CN216301420U - Rig work platform on water - Google Patents

Rig work platform on water Download PDF

Info

Publication number
CN216301420U
CN216301420U CN202122560775.2U CN202122560775U CN216301420U CN 216301420 U CN216301420 U CN 216301420U CN 202122560775 U CN202122560775 U CN 202122560775U CN 216301420 U CN216301420 U CN 216301420U
Authority
CN
China
Prior art keywords
platform
box
standard
water
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122560775.2U
Other languages
Chinese (zh)
Inventor
张利荣
吴志刚
胡继峰
齐建飞
王晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Aneng Construction Group Co ltd
China Energy Group Second Engineering Bureau Co ltd
Original Assignee
China Aneng Construction Group Co ltd
China Energy Group Second Engineering Bureau Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Aneng Construction Group Co ltd, China Energy Group Second Engineering Bureau Co ltd filed Critical China Aneng Construction Group Co ltd
Priority to CN202122560775.2U priority Critical patent/CN216301420U/en
Application granted granted Critical
Publication of CN216301420U publication Critical patent/CN216301420U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

A water rig operation platform belongs to the technical field of water area operation and comprises a standard box, a bow and stern box, a pile fixing frame, vertical piles, anchor steel, a fence and a working hole. The whole water rig work platform comprises a plurality of standard boxes, a plurality of fore-aft boxes, four pile fixing frames, four vertical piles, a plurality of anchor steels and a pair of fences. The pile driving operation platform comprises a foundation platform, a plurality of standard boxes, a plurality of anchor steel rods and a plurality of water banks, wherein the foundation platform is spliced vertically and horizontally, 2-3 working holes are reserved in the foundation platform, the space of each working hole is the position of one standard box which is vacant, the working space is reserved for operation of a drilling machine, the two ends of the foundation platform are spliced with a bow-stern box to form the integral structure of the drilling machine operation platform, a pile fixing frame is arranged on the bow-stern box at four angular points of the drilling machine operation platform, vertical piles are arranged on the pile fixing frame and connect the whole pile driving operation platform with the water bottom, so that a relatively stable operation platform structure is formed, the anchor steel rods are connected with the pile driving operation platform and the close water banks, the stability of the operation platform is further improved, and a group of fences are respectively arranged on the two sides of the drilling machine operation platform.

Description

Rig work platform on water
Technical Field
The utility model belongs to the technical field of water area operation, and particularly relates to a water rig operation platform.
Background
The operation types of the water areas are diversified nowadays, different engineering operations need to be performed in the water areas under different conditions, one of the common operations is the operation of a drilling machine in the water areas, the operation is limited by the characteristics of the water areas, the conventional drilling machine operation mode cannot be implemented, and a proper bearing platform needs to be provided for the drilling machine equipment.
Disclosure of Invention
The utility model provides a water rig operation platform, which aims to solve the problems in the background technology.
The technical problem solved by the utility model is realized by adopting the following technical scheme:
a water rig operation platform comprises a standard box, a bow and stern box, a pile fixing frame, vertical piles, anchor steel, a fence and a working hole. The whole water rig work platform comprises a plurality of standard boxes, a plurality of fore-aft boxes, four pile fixing frames, four vertical piles, a plurality of anchor steels and a pair of fences. The pile driving operation platform comprises a foundation platform, a plurality of standard boxes, a plurality of anchor steel rods and a plurality of anchor steel rods, wherein the foundation platform is formed by splicing the plurality of standard boxes vertically and horizontally, 2-3 working holes are reserved in the foundation platform, the space of each working hole is the position of one standard box which is vacant, the working space is reserved for operation of a drilling machine, the two ends of the foundation platform are spliced with a bow-stern box to form the integral structure of the drilling machine operation platform, the bow-stern boxes positioned at four angular points of the drilling machine operation platform are provided with a pile fixing frame, the pile fixing frame is provided with vertical piles, the whole pile driving operation platform is connected with the water bottom through the vertical piles to form a relatively stable operation platform structure, the plurality of anchor steel rods are connected with the pile driving operation platform and a close water bank, the stability of the operation platform is further improved, and a group of fences are respectively arranged at the two sides of the drilling machine operation platform to provide necessary protection for operation personnel and equipment and prevent water falling accidents.
The standard box comprises a standard box body, a single-lug connector and double-lug connectors, wherein the standard box body is a sealed box body formed by welding a steel plate and an internal supporting structure, the single-lug connector and the double-lug connector are arranged on the periphery of the upper surface and the lower surface of the standard box body in a staggered and equidistant mode, the single-lug connector is in butt joint with the double-lug connector of the adjacent standard box, and the double-lug connector is in butt joint with the single-lug connector of the adjacent standard box. The fore-and-aft box comprises a fore-and-aft box body, an oblique angle, a single lug joint and a double lug joint, wherein the structure of the single lug joint and the structure of the double lug joint are the same as that of the standard box, so that the fore-and-aft box can be ensured to be in butt joint with the standard box. The lower side of the front end of the fore-aft box is provided with an oblique angle, and the oblique angle structure can ensure that the fore-aft box can better approach a water bank, namely, the operation platform can be closer to the water bank, so that the field arrangement and the platform erection are convenient. The middle part of the front end of the fore-and-aft box is provided with a pile hole which penetrates through the whole fore-and-aft box and keeps sealing. The pile fixing frame is arranged in the pile hole, the vertical pile is vertically arranged in the pile fixing frame, and the vertical pile extends downwards into the underwater ground to form stable connection.
Further, in order to improve the bearing capacity of the foundation platform, the end parts of the standard boxes which are transversely spliced are vertically spliced to form a foundation platform structure which is staggered transversely and vertically.
Furthermore, antislip strips are evenly arranged on the upper surface of the standard box body, so that accidents such as skidding and the like when people and vehicles work on the platform are prevented.
Furthermore, four angular points of the whole drilling rig operation platform are connected with a water bank through anchor steel, so that the stability of the piling operation platform is further improved.
The utility model has the beneficial effects that:
the utility model is used for water area operation, provides an operation platform for drilling equipment on a water area, and has good water area adaptability and operation safety.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a top plan view, pictorial illustration, of the present invention;
FIG. 3 is a schematic view of a standard case of the present invention;
FIG. 4 is a schematic view of the fore and aft case of the present invention;
in the figure: 10. the steel structure comprises a standard box, 11 standard box bodies, 12 single lug joints, 13 double lug joints, 14 anti-slip strips, 20 fore and aft boxes, 21 fore and aft box bodies, 22 bevel angles, 30 pile fixing frames, 40 vertical piles, 50 anchor steel, 60 fences and 70 working holes.
Detailed Description
To facilitate an understanding of the utility model, the utility model will now be described more fully with reference to the accompanying drawings. Preferred embodiments of the present invention are shown in the drawings. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
Referring to fig. 1-4, the water rig work platform comprises a standard box 10, a fore-aft box 20, a pile fixing frame 30, a vertical pile 40, anchor steel 50, a fence 60 and a work hole 70.
The whole water rig work platform comprises a plurality of standard boxes 10, a plurality of fore and aft boxes 20, four pile fixing frames 30, four vertical piles 40, a plurality of anchor steels 50 and a pair of fences 60. A plurality of standard boxes 10 are spliced into a foundation platform in a longitudinal and transverse mode, in order to improve the bearing capacity of the foundation platform, the end portions of the standard boxes 10 which are spliced transversely are vertically spliced into the standard boxes 10 to form a foundation platform structure which is staggered transversely and vertically, 2-3 working holes 70 are reserved on the foundation platform, the space of each working hole 70 is the position where one standard box 10 is vacant, a working space is reserved for the operation of a drilling machine, the fore-and-aft boxes 20 are spliced at two ends of the foundation platform to form an integral structure of the operation platform of the drilling machine, a pile fixing frame 30 is arranged on the fore-and-aft boxes 20 at four angular points of the operation platform of the drilling machine, a vertical pile 40 is arranged on the pile fixing frame 30, the vertical pile 40 connects the whole pile driving operation platform with the water bottom to form a relatively stable operation platform structure, a plurality of anchor steels 50 are connected with the pile driving operation platform and a water bank close to further improve the stability of the operation platform, a group of fences 60 is arranged on two sides of the operation platform of the drilling machine, necessary protection is provided for operating personnel and equipment, and water falling accidents are prevented.
Standard box 10 includes standard box 11, the monaural connects 12, the ears connect 13 and antislip strip 14, standard box 11 is the sealed box that steel sheet and internal support structure welding formed, crisscross equidistance all around on the standard box 11 is arranged monaural joint 12 and ears and is connected 13, monaural joint 12 connects 13 docks with the ears of adjacent standard box 10, the ears connect 13 and the butt joint of 12 of monaural joint of adjacent standard box 10, antislip strip 14 is evenly arranged to the 11 upper surface of standard box, accidents such as taking place to skid when preventing personnel and vehicle from the operation on the platform.
The fore-aft box 20 comprises a fore-aft box body 21, an oblique angle 22, a monaural joint 12, a binaural joint 13 and a non-slip strip 14, wherein the monaural joint 12, the binaural joint 13 and the non-slip strip 14 have the same structure as the standard box 10, which also ensures that the fore-aft box 20 can be butted with the standard box 10. The lower side of the front end of the fore-aft box 20 is provided with an oblique angle 22, and the structure of the oblique angle 22 can ensure that the fore-aft box 20 can better approach a water bank, namely, an operation platform can be closer to the water bank, so that the field arrangement and the platform erection are convenient. The middle part of the front end of the fore-and-aft box 20 is provided with a pile hole which penetrates through the whole fore-and-aft box 20 and keeps sealing. The pile fixing frame 30 is arranged in the pile hole, the vertical pile 40 is vertically arranged in the pile fixing frame 30, and the vertical pile 40 extends downwards into the underwater ground to form stable connection.
Four angular points of the whole drilling rig working platform are connected with the water bank through anchor steel 50, and the stability of the piling working platform is further improved.
The above embodiments have mainly described the water rig work platform of the present invention. While only a limited number of embodiments and features have been described, those skilled in the art will recognize that the utility model can be embodied in many other forms without departing from the spirit or scope thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, and various modifications and alternative arrangements may be devised without departing from the spirit and scope of the present invention as defined by the appended claims.

Claims (4)

1. A water rig operation platform comprises standard boxes (10), fore-and-aft boxes (20), pile fixing frames (30), vertical piles (40), anchor steels (50), fences (60) and working holes (70), and is characterized in that the water rig operation platform comprises a plurality of standard boxes (10), a plurality of fore-and-aft boxes (20), four pile fixing frames (30), four vertical piles (40), a plurality of anchor steels (50) and a pair of fences (60), the plurality of standard boxes (10) are spliced into a basic platform vertically and horizontally, 2-3 working holes (70) are reserved on the basic platform, the space of each working hole (70) is the position of one standard box (10) which is vacant, the fore-and-aft boxes (20) are spliced at two ends of the basic platform to form an integral structure of the rig operation platform, the pile fixing frames (30) are installed on the fore-and-aft boxes (20) positioned at four corners of the rig operation platform, the pile fixing frames (30) are provided with the vertical piles (40), the pile erecting operation platform is connected with the water bottom through a vertical pile (40), a group of fences (60) are respectively arranged on two sides of the rig operation platform, the standard box (10) comprises a standard box body (11), a single lug joint (12) and a double lug joint (13), the standard box body (11) is a sealed box body formed by welding a steel plate and an internal supporting structure, the single lug joint (12) and the double lug joint (13) are arranged on the periphery of the upper surface and the lower surface of the standard box body (11) in a staggered and equidistant mode, the single lug joint (12) is in butt joint with the double lug joint (13) of the adjacent standard box (10), the double lug joint (13) is in butt joint with the single lug joint (12) of the adjacent standard box (10), the bow box (20) comprises a bow box body (21), a bevel (22), a stern (12), the single lug joint (13) and the double lug joint (13), the structures of the single lug joint (12) and the standard box (10) are the same, and the lower side of the front end of the stern box (20) is provided with the bevel (22), the structure of the bevel angle (22) can ensure that the fore-aft box (20) can better approach to the water bank, the middle part of the front end of the fore-aft box (20) is provided with a pile hole which penetrates through the whole fore-aft box (20) and keeps sealing, and a pile fixing frame (30) is arranged in the pile hole.
2. The water rig work platform of claim 1, wherein the standard boxes (10) are vertically spliced at the ends of the standard boxes (10) which are transversely spliced to form a base platform structure which is staggered transversely and vertically.
3. The water rig work platform of claim 1, characterized in that cleats (14) are evenly disposed on the upper surface of the standard box (11).
4. The water rig work platform of claim 1, wherein four corner points of the rig work platform are connected to the shore by anchor steel (50).
CN202122560775.2U 2021-10-25 2021-10-25 Rig work platform on water Active CN216301420U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122560775.2U CN216301420U (en) 2021-10-25 2021-10-25 Rig work platform on water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122560775.2U CN216301420U (en) 2021-10-25 2021-10-25 Rig work platform on water

Publications (1)

Publication Number Publication Date
CN216301420U true CN216301420U (en) 2022-04-15

Family

ID=81115647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122560775.2U Active CN216301420U (en) 2021-10-25 2021-10-25 Rig work platform on water

Country Status (1)

Country Link
CN (1) CN216301420U (en)

Similar Documents

Publication Publication Date Title
US8292548B2 (en) Method and apparatus for improving the lateral support provided by the legs of a jack-up drilling rig
CN216301420U (en) Rig work platform on water
CN112195962A (en) Offshore electric platform pile-sleeve foundation structure with anti-sinking box structure
JP2870683B2 (en) Steel adjustable frame with slope and method of assembling the same
CN109898536A (en) Caisson and its installation method with stake holes
CN216301419U (en) Overwater piling operation platform
CN219033233U (en) Unequal-height double-row pile foundation pit supporting structure system applied to subway construction
CN111980049A (en) Foundation device of deep riverbed mast type wharf crane and construction method
US4966496A (en) Method of erecting offshore platforms
CN218580644U (en) Amphibious formula mud flat photovoltaic pile driving equipment
CN216304398U (en) Heavy-load buoyancy tank pontoon bridge
CN210975827U (en) Deep foundation pit reinforced concrete inner support oblique trestle structure
CN205369269U (en) Adopt prefabricated component to carry out excavation supporting's structure
CN218932999U (en) Sea wall connection structure
CN214423126U (en) Steel temporary bridge for high-pile wharf construction
CN217174967U (en) Shallow foundation building reinforced structure of rectifying
JP3130467B2 (en) Offshore workboat
CN215922500U (en) Structure is refuted in flotation tank ferry
JPS61222892A (en) Semisubmersible type floating structure and construction method thereof
CN215165801U (en) Matching structure of coping building block and main building block
CN212223928U (en) Cabin sealing bottom plate structure for floating transportation of open caisson
CN211948476U (en) Assembled protector
CN215165476U (en) Steel support wailing system