CN216131625U CN202121910698.2U CN202121910698U CN216131625U CN 216131625 U CN216131625 U CN 216131625U CN 202121910698 U CN202121910698 U CN 202121910698U CN 216131625 U CN216131625 U CN 216131625U
Authority
CN
China
Prior art keywords
fixedly connected
fixed
pay
engineering
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121910698.2U
Other languages
Chinese (zh)
Inventor
邱小洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Huamin Construction Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121910698.2U priority Critical patent/CN216131625U/en
Application granted granted Critical
Publication of CN216131625U publication Critical patent/CN216131625U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model discloses an engineering measurement technology pay-off device, which belongs to the technical field of engineering measurement and comprises two fixed transverse plates, wherein one side of each of the two fixed transverse plates is fixedly connected with two fixed side plates, one side of each of the two fixed side plates is provided with a rotating hole, a rotating shaft is inserted into the rotating hole, and the outer surface of the rotating shaft is fixedly connected with a baffle plate. This engineering survey technique pay-off, when setting up the operative installations, at the inside grafting support column of injecting the cover, use the inserted block to insert the spliced eye that grafting cover and support column were seted up, control the length that the support column stretches out from the grafting cover, the effect of support column is to supporting the device, the fixed awl post of support column bottom can insert ground when using, makes the device fix with ground, strengthens the stability of device.

Description

Engineering surveying technique pay-off
Technical Field
The utility model relates to the technical field of engineering measurement, in particular to a pay-off device for the engineering measurement technology.
Background
The engineering survey comprises various measurement works in the surveying, designing, constructing and managing stages of engineering construction, is directly served for a series of engineering procedures of surveying, designing, constructing, installing, completing, monitoring, operating and managing and the like of various construction projects, can be divided into the engineering survey, line survey, bridge and tunnel survey, mine survey, city survey, water conservancy project survey and the like according to the engineering types served by the engineering survey, no matter the measurement work in each stage of the engineering process or the measurement work of different projects, a proper measurement means needs to be selected according to error analysis and measurement adjustment theory, and the measurement results are processed and analyzed, namely, the measurement data processing is also the important content of the engineering survey, the measurement paying-off is one of the very important procedures in the construction process, and the accuracy of the measurement paying-off directly influences the construction accuracy, pay-off devices are commonly used in measuring pay-off. The existing pay-off device is simple in support structure and poor in stability when placed after the pay-off device is measured in the pay-off process, the placement device is not favorable for use, the existing pay-off device is poor in control of wire alignment in the pay-off process, and errors are easily generated during measurement.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems of poor stability when the device is placed and poor control of a wire during paying off in the prior art, and provides a paying off device adopting an engineering measurement technology.
In order to achieve the purpose, the utility model adopts the following technical scheme: the utility model provides an engineering surveying technique pay-off, includes fixed diaphragm, the quantity of fixed diaphragm is two, two the equal fixedly connected with fixed curb plate in one side of fixed diaphragm, the quantity of fixed curb plate is two, two the rotation hole has all been seted up to one side of fixed curb plate, the inside in rotation hole is pegged graft and is had the axis of rotation, the outer fixed surface of axis of rotation is connected with the baffle, the quantity of baffle is two, the surface of axis of rotation has cup jointed the line book.
Preferably, the outer surface of the fixing transverse plate is provided with two wire releasing holes, and the inner parts of the two wire releasing holes are fixedly connected with conical openings.
Preferably, one side of the fixed side plate is fixedly connected with a connecting column, one side of the connecting column is fixedly connected with two fixed sleeves, and the inner parts of the fixed sleeves are fixedly connected with stable pipelines.
Preferably, the outer surface of the rotating shaft is fixedly connected with a connecting plate, one side of the connecting plate is fixedly connected with a hand-operated handle, and the outer surface of the hand-operated handle is sleeved with a sponge sleeve.
Preferably, one side fixedly connected with second spliced pole of fixed curb plate, the quantity of second spliced pole is a plurality of, a plurality of one side fixedly connected with plug bush of second spliced pole, the inside grafting of plug bush has the support column, the bottom fixedly connected with of support column connects the base, the fixed awl post of bottom fixedly connected with of connecting the base, the quantity of fixed awl post is a plurality of.
Preferably, the outer surfaces of the inserting sleeve and the supporting column are provided with inserting holes, and inserting blocks are inserted in the inserting holes.
Compared with the prior art, the utility model provides the pay-off device for the engineering measurement technology, which has the following beneficial effects:
1. according to the utility model, by arranging the inserting sleeve, the supporting column and the fixed conical column, when the device is used, the supporting column is inserted into the inserting sleeve, the inserting block is inserted into the inserting holes formed in the inserting sleeve and the supporting column to control the length of the supporting column extending out of the inserting sleeve, the supporting column is used for supporting the device, the fixed conical column at the bottom end of the supporting column can be inserted into the ground when the device is used, so that the device is fixed with the ground, the stability of the device is enhanced, and the aim of better stability of the device is fulfilled.
2. According to the utility model, through the arrangement of the conical opening and the stable pipeline, when measurement is required, the coil is pulled, one end of the coil penetrates through the stable pipeline in the fixed sleeve, so that the coil is kept straight and cannot deviate greatly when being pulled out, the stability of paying off is enhanced, one end of the coil is discharged from the conical opening, the deviation of the coil when the coil is discharged from the device is limited again, the coil can be kept straight when the coil is discharged from the device, and the aim of better controlling the coil when the device pays off the coil is fulfilled.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the plug bush of the present invention;
FIG. 3 is an enlarged view of the structure at A in FIG. 1 according to the present invention;
FIG. 4 is an enlarged view of the structure at B in FIG. 1 according to the present invention.
In the figure: 1. fixing the transverse plate; 2. fixing the side plate; 3. a rotating shaft; 4. a baffle plate; 5. coiling the wire; 6. a wire releasing hole; 7. a tapered mouth; 8. connecting columns; 9. fixing a sleeve; 10. stabilizing the pipeline; 11. a connecting plate; 12. a hand-operated grip; 13. a sponge sleeve; 14. a second connecting column; 15. a plug bush; 16. a support pillar; 17. fixing the conical column; 18. inserting holes; 19. the plug block is connected with the base.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Referring to fig. 1-4, an engineering surveying technology pay-off device comprises two fixing transverse plates 1, the outer surface of the fixing transverse plates 1 is provided with two pay-off holes 6, the inner parts of the two pay-off holes 6 are fixedly connected with tapered openings 7, the tapered openings 7 are used for limiting the deviation of one end of a coil when the coil is discharged from the device, so that the coil can keep straight when the coil is discharged from the device, the engineering surveying technology pay-off device is characterized in that the number of the fixing transverse plates 1 is two, one sides of the two fixing transverse plates 1 are fixedly connected with fixing side plates 2, one sides of the fixing side plates 2 are fixedly connected with connecting columns 8, one sides of the connecting columns 8 are fixedly connected with fixing sleeves 9, the number of the fixing sleeves 9 is two, the inner parts of the two fixing sleeves 9 are fixedly connected with stabilizing pipelines 10, the connecting columns 8 are used for connecting and fixing the fixing sleeves 9, and the fixing sleeves 9 are used for fixing the inner stabilizing pipelines 10, the stabilizing pipeline 10 has the effects that one end of the wire coil 5 penetrates through the stabilizing pipeline inside the fixing sleeve, so that the wire can be kept straight and cannot deviate greatly when being pulled out, the stability of paying-off is enhanced, one side of the fixing side plate 2 is fixedly connected with a plurality of second connecting columns 14, one side of each of the plurality of second connecting columns 14 is fixedly connected with an inserting sleeve 15, a supporting column 16 is inserted inside the inserting sleeve 15, the bottom end of the supporting column 16 is fixedly connected with a connecting base 20, the bottom end of the connecting base 15 is fixedly connected with a fixing conical column 17, the number of the fixing conical columns 17 is a plurality, the second connecting columns 14 are used for fixing the inserting sleeve 15, the supporting column 16 is used for supporting the device, the fixing conical columns 17 are used for inserting the ground reinforcing device when the device is placed on the ground, inserting holes 18 are formed in the outer surfaces of the inserting sleeve 15 and the supporting column 16, the inside grafting of spliced eye 18 has inserted block 19, the support column 16 is connected through inserting block 19 and is controlled the length that support column 16 stretched out from grafting cover 15 in the inside of inserting into hole 18, the quantity of fixed curb plate 2 is two, the rotation hole has all been seted up to one side of two fixed curb plate 2, the inside grafting in rotation hole has axis of rotation 3, the outer fixed surface of axis of rotation 3 is connected with connecting plate 11, one side fixedly connected with hand handle 12 of connecting plate 11, the surface of hand handle 12 has cup jointed sponge cover 13, the effect of hand handle 12 is conveniently to rotate axis of rotation 3, conveniently pay off and receive the line to line book 5, the effect of sponge cover 13 is that the frictional force between staff and hand handle 12 increases, the outer fixed surface of axis of rotation 3 is connected with baffle 4, the quantity of baffle 4 is two, the surface of axis of rotation 3 has cup jointed line book 5.
According to the utility model, when the device is used, the support column 16 is inserted into the insertion sleeve 15, the insertion block 19 is inserted into the insertion holes 18 formed in the insertion sleeve 15 and the support column 16 to control the length of the support column 16 extending from the insertion sleeve 15, the support column 16 is used for supporting the device, the fixing conical column 17 at the bottom end of the support column 16 can be inserted into the ground when the device is used, so that the device is fixed with the ground, the stability of the device is enhanced, when measurement is needed, the coil 5 is pulled, one end of the coil 5 penetrates through the stabilizing pipeline 10 in the fixing sleeve, so that the wire is kept straight and cannot be greatly deviated when being pulled out, the stability of paying off is enhanced, one end of the coil 5 is further pulled out from the conical opening 7, the deviation of the wire when the wire is out of the device is limited again, and the wire can be kept straight when the wire is taken out of the device.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (6)

1. The utility model provides an engineering surveying technique pay-off, includes fixed diaphragm (1), its characterized in that, the quantity of fixed diaphragm (1) is two, two the equal fixedly connected with fixed curb plate (2) in one side of fixed diaphragm (1), the quantity of fixed curb plate (2) is two, two the rotation hole has all been seted up to one side of fixed curb plate (2), the inside in rotation hole is pegged graft and is had axis of rotation (3), the outer fixed surface of axis of rotation (3) is connected with baffle (4), the quantity of baffle (4) is two, the surface of axis of rotation (3) has cup jointed coil of wire (5).
2. The pay-off device for the engineering measurement technology is characterized in that two pay-off holes (6) are formed in the outer surface of the fixing transverse plate (1), and conical openings (7) are fixedly connected inside the two pay-off holes (6).
3. An engineering surveying technique pay-off as defined in claim 1, characterized in that one side of said fixed side plate (2) is fixedly connected with a connecting post (8), one side of said connecting post (8) is fixedly connected with a fixing sleeve (9), the number of said fixing sleeves (9) is two, the interior of two of said fixing sleeves (9) is fixedly connected with a stabilizing duct (10).
4. The pay-off device for the engineering measurement technology as claimed in claim 1, wherein a connecting plate (11) is fixedly connected to the outer surface of the rotating shaft (3), a hand-operated grip (12) is fixedly connected to one side of the connecting plate (11), and a sponge sleeve (13) is sleeved on the outer surface of the hand-operated grip (12).
5. The pay-off device for the engineering measurement technology is characterized in that one side of each fixed side plate (2) is fixedly connected with a plurality of second connecting columns (14), the number of the second connecting columns (14) is several, one side of each second connecting column (14) is fixedly connected with an inserting sleeve (15), a supporting column (16) is inserted into each inserting sleeve (15), the bottom end of each supporting column (16) is fixedly connected with a connecting base (20), the bottom end of each connecting base (20) is fixedly connected with a fixed conical column (17), and the number of the fixed conical columns (17) is several.
6. The pay-off device for the engineering measurement technology is characterized in that the outer surfaces of the inserting sleeve (15) and the supporting column (16) are respectively provided with an inserting hole (18), and an inserting block (19) is inserted into the inserting hole (18).
CN202121910698.2U 2021-08-14 2021-08-14 Engineering surveying technique pay-off Expired - Fee Related CN216131625U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121910698.2U CN216131625U (en) 2021-08-14 2021-08-14 Engineering surveying technique pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121910698.2U CN216131625U (en) 2021-08-14 2021-08-14 Engineering surveying technique pay-off

Publications (1)

Publication Number Publication Date
CN216131625U true CN216131625U (en) 2022-03-25

Family

ID=80770104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121910698.2U Expired - Fee Related CN216131625U (en) 2021-08-14 2021-08-14 Engineering surveying technique pay-off

Country Status (1)

Country Link
CN (1) CN216131625U (en)

Similar Documents

Publication Publication Date Title
CN208418073U (en) A kind of rangefinder adapter rack
CN216131625U (en) Engineering surveying technique pay-off
CN208688489U (en) A kind of architectural design special measurement device convenient for adjusting
CN104848834B (en) A kind of self-leveling longitude and latitude instrument apparatus
CN212986558U (en) Firm surveyor's level is used in soil property exploration
CN210396185U (en) Novel pay-off fixture
CN112195788A (en) Bridge pier column steel bar positioning, butting and fixing device and using method
CN111677935A (en) Equipment is assembled with quick butt joint of pipe to water and electricity heating pipe laying
CN104713523B (en) A kind of liquid-level type settlement observation auxiliary device and using method
CN210918300U (en) Building engineering datum line pay-off
CN110900529A (en) Electric hammer with auxiliary positioning and drilling functions
CN216348128U (en) Automatic loading tool for tunnel smooth blasting
CN213688372U (en) Building is supervised with straightness detection instrument that hangs down
CN114719740A (en) Area measuring device for territorial resource planning and automatic alignment method
KR101793029B1 (en) Bracket apparatus for survey of skyscraper
CN210113130U (en) Portable easel for drawing
CN208985514U (en) A kind of directed drilling pendulum tool-face apparatus for demonstrating
CN215984561U (en) Fixed point marking device in engineering survey
CN212617387U (en) Bridge engineering bridge surveying equipment
CN215366751U (en) Circular basis laying-out marking tool
CN211421897U (en) Building engineering datum line pay-off
CN218380991U (en) Device for improving installation verticality and horizontal precision of vertical sleeve
CN217232253U (en) Pre-buried sleeve pipe of accurate positioning
KR102395438B1 (en) Level indicator for construction
CN217493339U (en) Installation auxiliary device for thickener lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220926

Address after: Room 11006, Building A, Fengdong I Cube, Keyuan 1st Road, Fengdong New Town, Xi'an City, Shaanxi Province 710000

Patentee after: Shaanxi Huamin Construction Group Co.,Ltd.

Address before: No.100, south section of Dongliu Road, Changsha Economic and Technological Development Zone, Hunan 410000

Patentee before: Qiu Xiaoyang

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220325