CN216197024U - Temporary cable arrangement support for building construction - Google Patents
Temporary cable arrangement support for building construction Download PDFInfo
- Publication number
- CN216197024U CN216197024U CN202122367902.7U CN202122367902U CN216197024U CN 216197024 U CN216197024 U CN 216197024U CN 202122367902 U CN202122367902 U CN 202122367902U CN 216197024 U CN216197024 U CN 216197024U
- Authority
- CN
- China
- Prior art keywords
- rod
- rod body
- fixing
- pulley
- building construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 15
- 238000010276 construction Methods 0.000 claims description 13
- 238000004804 winding Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 abstract description 4
- 241000272165 Charadriidae Species 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000006748 scratching Methods 0.000 description 1
- 230000002393 scratching effect Effects 0.000 description 1
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model relates to the field of cable arrangement brackets, and particularly discloses a temporary cable arrangement bracket for building construction, which comprises a rod body and a box body movably arranged on the rod body, wherein the bracket is arranged in the box body, the rod body is of a hollow structure, the top end of the rod body is provided with a first pulley, the bottom end of the rod body is provided with a second pulley, one side of the rod body is provided with a mounting frame, a winding wheel is rotatably connected onto the mounting frame, a connecting wire is connected onto the winding wheel, the connecting wire sequentially passes through the second pulley and the first pulley and then is connected with the box body, one side of the winding wheel is provided with a fixing hole along the circumference, one side of the mounting frame is movably provided with a movable rod, one end of the movable rod is provided with a fixing rod capable of being inserted into the fixing hole, the utility model winds the connecting wire on the winding wheel, and then can adjust the height of box on the body of rod, realize the adjustment to the position of box, be applicable to among the building construction process to the built on stilts needs that super high machinery got into when setting up of cable.
Description
Technical Field
The utility model relates to the technical field of cable arrangement supports, in particular to a temporary cable arrangement support for building construction.
Background
Generally, in the construction process, cables on a construction site need to be buried underground, the buried depth is eighty centimeters, protective sleeves need to be sleeved on passing roads, however, due to the fact that the construction site environment is complex, the cables need to be arranged in an overhead mode in some construction sites, the existing temporary cable arrangement support for construction is fixed in height, scratch and rub easily on temporarily entering ultrahigh machinery, and construction safety is further affected.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects that in the prior art, a temporary cable arrangement support is fixed in height, scratch is easy to occur to temporarily-entering ultrahigh machinery, and construction safety is further influenced.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a temporary cable arranges support for construction, is in including the body of rod and activity setting box on the body of rod, be provided with the support in the box, the body of rod is hollow structure, the top of the body of rod is provided with first pulley, the bottom of the body of rod is provided with the second pulley, one side of the body of rod is provided with the mounting bracket, it is connected with the reel to rotate on the mounting bracket, be connected with the connecting wire on the reel, the connecting wire passes in proper order behind second pulley and the first pulley with the box is connected, one side of reel is provided with the fixed orifices along the circumference, one side activity of mounting bracket is provided with the carriage release lever, the one end of carriage release lever is provided with and can insert dead lever in the fixed orifices.
Preferably, the one end of reel is connected with the handle, perhaps install servo motor on the mounting bracket, servo motor's output with the reel is connected.
Preferably, still include the spud pile, the top of spud pile is provided with the confession the body of rod inserts fixed slot, the top of spud pile is provided with the bottom plate.
Preferably, the top end of the bottom plate is rotatably connected with a supporting rod, a first movable part is movably arranged on the rod body, one end of the supporting rod is detachably connected with the first movable part, a fixing bolt is connected to the first movable part, and a fixing screw hole matched with the fixing bolt is formed in the rod body.
Preferably, one end of the supporting rod is provided with a J-shaped hole, a rotating rod is rotatably connected in the J-shaped hole, and the length of the rotating rod is greater than the width of the J-shaped hole.
Preferably, a second movable part is movably arranged on the rod body, and the second movable part is fixed with one side of the box body.
The utility model has the beneficial effects that:
1. according to the utility model, the winding wheel is rotated through the handle or the servo motor, the connecting wire is wound on the winding wheel, so that the height of the box body on the rod body can be adjusted, the position of the box body can be adjusted, and the device is suitable for the requirement of ultrahigh mechanical access when a cable is arranged in an overhead manner in the building construction process.
2. According to the utility model, the temporary cable is drilled and piled at a construction site where the temporary cable needs to be erected, the rod body is fixed on the fixing pile after the fixing pile is fixed, and the bottom plate at the top end of the fixing pile can improve the stability of the rod body after the fixing pile is installed.
3. According to the utility model, the support rod is rotated to move and adjust the position of the first movable part, the connecting rod is arranged at one end of the first movable part, the connecting rod penetrates through the J-shaped hole, so that the rotating rod can be abutted against the connecting rod, and then the first movable part is fixed after the fixing bolt is fixed with the fixing screw hole, so that the stability of the rod body can be improved.
Drawings
Fig. 1 is a perspective view of a temporary cable arranging bracket for building construction according to the present invention;
fig. 2 is a partially enlarged view of a portion a of the temporary cable-laying support for construction shown in fig. 1;
fig. 3 is a plan view of a temporary cable arranging bracket for construction shown in fig. 1;
FIG. 4 is a cross-sectional view taken at B-B of FIG. 3;
fig. 5 is a perspective view of a mounting bracket in another perspective view in the temporary cable management bracket for construction shown in fig. 1.
In the figure: the device comprises a box body 1, a first pulley 2, a bracket 3, a rod body 4, a fixing screw hole 41, a first movable part 5, a fixing bolt 6, a supporting rod 7, a connecting line 8, a reel 9, a fixing hole 91, a handle 10, a mounting rack 11, a bottom plate 12, a fixing pile 13, a second movable part 14, a second pulley 15, a rotating rod 16, a moving rod 17, a hole 71J and a fixing rod 18.
Detailed Description
To facilitate an understanding of the utility model, the utility model will now be described more fully with reference to the accompanying drawings. Preferred embodiments of the present invention are shown in the drawings. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only and do not represent the only embodiments.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1 to 5, a temporary cable arrangement support for building construction includes a rod 4 and a box 1 movably disposed on the rod 4, specifically, a second movable portion 14 is movably disposed on the rod 4, and the second movable portion 14 is fixed to one side of the box 1. The utility model discloses a box, be provided with support 3 in the box 1, the body of rod 4 is hollow structure, the top of the body of rod 4 is provided with first pulley 2, the bottom of the body of rod 4 is provided with second pulley 15, one side of the body of rod 4 is provided with mounting bracket 11, the last rotation connection of mounting bracket 11 has reel 9, be connected with connecting wire 8 on the reel 9, connecting wire 8 passes in proper order behind second pulley 15 and the first pulley 2 with box 1 connects, one side of reel 9 is provided with fixed orifices 91 along the circumference, one side activity of mounting bracket 11 is provided with carriage release lever 17, the one end of carriage release lever 17 is provided with and can inserts dead lever 18 in the fixed orifices 91.
In one embodiment, a handle 10 is connected to one end of the reel 9, and in another embodiment, a servo motor is mounted on the mounting bracket 11, and the output end of the servo motor is connected to the reel 9. Make reel 9 rotate through handle 10 or servo motor, twine connecting wire 8 on reel 9, and then can adjust the height of box 1 on the body of rod 4, realize the adjustment to the position of box 1.
In a preferred embodiment, the temporary cable arranging bracket for building construction further comprises a fixing pile 13, wherein a fixing groove for inserting and fixing the rod body 4 is formed at the top end of the fixing pile 13, and a bottom plate 12 is formed at the top end of the fixing pile 13. In this embodiment, the top end of the bottom plate 12 is rotatably connected with a supporting rod 7, a first movable portion 5 is movably arranged on the rod body 4, one end of the supporting rod 7 is detachably connected with the first movable portion 5, a fixing bolt 6 is connected to the first movable portion 5, and a fixing screw hole 41 matched with the fixing bolt 6 is arranged on the rod body 4. Further, one end of the support rod 7 is provided with a J-shaped hole 71, a rotating rod 16 is rotatably connected in the J-shaped hole 71, and the length of the rotating rod 16 is greater than the width of the J-shaped hole 71.
In this embodiment, first, a temporary cable is drilled and driven at a site where the temporary cable needs to be erected, the rod body 4 is fixed to the fixing pile 13 after the fixing pile 13 is fixed, and the bottom plate 12 at the top end of the fixing pile 13 can improve the stability of the rod body 4 after the fixing pile 13 is installed. Considering that the length of the rod body 4 is long due to the fact that scratching of ultra-high machinery is avoided, and further in order to improve the stability of the rod body 4, the support rod 7 is rotated to move and adjust the position of the first movable portion 5, a connecting rod is arranged at one end of the first movable portion 5 and penetrates through the J-shaped hole 71, so that the rotating rod 16 can be abutted against the connecting rod, and then the position of the first movable portion 5 is fixed after the fixing bolt 6 is fixed with the fixing screw hole 41. Then adjust the height of box 1, it is concrete, make reel 9 rotate through handle 10 or servo motor, twine connecting wire 8 on reel 9, and then can adjust the height of box 1 on the body of rod 4, realize the adjustment to the position of box 1, be applicable to the needs that super high machinery got into when setting up to the cable frame among the building construction process.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.
Claims (6)
1. The temporary cable arrangement support for building construction is characterized by comprising a rod body (4) and a box body (1) movably arranged on the rod body (4), wherein a support (3) is arranged in the box body (1), the rod body (4) is of a hollow structure, a first pulley (2) is arranged at the top end of the rod body (4), a second pulley (15) is arranged at the bottom end of the rod body (4), a mounting frame (11) is arranged on one side of the rod body (4), a reel (9) is rotatably connected onto the mounting frame (11), a connecting wire (8) is connected onto the reel (9), the connecting wire (8) sequentially penetrates through the second pulley (15) and the first pulley (2) and then is connected with the box body (1), a fixing hole (91) is formed in one side of the reel (9) along the circumference, a moving rod (17) is movably arranged on one side of the mounting frame (11), one end of the movable rod (17) is provided with a fixed rod (18) which can be inserted into the fixed hole (91).
2. A temporary cable arranging bracket for construction according to claim 1, wherein a handle (10) is connected to one end of the reel (9), or a servo motor is mounted on the mounting bracket (11), and an output end of the servo motor is connected to the reel (9).
3. A temporary cable arranging bracket for building construction according to claim 1, further comprising a fixing pile (13), wherein a fixing groove for inserting and fixing the rod body (4) is provided at a top end of the fixing pile (13), and a bottom plate (12) is provided at a top end of the fixing pile (13).
4. The temporary cable arrangement support for building construction according to claim 3, wherein a support rod (7) is rotatably connected to the top end of the bottom plate (12), a first movable portion (5) is movably arranged on the rod body (4), one end of the support rod (7) is detachably connected with the first movable portion (5), a fixing bolt (6) is connected to the first movable portion (5), and a fixing screw hole (41) matched with the fixing bolt (6) is arranged on the rod body (4).
5. A temporary cable arrangement support for building construction according to claim 4, characterized in that one end of the support rod (7) is provided with a J-shaped hole (71), a rotating rod (16) is rotatably connected in the J-shaped hole (71), and the length of the rotating rod (16) is greater than the width of the J-shaped hole (71).
6. A temporary cable laying bracket for building construction according to claim 1, wherein a second movable portion (14) is movably provided on the rod body (4), and the second movable portion (14) is fixed to one side of the box body (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122367902.7U CN216197024U (en) | 2021-09-28 | 2021-09-28 | Temporary cable arrangement support for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122367902.7U CN216197024U (en) | 2021-09-28 | 2021-09-28 | Temporary cable arrangement support for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216197024U true CN216197024U (en) | 2022-04-05 |
Family
ID=80928210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122367902.7U Active CN216197024U (en) | 2021-09-28 | 2021-09-28 | Temporary cable arrangement support for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216197024U (en) |
-
2021
- 2021-09-28 CN CN202122367902.7U patent/CN216197024U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111600244A (en) | Assembled cable pit cable laying device | |
CN210393169U (en) | Portable cable unwrapping wire support | |
CN111668757A (en) | Convenient support is used in cable erection convenient to adjustment cable interval | |
CN114057009B (en) | Efficient wiring device and wiring method for outdoor cable trench | |
CN216197024U (en) | Temporary cable arrangement support for building construction | |
CN220306852U (en) | Cable traction device for cable laying | |
CN117864869A (en) | Cable paying-off system and method for cable trench | |
CN112018664A (en) | Cable testing bridge laying device | |
CN115288410B (en) | External protective device for outer wall decoration board construction | |
CN110748173A (en) | Portable autoclaved aerated concrete strip installation device | |
CN110581459A (en) | Threading construction auxiliary device for building electrical engineering and use method thereof | |
CN216335775U (en) | Cable laying device for transformer substation | |
CN113067288B (en) | Multifunctional cable supporting tool for power construction | |
CN214243489U (en) | Building pile device of fetching earth | |
CN210594734U (en) | Copper line unwinding device | |
CN111049062B (en) | Reel support that power cable laid for electromechanical engineering construction | |
CN211169358U (en) | Remote control crawler-type self-propelled bypass vehicle | |
CN213474995U (en) | Rolling machine | |
CN221278671U (en) | Pipeline bracket for building construction | |
CN219754136U (en) | Wallboard fixed support structure for construction | |
CN218990225U (en) | Slope protection net | |
CN217656330U (en) | Electric cable laying device | |
CN214530327U (en) | Road traffic barrier safety erection equipment | |
CN221842230U (en) | Construction tool for cable stay wire of building electrical engineering | |
CN215701014U (en) | Installation device is assisted in overall process safety construction of prefabricated building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A temporary cable layout bracket for construction Granted publication date: 20220405 Pledgee: Bank of China Limited by Share Ltd. Guangzhou Haizhu branch Pledgor: Guangdong Yajian Construction Technology Co.,Ltd. Registration number: Y2024980007620 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |