Adjustable concrete upright post maintenance cover and concrete upright post maintenance system Download PDFInfo
- Publication number
- CN216196779U CN216196779U CN202122432881.2U CN202122432881U CN216196779U CN 216196779 U CN216196779 U CN 216196779U CN 202122432881 U CN202122432881 U CN 202122432881U CN 216196779 U CN216196779 U CN 216196779U
- Authority
- CN
- China
- Prior art keywords
- cover
- cover cloth
- concrete column
- cloth
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides an adjustable concrete upright post maintenance cover and a concrete upright post maintenance system, and the technical scheme is that the adjustable concrete upright post maintenance cover comprises a cover cloth assembly and a plurality of spray heads, the spray heads are arranged on the cover cloth assembly and are arranged at intervals along the circumferential direction of the cover cloth assembly, the cover cloth assembly comprises a supporting seat and cover cloth, the supporting seat is connected to the top of the cover cloth, the cover cloth surrounds to form an annular structure and is used for surrounding the periphery of an upright post, the supporting seat comprises a fixed assembly and a movable assembly, and the movable assembly can move relative to the fixed assembly and drive the cover cloth to be folded towards the direction close to the fixed assembly. The movable assembly can be movably adjusted relative to the fixed assembly to adjust the space in the cover cloth and is suitable for concrete columns with different section sizes; utilize the shower nozzle to carry out the humidification to the concrete stand, reduce the manpower burden, spray more evenly, cover cloth cladding in the concrete stand surface moreover has reduced the evaporation of moisture, has reduced the consumption of moisture.
Description
Technical Field
The utility model relates to the field of constructional engineering, in particular to an adjustable concrete upright post maintenance cover and a concrete upright post maintenance system.
Background
In the building, bridge and road construction process, a large number of concrete columns are used as supporting members, and due to the characteristics of concrete, the concrete needs to be maintained after the concrete is poured, so that the concrete reaches the design strength. Currently, in the prior art, a commonly used concrete upright post moisturizing and curing operation is to cover a plastic film on the periphery of the concrete upright post and water the concrete upright post at certain intervals to ensure that the concrete is always kept moist during curing. However, the maintenance method has the disadvantages that the watering is not uniform, the maintenance quality of each part of the concrete upright column cannot be guaranteed to be consistent, the concrete upright column on the construction site has various sizes, and the height size of the individual upright column is high, if the plastic film is still used for watering and maintenance, maintenance workers need to work at high altitude in the maintenance process, safety accidents are easily caused, and particularly, the operation of the individual concrete upright column with large outer diameter is abnormal and troublesome in the maintenance process.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an adjustable concrete upright post maintenance cover which can meet the maintenance requirements of concrete upright posts with different section sizes and reduce the labor burden.
Another object of the present invention is to provide a concrete column maintenance system using the adjustable concrete column maintenance cover.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model provides a concrete column support guard shield with adjustable, includes cover cloth subassembly and shower nozzle, the shower nozzle is installed on the cover cloth subassembly and is equipped with a plurality ofly along the circumference interval of cover cloth subassembly, the cover cloth subassembly includes supporting seat and cover cloth, supporting seat connection is at the top of cover cloth, the cover cloth encloses and forms annular structure and is used for encircleing the periphery at the stand, the supporting seat includes fixed subassembly and movable assembly, fixed subassembly is used for fixing with the steel reinforcement cage at stand top, movable assembly connects between fixed subassembly and cover cloth, just movable assembly can be relative fixed subassembly removes and drives the cover cloth and draws in towards being close to fixed subassembly direction, the shower nozzle is used for being connected with water supply installation and is the outer wall humidification of stand.
Further setting: the movable assembly comprises a rotating piece, a first connecting rod and a second connecting rod, the two ends of the first connecting rod are respectively corresponding to the cover cloth and hinged to the fixing assembly, the two ends of the second connecting rod are respectively corresponding to the first connecting rod and hinged to the rotating piece, and the rotating piece can rotate relative to the fixing assembly and drive the first connecting rod to swing through the second connecting rod.
