CN216159751U - Anti-slide pile hole digging construction structure - Google Patents

Anti-slide pile hole digging construction structure Download PDF

Info

Publication number
CN216159751U
CN216159751U CN202122199162.0U CN202122199162U CN216159751U CN 216159751 U CN216159751 U CN 216159751U CN 202122199162 U CN202122199162 U CN 202122199162U CN 216159751 U CN216159751 U CN 216159751U
Authority
CN
China
Prior art keywords
areas
digging
rotary
slide
blasting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122199162.0U
Other languages
Chinese (zh)
Inventor
王文涛
刘元元
师恩来
韩贺明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Second Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202122199162.0U priority Critical patent/CN216159751U/en
Application granted granted Critical
Publication of CN216159751U publication Critical patent/CN216159751U/en
Priority to DE202022103722.1U priority patent/DE202022103722U1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses an anti-slide pile hole digging construction structure which comprises a plurality of rotary digging areas, a plurality of blast holes and a plurality of man-digging areas, wherein the rotary digging areas, the blast holes and the man-digging areas are arranged in a rectangular anti-slide pile, the outer edge of each rotary digging area is positioned at the edge of the rectangular anti-slide pile, the man-digging areas are the outer sides of the rotary digging areas of the rectangular anti-slide pile, the blast holes are distributed in the man-digging areas, a charging structure in each blast hole comprises a bamboo chip, emulsion explosives, a detonating cord and a detonator, and the emulsion explosives comprise reinforcing explosives far away from one end of the detonator and normal explosives uniformly distributed on the bamboo chip at intervals. Adopt combination formula bored pile, dig soon promptly and add the blasting and dig the combination of stake three with the manual work and construct, when meetting hard rock stratum excavation, very big reduction people dig the excavation degree of difficulty of regional stake, to the excavation on hard rock stratum, guaranteed that the people dig smoothly developing of regional stake engineering, guaranteed anchor rope construction quality, adopt the supplementary artifical excavation of machinery pore-forming very big reduction labour's input, have better economic benefits.

Description

Anti-slide pile hole digging construction structure
Technical Field
The utility model belongs to the field of hole forming construction of slide-resistant piles, and particularly relates to a hole digging construction structure of a slide-resistant pile.
Background
The side slope support refers to a retaining, reinforcing and protecting measure which is taken for the side slope to ensure the safety of the side slope and the environment.
People dig regional stake and can bear the weight of the less and great structural subject of pressure of floor, and the present application is more common. The pile is provided with bearing platform and connected with bearing platform beam to distribute the stress of the piles homogeneously for supporting the whole building. The manually excavated regional cast-in-place pile is a pile formed by forming a hole in a pile hole by adopting a manual excavation method, then placing a steel reinforcement cage and pouring concrete.
However, under the working condition of meeting a harder rock stratum, due to the fact that the rock stratum geological excavation difficulty is increased, the manual excavation work efficiency is extremely low, the requirement that piles in a human excavation area are excavated as soon as possible cannot be met, the requirement for supporting strength is met as soon as possible, the safety of a side slope is extremely bad, the influence on the construction progress is serious, the anti-slide piles are often required to be constructed into rectangles, and the anti-slide piles can only dig circles by mechanical rotary excavation and cannot realize rectangular supporting.
SUMMERY OF THE UTILITY MODEL
The utility model provides a hole digging construction structure for an anti-slide pile, which is used for solving the technical problems that the anti-slide pile is often required to be constructed into a rectangular shape, only a circular shape can be dug by adopting mechanical rotary digging, and rectangular support cannot be realized, because the geological excavation difficulty of rock strata is increased more and more, the manual excavation work efficiency is extremely low, the requirement of pile excavation in a human excavation region as soon as possible cannot be met, and the requirement of support strength is met as soon as possible, so that the safety of side slopes is extremely unfavorable.
In order to achieve the purpose, the utility model adopts the following technical scheme: the utility model provides an anti-slide pile hole digging construction structure, digs the region including being located the many places of arranging in the rectangle anti-slide pile and digs the region, many places blast hole and many places people, dig the edge that the regional outside is located the rectangle anti-slide pile soon, the people digs regional outside for digging soon of rectangle anti-slide pile, blast hole distributes and digs the region at the people, the downthehole charging structure of blasting includes bamboo chip, emulsion explosive, detonating cord and detonator, emulsion explosive is including the enhancement explosive of keeping away from detonator one end and the normal explosive of interval evenly arranging on the bamboo chip, and the dose of strengthening the explosive is the twice of normal explosive, and detonating cord connects on strengthening explosive and all normal explosives, and the detonator is connected on detonating cord.
Through adopting above-mentioned technical scheme, adopt combination formula bored pile, dig soon promptly and add the blasting and the artifical combination of digging pile three is under construction, when meetting hard rock stratum excavation, the very big reduction people dig the excavation degree of difficulty of regional stake, to the excavation of hard rock stratum, the people has been guaranteed to dig smooth the developing of regional stake engineering, anchor rope construction quality has been guaranteed, adopt the supplementary artifical very big input that has reduced of excavation of machinery pore-forming, better economic benefits has, and the dose in the blast hole is arranged rationally, be difficult to appear letting out the ability, make the blasting effect better.
Preferably, the rotary excavating region comprises a first batch of rotary excavating regions and a second batch of rotary excavating regions, circles of the first batch of rotary excavating regions are circumscribed on the edge of the rotary excavating region, the second batch of rotary excavating regions are arranged between adjacent first batch of rotary excavating regions and have overlapping portions with the first batch of rotary excavating regions, and the second batch of rotary excavating regions are formed by excavating after the first batch of rotary excavating regions are backfilled.
Through adopting above-mentioned technical scheme, reduce and creep into the in-process and appear perforating.
Preferably, the blasting holes comprise a first group of blasting holes between the rotary excavating areas, a second group of blasting holes located on the side line of the slide-resistant piles between the rotary excavating areas, and a third group of blasting holes located at four corners of the slide-resistant piles and located outside the rotary excavating areas.
Through adopting above-mentioned technical scheme, carry out reasonable overall arrangement to people on digging regional different region and the border line of friction pile for after the blasting, people dig the very big reduction of the excavation degree of difficulty of regional stake.
Preferably, the included angle between the first group of blasts and the working face is 90 degrees, the included angle between the second group of blasts and the working face is 90 degrees, and the included angle between the third group of blasts and the working face is 92 degrees.
Through adopting above-mentioned technical scheme, the blasting effect is better.
Preferably, the first group of blasting is uniformly distributed with two places, and the second group of blasting and the third group of blasting are uniformly distributed with three places.
By adopting the technical scheme, the blasting quantity is reasonably arranged according to the region where people dig the region, so that the blasting effect is better.
Preferably, the explosive hole of the first group of blasts, the second group of blasts and the third group of blasts are all 300 g.
Through adopting above-mentioned technical scheme, blasting effect satisfies the requirement and reduces the disturbance to the country rock.
Preferably, the horizontal cross-sectional dimension of the slide-resistant pile is 2.9m 4.1m, three first rotary digging areas are arranged on the long side, two first rotary digging areas are arranged on the short side, the rotary digging diameters of the first rotary digging areas and the second rotary digging areas are 1200mm, the distance is 250mm, the diameter of the blasting holes is 42mm, and the distance between the rotary digging areas is 0.25 m.
By adopting the technical scheme, the size arrangement is reasonable, and the supporting effect of the manufactured anti-slide piles at multiple positions is stable and reliable.
The utility model has the beneficial effects that: dig soon in batches, reduce and creep into the in-process and appear the perforation, adopt combination formula bored pile, dig soon promptly and add the blasting and dig the combination of stake three with the manual work and construct, when meetting hard rock stratum excavation, the very big reduction people dig the excavation degree of difficulty of regional stake, to the excavation on hard rock stratum, guaranteed the smooth of digging regional stake engineering of people, guaranteed anchor rope construction quality, adopt the supplementary artifical very big input that has reduced labour of mechanical pore-forming, better economic benefits has.
Additional features and advantages of the utility model will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the utility model; the primary objects and other advantages of the utility model may be realized and attained by the instrumentalities particularly pointed out in the specification.
Drawings
Fig. 1 is a schematic view of a combined type bored pile construction structure according to an embodiment of the present invention;
fig. 2 is a schematic diagram of a charge configuration within a blast hole in accordance with an embodiment of the present invention.
Reference numerals: 1. anti-slide piles; 2. a rotary digging area; 21. a first batch of rotary digging areas; 22. a second batch of rotary digging areas; 3. a blast hole; 31. blasting a first group; 32. blasting a second group; 33. blasting the third group; 4. digging an area by people; 5. bamboo chips; 6. an emulsion explosive; 7. a detonating cord; 8. and (4) a detonator.
Detailed Description
The technical solutions of the present invention are described in detail below by examples, and the following examples are only exemplary and can be used only for explaining and illustrating the technical solutions of the present invention, but not construed as limiting the technical solutions of the present invention.
The utility model provides an anti-slide pile hole digging construction structure, dig regional 2 including being located the many places of arranging in rectangular anti-slide pile 1 soon, many places blast hole 3 and many places people dig regional 4, dig the edge that regional 2 is located rectangular anti-slide pile 1 soon, the people dig regional 4 for the regional 2 outsides of digging soon of rectangular anti-slide pile 1, blast hole 3 distributes and digs regional 4 in the people, the charge structure in blast hole 3 includes bamboo chip 5, emulsion explosive 6, detonating cord 7 and detonator 8, emulsion explosive 6 is including the enhancement explosive and the interval of keeping away from 8 one end of detonator and evenly arrange the normal explosive on bamboo chip 5, the dose of strengthening the explosive is the twice of normal explosive, detonating cord 7 is connected on strengthening and all normal explosives, detonator 8 is connected on detonating cord 7.
Adopt combination formula pile of digging a hole, dig soon promptly and add the blasting and dig the combination of stake three with the manual work and construct, when meetting hard rock stratum excavation, the very big reduction people dig the excavation degree of difficulty of regional 4 stake, to the excavation of hard rock stratum, guaranteed that the people dig smooth of regional 4 stake engineering and develoied, anchor rope construction quality has been guaranteed, adopt the supplementary artifical input that excavates of very big reduction of mechanical pore-forming, better economic benefits has, and the dose in the blast hole is arranged rationally, be difficult to appear letting out the ability, make the blasting effect better.
The rotary drilling area 2 comprises a first batch of rotary drilling areas 21 and a second batch of rotary drilling areas 22, circles of the first batch of rotary drilling areas 21 are circumscribed on the edge of the rotary drilling area 2, the second batch of rotary drilling areas 22 are arranged between adjacent first batch of rotary drilling areas 21 and have overlapping portions with the first batch of rotary drilling areas 21, the second batch of rotary drilling areas 22 are formed by excavation after the first batch of rotary drilling areas 21 are backfilled, and perforation in the drilling process is reduced.
The blasting holes 3 comprise a first group of blasting 31 among the rotary excavating areas 2, a second group of blasting 32 located on the side line of the anti-slide piles 1 among the rotary excavating areas 2 and a third group of blasting 33 located at four corners of the anti-slide piles 1 and located outside the rotary excavating areas 2, and reasonable layout is conducted on different areas of the human excavating areas 4 and the edge line of the anti-slide piles 1, so that after blasting, the excavation difficulty of the human excavating the piles in the areas 4 is greatly reduced.
The included angle between the first group of blasting 31 and the working face is 90 degrees, the included angle between the second group of blasting 32 and the working face is 90 degrees, the included angle between the third group of blasting 33 and the working face is 92 degrees, and the blasting effect is good.
Two places are uniformly distributed on the first group of blasting 31, three places are uniformly distributed on the second group of blasting 32 and the third group of blasting 33, and the number of blasting is reasonably distributed according to the region of the man-cut region 4, so that the blasting effect is good.
The explosive quantities in the blast holes 3 of the first group of blasts 31, the second group of blasts 32 and the third group of blasts 33 are all 300g, the blasting effect meets the requirement, and the disturbance to the surrounding rock is reduced.
The horizontal cross section size of the anti-slide pile 1 is 2.9m 4.1m, three first rotary digging areas 21 are arranged on the long side, two first rotary digging areas 21 are arranged on the short side, the rotary digging diameters of the first rotary digging areas 21 and the second rotary digging areas 22 are 1200mm, the distance is 250mm, the diameter of the blast hole 3 is 42mm, the distance between the rotary digging areas 2 is 0.25m, the size arrangement is reasonable, and the supporting effect of the manufactured anti-slide piles 1 is stable and reliable.
A construction method of a hole digging construction structure of an anti-slide pile 1 comprises the following steps,
firstly, digging holes in a first batch of rotary digging areas 21, backfilling, leveling hole openings before digging the holes, well constructing a pile area fence, a temporary protective measure, surface water interception and drainage and seepage prevention work, and building a cofferdam with a proper height on the hole opening ground during construction in rainy seasons; when the opening terrain has large gradient and is not suitable for excavating earthwork, bricks or blocks are manually piled and cut to form a construction platform; the method comprises the following steps that during pile hole excavation, reinforced concrete retaining wall supporting is carried out in time, the thickness of a retaining wall meets design requirements, the retaining wall is required to be uniform, and the retaining wall is in good contact with surrounding rocks; the pile hole behind the retaining wall meets the design requirement and keeps vertical and smooth;
step two, digging holes in the second batch of rotary digging areas 22, backfilling, and digging holes in the same operation as the step one;
step three, uniformly positioning and marking the blast holes 3;
drilling a blast hole 3 by adopting a handheld pneumatic rock drill;
fifthly, placing explosives in the blast hole 3;
step six, detonating the blast hole 3;
step seven, after detonation, ventilation is carried out, and after gas detection is qualified, field inspection is carried out;
and step eight, after field inspection, manually cleaning the slag soil on the spot according to the height of each mold, and constructing one mold for the retaining wall after cleaning one mold every time.
In the first step, the first batch of rotary excavating areas 21 are constructed by adopting V-shaped sequential drilling, the residue soil taken out of the first hole is lifted out of the first hole, the residue soil taken out of the two holes is backfilled into the first hole, and the rest is poured into the last hole for backfilling.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that may be made by those skilled in the art within the technical scope of the present invention will be covered by the scope of the present invention.

Claims (7)

1. The utility model provides an anti-slide pile hole digging construction structure which characterized in that: comprises a plurality of rotary digging areas (2), a plurality of blast holes (3) and a plurality of man-digging areas (4) which are arranged in a rectangular slide-resistant pile (1), the outer edge of the rotary digging area (2) is positioned at the edge of the rectangular anti-slide pile (1), the man-digging area (4) is the outer side of the rotary digging area (2) of the rectangular anti-slide pile (1), the blast holes (3) are distributed in the man-cut area (4), the charge structure in the blast holes (3) comprises bamboo chips (5), emulsion explosive (6), detonating cords (7) and detonators (8), the emulsion explosive (6) comprises a reinforced explosive far away from one end of the detonator (8) and normal explosives uniformly arranged on the bamboo chips (5) at intervals, the amount of the reinforced explosive is twice that of the normal explosives, the detonating cord (7) is connected to the reinforced explosive and all the normal explosives, and the detonator (8) is connected to the detonating cord (7).
2. The slide-resistant pile boring construction structure according to claim 1, wherein: the rotary excavating area (2) comprises a first rotary excavating area (21) and a second rotary excavating area (22), the circle of the first rotary excavating area (21) is circumscribed at the edge of the rotary excavating area (2), the second rotary excavating area (22) is arranged between adjacent first rotary excavating areas (21) and has an overlapping part with the first rotary excavating areas (21), and the second rotary excavating area (22) is formed by excavating after the first rotary excavating areas (21) are backfilled.
3. The slide-resistant pile boring construction structure according to claim 2, wherein: the blasting holes (3) comprise a first group of blasting (31) between the rotary excavating areas (2), a second group of blasting (32) located on the sidelines of the anti-slide piles (1) between the rotary excavating areas (2), and a third group of blasting (33) located at four corners of the anti-slide piles (1) and located on the outer side of the rotary excavating areas (2).
4. The slide-resistant pile boring construction structure according to claim 3, wherein: the included angle between the first group of blasting shots (31) and the working face is 90 degrees, the included angle between the second group of blasting shots (32) and the working face is 90 degrees, and the included angle between the third group of blasting shots (33) and the working face is 92 degrees.
5. The slide-resistant pile hole digging construction structure according to claim 4, characterized in that: the first set of shots (31) are evenly arranged at two places, and the second set of shots (32) and the third set of shots (33) are evenly arranged at three places.
6. The slide-resistant pile hole digging construction structure according to claim 5, characterized in that: the amount of explosive in the blastholes (3) of the first group of blasts (31), the second group of blasts (32) and the third group of blasts (33) is 300 g.
7. The slide-resistant pile hole digging construction structure according to claim 6, characterized in that: the horizontal cross section of the anti-slide pile (1) is 2.9m 4.1m, three first rotary digging areas (21) are arranged on the long side, two first rotary digging areas (21) are arranged on the short side, the rotary digging diameters of the first rotary digging areas (21) and the second rotary digging areas (22) are 1200mm, the distance is 250mm, the diameter of the blasting hole (3) is 42mm, and the distance between the rotary digging areas (2) is 0.25 m.
CN202122199162.0U 2021-09-13 2021-09-13 Anti-slide pile hole digging construction structure Active CN216159751U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202122199162.0U CN216159751U (en) 2021-09-13 2021-09-13 Anti-slide pile hole digging construction structure
DE202022103722.1U DE202022103722U1 (en) 2021-09-13 2022-07-05 A hole-digging construction structure for anti-slip poles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122199162.0U CN216159751U (en) 2021-09-13 2021-09-13 Anti-slide pile hole digging construction structure

Publications (1)

Publication Number Publication Date
CN216159751U true CN216159751U (en) 2022-04-01

Family

ID=80848688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122199162.0U Active CN216159751U (en) 2021-09-13 2021-09-13 Anti-slide pile hole digging construction structure

Country Status (2)

Country Link
CN (1) CN216159751U (en)
DE (1) DE202022103722U1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116005693B (en) * 2023-01-04 2023-08-25 北京住总集团有限责任公司 Rock area combined type hole digging anti-slide pile structure and construction method thereof

Also Published As

Publication number Publication date
DE202022103722U1 (en) 2022-08-17

Similar Documents

Publication Publication Date Title
CN113832958B (en) Anti-slide pile construction method with mechanical cooperation with manual excavation
CN111101540B (en) Construction method for passing existing electric power tunnel on open cut tunnel
US4496268A (en) Method and apparatus for constructing reinforced concrete walls in the earth
CN114278310A (en) Construction method for micro steel pipe pile lattice beam at shallow buried section of tunnel
CN216159751U (en) Anti-slide pile hole digging construction structure
CN113737781B (en) Combined type hole digging pile construction structure and construction method thereof
CN101748735A (en) Foundation ditch excavation method for reducing pile deflection in soft soil area
CN110030001B (en) Construction method for mountain tunnel to go out of hole
CN115262567A (en) Ultra-narrow full-hard rock deep foundation pit excavation method
CN115478552A (en) Sinking and underground sinking construction method for hard rock geological condition
CN111851510B (en) Earth rock foundation pit blasting excavation system and construction method applying same
CN110735434B (en) Method for replacing traditional inner support construction by underground force transmission belt in long and narrow deep foundation pit
CN113684838A (en) Grooving construction method for rock-socketed ultra-deep underground diaphragm wall
RU2209268C1 (en) Process of development of foundation pit
CN112593576A (en) Coal mine air return vertical shaft wind cave construction method under high hydrostatic level impact layer condition
CN212673968U (en) Earth rock foundation pit blasting excavation system
JP2916596B2 (en) Rock excavation method in the pneumatic caisson method.
JP2006336228A (en) Construction method of underground space
CN110906819B (en) Cofferdam blasting method for reducing water body damage
CN218716780U (en) Be used for hard stratum mechanical excavation to unite blasting construction structures under soft
CN114645521B (en) Construction method for import of emergency water discharge hole of existing reservoir
SU1765400A1 (en) Method at sail mass reclamation during preparation of quarry sanitary-protection zone
CN217974507U (en) Protection system of subway tunnel structure crouches down during soft soil foundation ditch excavation
CN113931228B (en) Material platform construction method for basement construction
CN210002338U (en) transformation structure crossing foundation ditch in foundation ditch construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant