CN216272659U - Main transformer sleeve hoisting balancing tool - Google Patents

Main transformer sleeve hoisting balancing tool Download PDF

Info

Publication number
CN216272659U
CN216272659U CN202121629326.2U CN202121629326U CN216272659U CN 216272659 U CN216272659 U CN 216272659U CN 202121629326 U CN202121629326 U CN 202121629326U CN 216272659 U CN216272659 U CN 216272659U
Authority
CN
China
Prior art keywords
lifting rope
main transformer
arc
lantern ring
quick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121629326.2U
Other languages
Chinese (zh)
Inventor
焦宝安
尚昆
张维东
姜磊
李俊男
周武
董军
陈兵
厉荣杰
王作鹏
林峰
徐立恒
刘思华
田鲁博
周大伟
魏宪
蔡清亮
孔峥
王晓华
王同来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Maintenance Branch of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202121629326.2U priority Critical patent/CN216272659U/en
Application granted granted Critical
Publication of CN216272659U publication Critical patent/CN216272659U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a main transformer sleeve hoisting balancing tool, which comprises an upper fixing frame, a lower fixing frame, a lifting rope and a lifting rope, wherein the upper fixing frame and the lower fixing frame respectively comprise an arc-shaped plate.

Description

Main transformer sleeve hoisting balancing tool
Technical Field
The utility model relates to a tool, in particular to a main transformer sleeve hoisting balance tool.
Background
The replacement of the main transformer bushing is a large-scale operation in the maintenance of the main transformer, and the hoisting of the bushing is the most critical step. At present, a sling binding type hoisting method is generally adopted in the maintenance work. In the hoisting process, the sleeve insulating porcelain insulator bears all gravity, so that the porcelain insulator is easy to damage and the like; in addition, the sleeve and the ground are in an inclined state, the installation stress is uneven, and the situations of oil leakage and the like at the joint part of the sleeve and the body of the main transformer after the main transformer is put into operation are easy to occur. Once the transformer is put into operation, the system operation mode makes it difficult to cut off power again, and the oil leakage of the main transformer can cause the reduction of the insulation performance, thus causing great potential safety hazard.
Disclosure of Invention
The utility model aims to provide a main transformer bushing hoisting balancing tool, which can be combined with a lifting rope by utilizing an upper fixing frame, a lower fixing frame, a lifting rope and the lifting rope, wherein the upper fixing frame and the lower fixing frame can be used for fixing the upper part and the lower part of a main transformer bushing respectively, so that the main transformer bushing is stressed more uniformly, the stress of the main transformer bushing is shared, the main transformer bushing is prevented from being easily damaged, and the safety is improved.
In order to achieve the purpose, the utility model is realized by the following technical scheme:
become bushing hoist and mount balancing tool of owner, including the upper bracket, the lower mounting, lifting rope and lifting rope, the upper bracket, the lower mounting all includes the arc, the both sides of arc are all articulated the extension arm, the device is bound in the lateral part installation of arc, with the end connection lantern ring of upper bracket complex extension arm, with the end connection link of lower mounting complex extension arm, the lifting rope is all connected at the both ends of lifting rope, the middle part of lifting rope passes the lantern ring, the one end and the link of lifting rope are connected.
In order to further realize the purpose of the utility model, the binding device also can adopt the following technical scheme that the binding device comprises a binding belt, one side of the binding belt is connected with one side of an arc-shaped plate, a quick-disassembly belt lock is arranged between the other side of the arc-shaped plate and the other side of the binding belt, the quick-disassembly belt lock comprises a fixed seat and a quick-disassembly locking end, one side of the fixed seat is connected with the arc-shaped plate, the fixed end of the quick-disassembly locking end is connected with the fixed seat, the quick-disassembly locking end is provided with a quick-disassembly locking ring, one side of the bottom of the fixed seat is connected with a first sawtooth block, one side of the first sawtooth block is provided with a sawtooth surface, the inner side of the quick-disassembly locking ring is connected with a second sawtooth block, one side of the second sawtooth block is provided with a sawtooth surface, and the second sawtooth block can be matched with the second sawtooth block to clamp the binding belt.
The side part of the binding band is connected with a plurality of bulges.
The arc-shaped plate is composed of two matching plates which are hinged with each other in a straight line.
Two through holes are formed in the side portion of the lantern ring, the U-shaped rod is installed on the lantern ring, two ends of the U-shaped rod penetrate through the two through holes in the lantern ring respectively, the middle portion of the U-shaped rod can be sleeved on the lifting rope, external threads are formed in two ends of the U-shaped rod, and nuts are connected with two ends of the U-shaped rod in a threaded mode.
The utility model has the advantages that: the upper fixing frame and the lower fixing frame can respectively fix the upper part and the lower part of the main transformer sleeve by combining the upper fixing frame, the lower fixing frame, the lifting rope and the lifting rope, so that the main transformer sleeve is stressed more uniformly, the stress of the main transformer sleeve is shared, the main transformer sleeve is prevented from being easily damaged, and the safety is improved. The extension arm can rotate within a certain range, so that the distance between the end parts of the two extension arms can be adjusted within a certain range according to the size of a main transformer bushing, and the main transformer bushing is convenient to install.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the principles of the utility model and not to limit the utility model. In the drawings:
FIG. 1 is a schematic view of the present invention;
FIG. 2 is an enlarged view of the structure of FIG. 1 from direction A;
FIG. 3 is an enlarged view of part I of FIG. 2;
FIG. 4 is a second schematic structural diagram of the present invention;
FIG. 5 is an enlarged view of section II of FIG. 4;
fig. 6 is a third schematic structural diagram of the present invention.
Detailed Description
Preferred embodiments of the present invention will be described below with reference to the accompanying drawings.
Example 1:
main transformer sleeve pipe hoist and mount balancing tool, as shown in fig. 1-6, including the upper bracket, lower mount, lifting rope 7 and lifting rope 1, the upper bracket, lower mount all includes arc 2, extension arm 3 is all articulated to the both sides of arc 2, the lateral part installation binding means of arc 2, with the end connection lantern ring 4 of upper bracket complex extension arm 3, with the end connection link 6 of lower mount complex extension arm 3, lifting rope 7 is all connected at the both ends of lifting rope 1, the middle part of lifting rope 7 passes the lantern ring 4, the one end and the link 6 of lifting rope 7 are connected.
The upper fixing frame and the lower fixing frame can respectively fix the upper part and the lower part of the main transformer sleeve by combining the upper fixing frame, the lower fixing frame and the lifting rope 7 with the lifting rope 1, so that the main transformer sleeve is stressed more uniformly, the stress of the main transformer sleeve is shared, the main transformer sleeve is prevented from being easily damaged, and the safety is improved. The extension arms 3 can rotate within a certain range, so that the distance between the end parts of the two extension arms 3 can be adjusted within a certain range according to the size of a main transformer bushing, and the installation of the main transformer bushing is facilitated.
Material selection and feasibility analysis of specific implementation of application range: the practical manufactured sample is implemented by taking the specification attached drawing as a drawing according to the proportion and the matching mode of each part in the specification attached drawing, the connection is a common connection mode such as a connection of a strong adhesive, a welding, riveting and a flange connection and an integral forming type connection, and the thickness and the strength of a corresponding connection mode connection point can be selected without creativity according to the requirement of practical connection strength during practical manufacturing.
Example 2:
main transformer sleeve pipe hoist and mount balancing tool, as shown in fig. 1-4, including the upper bracket, lower mount, lifting rope 7 and lifting rope 1, the upper bracket, lower mount all includes arc 2, extension arm 3 is all articulated to the both sides of arc 2, the lateral part installation binding means of arc 2, with the end connection lantern ring 4 of upper bracket complex extension arm 3, with the end connection link 6 of lower mount complex extension arm 3, lifting rope 7 is all connected at the both ends of lifting rope 1, the middle part of lifting rope 7 passes the lantern ring 4, the one end and the link 6 of lifting rope 7 are connected. Binding means includes bandage 5, and one side of bandage 5 is connected with one side of arc 2, installs quick assembly disassembly belt tool to lock between the opposite side of arc 2 and the opposite side of bandage 5, quick assembly disassembly belt tool to lock includes fixing base 8, quick detach locking end 10, and one side of fixing base 8 is connected with arc 2, and the stiff end of quick detach locking end 10 is connected with fixing base 8, has quick detach locking collar 11 on the quick detach locking end 10, and first serration block 12 is connected to bottom one side of fixing base 8, and one side of first serration block 12 has the sawtooth surface, and second serration block 13 is connected to quick detach locking collar 11's inboard, and one side of second serration block 13 has the sawtooth surface, and bandage 5 can be cliied in the cooperation to second serration block 13.
According to the binding device, on one hand, the binding band 5 can be used for binding the main transformer sleeve, and on the other hand, after the binding band 5 binds the main transformer sleeve, a user can utilize the quick-release locking ring 11 of the quick-release locking end 10 to drive the second sawtooth block 13 to be matched with the first sawtooth block 12 to clamp the binding band 5, so that the binding band 5 is locked in a binding state of the main transformer sleeve. When the quick release locking end 10 is converted into a locking state, in fig. 3, the quick release locking end 10 pulls the quick release locking ring 11 upward, so that the second sawtooth block 13 of the quick release locking ring 11 cooperates with the first sawtooth block 12 to clamp the strap 5. When the installation is carried out, the main transformer sleeve can be firstly placed into the inner side of the arc-shaped plate 2, and then the main transformer sleeve is bound by utilizing the binding band 5.
Example 3:
main transformer sleeve pipe hoist and mount balancing tool, as shown in fig. 1-4, including the upper bracket, lower mount, lifting rope 7 and lifting rope 1, the upper bracket, lower mount all includes arc 2, extension arm 3 is all articulated to the both sides of arc 2, the lateral part installation binding means of arc 2, with the end connection lantern ring 4 of upper bracket complex extension arm 3, with the end connection link 6 of lower mount complex extension arm 3, lifting rope 7 is all connected at the both ends of lifting rope 1, the middle part of lifting rope 7 passes the lantern ring 4, the one end and the link 6 of lifting rope 7 are connected. The side of the strap 5 is connected with a plurality of protrusions 9.
The bulge 9 can improve the friction force of the binding band 5, and is convenient for the binding band 5 to bind the main transformer casing.
The arc-shaped plate 2 is composed of two matching plates 14, and the two matching plates 14 are hinged to each other in a straight line.
When the main transformer bushing has a large inner diameter, the opening angle between the two matching plates 14 can be changed according to the contour of the main transformer bushing, so that the stability of the arc-shaped plate 2 and the main transformer bushing is improved.
Two through holes are formed in the side portion of the lantern ring 4, the lantern ring 4 is provided with the U-shaped rod 16, two ends of the U-shaped rod 16 penetrate through the two through holes in the lantern ring 4 respectively, the middle portion of the U-shaped rod 16 can be sleeved on the lifting rope 7, external threads are formed in two ends of the U-shaped rod 16, and the two ends of the U-shaped rod 16 are in threaded connection with the nuts 15.
The U-shaped rod 16 of the utility model can lock the lifting rope 7 and the lantern ring 4 by using the nut 15, thereby preventing the lifting rope 7 and the lantern ring 4 from sliding relatively and preventing the lifting rope 7 from being easily damaged by friction.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention.

Claims (5)

1. Main transformer sleeve pipe hoist and mount balancing tool, its characterized in that: including the upper bracket, the lower fixed frame, lifting rope (7) and lifting rope (1), the upper bracket, the lower fixed frame all includes arc (2), the both sides of arc (2) are all articulated extension arm (3), the device is bound in the lateral part installation of arc (2), with the end connection lantern ring (4) of upper bracket complex extension arm (3), with end connection link (6) of lower fixed frame complex extension arm (3), lifting rope (7) are all connected at the both ends of lifting rope (1), the middle part of lifting rope (7) passes lantern ring (4), the one end and the link (6) of lifting rope (7) are connected.
2. The main transformer bushing hoisting balancing tool of claim 1, characterized in that: the binding device comprises a binding band (5), one side of the binding band (5) is connected with one side of the arc-shaped plate (2), a quick-assembly and disassembly belt lock is arranged between the other side of the arc-shaped plate (2) and the other side of the binding band (5), quick assembly disassembly belt tool to lock includes fixing base (8), quick detach locking end (10), one side and arc (2) of fixing base (8) are connected, the stiff end and fixing base (8) of quick detach locking end (10) are connected, quick detach locking collar (11) have on quick detach locking end (10), first sawtooth block (12) are connected to bottom one side of fixing base (8), one side of first sawtooth block (12) has the serrated surface, second sawtooth block (13) are connected to the inboard of quick detach locking collar (11), one side of second sawtooth block (13) has the serrated surface, bandage (5) can be cliied in cooperation to second sawtooth block (13) and second sawtooth block (13).
3. The main transformer bushing hoisting balancing tool of claim 2, characterized in that: the side part of the binding band (5) is connected with a plurality of bulges (9).
4. The main transformer bushing hoisting balancing tool of claim 1, characterized in that: the arc-shaped plate (2) is composed of two matching plates (14), and the two matching plates (14) are hinged to each other in a straight line manner.
5. The main transformer bushing hoisting balancing tool of claim 1, characterized in that: two through-holes are opened at the side part of the lantern ring (4), a U-shaped rod (16) is installed on the lantern ring (4), two through-holes in the lantern ring (4) are respectively penetrated at the two ends of the U-shaped rod (16), the middle part of the U-shaped rod (16) can be sleeved on the lifting rope (7), external threads are opened at the two ends of the U-shaped rod (16), and nuts (15) are connected with the two ends of the U-shaped rod (16) in a threaded mode.
CN202121629326.2U 2021-07-16 2021-07-16 Main transformer sleeve hoisting balancing tool Expired - Fee Related CN216272659U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121629326.2U CN216272659U (en) 2021-07-16 2021-07-16 Main transformer sleeve hoisting balancing tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121629326.2U CN216272659U (en) 2021-07-16 2021-07-16 Main transformer sleeve hoisting balancing tool

Publications (1)

Publication Number Publication Date
CN216272659U true CN216272659U (en) 2022-04-12

Family

ID=81059435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121629326.2U Expired - Fee Related CN216272659U (en) 2021-07-16 2021-07-16 Main transformer sleeve hoisting balancing tool

Country Status (1)

Country Link
CN (1) CN216272659U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113682942A (en) * 2021-07-16 2021-11-23 国家电网有限公司 Main transformer sleeve hoisting balancing tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113682942A (en) * 2021-07-16 2021-11-23 国家电网有限公司 Main transformer sleeve hoisting balancing tool

Similar Documents

Publication Publication Date Title
CN105398990B (en) Electric power angle steel tower auxiliary lifting apparatus
CN216272659U (en) Main transformer sleeve hoisting balancing tool
CN204150943U (en) A kind of Novel hook device
CN210029736U (en) Tool for vertically hoisting motor cast-aluminum rotor
CN105846378B (en) Rotary spacer capable of being installed rapidly and installation method thereof
CN113682942B (en) Main transformer sleeve hoisting balancing tool
CN106992474A (en) 10kV ends dismount aid
CN202978103U (en) Insulator fixture
CN218326581U (en) Locking device for pipe fitting hoisting elevator
CN207829577U (en) A kind of mounting structure of communication equipment platform
CN206685815U (en) 10kV ends dismount aid
CN202978098U (en) Overhead ground wire lifter
CN213294430U (en) Device for dismounting and hoisting bushing
CN112299247A (en) Cantilever type motor maintenance hoisting tool and method
CN208454294U (en) Finished pressure steel pipe turns over combined sling
CN217890836U (en) Portal crane cart drive chain dismouting device
CN219420147U (en) Fixing clamp
CN220593002U (en) Grinding roller assembly dismounting device
CN219344216U (en) Auxiliary installation structure for power engineering assembled power transmission integrated pole tower
CN219967824U (en) Tool for disassembling and assembling wall-attached parts of tower crane
CN216971717U (en) Variable-cone-section hoisting device for rocket
CN219174013U (en) Lifting appliance connector for curved wall plate and lifting appliance
CN202030436U (en) Anti-rotation mechanism for lifting appliance
CN218988560U (en) Simple double-string type tension insulator string lifting tool
CN112479013B (en) Wire lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220412

CF01 Termination of patent right due to non-payment of annual fee