Further setting: the fixed subassembly includes a supporting bench, the supporting bench is the frustum form and can insert in arranging the steel reinforcement cage at stand top in, the cross-sectional diameter at supporting bench top is greater than the cross-sectional diameter of its bottom.
Further setting: the side wall of the supporting table is connected with a partition plate, and the partition plate is used for separating and blocking the reinforcing steel bars in the reinforcing cage.
Further setting: the bottom surface of the partition board is convexly provided with a furling ring, and the furling ring is used for furling the reinforcing steel bars on the periphery of the reinforcing cage.
Further setting: the cover cloth subassembly is including a plurality of sections covers of end to end connection in proper order from top to bottom, every the section cover all is equipped with cover cloth, the section cover that is located the top is equipped with the supporting seat.
Further setting: the section covers comprise two connecting pieces which are respectively positioned at the upper end and the lower end of the section covers, the cover cloth is connected between the two connecting pieces, the adjacent two section covers are fixedly connected through the connecting pieces, and the connecting piece positioned at the upper end of the topmost section cover is the first connecting rod.
Further setting: the section cover further comprises a chain, and the chain is connected between the two connecting pieces.
Further setting: the spray head is arranged on at least one connecting piece of at least one section cover.
Further setting: the cover cloth is made of waterproof materials.
Further setting: the cover cloth is made of transparent materials.
The utility model also provides a concrete upright post maintenance system which comprises the concrete upright post maintenance cover and a water supply device, wherein the water supply device comprises a water tank, a pump control device and a flexible water pipe, the flexible water pipe is connected with the spray head, and the pump control device is used for conveying water in the water tank to the spray head through the flexible water pipe.
Further setting: concrete column maintenance system still includes monitoring control device, monitoring control device includes humiture response piece, wireless transmitting device, wireless receiving device and control module, humiture response piece is installed in the health preserving cover and is used for detecting the temperature and the humidity of shower nozzle department, wireless transmitting device is used for sending the temperature and the humidity information that humiture response piece acquireed to wireless receiving device, wireless receiving device is used for transmitting received temperature and humidity information to control module, control module is used for responding temperature and humidity information and sends control command to water supply installation.
Compared with the prior art, the scheme of the utility model has the following advantages:
1. in the adjustable concrete upright post maintenance cover, the movable assembly can be movably adjusted relative to the fixed assembly, and drives the cover cloth to move and fold the cover cloth towards the center, so that the space enclosed by the cover cloth is adjusted and is suitable for concrete upright posts with different section sizes; utilize the shower nozzle to carry out the humidification to the concrete stand, reduce the manpower burden, spray more evenly, cover cloth cladding in the concrete stand surface moreover has reduced the evaporation of moisture, has reduced the consumption of moisture.
2. According to the concrete upright post curing system, the water supply device and the monitoring control device are arranged, the water supply device provides water for the spray head, the monitoring control device can detect the temperature and the humidity inside the curing cover through the temperature and humidity sensing part and feed back the temperature and the humidity to the control module, the water supply device is controlled to supply water to the spray head, the temperature and the humidity inside the curing cover are kept at a proper level, the curing quality of the concrete upright post is improved, meanwhile, the water consumption in the curing process of the concrete upright post can be effectively controlled, and the water consumption is greatly reduced.
Additional aspects and advantages of the utility model will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the utility model.
Drawings
The foregoing and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
FIG. 1 is a schematic structural view of an adjustable concrete column maintenance cover according to an embodiment of the present invention;
FIG. 2 is a schematic view of a positioning dome according to an embodiment of the present invention;
FIG. 3 is a top view of the cap assembly in a first state of motion in accordance with an embodiment of the present invention;
FIG. 4 is a simplified schematic illustration of a mask assembly in a first state of motion according to an embodiment of the present invention;
FIG. 5 is a schematic view of a shield assembly in a second state of motion according to an embodiment of the present invention;
FIG. 6 is a top view of the cap assembly in a second state of motion in accordance with an embodiment of the present invention;
FIG. 7 is a schematic view of the construction of the middle joint cover in an embodiment of the present invention;
FIG. 8 is a schematic view of a connection structure of a positioning top cover and a middle joint cover or a middle joint cover and a floor cover according to an embodiment of the present invention;
FIG. 9 is a schematic view of a floor covering according to an embodiment of the present invention;
FIG. 10 is a schematic structural view of a concrete pole maintenance system according to an embodiment of the present invention;
fig. 11 is a schematic structural diagram of a monitoring and control device according to an embodiment of the present invention.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are illustrative only and should not be construed as limiting the utility model.
As shown in fig. 1 to 9, the utility model provides an adjustable concrete column curing hood 1, which comprises a hood cloth assembly, wherein the hood cloth assembly comprises a plurality of section hoods which are sequentially connected end to end from top to bottom, in the embodiment, the plurality of segment covers are respectively a positioning top cover 11, a middle segment cover 12 and a floor cover 13, the positioning top cover 11, the middle segment cover 12 and the floor cover 13 are sequentially arranged from top to bottom, wherein, the positioning top cover 11 and the landing cover 13 are respectively arranged one by one, the positioning top cover 11 is arranged at the top of the nursing cover 1, the landing cover 13 is arranged at the bottom of the nursing cover 1, the middle section cover 12 is connected between the positioning top cover 11 and the landing cover 13, at least one middle section cover 12 is arranged, in this embodiment, a plurality of the intermediate joint covers 12 are provided, a plurality of the intermediate joint covers 12 are connected end to end, and the number of the intermediate joint covers 12 is selected according to the height of the concrete column. In the embodiment, each section cover is provided with a cover cloth 115, and the cover cloth 115 encloses to form an annular structure and is used for surrounding the periphery of the upright post.
In this embodiment, the positioning top cover 11 includes a support seat for fixing with a reinforcement cage at the top of the column. The supporting seat comprises a fixed assembly and a movable assembly, the fixed assembly is used for being fixed with a reinforcement cage at the top of the upright column, the movable assembly is connected between the fixed assembly and the cover cloth 115, and the movable assembly can move relative to the fixed assembly and drive the cover cloth 115 to be folded in the direction close to the fixed assembly.
In this embodiment, fixed subassembly includes supporting bench 111, supporting bench 111 is the frustum form and can insert and arrange in the steel reinforcement cage at stand top, the cross-sectional diameter at supporting bench 111 top is greater than the cross-sectional diameter of its bottom.
In the process of fixing the positioning top cover 11 and the reinforcement cage, the support table 111 can be inserted into the reinforcement cage by using the frustum-shaped structure of the support table 111, and the support table 111 is pressed in the reinforcement cage by using the self weight of the positioning top cover 11, so that the positioning top cover 11 and the concrete column are relatively fixed.
The movable assembly includes a first connecting rod 112, a rotating member 113 and a second connecting rod 114, in this embodiment, the rotating member 113 is sleeved on the side wall of the supporting platform 111, two ends of the first connecting rod 112 are respectively hinged to the cover cloth 115 and the supporting platform 111, two ends of the second connecting rod 114 are respectively hinged to the first connecting rod 112 and the rotating member 113, and specifically, the hinge position of the second connecting rod 114 and the first connecting rod 112 is not the hinge point of the first connecting rod 112 and the supporting platform 111. The rotating member 113 can rotate relative to the supporting platform 111 and drive the first link 112 to swing through the second link 114. The number of the first connecting rods 112 is at least four, in the embodiment, ten first connecting rods 112 are provided, and the number of the first connecting rods 112 is adaptively matched according to the sectional dimension of the concrete column.
Through the arrangement, when the rotating part 113 rotates, the rotating part 113 drives the first connecting rod 112 to swing through the second connecting rod 114, the distance between one end of the first connecting rod 112, which is far away from the supporting platform 111, and the central axis of the supporting platform 111 changes, so that the first connecting rod 112 drives the cover cloth 115 to be inwardly pulled or outwardly stretched, and the size of a space formed by enclosing the cover cloth 115 is changed, and the concrete upright posts are suitable for concrete upright posts with different sizes. After the cover cloth 115 is partially folded inward, it is partially wavy.
Preferably, in one embodiment, the rotating member 113 may be powered by a motor, and the rotating member 113 is driven by a gear train to rotate relative to the support table 111.
In other embodiments, the movable component may also be configured to move linearly relative to the fixed component, the moving direction is along the connection line between the axis of the fixed component and the cover cloth 115, and the cover cloth 115 is driven to move inward by moving the movable component linearly, so as to adapt to concrete columns with different cross-sectional dimensions.
Furthermore, each section cover comprises two connecting pieces which are respectively positioned at the upper end and the lower end of the section cover, the cover cloth 115 is connected between the two connecting pieces, and the two adjacent section covers are fixedly connected through the connecting pieces.
In this embodiment, the connecting member at the upper end of the positioning top cover 11 is the first connecting rod 112, the connecting member at the lower end is the first connecting frame 116, the cover cloth 115 is connected between the first connecting rod 112 and the first connecting frame 116, and preferably, the cover cloth 115 and the first connecting frame 116 are fixed by rivets.
Furthermore, a partition plate 117 is connected to a side wall of the support platform 111, and the partition plate 117 is used for partitioning the steel bars in the steel bar cage. The partition 117 is preferably provided at a middle position of the side wall of the support table 111. By providing the partition 117 at the side wall of the support table 111, the reinforcing bars can be isolated from the first link 112 and the second link 114, providing a space for the movement of the first link 112, the second link 114, and the rotation member 113.
Further, a gathering ring 118 is protruded from the bottom surface of the partition 117, and the gathering ring 118 is used for gathering the reinforcement bars around the reinforcement cage. Preferably, the gathering ring 118 is disposed near the outer edge of the baffle 117.
Through set up in the ring 118 of drawing in on baffle 117, draw in the ring 118 and can carry on spacingly to the steel reinforcement cage, draw in the reinforcing bar at concrete column top in drawing in the ring 118, prevent that the crooked reinforcing bar of steel reinforcement cage periphery from contacting with cover cloth 115, avoid cover cloth 115 to be stabbed by the reinforcing bar, ensure cover cloth 115's integrality to promote the overall structure stability of health preserving cover 1.
Preferably, the gathering ring 118 is an annular thin-wall body with a diameter larger than the cross-sectional diameter of the reinforcement cage, and the height of the gathering ring 118 is selected according to actual conditions, and is preferably 30-40 cm.
Further, the top surface of the supporting platform 111 is covered with a circular cover cloth, and the circular cover cloth completely covers the first connecting rod 112, so that water vapor is prevented from being emitted outwards from a gap between the supporting platform 111 and the cover cloth 115, and evaporation of the water vapor is reduced.
Further, the connecting pieces at the upper end and the lower end of the middle section cover 12 are both second connecting frames 121, the cover cloth 115 is connected between the two second connecting frames 121, and the second connecting frames 121 and the cover cloth 115 are preferably fixed in a rivet mode. The second connecting frame 121 of the uppermost intermediate joint cover 12 is connected to the first connecting frame 116, and the second connecting frames 121 of two adjacent intermediate joint covers 12 are connected and fixed to each other.
Further, the connecting pieces at the upper and lower ends of the floor hood 13 are third connecting frames 131, the hood cloth 115 is connected between the two third connecting frames 131, and the third connecting frames 131 and the hood cloth 115 are preferably fixed by rivets. The second connection frame 121 of the lowermost intermediate joint cover 12 is connected to the third connection frame 131. In this embodiment, the structure of the floor cover 13 is identical to that of the middle section cover 12, and the floor cover 13 naturally falls to the ground to compensate the distance between the lowest middle section cover 12 and the ground, and generally, the height of the floor cover 13 is smaller than that of the middle section cover 12.
In this embodiment, the first connecting frame 116, the second connecting frame 121, and the third connecting frame 131 are made of a flexible material, and the first connecting frame 116, the second connecting frame 121, and the third connecting frame 131 are respectively formed by splicing a plurality of frame units with the same length, so that when the cover fabric 115 is deformed inward to form a wave shape, the first connecting frame 116 can be deformed into the wave shape adaptively.
In this embodiment, the sizes of the first connecting frame 116, the second connecting frame 121 and the third connecting frame 131 are matched. The first connection frame 116 and the second connection frame 121, the second connection frame 121 and the third connection frame 131, and two adjacent second connection frames 121 may be connected by snap fasteners. Preferably, positioning blocks are arranged between the first connecting frame 116 and the second connecting frame 121, between the second connecting frame 121 and the third connecting frame 131, and between two adjacent second connecting frames 121, and the positioning blocks may be magnetic components, and are attracted to each other by magnetism during connection, so as to facilitate positioning and assembling of the positioning top cover 11, the middle joint cover 12, and the floor cover 13.
Further, the maintenance cover 1 further comprises a spray head 14, the spray head 14 is preferably an atomization spray head, the spray head 14 is mounted on the cover cloth assembly and is used for humidifying the outer wall of the concrete upright post, in this embodiment, the spray head 14 is mounted on the connecting piece of the joint cover, preferably on the second connecting frame 121, and may also be mounted on the first connecting frame 116 and the third connecting frame 131. In other embodiments, the spray head 14 may also be mounted to the cover cloth 115. In this embodiment, the nozzles 14 are disposed on the cover cloth assembly at intervals along the vertical direction, and the nozzles 14 are disposed at intervals along the circumferential direction of the cover cloth assembly.
By coating the concrete upright post by the cover cloth 115 and humidifying the concrete upright post by the spray head 14, manual spraying and humidifying are not needed, the labor burden is reduced, the condition of uneven spraying can be avoided, and the maintenance quality is greatly improved. In addition, the cover cloth 115 covers the concrete column, thereby greatly reducing the evaporation of water and reducing the consumption of water. The shower nozzle 14 sets up a plurality ofly along vertical direction to and set up a plurality ofly along cover cloth subassembly circumference, can spray more evenly concrete column surface, improve concrete column's maintenance quality.
Further, the link cover further includes a chain 132, and the chain 132 is connected between the two connecting members, wherein in the positioning top cover 11, the chain 132 is connected between the first connecting rod 112 and the first connecting frame 116, in the middle link cover 12, the chain 132 is connected between the two second connecting frames 121, and in the floor cover 13, the chain 132 is connected between the two third connecting frames 131.
Through set up chain 132 in the festival cover, can reduce the atress of cover cloth 115, prevent that cover cloth 115 atress is too big and damaged, improve the overall structure intensity of festival cover, improve the durability of the maintenance cover 1.
Furthermore, a lifting lug 119 is arranged on the top surface of the support platform 111, and the lifting lug 119 is preferably welded and fixed with the support platform 111, and may be in other connection and fixing manners. Through set up lug 119 on brace table 111, can be more convenient for support the hoist and mount of guard shield 1, reduce the degree of difficulty of installation and demolition.
In this embodiment, the supporting platform 111 is preferably a hollow structure, both the top surface and the bottom surface of the supporting platform 111 can be open, and the middle of the supporting platform 111 is a through structure. In other embodiments, the supporting platform 111 may have an open top surface and a plurality of water leakage holes on its bottom surface. In other embodiments, the support base 111 may be a solid structure or a closed structure with both top and bottom surfaces.
Through being hollow structure with the design of brace table 111, and the bottom is for opening the structure or setting up a plurality of holes that leak, both can reduce the weight of brace table 111, reduce material consumption, also can avoid the accumulation rainwater.
In this embodiment, the cover cloth 115 is preferably made of a waterproof material, and may be made of a canvas material having a water-blocking ability. By making the cover cloth 115 of a waterproof material, the loss of moisture can be reduced, the moisture can be sufficiently retained on the surface of the concrete column, and the consumption of the moisture can be reduced.
Further, the cover cloth 115 may be made of a transparent material. The cover cloth 115 is made of transparent materials, so that the condition of the concrete upright post can be observed more conveniently, and the maintenance process of the concrete upright post is controlled better.
Referring to fig. 10 and 11, the utility model further provides a concrete column maintenance system, which includes the concrete column maintenance cover 1, and further includes a water supply device 2, where the water supply device 2 includes a water tank 21, a pump control device 22, and a flexible water pipe 23, the flexible water pipe 23 is connected to the spray head 14, and the pump control device 22 is used to deliver water in the water tank 21 to the spray head 14 through the flexible water pipe 23.
Further, the water inlet of the water tank 21 is provided with a water inlet filtering device, so that the sprayed water is filtered, and the surface of the concrete upright post is prevented from being polluted.
In this embodiment, each middle section cover 12 is provided with nozzles 14 in a surrounding manner, the flexible water pipe 23 is communicated with the plurality of nozzles 14 through a three-way joint, and water is delivered to the plurality of nozzles 14 from the water tank 21 to spray the surface of the concrete column.
Further, concrete column maintenance system still includes monitoring control device 3, monitoring control device 3 includes control module (not shown in the figure), humiture response 31, wireless transmitting module 32 and wireless receiving module 33, humiture response 31 is temperature and humidity sensor, and it installs in the maintenance cover 1 and is used for detecting the temperature and the humidity of shower nozzle 14 department, wireless transmitting module 32 is used for sending the temperature and the humidity information that humiture response 31 obtained to wireless receiving module 33, wireless receiving module 33 is used for transmitting received temperature and humidity information to control module, control module is used for responding temperature and humidity information and sends control command to water supply installation 2.
Utilize temperature and humidity sensor, but the temperature and humidity of the inside shower nozzle 14 department of real-time supervision maintenance cover 1 to feedback to control module, control module sends control command to water supply installation 2, makes the inside humiture of maintenance cover 1 keep at suitable level, improves the maintenance quality of concrete stand, can also carry out effective control to the moisture consumption of concrete stand maintenance in-process simultaneously, reduces the consumption of moisture by a wide margin.
Further, the monitoring and control device 3 further includes a water level sensor 34, the water level sensor 34 is disposed in the water tank 21 and is used for acquiring water level information in the water tank 21, the water level sensor 34 can send the water level information in the water tank 21 to the control module, and when the water level in the water tank 21 is lower than a set value, water can be automatically poured into the water tank 21 until the water level reaches a preset value.
Monitoring control device 3 still includes line concentration box 35, line concentration box 35 installs on support cover 1, and the data information accessible signal line of the temperature and humidity that temperature and humidity sensor acquireed collects to in the line concentration box 35.
When the concrete column needs to be maintained, the height of the concrete column is measured, for example, the height of the positioning top cover 11 and the height of the floor cover 13 are both 3 meters, the height of the middle section cover 12 is 2 meters, if the height of the concrete column is 11 meters, one positioning top cover 11, three middle section covers 12 and one floor cover 13 are needed respectively, and the positioning top cover 11, two middle section covers 12 and one floor cover 13 are fixedly connected in sequence. The maintenance cover 1 is firstly hung over the concrete upright column through a crane or other hoisting equipment, the floor cover 13 firstly covers the concrete upright column, then the maintenance cover 1 slowly falls down, the concrete upright column is sleeved in the maintenance cover 1, the installation of the maintenance cover 1 is completed, and after the installation is completed, the positioning top cover 11 can be locally or completely higher than the top surface of the concrete upright column. Through rotating the rotating member 113, the rotating member 113 drives the first connecting rod 112 to swing through the second connecting rod 114, so that the cover cloth 115 moves inwards and is attached to the concrete upright column, the space between the curing cover 1 and the concrete upright column is reduced, and the waste of water vapor is reduced. Set up after the requirement of temperature and humidity through monitoring control device 3 alright in order to begin to work, owing to adopt shower nozzle 14 to atomize water, cover cloth 115 is made by the material that closes water, consequently at the inside water smoke that forms of maintenance cover 1, the humidity of the inside air of maintenance cover 1 has greatly been improved, be favorable to the maintenance of concrete stand, effectively reduce the waste of water resource, and through temperature and humidity in temperature and humidity sensor real time monitoring maintenance cover 1, when reaching the maintenance condition, alright with stopping spraying, the consumption of water resource has further been reduced.
