CN216340095U - But quick assembly disassembly's steel construction board house - Google Patents

But quick assembly disassembly's steel construction board house Download PDF

Info

Publication number
CN216340095U
CN216340095U CN202122574514.6U CN202122574514U CN216340095U CN 216340095 U CN216340095 U CN 216340095U CN 202122574514 U CN202122574514 U CN 202122574514U CN 216340095 U CN216340095 U CN 216340095U
Authority
CN
China
Prior art keywords
plate
bearing end
fixedly connected
end seat
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122574514.6U
Other languages
Chinese (zh)
Inventor
张雪枝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Kaichengyu Construction Technology Co ltd
Original Assignee
Jiangsu Kaichengyu Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Kaichengyu Construction Technology Co ltd filed Critical Jiangsu Kaichengyu Construction Technology Co ltd
Priority to CN202122574514.6U priority Critical patent/CN216340095U/en
Application granted granted Critical
Publication of CN216340095U publication Critical patent/CN216340095U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model discloses a steel structure board house capable of being quickly disassembled and assembled, and relates to the technical field of steel structure board houses. According to the utility model, the dismounting and mounting rod is inserted into the hole grooves of the first connecting hole and the second connecting hole, then the dismounting and mounting rod is rotated to drive the swinging rod to rotate, and meanwhile, the positioning rod is pulled upwards, so that the positioning rod drives the limiting ring to move upwards, and the positioning rod moves downwards and is inserted into the positioning hole under the elastic recovery action of the buffer spring, so that the upper bearing end seat and the lower bearing end seat are further mounted and connected.

Description

But quick assembly disassembly's steel construction board house
Technical Field
The utility model relates to the technical field of steel structure board houses, in particular to a steel structure board house capable of being quickly disassembled and assembled.
Background
The board house is an environment-friendly economical movable board house which takes light steel as a framework, takes a sandwich board as a containment material, is closed in space by a standard modulus series, and is assembled and disassembled by adopting bolt connection.
The existing steel structure board room is formed by connecting bolts through a base, a side supporting plate, an upper top plate and the like, when the steel structure board room is assembled, a plurality of workers are required to use a wrench to screw the bolts into corresponding threaded holes in the base, the side supporting plate and the upper top plate, and the steel structure board room can be assembled.
Therefore, it is necessary to provide a quick-detachable steel structure board house to solve the above problems.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model aims to: the utility model provides a steel structure board house capable of being quickly disassembled and assembled, and aims to solve the problems that the existing steel structure board house is troublesome to disassemble and assemble, needs a professional tool and is time-consuming and labor-consuming.
(II) technical scheme
The utility model specifically adopts the following technical scheme for realizing the purpose:
a steel structure board house capable of being quickly disassembled and assembled comprises a first installation bottom plate and a second installation bottom plate, wherein a connecting groove is formed in the right side end face of the first installation bottom plate, a connecting plate is formed in the left side end face of the second installation bottom plate, the connecting groove is clamped in the connecting plate, lower bearing end seats are fixedly connected to four corners of the first installation bottom plate and the second installation bottom plate respectively, the lower bearing end seats are clamped with the upper bearing end seats, first connecting blocks are fixedly connected to the side surfaces of the lower bearing end seats, second connecting blocks are fixedly connected to the side surfaces of the upper bearing end seats, first connecting holes are formed in the upper surfaces of the first connecting blocks, second connecting holes are formed in the upper surfaces of the second connecting blocks, disassembling and assembling rods are inserted in the first connecting holes and the second connecting holes, swinging plates are fixedly connected to the upper surfaces of the disassembling and assembling rods, and assembling center holes are formed in the upper surfaces of the swinging plates, the bearing device is characterized in that a central cushion block is fixedly connected to the center of the side surface of the upper bearing end seat, a positioning hole is formed in the upper surface of the central cushion block, a buffer spring is fixedly connected to the lower surface of the upper end of the central cushion block, a limiting ring is fixedly connected to one end, far away from the central cushion block, of the buffer spring, the limiting ring is fixedly connected with a positioning rod, and the positioning rod is inserted into the central hole and the positioning hole.
Furthermore, the two first connecting blocks are attached to and connected with the outermost surface of the lower bearing end seat, and the two second connecting blocks are attached to and connected with the outermost surface of the upper bearing end seat.
Furthermore, the diameters of the first connecting hole and the second connecting hole are the same, the diameter of the disassembling and assembling rod is matched with the diameters of the first connecting hole and the second connecting hole, and the outer side surface of the disassembling and assembling rod is uniformly sprayed with wear-resistant materials.
Further, the diameter of the outer ring of the buffer spring is slightly smaller than that of the limiting ring, and the diameter of the inner ring of the buffer spring is slightly larger than that of the positioning rod.
Furthermore, four corners of the bottoms of the first mounting base plate and the second mounting base plate are fixedly connected with movable roller assemblies, the bottoms of the first mounting base plate and the second mounting base plate are fixedly connected with hydraulic rod mechanisms, and the lower surfaces of the hydraulic rod mechanisms are fixedly connected with brake bases.
Furthermore, the upper surface of the upper bearing end seat is clamped with the upper top plate through a rectangular column, and the lower surface of the upper top plate is provided with a honeycomb-shaped air exchange plate.
Furthermore, two of the left end go up the joint and have the side-mounting board between the end socket of accepting, the outside of side-mounting board is provided with the chamber door, two of front end go up the joint and have preceding mounting panel between the end socket of accepting.
(III) advantageous effects
The utility model has the following beneficial effects:
1. the utility model inserts the disassembling and assembling rod into the hole grooves of the first connecting hole and the second connecting hole, then rotates the disassembling and assembling rod to drive the swinging rod to rotate, simultaneously pulls the positioning rod upwards to drive the positioning rod to drive the limiting ring to move upwards, at the same time, the buffer spring is stressed and compressed, thereby the swinging rod rotates until the side surface of the swinging rod is parallel to the front end surface of the upper bearing end seat, then releases the positioning rod, the positioning rod moves downwards under the elastic return action of the buffer spring and is inserted into the positioning hole, at the same time, the upper bearing end seat and the lower bearing end seat complete further installation and connection, when disassembling, only the positioning rod needs to be pulled upwards to be moved out of the positioning hole, then rotates the swinging rod to drive the disassembling and assembling rod to rotate until the swinging rod is vertical to the front end surface of the upper bearing end seat, then the disassembling and assembling rod can be pulled upwards to take out of the disassembling and assembling rod from the first connecting hole and the second connecting hole, can be finished without a professional tool, and meanwhile, the bolt does not need to be rotated for fastening, so that time and labor are saved.
2. According to the utility model, by utilizing the elastic characteristic of the buffer spring, after the positioning rod is arranged at the middle upper part of the positioning hole, when an installer does not pull upwards by hands any more, the buffer spring is not compressed any more under the elastic recovery action of the buffer spring, and the buffer spring restores the deformation of the buffer spring, so that the positioning rod is driven to move downwards to be inserted into the positioning hole, the installation and connection are completed, and the connection between the lower bearing end seat and the upper bearing end seat is more stable and reliable.
3. The utility model can save more labor when the first installation bottom plate and the second installation bottom plate are spliced by fixedly connecting the movable roller components at the bottoms of the first installation bottom plate and the second installation bottom plate, only needs to push the first installation bottom plate and the second installation bottom plate or push any one of the first installation bottom plate and the second installation bottom plate after the positions between the connecting plate and the connecting groove are aligned, can enable the connecting plate to be quickly and completely inserted into the connecting groove, after the connection between the first installation bottom plate and the second installation bottom plate is completed, the hydraulic rod mechanism is pressurized, so that the hydraulic rod mechanism drives the brake base to move downwards and be in close contact with the ground, thereby playing the braking effect, placing the first installation bottom plate and the second installation bottom plate after installation to move, and preventing external mosquitoes from entering the interior of a board house by arranging the honeycomb air exchange plate at the lower surface of the upper top plate, meanwhile, the ventilation effect is achieved.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is a schematic view of the construction of the coupling mechanism of the present invention;
FIG. 3 is a schematic diagram of a front view configuration of the present invention;
FIG. 4 is a schematic illustration of a left side view configuration of the present invention;
fig. 5 is a schematic view of a connection structure of a first installation base and a second installation base according to the present invention.
Reference numerals: 1. a first mounting baseplate; 2. a second mounting baseplate; 3. connecting grooves; 4. a connecting plate; 5. a lower receiving end seat; 6. an upper bearing end seat; 7. a first connection block; 8. a second connecting block; 9. a first connection hole; 10. a second connection hole; 11. disassembling and assembling the rod; 12. a swing plate; 13. a central bore; 14. a central cushion block; 15. positioning holes; 16. a buffer spring; 17. a limiting ring; 18. positioning a rod; 19. a front mounting plate; 20. moving the roller assembly; 21. a hydraulic lever mechanism; 22. a brake base; 23. an upper top plate; 24. a honeycomb air exchange panel; 25. and (7) side mounting plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
Referring to fig. 1-5, a steel structure house capable of being quickly disassembled and assembled comprises a first installation bottom plate 1 and a second installation bottom plate 2, wherein a connecting groove 3 is formed on the right side end surface of the first installation bottom plate 1, a connecting plate 4 is formed on the left side end surface of the second installation bottom plate 2, the connecting groove 3 is clamped inside the connecting plate 4, lower bearing end seats 5 are fixedly connected to four corners of the first installation bottom plate 1 and the second installation bottom plate 2, the lower bearing end seats 5 are clamped with upper bearing end seats 6, first connecting blocks 7 are fixedly connected to the side surfaces of the lower bearing end seats 5, the two first connecting blocks 7 are attached to the outermost side surfaces of the lower bearing end seats 5, the two second connecting blocks 8 are attached to the outermost side surfaces of the upper bearing end seats 6, second connecting blocks 8 are fixedly connected to the side surfaces of the upper bearing end seats 6, first connecting holes 9 are formed on the upper surfaces of the first connecting blocks 7, second connecting hole 10 has been seted up to the upper surface of second connecting block 8, the diameter of first connecting hole 9 is the same with the diameter looks adaptation of first connecting hole 9 and second connecting hole 10, wear-resistant material has evenly been spouted and has been plated to the lateral surface of dismouting pole 11, dismouting pole 11 has been pegged graft in the inside of first connecting hole 9 and second connecting hole 10, the last fixed surface of dismouting pole 11 is connected with swinging plate 12, centre bore 13 has been seted up to the upper surface of swinging plate 12, the side surface center fixedly connected with center cushion 14 of upper bearing end seat 6, locating hole 15 has been seted up to the upper surface of center cushion 14, the lower fixed surface of center cushion 14 of upper end is connected with buffer spring 16, buffer spring 16 keeps away from center cushion 14's one end fixedly connected with spacing ring 17, spacing ring 17 and locating lever 18 fixed connection, locating lever 18 is pegged graft in centre bore 13 and locating hole 15.
In this embodiment, when in use, the connecting plate 4 fixedly connected with the second mounting plate 2 is first placed in the connecting groove 3 formed on the first mounting plate 1, the splicing between the first mounting plate 1 and the second mounting plate 2 is completed, after the splicing is completed, the fixture block at the lower end of the upper receiving end seat 6 is clamped in the clamping groove formed on the upper surface of the lower receiving end seat 5, so that the splicing between the upper receiving end seat 6 and the lower receiving end seat 5 is completed, then the two side mounting plates 25 are placed in the connecting grooves of the two upper receiving end seats 6 at both sides, the two front mounting plates 19 are placed in the connecting grooves of the two upper receiving end seats 6 at the front end, then the rectangular clamping column at the lower end of the upper top plate 23 is clamped in the connecting groove of the upper receiving end seat 6, so that the upper top plate 23 is connected with the upper receiving end seat 6, then the dismounting rod 11 is inserted into the hole grooves of the first connecting hole 9 and the second connecting hole 10, then the disassembling and assembling rod 11 is rotated to drive the swinging rod 12 to rotate, and simultaneously the positioning rod 18 is pulled upwards, so that the positioning rod 18 drives the limiting ring 17 to move upwards, at the moment, the buffer spring 16 is compressed under stress, so that the swinging rod 12 rotates until the side surface of the swinging rod 12 is parallel to the front end surface of the upper bearing end seat 6, then the positioning rod 18 is loosened, the positioning rod 18 moves downwards and is inserted into the positioning hole 15 under the elastic recovery action of the buffer spring 16, at the moment, further installation and connection between the upper bearing end seat 6 and the lower bearing end seat 5 are completed, the disassembling and assembling can be realized by pulling the positioning rod 18 upwards until the positioning rod 18 is moved out of the positioning hole 15, then the swinging rod 12 is rotated to drive the disassembling and assembling rod 11 to rotate until the swinging rod 12 is vertical to the front end surface of the upper bearing end seat 6, then the disassembling and assembling rod 11 can be pulled upwards to take out the disassembling and assembling rod 11 from the first connecting hole 9 and the second connecting hole 10, can be finished without a professional tool, and meanwhile, the bolt does not need to be rotated for fastening, so that time and labor are saved.
Example 2
Referring to fig. 2, the present embodiment is further optimized based on embodiment 1, specifically, the diameter of the outer ring of the buffer spring 16 is slightly smaller than the diameter of the limit ring 17, and the diameter of the inner ring of the buffer spring 16 is slightly larger than the diameter of the positioning rod 18.
In this embodiment, by using the elastic characteristic of the buffer spring 16, after the positioning rod 18 is placed in the middle upper portion of the positioning hole 15, when the installer no longer pulls up with the hand, under the elastic recovery effect of the buffer spring 16, the buffer spring 16 is no longer compressed, and restores its deformation, so as to drive the positioning rod 18 to move downward and insert into the positioning hole 15, thereby completing the installation connection, and making the connection between the lower receiving end seat 5 and the upper receiving end seat 6 more stable and reliable.
Example 3
Referring to fig. 1, 3 and 4, the present embodiment is optimized based on the embodiment 1 or 2, specifically, four corners of the bottoms of the first installation bottom plate 1 and the second installation bottom plate 2 are fixedly connected with a movable roller assembly 20, the bottoms of the first installation bottom plate 1 and the second installation bottom plate 2 are fixedly connected with a hydraulic rod mechanism 21, and the lower surface of the hydraulic rod mechanism 21 is fixedly connected with a brake base 22.
Specifically, the upper surface of the upper bearing end seat 6 is clamped with the upper top plate 23 through a rectangular column, and the lower surface of the upper top plate 23 is provided with a honeycomb-shaped ventilation plate 24.
Specifically, side mounting plates 25 are clamped between two upper bearing end seats 6 at the left end, a box door is arranged outside the side mounting plates 25, and a front mounting plate 19 is clamped between two upper bearing end seats 6 at the front end.
In this embodiment, the roller assembly 20 is fixedly connected to the bottom of the first mounting base plate 1 and the bottom of the second mounting base plate 2, so that the roller assembly saves more labor when the first mounting base plate 1 and the second mounting base plate 2 are spliced, only after the connecting plate 4 and the connecting groove 3 are aligned, the first mounting base plate 1 and the second mounting base plate 2 are pushed or any one of the first mounting base plate 1 and the second mounting base plate 2 is pushed, the connecting plate 4 can be quickly and completely inserted into the connecting groove 3, after the connection between the first mounting base plate 1 and the second mounting base plate 2 is completed, the hydraulic rod mechanism 21 is pressurized to drive the brake base 22 to move downwards and tightly contact with the ground, so that the braking effect is achieved, the first mounting base plate 1 and the second mounting base plate 2 after installation are placed to move, and the honeycomb-shaped ventilation plate 24 is arranged on the lower surface of the upper top plate 23, can avoid external mosquito to enter into the inside in steel construction board room, have ventilation's effect simultaneously.
In summary, the following steps: in the utility model, when in use, a connecting plate 4 fixedly connected with a second mounting bottom plate 2 is firstly arranged in a connecting groove 3 arranged on a first mounting plate 1 to complete the splicing between the first mounting bottom plate 1 and the second mounting bottom plate 2, after the splicing is completed, a clamping block at the lower end of an upper bearing end seat 6 is clamped in a clamping groove arranged on the upper surface of a lower bearing end seat 5, so that the splicing between the upper bearing end seat 6 and the lower bearing end seat 5 is completed, then two side mounting plates 25 are arranged in the connecting grooves of the two upper bearing end seats 6 at two sides, two front mounting plates 19 are arranged in the connecting grooves of the two upper bearing end seats 6 at the front end, then a rectangular clamping column at the lower end of an upper top plate 23 is clamped in the connecting groove of the upper bearing end seat 6, so that the upper top plate 23 is connected with the upper bearing end seat 6, then a dismounting rod 11 is inserted into hole grooves of a first connecting hole 9 and a second connecting hole 10, then the disassembling and assembling rod 11 is rotated to drive the swinging rod 12 to rotate, and simultaneously the positioning rod 18 is pulled upwards, so that the positioning rod 18 drives the limiting ring 17 to move upwards, at the moment, the buffer spring 16 is compressed under stress, so that the swinging rod 12 rotates until the side surface of the swinging rod 12 is parallel to the front end surface of the upper bearing end seat 6, then the positioning rod 18 is loosened, the positioning rod 18 moves downwards and is inserted into the positioning hole 15 under the elastic recovery action of the buffer spring 16, at the moment, further installation and connection between the upper bearing end seat 6 and the lower bearing end seat 5 are completed, the disassembling and assembling can be realized by pulling the positioning rod 18 upwards until the positioning rod 18 is moved out of the positioning hole 15, then the swinging rod 12 is rotated to drive the disassembling and assembling rod 11 to rotate until the swinging rod 12 is vertical to the front end surface of the upper bearing end seat 6, then the disassembling and assembling rod 11 can be pulled upwards to take out the disassembling and assembling rod 11 from the first connecting hole 9 and the second connecting hole 10, need not fasten with the help of professional instrument alright with the completion, do not need rotatory bolt simultaneously, time saving and labor saving, accomplish between first mounting plate 1 and second mounting plate 2 and connect the back, pressurize through hydraulic stem mechanism 21, make hydraulic stem mechanism 21 drive brake base 22 downstream and with between the ground in close contact with, thereby play the effect of braking, place first mounting plate 1 and the removal of second mounting plate 2 position after the installation, through setting up cellular board 24 of breathing freely on the lower surface of last roof 23, can avoid external mosquito to enter into the inside in steel construction board room, ventilation's effect has simultaneously.
The above description is only a preferred embodiment of the present invention, and not intended to limit the present invention, and the scope of the present invention is defined by the appended claims, and all structural changes that can be made by using the contents of the description and the drawings of the present invention are intended to be covered by the scope of the present invention.

Claims (7)

1. The utility model provides a but quick assembly disassembly's steel construction board house, includes first mounting plate (1) and second mounting plate (2), its characterized in that: the right side end face of the first mounting base plate (1) is provided with a connecting groove (3), the left side end face of the second mounting base plate (2) is provided with a connecting plate (4), the connecting groove (3) is clamped inside the connecting plate (4), four corners of the first mounting base plate (1) and the second mounting base plate (2) are fixedly connected with a lower bearing end seat (5), the lower bearing end seat (5) is clamped with an upper bearing end seat (6), the side surface of the lower bearing end seat (5) is fixedly connected with a first connecting block (7), the side surface of the upper bearing end seat (6) is fixedly connected with a second connecting block (8), the upper surface of the first connecting block (7) is provided with a first connecting hole (9), the upper surface of the second connecting block (8) is provided with a second connecting hole (10), and the insides of the first connecting hole (9) and the second connecting hole (10) are inserted with a dismounting rod (11), the upper surface fixedly connected with swing board (12) of dismouting pole (11), centre bore (13) have been seted up to the upper surface of swing board (12), go up side surface center fixedly connected with center cushion (14) of bearing end seat (6), locating hole (15), upper end have been seted up to the upper surface of center cushion (14) the lower fixed surface of center cushion (14) is connected with buffer spring (16), the one end fixedly connected with spacing ring (17) of center cushion (14) are kept away from in buffer spring (16), spacing ring (17) and locating lever (18) fixed connection, peg graft in centre bore (13) and locating hole (15) locating lever (18).
2. The steel structure board room capable of being disassembled and assembled quickly as claimed in claim 1, wherein: the two first connecting blocks (7) are attached to and connected with the outermost surface of the lower bearing end seat (5), and the two second connecting blocks (8) are attached to and connected with the outermost surface of the upper bearing end seat (6).
3. The steel structure board room capable of being disassembled and assembled quickly as claimed in claim 1, wherein: the diameter of first connecting hole (9) and second connecting hole (10) is the same, the diameter of dismouting pole (11) and the diameter looks adaptation of first connecting hole (9) and second connecting hole (10), the lateral surface of dismouting pole (11) is evenly spouted and is plated wear-resisting material.
4. The steel structure board room capable of being disassembled and assembled quickly as claimed in claim 1, wherein: the diameter of the outer ring of the buffer spring (16) is slightly smaller than that of the limiting ring (17), and the diameter of the inner ring of the buffer spring (16) is slightly larger than that of the positioning rod (18).
5. The steel structure board room capable of being disassembled and assembled quickly as claimed in claim 1, wherein: the movable roller assembly is characterized in that four corners of the bottoms of the first mounting bottom plate (1) and the second mounting bottom plate (2) are fixedly connected with movable roller assemblies (20), the bottoms of the first mounting bottom plate (1) and the second mounting bottom plate (2) are fixedly connected with hydraulic rod mechanisms (21), and the lower surfaces of the hydraulic rod mechanisms (21) are fixedly connected with brake bases (22).
6. The steel structure board room capable of being disassembled and assembled quickly as claimed in claim 1, wherein: the upper surface of the upper bearing end seat (6) is clamped with the upper top plate (23) through a rectangular column, and the lower surface of the upper top plate (23) is provided with a honeycomb-shaped air exchange plate (24).
7. The steel structure board room capable of being disassembled and assembled quickly as claimed in claim 1, wherein: two of left end go up and accept side mounting panel (25) of joint between end socket (6), the outside of side mounting panel (25) is provided with the chamber door, two of front end go up and accept the joint between end socket (6) and have preceding mounting panel (19).
CN202122574514.6U 2021-10-25 2021-10-25 But quick assembly disassembly's steel construction board house Active CN216340095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122574514.6U CN216340095U (en) 2021-10-25 2021-10-25 But quick assembly disassembly's steel construction board house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122574514.6U CN216340095U (en) 2021-10-25 2021-10-25 But quick assembly disassembly's steel construction board house

Publications (1)

Publication Number Publication Date
CN216340095U true CN216340095U (en) 2022-04-19

Family

ID=81180726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122574514.6U Active CN216340095U (en) 2021-10-25 2021-10-25 But quick assembly disassembly's steel construction board house

Country Status (1)

Country Link
CN (1) CN216340095U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114812112A (en) * 2022-04-27 2022-07-29 江苏博一环保科技有限公司 Movable sludge heat pump drying room

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114812112A (en) * 2022-04-27 2022-07-29 江苏博一环保科技有限公司 Movable sludge heat pump drying room
CN114812112B (en) * 2022-04-27 2023-12-26 江苏博一环保科技有限公司 Portable mud heat pump stoving room

Similar Documents

Publication Publication Date Title
CN111485632B (en) Fully-assembled detachable house building structure and construction method thereof
CN216340095U (en) But quick assembly disassembly's steel construction board house
CN109826460B (en) Interim room in building site of easy dismouting
CN111663738B (en) Outer wall decorative plate and mounting method thereof
CN110847455A (en) Curtain wall structure and mounting method thereof
CN112509451A (en) Building entity model for teaching and teaching method
CN114525864A (en) Assembly type facing light steel keel partition wall structure and construction method thereof
CN213015562U (en) Community convenience service channel
CN218541113U (en) Outdoor curtain wall aluminum plate
CN210917749U (en) Connection structure of steel construction for green construction
CN216813688U (en) Intelligent display device for architectural design
CN219508827U (en) Easy-to-disassemble movable house
CN2604485Y (en) Assembling scaffold for construction use
CN218091406U (en) Quick mounting structure of wallboard for green assembly type structure
CN220868445U (en) Net rack assembling die
CN215367823U (en) Auxiliary fixing structure for exhibitions
CN113530037B (en) Quick detach formula building unit curtain
CN215211688U (en) Modular assembly building wallboard
CN216766621U (en) Energy-saving environment-friendly decorative plate for building outer wall
CN220930535U (en) Impact-resistant support and hanger
CN217080989U (en) Assembled plywood
CN221119303U (en) Building outer wall safety protection net
CN215858457U (en) Exhibition hall curtain of easily buildding fast and dismantling
CN220701382U (en) Assembled unmanned aerial vehicle of concatenation
CN217362956U (en) Photovoltaic support of photovoltaic board installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant