CN216276811U - Disposable jacking device of building machine - Google Patents

Disposable jacking device of building machine Download PDF

Info

Publication number
CN216276811U
CN216276811U CN202122203384.5U CN202122203384U CN216276811U CN 216276811 U CN216276811 U CN 216276811U CN 202122203384 U CN202122203384 U CN 202122203384U CN 216276811 U CN216276811 U CN 216276811U
Authority
CN
China
Prior art keywords
building machine
jacking device
wall
sleeve frame
upright post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122203384.5U
Other languages
Chinese (zh)
Inventor
何卫东
徐栋
薛超
袁用纪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Dameng Security Technology Co ltd
Original Assignee
Guangzhou Dameng Security Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Dameng Security Technology Co ltd filed Critical Guangzhou Dameng Security Technology Co ltd
Priority to CN202122203384.5U priority Critical patent/CN216276811U/en
Application granted granted Critical
Publication of CN216276811U publication Critical patent/CN216276811U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a one-time jacking device of a building machine, which is characterized in that a long-stroke hydraulic cylinder is arranged and is hinged with a rail upright post, the rail upright post and a sleeve frame are respectively driven to climb by telescopic bidirectional acting of the long-stroke hydraulic cylinder, and one floor height can be jacked at one time; the hanging rod slides in the sliding groove, and the hook and the sleeve frame are integrally formed, so that compared with a hinged hook, the hook has higher strength, and meanwhile, the hanging rod can automatically avoid the position relative to the hook; the embedded groove at the bottom of the connecting base has a small opening and a large cavity, so that the wall attaching plate can be conveniently penetrated and fixed from the side surface, and the structure of the connecting base and the wall attaching plate is designed in a split manner, so that the wall attaching plate can be conveniently arranged on a wall body.

Description

Disposable jacking device of building machine
Technical Field
The utility model relates to the field of building construction, in particular to a one-time jacking device of a building machine.
Background
Traditional high-rise building construction platform generally calls as climbing frame or scaffold frame, through climbing mechanism, and the drive stores pylon rises, and constructor carries out the construction operation on the stores pylon.
Along with the rapid rising of labor cost in recent years, the building industry also faces the situation of insufficient human resources, so the concept of the building machine is proposed, a large-scale operation platform is arranged at the top of a traditional climbing frame or a scaffold, the large-scale operation platform and the hanging frame are driven to rise through a jacking mechanism, and the automation equipment carried on the large-scale operation platform and the hanging frame is used for rapid construction and reducing the requirement of human resources.
Chinese patent CN111219055A provides a light-duty turnover high-efficiency construction building device, which comprises hanging seats, a sleeve frame, a hydraulic cylinder, an upper reversing box, a lower reversing box and a rail upright post, wherein a plurality of hanging seats are fixed on the outer side of an outer wall shear wall, the sleeve frame is in sliding fit with the rail upright post, the lower reversing box is fixed at the upper end of the sleeve frame, the hydraulic cylinder is connected with the upper reversing box and the lower reversing box, and the upper reversing box is in sliding connection with the rail upright post. Wherein, the hydraulic cylinder adopts the hydraulic cylinder of little stroke. When climbing operation is carried out, the upper reversing box and the lower reversing box are hung at the bottom of the rail upright post window lattice hole or are jacked at the top of the rail upright post window lattice hole, and the upper reversing box and the lower reversing box reciprocate to realize jacking of the rail upright post or lifting of the sleeve frame. The above mode is through last switching-over box and lower switching-over box reciprocating motion to need frequently to carry out the locking of last switching-over box and lower switching-over box and track stand and remove locking operation, very loaded down with trivial details, and can only climb a stroke of little stroke pneumatic cylinder at most once, just can be with the height of a floor with large-scale work platform and stores pylon jacking through climbing many times, inefficiency.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model provides a one-time jacking device of a building machine, which can jack up one floor at a time and is simple and convenient to operate.
The technical scheme of the utility model is realized as follows: the utility model provides a one-time jacking device of a building machine, which comprises at least three wall attaching seats, a hydraulic cylinder, a sleeve frame and a rail upright post, wherein the sleeve frame and the rail upright post are connected in a sliding manner in the vertical direction; the stroke of the hydraulic cylinder is at least one floor height, and two ends of the hydraulic cylinder are respectively hinged with the rail upright post and the sleeve frame.
On the basis of the technical scheme, preferably, the connecting base comprises a connecting base body, two supporting plates, a pin shaft and a reset spring, the two supporting plates are arranged on the surface of the connecting base body in parallel, the pin shaft sequentially penetrates through one supporting plate, a pin and the other supporting plate, and the reset spring is nested on the pin shaft and drives the free end of the pin to rotate towards one side of the track stand column.
Further preferably, connect the base and still include two support seats, two support seat parallel arrangement have seted up the spout of slope on connecting the base body surface on two support seats, the peg slides in the spout, and the spout highest position is outside couple stroke line, and the spout lowest position is on couple stroke line.
Preferably, the two support seats are located on the outer sides of the two support plates, the two support plates and the two support seats are respectively provided with a sliding groove in parallel, the two hanging rods are arranged, the upper end and the lower end of the sleeve frame are respectively and correspondingly provided with two hooks, and the hanging rods are located in the sliding grooves of the adjacent support plates and the adjacent support seats.
Still further preferably, the sliding groove is arc-shaped.
Further preferably, the wall-attached seat further comprises two sets of rollers, the two sets of rollers are respectively in rolling connection with the inner edge and the outer edge of the rail upright post, and the two sets of rollers are rotatably connected with the two supporting plates.
Further preferably, attach the wall base and still include and attach the wallboard, the embedded groove has been seted up to the connection base bottom, the embedded groove opening is little, the cavity is big and run through the connection base both sides, attach the wallboard and fix with the wall body and penetrate in the embedded groove from the side.
On the basis of the technical scheme, preferably, the sleeve frame is of a hollow structure, a through hole is formed in the top of the sleeve frame, and the hydraulic cylinder penetrates through the through hole and is hinged with the inner wall of the bottom of the sleeve frame.
On the basis of the technical scheme, preferably, the outer side of the hook is of an arc structure.
On the basis of the technical scheme, preferably, the top of the rail upright post is fixedly connected with a building machine operation platform.
Compared with the prior art, the one-time jacking device of the building machine has the following beneficial effects:
(1) the long-stroke hydraulic cylinder is arranged and hinged with the rail upright post, the rail upright post and the sleeve frame are respectively driven to climb through the telescopic bidirectional acting of the long-stroke hydraulic cylinder, so that the height of a floor can be lifted up one time, and in the process, the bolt is matched with the counter bore to selectively fix the rail upright post or the sleeve frame;
(2) the hanging rod slides in the sliding groove, and the hook and the sleeve frame are integrally formed, so that compared with a hinged hook, the hook has higher strength, and meanwhile, the hanging rod can automatically avoid the position relative to the hook;
(3) the embedded groove at the bottom of the connecting base has a small opening and a large cavity, so that the wall attaching plate can be conveniently penetrated and fixed from the side surface, and the structure of the connecting base and the wall attaching plate is designed in a split manner, so that the wall attaching plate can be conveniently arranged on a wall body.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a view showing a state of use of a disposable jacking device of a building construction machine according to the present invention;
FIG. 2 is a perspective view of a disposable jacking device of the building construction machine of the present invention;
FIG. 3 is an enlarged view of the circled area of FIG. 2;
FIG. 4 is a perspective view of the wall-attached seat of the one-time jacking device of the building construction machine of the present invention;
FIG. 5 is a top view of the wall-attached seat of the disposable jacking device of the building construction machine of the present invention;
FIG. 6 is a side view of the wall-attached seat of the disposable jacking device of the building construction machine of the present invention;
fig. 7 is a perspective view of a rail upright of the one-time jacking device of the building machine of the utility model.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
As shown in fig. 1, the one-time jacking device of the building machine of the utility model comprises at least three wall-attached seats 1, hydraulic cylinders 2, a sleeve frame 3 and a rail upright post 4.
The top of the rail upright post 4 is fixedly connected with a building machine operating platform, and a hanging frame is hung below the building machine operating platform.
The sleeve frame 3 and the rail upright post 4 are connected in a sliding manner in the vertical direction, and the sleeve frame and the rail upright post alternately ascend under the expansion action of the hydraulic cylinder 2.
The stroke of the hydraulic cylinder 2 is at least one floor height, so that the rail upright post 4 can be jacked to one floor height by ensuring that the hydraulic cylinder extends out for work once. The two ends of the hydraulic cylinder 2 are respectively hinged with the rail upright post 4 and the sleeve frame 3, so that the rail upright post 4 and the sleeve frame 3 are always connected together, and one of the two falling situations can not occur. Specifically, the sleeve frame 3 is of a hollow structure, a through hole is formed in the top of the sleeve frame, and the hydraulic cylinder 2 penetrates through the through hole and is hinged to the inner wall of the bottom of the sleeve frame 3. Therefore, the hydraulic cylinder 2 and the sleeve frame 3 can be limited and can only move linearly relatively.
And the wall attaching base 1 is fixed on a wall body and supports a rail upright post 4 or a sleeve frame 3. Specifically, the three connecting bases 11 are arranged on the surface of the wall body at equal intervals along the vertical direction, and the interval between the adjacent connecting bases 11 is the height of one floor. In reality, the wall attaching seats 1 are arranged according to the number of floors, and when the number of floors is N, N ≧ 2, the wall attaching seats 1 can be arranged in N + 1.
When the hydraulic cylinder 2 contracts, the driving sleeve frame 3 rises, and in the process, the rail upright post 4 needs to be fixed on the wall attaching base 1, so that the rail upright post 4 is provided with a plurality of counter bores 40 towards one side of the wall attaching base 1 along the vertical direction, the wall attaching base 1 comprises a connecting base 11 and a plug pin 12, the plug pin 12 is selectively inserted into the counter bores 40, and when the plug pin 12 is inserted into the counter bores 40, the rail upright post 4 can be fixed to prevent the rail upright post from falling; when the rail upright 4 is raised, the latch 12 is disengaged from the counterbore 40. Specifically, the connection base 11 includes a connection base body 111, two support plates 112, a pin 113 and a return spring, the two support plates 112 are arranged on the surface of the connection base body 111 in parallel, the pin 113 sequentially passes through one support plate 112, the pin 12 and the other support plate 112, and the return spring is nested on the pin 113 and drives the free end of the pin 12 to rotate towards one side of the rail upright post 4.
When the hydraulic cylinder 2 extends out, the rail upright post 4 is driven to ascend, and in the process, the sleeve frame 3 needs to be fixed on the wall attaching base 1, so that the hook 31 is arranged on the sleeve frame 3, the wall attaching base 1 comprises a hanging rod 13, and the hook 31 is selectively hung on the hanging rod 13. When the hook 31 is hung on the hanging rod 13, the sleeve frame 3 can be fixed; when the jacket frame 3 is lifted, the hook 31 is released from the hanging rod 13. Specifically, connect base 11 and still include two support 114, two support 114 parallel arrangement in connecting base body 111 surfaces, set up the spout 110 of slope on two support 114, peg 13 slides in spout 110, and spout 110 highest position is outside couple 31 stroke line, and the spout 110 lowest position is on couple 31 stroke line. Therefore, when the hook 31 moves upwards and abuts against the hanging rod 13 on the other wall-attached base 1, the hanging rod 13 rolls along the sliding groove 110 and goes out of the stroke line of the hook 31, and interference on the movement of the hook 31 is avoided; meanwhile, after the hook 31 moves above the hanging rod 13, the hanging rod 13 can roll along the sliding groove 110 to reset, and the hook 31 is supported. Specifically, in order to prevent the hanging rod 13 from being locked in the sliding groove 110, the outer side of the hook 31 is in an arc structure. The chute 110 is arcuate in shape, based on the same considerations.
In order to disperse stress, the utility model adopts a structure of double hooks 31, two support seats 114 are positioned outside two support plates 112, sliding grooves 110 are respectively arranged on the two support plates 112 and the two support seats 114 in parallel, two hanging rods 13 are arranged, two hooks 31 are respectively correspondingly arranged at the upper end and the lower end of the sleeve frame 3, and the hanging rods 13 are positioned in the sliding grooves 110 of the adjacent support plates 112 and the adjacent support seats 114.
In order to limit the track upright post 4 to move linearly only in the vertical direction, the wall attaching seat 1 further comprises two sets of rollers 14, the two sets of rollers 14 are respectively in rolling connection with the inner edge and the outer edge of the track upright post 4, and the two sets of rollers 14 are rotatably connected with the two supporting plates 112.
The wall attaching seat 1 is complex in structure and heavy in weight, and in order to be mounted on a wall body conveniently, the wall attaching seat 1 further comprises a wall attaching plate 15, an embedded groove 10 is formed in the bottom of the connecting base 11, the embedded groove 10 is small in opening and large in cavity and penetrates through two sides of the connecting base 11, and the wall attaching plate 15 is fixed with the wall body and penetrates into the embedded groove 10 from the side face.
The working mode of the one-time jacking device of the building machine is described as follows:
firstly, a hook 31 is hung on a hanging rod 13, a hydraulic cylinder 2 is driven to extend out, a rail upright post 4 is jacked to a floor height, and the rail upright post 4 is fixed under the supporting action of a bolt 12 after slightly descending;
then, the hydraulic cylinder 2 is contracted to drive the sleeve frame 3 to ascend until the hook 31 crosses the hanging rod 13 and is hung on the hanging rod 13 to finish the jacking of one floor height;
the operation is alternately executed, and the jacking of different floors can be realized.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (10)

1. The utility model provides a make building machine disposable jacking device, it includes at least three attaches wall seat (1), pneumatic cylinder (2), set frame (3) and track stand (4), wherein, set frame (3) and track stand (4) are at vertical direction sliding connection, follow vertical direction on track stand (4), a plurality of counter bores (40) have been seted up to the orientation attaches wall seat (1) one side, be provided with couple (31) on set frame (3), attach wall seat (1) including connecting base (11), bolt (12) and peg (13), in insert counter bore (40) of bolt (12) selectivity, hang on peg (13) of couple (31) selectivity, its characterized in that: the three connecting bases (11) are arranged on the surface of the wall body at equal intervals along the vertical direction, and the interval between every two adjacent connecting bases (11) is the height of one floor; the stroke of the hydraulic cylinder (2) is at least one floor height, and two ends of the hydraulic cylinder are respectively hinged with the rail upright post (4) and the sleeve frame (3).
2. The one-time jacking device of a building machine as claimed in claim 1, wherein: connect base (11) including connecting base body (111), two backup pads (112), round pin axle (113) and reset spring, two backup pads (112) parallel arrangement are in connecting base body (111) surface, and round pin axle (113) passes a backup pad (112), bolt (12) and another backup pad (112) in proper order, and reset spring nestification is in round pin axle (113) and drive bolt (12) free end to track stand (4) one side rotation.
3. The one-time jacking device of a building machine as claimed in claim 2, wherein: connect base (11) and still include two supporting seat (114), two supporting seat (114) parallel arrangement are in connecting base body (111) surface, set up spout (110) of slope on two supporting seat (114), peg (13) slide in spout (110), and spout (110) highest position is outside couple (31) stroke line, and spout (110) lowest position is on couple (31) stroke line.
4. A one-time jacking device of a building machine as claimed in claim 3, wherein: the two supporting seats (114) are positioned at the outer sides of the two supporting plates (112), sliding grooves (110) are respectively formed in the two supporting plates (112) and the two supporting seats (114) in parallel, two hanging rods (13) are arranged, the upper end and the lower end of the sleeve frame (3) are respectively and correspondingly provided with two hooks (31), and the hanging rods (13) are positioned in the sliding grooves (110) of the adjacent supporting plates (112) and the adjacent supporting seats (114).
5. A one-time jacking device of a building machine as claimed in claim 3, wherein: the sliding groove (110) is arc-shaped.
6. The one-time jacking device of a building machine as claimed in claim 2, wherein: the wall attaching base (1) further comprises two groups of rollers (14), the two groups of rollers (14) are respectively in rolling connection with the inner edge and the outer edge of the rail upright post (4), and the two groups of rollers (14) are rotatably connected with the two supporting plates (112).
7. The one-time jacking device of a building machine as claimed in claim 2, wherein: attach wall seat (1) still including attaching wallboard (15), embedded groove (10) have been seted up to connection base (11) bottom, embedded groove (10) opening is little, the cavity is big and through connection base (11) both sides, attach wallboard (15) and wall body are fixed and penetrate in embedded groove (10) from the side.
8. The one-time jacking device of a building machine as claimed in claim 1, wherein: the sleeve frame (3) is of a hollow structure, a through hole is formed in the top of the sleeve frame, and the hydraulic cylinder (2) penetrates through the through hole and is hinged with the inner wall of the bottom of the sleeve frame (3).
9. The one-time jacking device of a building machine as claimed in claim 1, wherein: the outer side of the hook (31) is of a circular arc structure.
10. The one-time jacking device of a building machine as claimed in claim 1, wherein: the top of the rail upright post (4) is fixedly connected with an operation platform of the building machine.
CN202122203384.5U 2021-09-10 2021-09-10 Disposable jacking device of building machine Active CN216276811U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122203384.5U CN216276811U (en) 2021-09-10 2021-09-10 Disposable jacking device of building machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122203384.5U CN216276811U (en) 2021-09-10 2021-09-10 Disposable jacking device of building machine

Publications (1)

Publication Number Publication Date
CN216276811U true CN216276811U (en) 2022-04-12

Family

ID=81063544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122203384.5U Active CN216276811U (en) 2021-09-10 2021-09-10 Disposable jacking device of building machine

Country Status (1)

Country Link
CN (1) CN216276811U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115233962A (en) * 2022-07-08 2022-10-25 广州达蒙安防科技有限公司 Leveling component and method for building machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115233962A (en) * 2022-07-08 2022-10-25 广州达蒙安防科技有限公司 Leveling component and method for building machine

Similar Documents

Publication Publication Date Title
CN202763125U (en) Electric drill lifting and falling handling frame
CN216276811U (en) Disposable jacking device of building machine
CN112125131B (en) Be applicable to prefabricated plate stair lift by crane auxiliary device
CN215331368U (en) Automatic climbing device with scaffold alternately circulated and scaffold
CN110017019B (en) Hydraulic climbing formwork system and construction method thereof
CN115231427A (en) Pipe joint hoisting construction method and equipment
CN206319834U (en) Vertical raising rig
CN206088957U (en) Shear fork type lifting device
CN210084829U (en) Building anti-sticking companion ladder
CN217581155U (en) Building equipment is adjustable attaches wall seat subassembly
CN202718380U (en) Hydraulic climbing frame for construction of high-rise building
CN113775161B (en) Disposable wall-attached jacking mechanism and method
CN213864943U (en) Hoistway-free elevator driving device
CN217581124U (en) Building equipment guide assembly
CN2748566Y (en) Frame member for construction, frame composed of the same and crane
CN1072233A (en) The Work platform system that multistory building is used
CN212865342U (en) Device for taking and hanging clothes hanger in roller mode
CN210134364U (en) Bridge construction device
CN201099574Y (en) Hydraulic escalator
CN220365265U (en) Anti-drop building construction frame
CN201228183Y (en) Elevator frame for construction
CN212452320U (en) Climb case and be used for drive arrangement of creeping formwork
CN112761548A (en) Blowout preventer maintenance platform
CN219771549U (en) Telescopic crane hanger
CN216043785U (en) Removable supporting is used in building engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20240103

Granted publication date: 20220412