CN216196419U - Lifting scaffold for building construction - Google Patents
Lifting scaffold for building construction Download PDFInfo
- Publication number
- CN216196419U CN216196419U CN202120928176.9U CN202120928176U CN216196419U CN 216196419 U CN216196419 U CN 216196419U CN 202120928176 U CN202120928176 U CN 202120928176U CN 216196419 U CN216196419 U CN 216196419U
- Authority
- CN
- China
- Prior art keywords
- limiting
- fixing plate
- fixed plate
- support
- building construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 12
- 238000010276 construction Methods 0.000 claims abstract description 16
- 239000000463 material Substances 0.000 abstract description 15
- 238000000034 method Methods 0.000 abstract description 8
- 230000000694 effects Effects 0.000 description 4
- 239000004035 construction material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Abstract
The utility model relates to the technical field of building construction, in particular to a lifting construction frame for building construction, which comprises a support, wherein a fixing plate is arranged below the support, a hydraulic lifting rod is arranged at the bottom of the fixing plate, an output shaft of the hydraulic lifting rod penetrates through the fixing plate and extends out of the fixing plate to be fixedly connected with a supporting plate, a sliding groove is arranged above one side of the support, a traction belt is placed on the sliding groove, a handle is arranged at the other end of the traction belt, the fixing plate is fixedly connected with the traction belt, a binding belt is fixedly arranged on one side above the fixing plate, a limiting device is arranged on the other side of the binding belt, and the binding belt penetrates through the other side of the fixing plate and extends out downwards. According to the utility model, the two lifting systems which are not interfered with each other are formed by the material and the supporting plate through the movement of the traction belt and the fixing plate, the material does not occupy a supporting space at a high position, the moving space of constructors is larger, the safety risk of high-position construction is reduced, and the whole operation process is simple and rapid.
Description
Technical Field
The utility model relates to the technical field of building construction, in particular to a lifting scaffold for building construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite. The house is at the building in-process, when needing to handle the wall body, because wall body top part position is than higher, so need use supplementary elevating gear, often use the lift scaffold, in order to make things convenient for people to ascend a height the construction, because the platform space of eminence construction is limited, the construction material that needs to use at the work progress often needs the many times to go up and down the scaffold and carry the material, the operation process is very inconvenient, waste time and energy and inefficiency, if let construction material and constructor be in on high-rise platform simultaneously, will bring certain potential safety hazard because material extrusion activity space.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art and provides a lifting scaffold for building construction.
In order to achieve the above purposes, the technical scheme adopted by the utility model is as follows: the utility model provides a lifting scaffold for construction, includes the support, the below of support is equipped with the fixed plate, the bottom of fixed plate is equipped with the hydraulic lifting rod, the output shaft of hydraulic lifting rod runs through the fixed plate and extends away the fixedly connected with backup pad, the outside of backup pad is equipped with stop device, one side top of support is equipped with the spout, the traction band has been put on the spout, one side of traction band is equipped with fixing device, the handle is installed to the other end of traction band, fixing device includes the fixed plate, the fixed plate links to each other with the traction band is fixed, one side fixed mounting of fixed plate top has the band, the opposite side of band is equipped with stop device, the band runs through the opposite side of fixed plate and downwardly extending goes out.
As a preferable technical scheme, the limiting device comprises a limiting block and a limiting rod, the limiting block is fixedly arranged at the center of three sides of the supporting plate, and the limiting rod extends downwards from the upper end of the bracket, penetrates through the limiting block and is fixedly connected with the fixing plate.
As a preferable technical scheme, the limiting device comprises a limiting groove and a limiting block, the limiting groove is formed in the surface of the binding belt, and the limiting block is movably connected to the edge below the limiting groove.
Compared with the prior art, the utility model has the following beneficial effects:
the hydraulic lifting rod can drive the supporting plate to move up and down through the operation of the hydraulic lifting rod, so that personnel can smoothly complete the high-altitude operation of a wall body, the limiting device on the outer side of the supporting plate is used for enhancing the stability of the device, meanwhile, the materials and the supporting plate form two lifting systems which are not interfered with each other through the movement of the traction belt and the fixing plate, the handle is arranged at the other end of the traction belt, the materials and the fixing plate are stably connected through the binding belt, after the materials are installed below the support, the constructor can lift the materials at the high altitude by pulling the handle, the materials do not need to occupy the supporting space at the high altitude, the activity space of the constructor is larger, the safety risk of high-altitude construction is reduced, and the whole operation process is simple and fast.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the frame structure of the present invention;
fig. 3 is a partial structural schematic diagram of the present invention.
In the figure: fixing device 1, hydraulic pressure lifter 2, fixed plate 3, backup pad 4, stopper 5, support 6, gag lever post 7, traction belt 8, spout 9, second fixed plate 11, band 12, spacing groove 13, second stopper 14.
Detailed Description
The following description is presented to disclose the utility model so as to enable any person skilled in the art to practice the utility model. The preferred embodiments in the following description are given by way of example only, and other obvious variations will occur to those skilled in the art.
As shown in fig. 1-3, a lifting scaffold for building construction comprises a support 6, a fixing plate 3 is arranged below the support 6, a hydraulic lifting rod 2 is arranged at the bottom of the fixing plate 3, an output shaft of the hydraulic lifting rod 2 penetrates through the fixing plate 3 and extends out of the fixedly connected supporting plate 4, a constructor stands above the supporting plate 4 and can drive the supporting plate 4 to move up and down through the operation of the hydraulic lifting rod 2, so that the constructor can smoothly complete the operation at the high position of a wall body, a limiting device is arranged at the outer side of the supporting plate 4, the stability of the device is enhanced, a sliding chute 9 is arranged above one side of the support 6, a traction belt 8 is arranged on the sliding chute 9, a fixing device is arranged at one side of the traction belt 8, two lifting systems which are not interfered with each other can be formed by the materials and the supporting plate 4 through the movement of the traction belt 8 and the fixing device, a handle is arranged at the other end of the traction belt 8, fixing device includes second fixed plate 11, second fixed plate 11 links to each other with traction belt 8 is fixed, one side fixed mounting of second fixed plate 11 top has band 12, the opposite side of band 12 is equipped with limiting device, band 12 runs through the opposite side of fixed plate 11 and downwardly extending goes out, can make material and 11 stable connections of keeping of second fixed plate through band 12, accomplish the installation back of material in 6 below supports, constructor can carry the material up through the pulling handle in the eminence, the material need not occupy the bearing space of eminence, it is bigger to make constructor activity space, the safety risk of eminence construction has been reduced, and whole operation process is simple swift.
Further, stop device includes stopper 5 and gag lever post 7, and stopper 5 fixed mounting is put at the central point on the three limit of backup pad 4, and gag lever post 7 extends downwards from the upper end of support 7 and runs through stopper 5 and link to each other with fixed plate 3 is fixed, the security that improves the device.
Further, the limiting device comprises a limiting groove 13 and a second limiting block 14, the limiting groove 13 is arranged on the surface of the belt 12, the second limiting block 14 is movably connected to the edge below the limiting groove 13, the end point of the belt 12 can be clamped below the fixing plate 11 by rotating the second limiting block 14, and the stability of the material is maintained.
The foregoing shows and describes the general principles, essential features, and advantages of the utility model. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are merely illustrative of the principles of the utility model, but that various changes and modifications may be made without departing from the spirit and scope of the utility model, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (3)
1. The utility model provides a construction lifting frame for building construction, includes support (6), its characterized in that, the below of support (6) is equipped with fixed plate (3), the bottom of fixed plate (3) is equipped with hydraulic lifting rod (2), the output shaft of hydraulic lifting rod (2) runs through fixed plate (3) and extends fixedly connected with backup pad (4), the outside of backup pad (4) is equipped with stop device, one side top of support (6) is equipped with spout (9), put traction area (8) on spout (9), one side of traction area (8) is equipped with fixing device, the handle is installed to the other end of traction area (8), fixing device includes second fixed plate (11), second fixed plate (11) and traction area (8) are fixed continuous, one side fixed mounting above second fixed plate (11) has band (12), the other side of the strap (12) is provided with a limiting device, and the strap (12) penetrates through the other side of the second fixing plate (11) and extends downwards.
2. The lifting scaffold for building construction according to claim 1, wherein the limiting device comprises a limiting block (5) and a limiting rod (7), the limiting block (5) is fixedly installed at the center of three sides of the support plate (4), and the limiting rod (7) extends downwards from the upper end of the bracket (6) to penetrate through the limiting block (5) and is fixedly connected with the fixing plate (3).
3. The lifting scaffold for building construction according to claim 1, wherein the limiting means comprises a limiting groove (13) and a second limiting block (14), the limiting groove (13) is disposed on the surface of the binding band (12), and the second limiting block (14) is movably connected to the lower edge of the limiting groove (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120928176.9U CN216196419U (en) | 2021-04-30 | 2021-04-30 | Lifting scaffold for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120928176.9U CN216196419U (en) | 2021-04-30 | 2021-04-30 | Lifting scaffold for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216196419U true CN216196419U (en) | 2022-04-05 |
Family
ID=80858355
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120928176.9U Expired - Fee Related CN216196419U (en) | 2021-04-30 | 2021-04-30 | Lifting scaffold for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216196419U (en) |
-
2021
- 2021-04-30 CN CN202120928176.9U patent/CN216196419U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205575428U (en) | Component hoist and mount system | |
CN106013453B (en) | Long-span Cantilever transfinites structure construction engineering method | |
CN216196419U (en) | Lifting scaffold for building construction | |
CN213059933U (en) | Double-beam bridge crane | |
CN211254967U (en) | Adjustable automatic general hoist of microsatellite hoisting point | |
CN218467152U (en) | Electric discharging platform | |
CN206336964U (en) | A kind of support top formula lifting pipeline apparatus and system | |
CN206352387U (en) | A kind of deformable hoistway operation steel platform of automatic climbing formula | |
CN212771963U (en) | Movable suspension operation platform | |
CN205976394U (en) | Convenient low layer construction scaffolding | |
CN211198328U (en) | Fabricated bridge lower pier column lifting appliance | |
CN210636779U (en) | Protective hanging basket for high-altitude operation | |
CN104806001B (en) | The sliding safe operation platform of elevator guide rail and construction method | |
CN209163415U (en) | A kind of low-rise building elevating platform for construction use | |
CN208934392U (en) | Construction mould bases | |
CN206088946U (en) | A integrally lift up displacement device for unsettled steel gallery of large -span | |
CN112239185A (en) | Lifting device for electric power overhaul | |
CN216662279U (en) | Building construction hoisting device | |
CN206203763U (en) | Self-driving floor hanging apparatus | |
CN213569319U (en) | Building engineering material lifting machine | |
CN205531262U (en) | Steel construction construction platform can rise automatically | |
CN2594245Y (en) | Metal cage range extension style electric elevator | |
CN217400399U (en) | All-weather intelligent building machine | |
CN105712213B (en) | AP1000 nuclear power superposed type dome lifting and fixing construction methods | |
CN203754183U (en) | Lifter for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220405 |