Compared with the prior art, the scheme of the utility model has the following advantages:
1. in the concrete column maintenance cover 1, the movable component can be movably adjusted relative to the fixed component, and the movable component drives the cover cloth 115 to move and enables the cover cloth 115 to be folded towards the center, so that the space enclosed by the cover cloth 115 is adjusted, and the concrete column maintenance cover is suitable for concrete columns with different section sizes; utilize shower nozzle 14 to carry out the humidification to the concrete stand, reduce the manpower burden, spray more evenly, cover cloth 115 cladding in the concrete stand surface has reduced the evaporation of moisture moreover, has reduced the consumption of moisture.
2. In the concrete upright post curing system, the water supply device 2 and the monitoring control device 3 are arranged, the water supply device 2 provides water for the spray head 14, the temperature and humidity inside the curing cover 1 can be detected by the monitoring control device 3 through the temperature and humidity sensing part 31 and fed back to the control module, the water supply device 2 is controlled to supply water to the spray head 14, the temperature and humidity inside the curing cover 1 are kept at a proper level, the curing quality of the concrete upright post is improved, meanwhile, the water consumption in the curing process of the concrete upright post can be effectively controlled, and the water consumption is greatly reduced. The foregoing is only a partial embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.
Claims (13)
1. The utility model provides a concrete column support guard shield with adjustable, characterized by: including cover cloth subassembly and shower nozzle, the shower nozzle is installed and is equipped with a plurality ofly on the cover cloth subassembly and along the circumference interval of cover cloth subassembly, the cover cloth subassembly includes supporting seat and cover cloth, supporting seat connection is at the top of cover cloth, the cover cloth encloses to form annular structure and is used for encircleing the periphery at the stand, the supporting seat includes fixed subassembly and movable assembly, fixed subassembly is used for fixing with the steel reinforcement cage at stand top, movable assembly connects between fixed subassembly and cover cloth, just movable assembly can be relative fixed subassembly removes and drives cover cloth and draws in near fixed subassembly direction, the shower nozzle is used for being connected with water supply installation and for the outer wall humidification of stand.
2. The adjustable concrete column maintenance cover of claim 1, wherein: the movable assembly comprises a rotating piece, a first connecting rod and a second connecting rod, the two ends of the first connecting rod are respectively corresponding to the cover cloth and hinged to the fixing assembly, the two ends of the second connecting rod are respectively corresponding to the first connecting rod and hinged to the rotating piece, and the rotating piece can rotate relative to the fixing assembly and drive the first connecting rod to swing through the second connecting rod.
3. The adjustable concrete column maintenance cover of claim 2, wherein: the fixed subassembly includes a supporting bench, the supporting bench is the frustum form and can insert in arranging the steel reinforcement cage at stand top in, the cross-sectional diameter at supporting bench top is greater than the cross-sectional diameter of its bottom.
4. The adjustable concrete column maintenance cover of claim 3, wherein: the side wall of the supporting table is connected with a partition plate, and the partition plate is used for separating and blocking the reinforcing steel bars in the reinforcing cage.
5. The adjustable concrete column maintenance cover of claim 4, wherein: the bottom surface of the partition board is convexly provided with a furling ring, and the furling ring is used for furling the reinforcing steel bars on the periphery of the reinforcing cage.
6. The adjustable concrete column maintenance cover of claim 2, wherein: the cover cloth subassembly is including a plurality of sections covers of end to end connection in proper order from top to bottom, every the section cover all is equipped with cover cloth, the section cover that is located the top is equipped with the supporting seat.
7. The adjustable concrete column maintenance cover of claim 6, wherein: the section covers comprise two connecting pieces which are respectively positioned at the upper end and the lower end of the section covers, the cover cloth is connected between the two connecting pieces, the adjacent two section covers are fixedly connected through the connecting pieces, and the connecting piece positioned at the upper end of the topmost section cover is the first connecting rod.
8. The adjustable concrete column maintenance cover of claim 7, wherein: the section cover further comprises a chain, and the chain is connected between the two connecting pieces.
9. The adjustable concrete column maintenance cover of claim 7, wherein: the spray head is arranged on at least one connecting piece of at least one section cover.
10. The adjustable concrete column maintenance cover of claim 1, wherein: the cover cloth is made of waterproof materials.
11. The adjustable concrete column maintenance cover of claim 1, wherein: the cover cloth is made of transparent materials.
12. The utility model provides a concrete column maintenance system which characterized by: the concrete column maintenance cover comprises the concrete column maintenance cover as claimed in any one of claims 1 to 11, and further comprises a water supply device, wherein the water supply device comprises a water tank, a pump control device and a flexible water pipe, the flexible water pipe is connected with the spray head, and the pump control device is used for conveying water in the water tank to the spray head through the flexible water pipe.
13. The concrete pole maintenance system of claim 12, wherein: still include monitoring control device, monitoring control device includes temperature and humidity response piece, wireless transmitting device, wireless receiving device and control module, temperature and humidity response piece is installed in the health preserving cover and is used for detecting the temperature and the humidity of shower nozzle department, wireless transmitting device is used for sending the temperature and the humidity information that temperature and humidity response piece acquireed to wireless receiving device, wireless receiving device is used for transmitting received temperature and humidity information to control module, control module is used for responding to temperature and humidity information and sends control command to water supply installation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122432881.2U CN216196779U (en) | 2021-10-08 | 2021-10-08 | Adjustable concrete upright post maintenance cover and concrete upright post maintenance system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122432881.2U CN216196779U (en) | 2021-10-08 | 2021-10-08 | Adjustable concrete upright post maintenance cover and concrete upright post maintenance system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216196779U true CN216196779U (en) | 2022-04-05 |
Family
ID=80862635
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122432881.2U Active CN216196779U (en) | 2021-10-08 | 2021-10-08 | Adjustable concrete upright post maintenance cover and concrete upright post maintenance system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216196779U (en) |
-
2021
- 2021-10-08 CN CN202122432881.2U patent/CN216196779U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3587265B1 (en) | Air-transportable device for projecting pressurised liquid | |
CN108378765A (en) | A kind of sucker type glass curtain cleaning device | |
CN113914643B (en) | Adjustable concrete upright post maintenance cover and concrete upright post maintenance system | |
CN108185901A (en) | A kind of high-altitude glass curtain wall cleaning machine device people | |
JP6778789B1 (en) | Greenhouse liquid sprayer | |
CN216196780U (en) | Concrete stand maintenance cover and concrete stand maintenance system | |
CN113898196B (en) | Concrete stand maintenance cover and concrete stand maintenance system | |
CN216196779U (en) | Adjustable concrete upright post maintenance cover and concrete upright post maintenance system | |
CN214459657U (en) | Little fog curing means that moisturizes of bridge pier | |
CN111589774B (en) | Laser radar surface cleaning mechanism and laser radar monitoring devices | |
CN207012163U (en) | A kind of new type washing machine | |
CN211822955U (en) | Windproof ventilating device for urban high-rise building | |
JPH119117A (en) | Spraying chemical in greenhouse and apparatus therefor | |
CN209106028U (en) | A kind of facility plastic greenhouse intelligence flusher | |
CN211201221U (en) | Concrete intelligence maintenance system | |
CN218643291U (en) | Watering dust fall equipment | |
CN204980940U (en) | Multifunctional tower crane | |
CN217678634U (en) | High and large pier stud maintenance device | |
CN216690304U (en) | Intelligent construction platform | |
CN108211164B (en) | Fire extinguishing equipment used on ocean engineering platform | |
CN213792387U (en) | Chimney paint spraying traveling device | |
CN220823782U (en) | Irrigation equipment for greening maintenance | |
KR102714042B1 (en) | Apparatus cooling for vinyl house | |
CN220766849U (en) | Green concrete moisturizing curing means | |
CN220343351U (en) | Novel automatic cableway medicine spraying machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |