CN216340618U - Assembled bath sweat evaporates room yurt molding design mounting structure - Google Patents

Assembled bath sweat evaporates room yurt molding design mounting structure Download PDF

Info

Publication number
CN216340618U
CN216340618U CN202122600131.1U CN202122600131U CN216340618U CN 216340618 U CN216340618 U CN 216340618U CN 202122600131 U CN202122600131 U CN 202122600131U CN 216340618 U CN216340618 U CN 216340618U
Authority
CN
China
Prior art keywords
keel
wall body
yurt
sweat
sliding groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122600131.1U
Other languages
Chinese (zh)
Inventor
黄志龙
魏金龙
贝莉
谢宁宁
汤海波
文佳
盛程龙
钱浴
李少飞
孔洁琼
宋朋
卢腾飞
袁梁哲
徐浩栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN202122600131.1U priority Critical patent/CN216340618U/en
Application granted granted Critical
Publication of CN216340618U publication Critical patent/CN216340618U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a yurt model design and installation structure of an assembled bath sudor steam room, which comprises a wall body, wherein the top of the wall body is provided with a plurality of first keels, the first keels are arranged along the circumferential direction of the wall body, one end of each first keel is connected on the wall body, the other end of each first keel is connected on a support column, the support column is fixedly connected on a ground base layer, and the support column is located the inside of wall body, be provided with the adjustment tank on the first fossil fragments, wear to be equipped with the connecting rod in the adjustment tank, first stone material board passes through the connecting rod and connects on first fossil fragments, one side of first fossil fragments relative first stone material board is provided with the heated board, the inboard of wall body is provided with keel frame, keel frame includes second fossil fragments and third fossil fragments, be provided with a plurality of first joint pieces of hanging on the third fossil fragments, it has the second to hang the joint piece to hang on the first joint piece, second is hung joint piece fixed connection on the second stone material board. The utility model can solve the problems that the tile paving stability of the yurt-shaped steam room is poor, the tile is easy to fall off and cannot be adjusted.

Description

Assembled bath sweat evaporates room yurt molding design mounting structure
Technical Field
The utility model belongs to the technical field of interior decoration, and particularly relates to a yurt model design and installation structure of an assembled bath court steam room.
Background
Decoration is also known as decoration or decoration. The method is a whole set of construction scheme and design scheme which are carried out in a certain area and range, wherein the construction scheme and the design scheme are realized by hydropower construction, walls, floors, ceilings, landscapes and the like and are formed according to a certain design concept and aesthetic rules; the decoration is embodied as small as the furniture placement and the door orientation and large as the customization of room accessories and lamps. Decoration is different from decoration, and the decoration is a method for performing art processing on living goods or living environment. Enhance the aesthetic effect, improve the function, economic value and social benefit, and take environmental protection as the design concept. Perfect decoration is closely combined with the functions of objects, is suitable for the manufacturing process, exerts the performance of material and has good artistic effect.
Along with the increasing pursuit of people on living standard, entertainment places such as bathing grounds and the like are increasingly popular in China. In particular, the requirements of people on sweat steaming and body-building rehabilitation are continuously increased. On one hand, the functional requirements under the special sweat steaming environment are met, and on the other hand, the leisure aesthetic appearance requirements of modern people are met. The common sauna room adopts the facing materials such as composite bamboo boards, glass and the like. But due to the improvement of design and customer requirements, the application of paving ceramic tiles and antique stone in the sauna room is more and more. In China, the shape of the steam room is mostly square and square, masonry or steel skeleton partition walls, and the materials are all light materials such as bamboo boards, glass partitions and the like. The base layer masonry or steel skeleton is constructed according to the traditional construction method, so that the cement mortar painting layer shrinks and falls off at high temperature, and the waterproof effect is greatly reduced. On the other hand, the Mongolian yurt sweat-steaming house aiming at the ceramic tiles and the archaized stones at home and abroad has less construction experience, and requires larger theoretical basis compared with the traditional Mongolian yurt modeling construction process under the special environment requirement of the sweat-steaming house. The yurt stone or the tile is paved and pasted under the common environment, the performance is extremely poor under the high-temperature condition, and the falling-off and other potential quality and safety hazards are very easy to occur. Secondly, due to the limitation of the traditional process level, the Mongolian yurt modeling needs manual paying-off by field constructors, and the foundation layer is installed. The error deviation is large, and the overall final effect is often not satisfactory. The arc-shaped position of the Mongolian yurt is unreasonable in stone and ceramic tile paving and parting, and the decorative effect is easy to reduce.
SUMMERY OF THE UTILITY MODEL
The utility model aims to: in order to solve the problems that the ceramic tile paving stability of the yurt-shaped steam room is poor, the ceramic tile paving is easy to fall off and cannot be adjusted, the yurt-shaped mounting structure of the prefabricated sauna room is provided.
In order to achieve the purpose, the utility model provides an assembled yurt sauna room yurt model design and installation structure, which comprises a wall body, a support pillar, a first keel, a keel frame, a first stone plate and a second stone plate, wherein the wall body is of a circular structure, the top of the wall body is provided with a plurality of first keels, the first keels are arranged along the circumferential direction of the wall body, one end of each first keel is connected to the wall body, the other end of each first keel is connected to the support pillar, the support pillar is fixedly connected to a ground base layer and is positioned in the wall body, the first keel is provided with an adjusting groove, a connecting rod penetrates through the adjusting groove, the first stone plate is connected to the first keel through the connecting rod, and one side of each first keel, opposite to the first stone plate, is provided with a heat insulation plate, the inboard of wall body is provided with keel frame, keel frame includes second fossil fragments and third fossil fragments, second fossil fragments fixed connection be in on the wall body, third fossil fragments fixed connection be in on the second fossil fragments, be provided with a plurality of first hitching member on the third fossil fragments, it has the second to hang to have hung on the first hitching member and has hung the piece, the second is hung a piece fixed connection and is in on the second stone material board, first stone material board with be provided with the receipts mouth strip between the second stone material board, receipts mouth strip fixed connection be in on the wall body, just the bottom and the third fossil fragments top looks butt of receipts mouth strip.
As a further description of the above technical solution:
sliding connection has the fixing base on the support column, be provided with first spout and second spout on the fixing base, first spout is located the top of second spout.
As a further description of the above technical solution:
the closing strip is provided with a third sliding groove, one end of the first stone plate is inserted into the third sliding groove, and the other end of the first stone plate is inserted into the second sliding groove.
As a further description of the above technical solution:
the top of the wall body is provided with a fourth sliding groove, one end of the heat-insulation board is inserted into the fourth sliding groove, and the other end of the heat-insulation board is inserted into the first sliding groove.
As a further description of the above technical solution:
the fixing seat is provided with a plurality of fixing holes, and locking rods penetrate through the fixing holes.
As a further description of the above technical solution:
one side of first stone material board is provided with the draw-in groove, the opposite side of first stone material board is provided with the matching the bellying of draw-in groove.
As a further description of the above technical solution:
the two ends of the first keel are respectively provided with a first connecting plate, the first connecting plate is provided with a plurality of screw holes, and screws penetrate through the screw holes.
As a further description of the above technical solution:
fixedly connected with second connecting plate on the first stone material board, be provided with the connecting hole on the second connecting plate, the one end of connecting rod is connected in the connecting hole.
As a further description of the above technical solution:
the connecting rod is a screw rod.
In summary, due to the adoption of the technical scheme, the utility model has the beneficial effects that:
1. according to the yurt modeling design and installation structure of the fabricated bathroom yurt, the top of the yurt modeling steam room can be conveniently formed through the arranged first keel, the construction difficulty can be reduced, the construction efficiency can be improved, meanwhile, the first stone plate can be conveniently installed, the first stone plate can be adjusted left and right through the adjusting groove arranged on the first keel, so that the first stone plates can be spliced more tightly, and the decoration effect can be improved.
2. According to the yurt modeling design installation structure of the fabricated bath sudor steam room provided by the utility model, through the arranged keel frame, the first hanging and connecting piece and the second hanging and connecting piece, the hanging and connecting of stone plates can be realized, the installation and the adjustment are convenient, the installation quality can be improved, the installation and the disassembly are also convenient, and the construction efficiency is improved; through the closing strip that sets up, can make and realize perfect closing in between first stone material board and the second stone material board, improve decorative effect.
3. In the yurt modeling design and installation structure of the fabricated bathroom sweat-steaming house provided by the utility model, the overall stability of the sweat-steaming house can be improved by arranging the support columns, and meanwhile, entertainment facilities such as a display screen, a sound box and the like can be installed on the support columns, so that not only can the space be saved, but also the interestingness can be improved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic structural diagram of a mounting structure for a yurt-shaped design of a sweat stream room of an assembled bathing place.
Fig. 2 is a sectional view of a mounting structure for the yurt model of the prefabricated sauna room.
FIG. 3 is a top view of a mounting structure for the yurt model of the prefabricated sauna room.
Fig. 4 is an enlarged view of a portion a in fig. 2.
Fig. 5 is a schematic structural diagram of a first stone plate in an assembled bath court sweat-steaming house yurt modeling design installation structure.
Fig. 6 is a schematic structural diagram of a fixing seat in an assembled bath court sweat-steaming room yurt model design installation structure.
Fig. 7 is a side view of a first keel in an assembled bath sweat-steaming house yurt model design installation structure.
Fig. 8 is a schematic structural diagram of a first keel in an assembled bath court sweat-steaming house yurt modeling design installation structure.
Illustration of the drawings:
1. a wall body; 2. a support pillar; 3. a first keel; 31. an adjustment groove; 4. a keel frame; 41. a second keel; 42. a second keel; 5. a first stone panel; 51. a card slot; 52. a boss portion; 6. a second stone panel; 7. a connecting rod; 8. a thermal insulation board; 9. a first hanging piece; 10. a second hanging piece; 11. closing the opening strip; 111. a third chute; 12. a fixed seat; 121. a first chute; 122. a second chute; 123. a locking lever; 13. a fourth chute; 14. a first connecting plate; 15. a second connecting plate.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the utility model, as claimed, but is merely representative of selected embodiments of the utility model. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
In the description of the embodiments of the present invention, it should be noted that the terms "upper", "inner", and the like refer to the orientation or position relationship based on the drawings or the orientation or position relationship that the utility model product is usually placed when in use, and are only used for convenience of describing the present invention and simplifying the description, but do not refer to or imply that the device or the element to be referred must have a specific orientation, be constructed in a specific orientation, and operate, and thus, should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to 8, the utility model provides an assembled yurt model design and installation structure, which is characterized by comprising a wall body 1, support columns 2, first keels 3, keel frames 4, first stone plates 5 and second stone plates 6, wherein the wall body 1 is of a circular structure, the top of the wall body 1 is provided with a plurality of first keels 3, the first keels 3 are arranged along the circumferential direction of the wall body 1, one ends of the first keels 3 are connected to the wall body 1, the other ends of the first keels 3 are connected to the support columns 2, the support columns 2 are fixedly connected to a ground base layer, the support columns 2 are located inside the wall body 1, the first keels 3 are provided with adjusting grooves 31, connecting rods 7 penetrate through the adjusting grooves 31, the connecting rods 7 are screws, the first stone plates 5 are connected to the first keels 3 through the connecting rods 7, first fossil fragments 3 are relative one side of first stone material board 5 is provided with heated board 8, the inboard of wall body 1 is provided with keel frame 4, keel frame 4 includes second fossil fragments 41 and third fossil fragments 42, second fossil fragments 41 fixed connection be in on the wall body 1, third fossil fragments 42 fixed connection be in on the second fossil fragments 41, be provided with a plurality of first union pieces 9 of hanging on the third fossil fragments 42, it has second union piece 10 to hang on the first union piece 9 of hanging, second union piece 10 fixed connection be in on the second stone material board 6, first stone material board 5 with be provided with receipts mouth strip 11 between the second stone material board 6, receipts mouth strip 11 fixed connection be in on the wall body 1, just the bottom and the third fossil fragments 42 top looks butt of receiving mouth strip 11.
Support column 2 goes up sliding connection and has fixing base 12, be provided with first spout 121 and second spout 122 on the fixing base 12, first spout 121 is located the top of second spout 122. The fixing base can be convenient for connect first stone material board, first fossil fragments and heated board.
The closing strip 11 is provided with a third sliding groove 111, one end of the first stone plate 5 is inserted into the third sliding groove 111, and the other end of the first stone plate 5 is inserted into the second sliding groove 122. This facilitates the rotation of the first stone plate and makes the joint between the first stone plates more compact.
The top of the wall body 1 is provided with a fourth sliding groove 13, one end of the heat insulation board 8 is inserted into the fourth sliding groove 13, and the other end of the heat insulation board 8 is inserted into the first sliding groove 121. The heated board can be convenient for rotate, make between the heated board inseparabler.
The fixing seat 12 is provided with a plurality of fixing holes, and a locking rod 123 penetrates through the fixing holes. The fixing seat can be conveniently assembled and disassembled.
One side of the first stone plate 5 is provided with a clamping groove 51, and the other side of the first stone plate 5 is provided with a protruding part 52 matching the clamping groove 5. This allows a tighter splice between the first stone panels.
The both ends of first fossil fragments 3 are provided with first connecting plate 14 respectively, be provided with a plurality of screws on the first connecting plate 14, wear to be equipped with the screw in the screw. First fossil fragments are dismantled in the installation of being convenient for, improve the efficiency of construction.
Fixedly connected with second connecting plate 15 on the first stone material board 5, be provided with the connecting hole on the second connecting plate 15, the one end of connecting rod 7 is connected in the connecting hole. Be convenient for the fixed first stone material board of installation, first stone material board and second stone material board are the ceramic tile.
The working principle is as follows: when the sweat evaporates the room installation, the fixing base moves to suitable position, it is fixed through the check lock lever, specific check lock lever screw rod, install keel frame on the wall body, keel frame can be fixed through the mode of welding or spiro union, with closing up strip fixed connection on the wall body, the second stone material board articulates through first link spare and second and installs on keel frame, install first stone material board on first fossil fragments, and fixed through the connecting rod, install the heated board at last, the one end of heated board is pegged graft in the fourth spout, the other end of heated board is pegged graft in first spout. Consequently, through the first fossil fragments that set up, the yurt molding sweat that is convenient for evaporates room top shaping, can reduce the construction degree of difficulty, improves the efficiency of construction, can be convenient for install first stone material board simultaneously, through the adjustment tank that sets up at first fossil fragments, can control first stone material board and adjust to can be inseparabler between the first stone material board, improve decorative effect. The keel frame, the first hanging and connecting piece and the second hanging and connecting piece are arranged, so that the second stone plate can be hung and connected, the installation and adjustment are convenient, the installation quality can be improved, the installation and the disassembly are convenient, and the construction efficiency is improved; through the closing strip that sets up, can make and realize perfect closing in between first stone material board and the second stone material board, improve decorative effect.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (9)

1. The yurt modeling design and installation structure of the assembled bathroom sweat stream room is characterized by comprising a wall body (1), support columns (2), first keels (3), keel frames (4), first stone plates (5) and second stone plates (6), wherein the wall body (1) is of a circular structure, a plurality of first keels (3) are arranged at the top of the wall body (1) along the circumferential direction of the wall body (1), one ends of the first keels (3) are connected to the wall body (1), the other ends of the first keels (3) are connected to the support columns (2), the support columns (2) are fixedly connected to a ground base layer, the support columns (2) are located in the wall body (1), adjusting grooves (31) are formed in the first keels (3), and connecting rods (7) penetrate through the adjusting grooves (31), the first stone plate (5) is connected to the first keel (3) through the connecting rod (7), the first keel (3) is opposite to one side of the first stone plate (5) and is provided with an insulation board (8), the inner side of the wall body (1) is provided with the keel frame (4), the keel frame (4) comprises a second keel (41) and a third keel (42), the second keel (41) is fixedly connected to the wall body (1), the third keel (42) is fixedly connected to the second keel (41), the third keel (42) is provided with a plurality of first hanging and connecting pieces (9), the first hanging and connecting pieces (9) are hung with a second hanging and connecting piece (10), the second hanging and connecting piece (10) is fixedly connected to the second stone plate (6), and a closing strip (11) is arranged between the first stone plate (5) and the second stone plate (6), the closing-in strip (11) is fixedly connected to the wall body (1), and the bottom of the closing-in strip (11) is abutted to the top of the third keel (42).
2. The yurt modeling design installation structure of the fabricated bath court sweat-steaming house according to claim 1, wherein a fixed seat (12) is slidably connected to the supporting column (2), a first sliding groove (121) and a second sliding groove (122) are arranged on the fixed seat (12), and the first sliding groove (121) is located above the second sliding groove (122).
3. The yurt modeling design and installation structure of the fabricated bathing spot sweat-steaming house according to claim 2, wherein a third sliding groove (111) is arranged on the closing strip (11), one end of the first stone plate (5) is inserted into the third sliding groove (111), and the other end of the first stone plate (5) is inserted into the second sliding groove (122).
4. The yurt modeling design and installation structure of the fabricated bathroom sweat-steaming room as claimed in claim 2, wherein a fourth sliding groove (13) is formed in the top of the wall body (1), one end of the heat-insulating plate (8) is inserted into the fourth sliding groove (13), and the other end of the heat-insulating plate (8) is inserted into the first sliding groove (121).
5. The yurt modeling design and installation structure of the fabricated bath court sweat-steaming house according to claim 2 is characterized in that a plurality of fixing holes are formed in the fixing base (12), and locking rods (123) penetrate through the fixing holes.
6. The yurt modeling design installation structure of assembled bath court sweat stream room of claim 1, characterized in that one side of the first stone plate (5) is provided with a slot (51), and the other side of the first stone plate (5) is provided with a protrusion (52) matching the slot (51).
7. The yurt modeling design and installation structure of the fabricated bath court sweat-steaming room as claimed in claim 1, wherein two ends of the first keel (3) are respectively provided with a first connecting plate (14), the first connecting plate (14) is provided with a plurality of screw holes, and screws are arranged in the screw holes in a penetrating manner.
8. The yurt modeling design installation structure of the fabricated bath court sweat-steaming house according to claim 1, wherein a second connecting plate (15) is fixedly connected to the first stone plate (5), a connecting hole is formed in the second connecting plate (15), and one end of the connecting rod (7) is connected in the connecting hole.
9. The yurt modeling design and installation structure of assembled bath court sweat-steaming house according to claim 1, characterized in that the connecting rod (7) is a screw rod.
CN202122600131.1U 2021-10-27 2021-10-27 Assembled bath sweat evaporates room yurt molding design mounting structure Active CN216340618U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122600131.1U CN216340618U (en) 2021-10-27 2021-10-27 Assembled bath sweat evaporates room yurt molding design mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122600131.1U CN216340618U (en) 2021-10-27 2021-10-27 Assembled bath sweat evaporates room yurt molding design mounting structure

