Prior art keywords
keel
jib
layer
fixedly connected
fixing piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122860401.2U
Other languages
Chinese (zh)
Inventor
宓吉
俞晓东
蒋芳敏
杨宇捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Holdand Construction Co ltd
Original Assignee
Zhejiang Holdand Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Holdand Construction Co ltd filed Critical Zhejiang Holdand Construction Co ltd
Priority to CN202122860401.2U priority Critical patent/CN216239293U/en
Application granted granted Critical
Publication of CN216239293U publication Critical patent/CN216239293U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cage And Drive Apparatuses For Elevators (AREA)

Abstract

The utility model belongs to the technical field of the interior decoration technique and specifically relates to a building top surface hoisting structure is related to, and it includes a plurality of jibs, jib one end fixed connection is on the ceiling, other end fixedly connected with elevator, it is equipped with keel structure to hang on the elevator, keel structure deviates from one side fixedly connected with panel layer of jib, panel layer with keel structure both are unequal through length the jib forms the multilayer structure of high-low straggle, be provided with a plurality of linkage plates between the adjacent two-layer panel layer of multilayer structure direction of height, just the back of the body both sides of linkage plate respectively fixed connection in multilayer structure direction of height is adjacent two-layerly keel structure is last. This application has the effect of providing vertical side hoist and mount face for the furred ceiling.

Description

Building top surface hoisting structure
Technical Field
The application relates to the technical field of interior decoration, in particular to a building top surface hoisting structure.
Background
The hoisting is the combination of a ceiling board and an electric appliance, a sub-buckling board module, a heating module, a lighting module, a ventilation module and the like. The device has the advantages of simple installation, flexible arrangement and convenient maintenance.
Most of integrated furred ceilings in the existing market are the planes, and when peripheral hardware such as air conditioners are installed between furred ceiling and roof to needs, corresponding export can only be adorned on the horizontal plane of furred ceiling, is difficult to directly install on the vertical side of furred ceiling.
SUMMERY OF THE UTILITY MODEL
In order to provide vertical side hoist and mount face for the furred ceiling, this application provides a mansion top surface hoisting structure.
The application provides a building top surface hoisting structure adopts following technical scheme:
mansion top surface hoisting structure, including a plurality of jibs, jib one end fixed connection is on the ceiling, other end fixedly connected with elevator, it is equipped with keel structure to hang on the elevator, keel structure deviates from one side fixedly connected with panel layer of jib, panel layer with keel structure both are through length inequality the jib forms the multilayer structure of high-low straggly, be provided with a plurality of joint boards between the adjacent two-layer panel layer of multilayer structure direction of height, just the mutually opposite sides of joint board respectively fixed connection in the adjacent two-layer of multilayer structure direction of height keel is structural.
Through adopting above-mentioned technical scheme, through the furred ceiling length of control setting to combine keel structure and fixed rather than the last panel layer, in order to constitute the multilayer structure on the panel layer of different altitude structure layer upon layer, between the adjacent two-layer structure of direction of height, the connection board that sets up makes and realizes connecting between the two adjacent layer structure, and form side structure, provide the side direction space for the peripheral hardware that needs the side direction installation.
Optionally, the keel structure includes main joist and secondary joist, the main joist with the secondary joist all adopts the steel joist that has the catching groove, the main joist wears to locate in the elevator draw-in groove, the fixed buckle that is provided with on the main joist, fixed buckle is provided with two fixture blocks on the back of the body both sides relatively, two the fixture block with the catching groove looks lock of secondary joist inslot both sides, the secondary joist tightly support in the main joist deviates from one side of jib, and with the crisscross setting of main joist.
Through adopting above-mentioned technical scheme, set up the mounting in the main joist that establishes through the elevator hoist for through fixed buckle fixed connection between main joist and the secondary joist, and both crisscross setting each other provides the installation skeleton for the installation of other parts of furred ceiling.
Optionally, a plurality of fixing pieces in a long strip shape are arranged on two opposite sides of the connecting plate, the fixing pieces are arranged in parallel with the length direction of the hanging rod, two ends of each fixing piece are fixedly connected to the keel structures of the two adjacent layers of the multilayer structure in the height direction respectively, and the connecting plate is fixedly connected to the fixing pieces and the areas surrounded by the keel structures of the two adjacent layers of the multilayer structure.
By adopting the technical scheme, the arranged fixing piece is convenient for limiting and sealing the edge of the connecting plate, and plays a role in guiding in the installation process of the connecting plate, thereby facilitating the installation of the connecting plate.
Optionally, the fixing part comprises an upper fixing part and a lower fixing part, the upper fixing part is provided with a sliding groove along the length direction of the suspender, the lower fixing part is fixedly provided with a sliding block, and the sliding block is connected in the sliding groove in a sliding mode.
Through adopting above-mentioned technical scheme, through sliding connection between sliding tray and the sliding block, the relative slip of mounting and lower mounting is gone up in the indirect realization to make the mounting adapt to the distance between two adjacent two-layer panel layer in more multilayer structure, improve the general usefulness of mounting.
Optionally, the edge has seted up one row of mounting hole in the sliding tray the jib length direction, the mounting hole runs through go up mounting one side lateral wall, set up on the sliding block with the installation blind hole of mounting hole looks adaptation, mounting hole pore wall threaded connection has the locking knob, just the locking knob simultaneously with installation blind hole threaded connection.
Through adopting above-mentioned technical scheme, slide to installation through-hole and installation blind hole both coincidence back between last mounting and the lower mounting, pass and threaded connection in both through the locking knob, realize going up the locking between mounting and the lower mounting and fix.
Optionally, a groove is formed in one side, facing the connecting plate, of the lower fixing member along the length direction of the hanging rod, and the connecting plate is embedded into the groove.
Through adopting above-mentioned technical scheme, in will linking up the fishplate bar embedding recess through the recess that sets up, avoid linking up the fishplate bar and take place to slide along perpendicular to jib length direction in the installation.
Optionally, the sliding groove is kept away from the one end of sliding block is provided with buffer spring, buffer spring one end is fixed in the sliding groove tip, other end fixedly connected with gasket.
Through adopting above-mentioned technical scheme, the buffer spring and the buffer shim of setting provide the cushioning effect when going up the mounting and taking place too big relative slip with lower mounting.
Optionally, a reinforcing block is arranged between the fixing member and the panel layer, and the reinforcing block is detachably connected to the upper fixing member and tightly abutted to the panel layer.
Through adopting above-mentioned technical scheme, the reinforcing block of setting is in order to further improve the intensity between the linkage plate of side direction setting, improves the shear capacity of linkage plate.
In summary, the present application at least includes the following beneficial technical effects:
1. the connecting plate is fixedly arranged between two adjacent layers in the multilayer structure through the multilayer structure, so that an installation surface is provided for peripheral equipment needing to be arranged laterally;
2. through the mounting that sets up, the adjacent two-layer structure of adaptable different difference in height, the recess of setting has further injectd fixedly to the connection board to be connected as whole through the overall structure of mounting and furred ceiling, structural strength when having improved the connection board side direction and setting up.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present application;
FIG. 2 is a view of the embodiment of the present application, with the direction A in FIG. 1 facing;
FIG. 3 is an enlarged view of a portion of FIG. 2 at B in an embodiment of the present application;
fig. 4 is a schematic structural diagram of a fixing member according to an embodiment of the present application.
Description of reference numerals:
1. a boom; 2. an elevator; 3. a keel structure; 31. a main keel; 32. a secondary keel; 33. fixing the buckle; 34. a clamping block; 4. a panel layer; 5. a multilayer structure; 6. a connector tile; 7. a fixing member; 71. an upper fixing member; 711. a sliding groove; 712. mounting a through hole; 713. a buffer spring; 714. a gasket; 72. a lower fixing member; 721. a slider; 722. installing blind holes; 73. a groove; 8. locking the knob; 9. a reinforcing block; 10. a connecting piece.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses mansion top surface hoisting structure. Referring to fig. 1, 2 and 3, the building top surface hoisting structure comprises a plurality of vertically arranged hanger rods 1, one end of each hanger rod 1 is fixedly connected to a ceiling through an expansion bolt, the other end of each hanger rod is connected with a G-shaped elevator 2 through a bolt, a main keel 31 made of light steel and provided with a fastening groove is horizontally hung in a groove of each elevator 2, the main keel 31 is arranged in the plurality of elevators 2 in a penetrating manner, notches of the main keel 31 are arranged towards the horizontal direction, a fixing buckle 33 is fixedly arranged on the outer side of each main keel 31, two clamping blocks 34 are respectively arranged on the fixing buckle 33 along the two sides of the length direction of the main keel 31, a plurality of horizontal secondary keels 32 provided with fastening grooves are arranged on the outer side of each main keel 31 and tightly attached to the bottom of the main keel 31, the secondary keels 32 are mutually perpendicular to the main keel 31, the clamping grooves on the two sides in the grooves of the secondary keels 32 are respectively buckled with the two clamping blocks 34 on the fixing buckle 33, and the main keel 31 and the secondary keels 32 are alternately arranged to form a suspended ceiling structure 3, the fixed horizontally panel layer 4 that is provided with in keel structure 3 bottom surface, panel layer 4 and keel structure 3 both are through length inequality 1 jib 1 forms the double-deck multilayer structure 5 of the height straggly, between bilayer structure, carries out the connection between the upper and lower floor through setting up vertical joint plate 6, so sets up the furred ceiling structure that has vertical side structure.
Referring to fig. 2 and 4, the connecting plate 6 is rectangular, fixing members 7 which are long and vertically arranged are arranged on two opposite sides of the connecting plate, two ends of each fixing member 7 are fixedly connected to the proximal ends of the secondary keels 32 on the keel structures 3 at the upper layer and the lower layer through screws, and the connecting plate 6 is vertically reinforced through the fixing members 7. The fixing member 7 includes an upper fixing member 71 and a lower fixing member 72, a sliding groove 711 is formed in the upper fixing member 71 along the vertical direction, a sliding block 721 is fixedly arranged on the lower fixing member 72, the lower fixing member 72 and the sliding block 721 are designed as a whole, the sliding block 721 is slidably connected in the sliding groove 711, and the lower fixing member 72 is attached to the bottom of the sliding groove 711 of the upper fixing member 71, so that the self-adjustable length of the fixing member 7 is realized. A buffer spring 713 is arranged at one end of the sliding groove 711 far away from the sliding block 721, one end of the buffer spring 713 is fixed at the end of the sliding groove 711, and a washer 714 is fixedly connected at the other end.
A row of mounting through holes 712 are formed in the side wall of the sliding groove 711 at equal intervals along the vertical direction, a mounting blind hole 722 matched with the mounting through holes 712 is formed in the sliding block 721 of the lower fixing member 72, the mounting through holes 712 and the mounting blind holes 722 are coaxially arranged, a locking knob 8 is in threaded connection with the two holes, and the upper fixing member 71 and the lower fixing member 72 are fixed through the locking knob 8. The lower fixing member 72 is formed with a groove 73 extending completely therethrough in a vertical direction toward the side of the joint plate 6, and the joint plate 6 is inserted into the groove 73 and fixedly coupled to the fixing member 7 by means of bolts. .
Referring to fig. 1, a reinforcing block 9 is disposed between the fixing member 7 and the panel layer 4, and the reinforcing block 9 is detachably connected to the upper fixing member 71 and tightly abuts against the panel layer 4. In whole furred ceiling structure, still have the place in great gap to be provided with linking piece 10 after the connection, linking piece 10 carries out the gap filling to the furred ceiling structure and handles, is carrying out the banding to the furred ceiling structure wholly after the gap filling is accomplished.
The implementation principle of mansion top surface hoisting structure of this application embodiment does: the installation of jib 1 is carried out earlier than on the ceiling, install main joist 31 in 2 on the jib and carry on spacingly in the elevator, install fixed buckle 33 on main joist 31, install secondary joist 32 again, between two-layer, install a mounting 7 in the secondary joist 32 tip of two-layer keel structure 3 earlier, install linkage plate 6 in the recess 73 of mounting 7 again, install another mounting 7 on this linkage plate 6 again, when two adjacent linkage plate 6 connect, set up linking piece 10 between two linkage plate 6 are equipped with mounting 7, and be fixed in on two mounting 7, realize the butt joint of two linkage plate 6, repeat so operation, use linking piece 10 to carry out gap filling processing and banding processing to the suspended ceiling structure wholly at last, accomplish the suspended ceiling installation.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. Mansion top surface hoisting structure, including a plurality of jib (1), jib (1) one end fixed connection is on the ceiling, other end fixedly connected with elevator (2), it is equipped with keel structure (3) to hang on elevator (2), keel structure (3) deviate from one side fixedly connected with panel layer (4) of jib (1), its characterized in that: the high-low-staggered multi-layer structure is characterized in that the panel layers (4) and the keel structures (3) are different in length, the hanging rods (1) form a multi-layer structure (5) with staggered heights, a plurality of connecting plates (6) are arranged between two adjacent panel layers (4) in the height direction of the multi-layer structure (5), and two opposite sides of each connecting plate (6) are fixedly connected to two adjacent layers in the height direction of the multi-layer structure (5) respectively on the keel structures (3).
2. The building roof lifting structure according to claim 1, characterized in that: keel structure (3) are including main joist (31) and secondary joist (32), main joist (31) with secondary joist (32) all adopt the steel joist that has the catching groove, main joist (31) are worn to locate in elevator (2) draw-in groove, the fixed buckle (33) that is provided with on main joist (31), fixed buckle (33) are provided with two fixture blocks (34) on the both sides of the back of the body mutually relatively, two fixture block (34) with the catching groove looks lock of secondary joist (32) inslot both sides, secondary joist (32) tightly support in main joist (31) deviates from one side of jib (1), and with the crisscross setting of main joist (31).
3. The building roof lifting structure according to claim 1, characterized in that: the two sides of the connection plate (6) back to the back are provided with a plurality of fixing pieces (7) which are long strips, the fixing pieces (7) are arranged in parallel with the length direction of the hanging rod (1), two ends of the fixing pieces (7) are fixedly connected to the keel structures (3) of the multilayer structures (5) in a two-layer mode in the height direction, and the connection plate (6) is fixedly connected to the fixing pieces (7) in a two-layer mode in the multilayer structures (5) in an area surrounded by the keel structures (3).
4. The building roof hoisting structure according to claim 3, wherein: the fixing piece (7) comprises an upper fixing piece (71) and a lower fixing piece (72), a sliding groove (711) is formed in the upper fixing piece (71) along the length direction of the hanging rod (1), a sliding block (721) is fixedly arranged on the lower fixing piece (72), and the sliding block (721) is connected in the sliding groove (711) in a sliding mode.
5. The building roof hoisting structure according to claim 4, wherein: follow in the sliding tray (711) jib (1) length direction has seted up one row of installation through-hole (712), installation through-hole (712) run through go up mounting (71) one side lateral wall, seted up on sliding block (721) with installation blind hole (722) of installation through-hole (712) looks adaptation, installation through-hole (712) pore wall threaded connection has locking knob (8), just locking knob (8) simultaneously with installation blind hole (722) threaded connection.
6. The building roof hoisting structure according to claim 4, wherein: the lower fixing piece (72) faces one side of the connecting plate (6) and is provided with a groove (73) along the length direction of the hanging rod (1), and the connecting plate (6) is embedded into the groove (73).
7. The building roof hoisting structure according to claim 4, wherein: one end, far away from the sliding block (721), of the sliding groove (711) is provided with a buffer spring (713), one end of the buffer spring (713) is fixed at the end of the sliding groove (711), and the other end of the buffer spring (713) is fixedly connected with a gasket (714).
8. The building roof hoisting structure according to claim 4, wherein: the fixing piece (7) and be provided with boss (9) between panel layer (4), boss (9) can dismantle connect in go up on fixing piece (71), and tightly support in on panel layer (4).
CN202122860401.2U 2021-11-22 2021-11-22 Building top surface hoisting structure Active CN216239293U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122860401.2U CN216239293U (en) 2021-11-22 2021-11-22 Building top surface hoisting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122860401.2U CN216239293U (en) 2021-11-22 2021-11-22 Building top surface hoisting structure

Publications (1)

Publication Number Publication Date
CN216239293U true CN216239293U (en) 2022-04-08

Family

ID=80946084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122860401.2U Active CN216239293U (en) 2021-11-22 2021-11-22 Building top surface hoisting structure

Country Status (1)

Country Link
CN (1) CN216239293U (en)

Similar Documents

Publication Publication Date Title
CN205935362U (en) Light gauge steel furred ceiling building structure
CN112962858B (en) Quick ceiling mounting structure and ceiling mounting method
CN205742560U (en) A kind of fixed connection structure between wallboard and the variola of integral bathroom
CN107724588B (en) Integrated curved surface suspended ceiling structure and construction method thereof
CN216239293U (en) Building top surface hoisting structure
CN211200882U (en) Steel construction conversion layer furred ceiling
CN208473060U (en) A kind of metal curtain wall
CN215759923U (en) Packway mounting structure of toilet ceiling
CN112900682B (en) Assembly type medical wall and medical unit assembly method
CN214169619U (en) Reverse installation aluminum honeycomb panel furred ceiling system
CN212427744U (en) Mineral wool board furred ceiling mounting structure
CN110342396B (en) GRC composite wallboard lifting appliance and lifting construction method
CN209277357U (en) A kind of fireproof partition wall and ceiling structure
CN218028413U (en) Suspended ceiling mounting assembly
CN216840362U (en) Light fossil fragments dry-hanging mounting structure
CN111395629A (en) Anti-deformation ceiling structure and ceiling hanging method thereof
CN218861890U (en) Half assembled furred ceiling conversion layer device
CN210395799U (en) Quick mounting structure of furred ceiling
CN218843732U (en) Suspension device and creeping formwork
CN219952408U (en) Suspended ceiling keel and suspended ceiling structure thereof
CN220266976U (en) Suspended ceiling partition structure with air outlet
CN218714420U (en) Prevent to warp ready-package GRG lighting window project organization who subsides
CN214834591U (en) Aluminum plate curtain wall construction is with furred ceiling operation platform
CN213393005U (en) Fireproof composite board convenient to disassemble
CN219431094U (en) Assembled non-bearing partition wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant