface at the launching tower main part is evenly installed to a plurality of solar cell panel, make solar cell panel can improve the power generation rate.
Drawings
FIG. 1 is a schematic perspective view of a structurally optimized 5G communication tower according to the present invention;
FIG. 2 is a schematic diagram of an elevation structure of a structurally optimized 5G communication launching tower according to the utility model;
FIG. 3 is a schematic side view of a structurally optimized 5G communication tower according to the present invention;
FIG. 4 is a schematic side cross-sectional structural view of a structurally optimized 5G communications tower of the present invention;
fig. 5 is a schematic system block structure diagram of the structurally optimized 5G communication transmission tower of the present invention.
In the figure: the launching tower comprises a launching tower body 1, communication equipment 2, an installation box 3, a wind wheel 4, a solar cell panel 5 and a signal emitter 6.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a structure-optimized 5G communication tower; the power transmission tower comprises a transmitting tower main body 1 and a power grid, wherein the transmitting tower main body 1 is hollow, communication equipment 2, an inverter and a storage battery are arranged in the transmitting tower main body 1, an installation box 3 is installed at the top of the transmitting tower main body 1, a signal transmitter 6 is installed at the top of the installation box 3, the signal transmitter 6 is connected with the communication equipment 2, a solar cell panel 5 is installed on the outer surface of the transmitting tower main body 1, the solar cell panel 5 is connected with the inverter, the inverter is connected with the storage battery, and the storage battery is connected with the communication equipment 2;
as a preferred technical scheme of the utility model: a wind generating set is installed in the installation box 3, a wind wheel 4 is installed on one side of the installation box 3, the wind wheel 4 is connected with the wind generating set, the wind generating set is connected with an inverter, wind power generation is used for supplying power to the communication equipment 2, and energy consumption of the 5G communication launching tower is reduced;
as a preferred technical scheme of the utility model: the wind generating set comprises a generator, the generator is connected with the wind wheel 4, so that the wind wheel 4 rotates to generate mechanical energy, and the mechanical energy is converted into electric energy through the generator for use;
as a preferred technical scheme of the utility model: the inverter is connected with a transformer, the transformer is electrically connected with a power grid, and the solar energy and wind power generation fully fills the storage battery and then transmits power to the power grid, so that the economic benefit is increased;
as a preferred technical scheme of the utility model: solar cell panel 5 is toughness solar cell panel, and a plurality of solar cell panel 5 are evenly installed at the surface of launching tower main part 1, make solar cell panel 5 can improve the power generation rate.
The working principle of the embodiment is as follows: when the 5G communication launching tower with the optimized structure is used, as shown in figures 1-5, the device integrally comprises a launching tower body 1, communication equipment 2, a mounting box 3, a wind wheel 4, a solar panel 5 and a signal transmitter 6, can be connected with an inverter through a solar panel 5 and a wind generating set, the inverter is connected with a storage battery, the storage battery is connected with a communication device 2, the communication device 2 is powered by light energy and wind energy, the consumption of a 5G communication launching tower can be reduced, a signal emitter 6 is connected with the communication device 2, the signal emitter 6 emits signals, the inverter is connected with a power grid through a transformer, the redundant electric quantity can increase the economic benefit, the above is the operation of the whole device, and the details which are not described in detail in this specification are well known to those skilled in the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it should be noted that, in the present invention, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," "fixed," and the like are to be construed broadly, and for example, may be fixedly connected or detachably connected; or indirectly through an intermediary. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations; it will be apparent to those skilled in the art that modifications and equivalents may be made in the embodiments and/or portions thereof without departing from the spirit and scope of the present invention.

Claims (5)

1. The utility model provides a 5G communication launching tower of configuration optimization, includes launching tower main part (1) and electric wire netting, its characterized in that, launching tower main part (1) is the cavity form, be provided with communication equipment (2), dc-to-ac converter and battery in launching tower main part (1), install box (3) are installed at the top of launching tower main part (1), signal transmitter (6) are installed at the top of install box (3), signal transmitter (6) are connected with communication equipment (2), the surface mounting of launching tower main part (1) has solar cell panel (5), solar cell panel (5) are connected with the dc-to-ac converter, the dc-to-ac converter is connected with the battery, the battery is connected with communication equipment (2).
2. A structurally optimized 5G communication launching tower as claimed in claim 1, characterized in that a wind generating set is installed in the installation box (3), a wind wheel (4) is installed on one side of the installation box (3), the wind wheel (4) is connected with the wind generating set, and the wind generating set is connected with an inverter.
3. A structurally optimized 5G communications tower according to claim 2, characterized in that said wind generator set comprises a generator connected to the wind rotor (4).
4. The structurally optimized 5G communication transmission tower as claimed in claim 1, wherein a transformer is connected to the inverter and is electrically connected with a power grid.
5. A structurally optimized 5G communication tower according to claim 1, wherein the solar panels (5) are flexible solar panels, and a plurality of solar panels (5) are uniformly installed on the outer surface of the tower body (1).
CN202121386310.3U 2021-06-22 2021-06-22 5G communication launching tower with optimized structure Active CN216341312U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121386310.3U CN216341312U (en) 2021-06-22 2021-06-22 5G communication launching tower with optimized structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121386310.3U CN216341312U (en) 2021-06-22 2021-06-22 5G communication launching tower with optimized structure

Publications (1)

Publication Number Publication Date
CN216341312U true CN216341312U (en) 2022-04-19

Family

ID=81160601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121386310.3U Active CN216341312U (en) 2021-06-22 2021-06-22 5G communication launching tower with optimized structure

Country Status (1)

Country Link
CN (1) CN216341312U (en)

Similar Documents

Publication Publication Date Title
CN207426809U (en) Photovoltaic generating system
CN101942921A (en) Wind-solar hybrid new energy communication tower
CN201937842U (en) Wind, light and electricity complementing communication base station
CN201738627U (en) Wind light complementary new energy communication tower
CN216341312U (en) 5G communication launching tower with optimized structure
CN103595337B (en) There is the solar power station of energy storage of drawing water
CN202586812U (en) Hydropower and solar energy combined power generation system
CN205160097U (en) Distributed photovoltaic power generation system
CN202127252U (en) Solar photovoltaic grid-connected generation system
CN204179991U (en) A kind of solar energy photovoltaic generator
CN108134844A (en) A kind of internet terminal control system
CN203604105U (en) Solar water pumping energy-storage power generation device
CN103607054A (en) Distributed solar pumped storage power station
CN203166548U (en) Intelligent microgrid system
CN203466579U (en) Grid-connected offline direct-current micro-grid system
CN202832983U (en) Wind power plant on high-rise building
CN203119502U (en) Solar energy balcony power generation system
CN203225569U (en) Wind generator charging control device having wireless communication function
CN111740487A (en) Flexible direct current distribution network for high-altitude area and distributed power supply access
CN217543980U (en) Remote control device for power supply of intelligent terminal of electric power tower
CN204304875U (en) The micro-base station of wind-solar hybrid new energy
CN219431961U (en) Breeze photovoltaic power generation base station based on composite material pole tower
CN217817157U (en) Solar photovoltaic integrated ventilator
CN203796494U (en) Minitype distributed energy resource station for electric power building
CN219795447U (en) Base station chimney type high-altitude wind power generation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221219

Address after: 201100 Room D591, Building 1, No. 5500, Yuanjiang Road, Minhang District, Shanghai

Patentee after: Shanghai Ruiyu Network Technology Co.,Ltd.

Address before: 222003 Wanglong e-commerce logistics city, Haizhou Electronic Information Industrial Park, No. 3 Fuhai Road, Haizhou District, Lianyungang City, Jiangsu Province

Patentee before: Cai Jianjun

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230816

Address after: Room 155, Building 1, No. 661-5 Gongfeng Road, Caolu Town, Pudong New Area, Shanghai, 200000

Patentee after: Shanghai Qirong Electronic Information Technology Co.,Ltd.

Address before: 201100 Room D591, Building 1, No. 5500, Yuanjiang Road, Minhang District, Shanghai

Patentee before: Shanghai Ruiyu Network Technology Co.,Ltd.

TR01 Transfer of patent right