Publications (1)

Publication Number Publication Date
CN216340618U true CN216340618U (en) 2022-04-19

Family

ID=81131593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122600131.1U Active CN216340618U (en) 2021-10-27 2021-10-27 Assembled bath sweat evaporates room yurt molding design mounting structure

Country Status (1)

Country Link
CN (1) CN216340618U (en)

Similar Documents

Publication Publication Date Title
CN100472015C (en) Light archaized architecture production method and product
CN216475823U (en) GRG modular piles up project organization based on umbrella-shaped skeleton
CN216196255U (en) Assembled decorative wallboard structure
CN216340618U (en) Assembled bath sweat evaporates room yurt molding design mounting structure
CN114086734A (en) Assembled bath sweat evaporates room yurt molding design mounting structure
CN114704021B (en) Wooden circular integrated furred ceiling assembled design structure
CN208996190U (en) A kind of profile steel house
CN204703338U (en) One is used for building the close framed wall structure of integrated log cabin
CN204091381U (en) Wardrobe and plate body integration member thereof
CN109826379A (en) A kind of full room of aluminium alloy structure is self-contained
CN205955063U (en) PVC is low, and welt is decorated in foaming
CN203514682U (en) Y-type steel plate encased column system
CN205100412U (en) Three -dimensional contouring furred ceiling dress escutcheon
CN103469979B (en) A kind of Y shape steel plate bag column system
CN207870591U (en) A kind of full aluminium bookcase of novel belt invisible handle
CN109057007B (en) Two-stage roof Chinese-style structure frame house prepared from aluminum profiles
CN103590530B (en) The special structure material of glass sunlight house and corresponding glass sunlight house
CN203569789U (en) Special member for sunlight room and corresponding sunlight room
CN1035539A (en) Multi-functional carrying thin-walled hollow wall and its application and carrying thin-wall hollow member
CN206600056U (en) A kind of wood moulding fence
CN208522313U (en) Assembled pseudo-classic architecture members
CN219280975U (en) Assembled building wall structure
CN201003212Y (en) Movable supporting bracket
CN216042379U (en) Assembled theater outer wall aluminum plate design mounting structure
CN203247736U (en) Module type finished product partition wall system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant