CN216109568U - Construction tool for quick pointing of building block wall - Google Patents

Construction tool for quick pointing of building block wall Download PDF

Info

Publication number
CN216109568U
CN216109568U CN202122540227.3U CN202122540227U CN216109568U CN 216109568 U CN216109568 U CN 216109568U CN 202122540227 U CN202122540227 U CN 202122540227U CN 216109568 U CN216109568 U CN 216109568U
Authority
CN
China
Prior art keywords
pointing
connecting beam
tie
construction tool
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122540227.3U
Other languages
Chinese (zh)
Inventor
杜道倾
路广
耿海龙
汪银伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
General Contracting Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
General Contracting Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd, General Contracting Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN202122540227.3U priority Critical patent/CN216109568U/en
Application granted granted Critical
Publication of CN216109568U publication Critical patent/CN216109568U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a construction tool for quick pointing of a block wall, which comprises a connecting beam positioned in the horizontal direction, a handle fixedly connected with the upper surface of the connecting beam, a roller mechanism connected with the left end and the right end of the connecting beam, pointing mechanisms fixedly connected with the middle part of the connecting beam and positioned below the connecting beam, and cleaning mechanisms positioned on the left side and the right side of the pointing mechanisms and fixedly connected with the connecting beam, wherein the utility model has simple structure, the pointing mechanisms perform pointing on a cement seam of an air-entraining block, reduce the probability of peeling of a plaster layer in a hollow drum state, greatly improve the perception quality of brickwork, improve the arrangement of the cleaning mechanisms, scrape residual slurry after pointing the wall, ensure no pollution to the wall surface while performing quick pointing, and can timely collect the blanking at the pointing position and the blanking cleaned by the cleaning mechanisms, avoid falling on the ground, and has low cost, the material is easy to obtain, the effect is obvious, the popularization is easy, and the economic and social benefits are good.

Description

Construction tool for quick pointing of building block wall
Technical Field
The utility model relates to the technical field of building construction, in particular to a construction tool for quick pointing of a block wall.
Background
The aerated concrete block has low cement content, the forming process of the bonding strength between mortar joint mortar and the masonry is slow, the bonding efficiency is low, and the leakage probability is high; the masonry has large volume and large temperature deformation of single bricks, so that mortar joints are easy to crack in the deformation process to form leak points. Mortar can be extruded through pointing, so that the bonding surface area between the mortar and the brick body is effectively increased, and the probability of forming through seams after cracking is reduced; after plastering is finished, the lower concave groove body generated by pointing forms a rib-shaped structure of a plastering layer, so that the probability of stripping of the plastering layer in a crack and hollow state is greatly reduced, and the sensory quality of the masonry is greatly improved. In the traditional pointing technology, a common iron pipe pointing device is usually used for pointing, the mode is low in working efficiency and inconsistent in pointing depth, tear-drop-shaped excess materials generated by pointing cannot be processed in place at one time, a broom is required to be used for cleaning the wall surface again, and accordingly labor cost is increased; meanwhile, if the pointing is not in place, the overall attractive effect of the wall body can be influenced, and the waterproof effect of the outer wall can also be influenced.
Therefore, the construction tool for quickly pointing the block wall, which is convenient to use, good in pointing quality and remarkable in effect, is a problem worthy of research.
Disclosure of Invention
In order to solve the defects in the prior art, the utility model provides the construction tool for quickly pointing the block wall, which is convenient to use, good in pointing quality and remarkable in effect.
The purpose of the utility model is realized as follows:
the utility model provides a building block wall body rapid pointing's construction tool, including the tie-beam that is located the horizontal direction, with the handle of the last fixed surface of tie-beam connection, still include the gyro wheel mechanism of being connected with the tie-beam about both ends, with tie-beam middle part fixed connection and be located the tie-beam below pointing mechanism, be located pointing mechanism left and right sides and with tie-beam fixed connection's clearance mechanism.
The pointing mechanism comprises a pointing rod with the bottom located in the horizontal direction and a first fixing mechanism used for fixing the pointing rod and the connecting beam, and the pointing rod is U-shaped with an upward opening.
First fixed establishment including be located the tie-beam and make the first fixed orifices that both ends passed about the linking pole, be located the upside and the downside of tie-beam and with linking pole threaded connection's first fixation nut.
The cleaning mechanism comprises cleaning discs positioned on the left side and the right side of the pointing mechanism, a connecting rod fixedly connected with the top of the cleaning discs, and a second fixing mechanism used for fixedly connecting the connecting rod with the connecting beam.
The second fixing mechanism comprises a second fixing hole positioned on the connecting beam, and a second fixing nut positioned on the upper side and the lower side of the connecting beam and connected with the connecting rod through threads.
Still including the mechanism that gathers materials that is used for collecting remaining mortar behind the pointing, the mechanism that gathers materials includes the collection feed bin that is connected and the opening orientation clearance mechanism with the lower fixed surface of tie-beam, is located the removal wheel on the collection feed bin, and collection feed bin sets up two, and two collection feed bins are located the left and right sides of tie-beam respectively.
Has the positive and beneficial effects that: the utility model has simple structure, the pointing mechanism performs pointing to the air-adding block mortar joint, reduces the probability of peeling off under the states of plastering layer crack and hollowing, greatly improves the sensory quality of the masonry, and the arrangement of the cleaning mechanism scrapes the residual slurry after wall pointing, ensures no pollution to the wall surface while performing fast pointing, and the arrangement of the collecting mechanism can collect the blanking at the pointing position and the blanking cleaned by the cleaning mechanism in time, avoid falling on the ground, has low cost, easily obtained materials, obvious effect and easy popularization, and has good economic and social benefits.
Drawings
FIG. 1 is a schematic structural view of example 1 of the present invention;
FIG. 2 is a top view of FIG. 1;
FIG. 3 is a schematic structural view of example 2 of the present invention;
FIG. 4 is a top view of FIG. 3;
in the figure, the following steps are carried out: the jointing device comprises a connecting beam 1, a handle 2, a pointing mechanism 3, a roller mechanism 4, a cleaning mechanism 5, a pointing rod 6, a first fixing nut 7, a mounting rod 8, a hard brush disc 9, a second fixing nut 10, a connecting shaft 11, a roller 12, an aggregate mechanism 13, an aggregate bin 14 and a moving wheel 15.
Detailed Description
The utility model is further illustrated by the following figures and examples.
Example 1
As shown in figures 1 and 2, the construction tool for quick jointing of the block wall comprises a connecting beam 1 positioned in the horizontal direction, a handle 2 fixedly connected with the upper surface of the connecting beam 1 through welding, a roller mechanism 4 connected with the left end and the right end of the connecting beam 1, a jointing mechanism 3 fixedly connected with the middle part of the connecting beam 1 and positioned below the connecting beam 1, and a cleaning mechanism 5 positioned on the left side and the right side of the jointing mechanism 3 and fixedly connected with the connecting beam 1, wherein the jointing mechanism 3 joints the mortar joint of the aerated block, reduces the probability of spalling under the state of mortar layer crack and empty drum, greatly improves the sensory quality of the masonry, and is provided with the cleaning mechanism for scraping residual mortar after the jointing of the wall and quickly jointing, the wall surface can be ensured not to be polluted, the cost is low, the materials are easy to obtain, the effect is obvious, the popularization is easy, and the economic and social benefits are good.
Pointing mechanism 3 includes that the bottom is located the linking pole 6 of horizontal direction, is used for making linking pole 6 and the first fixed establishment that tie-beam 1 is fixed, and pointing pole 6 is the ascending U type of opening, first fixed establishment including being located tie-beam 1 and making about the linking pole both ends pass first fixed orifices, be located tie-beam 1 upside and downside and with pointing pole threaded connection's first fixation nut 7, pointing pole 6's lower surface is located the below of 4 lower surfaces of gyro wheel mechanism, through not hard up first fixation nut 7, can adjust the distance of pointing between 6 lower surfaces of pole and tie-beam 1.
The cleaning mechanism 5 comprises cleaning discs 9 positioned on the left side and the right side of the pointing mechanism 3, a connecting rod 8 fixedly connected with the top of the cleaning disc 9 and a second fixing mechanism used for fixedly connecting the connecting rod 8 with the connecting beam 1, and the cleaning discs 9 are positioned in the horizontal direction. Second fixed establishment including being located the second fixed orifices on tie-beam 1, the upside and the downside that are located tie-beam 1 and with 8 threaded connection's of connecting rod second fixation nut 10, the lower surface of clearance dish 9 and the lower surface of gyro wheel mechanism 4 are on the coplanar, the lower surface of clearance dish 9 is the stereoplasm brush, is convenient for brush the mortar on wall body surface, when pointing rod 6 carries out the pointing, clearance dish 9 clears up the unnecessary mortar on wall body surface.
The roller mechanism 4 comprises a connecting shaft 11 fixedly connected with the left end and the right end of the connecting beam 1 in a welding mode and located on the horizontal plane, and rollers 12 connected with the front end and the rear end of the connecting shaft 11, wherein the rollers 12 rotate relative to the connecting shaft 11, the connecting beam 1 is perpendicular to the connecting shaft 11, the rollers 12 are made of rubber materials, friction force between the rollers and the surface of a wall is increased, and slipping is prevented.
When the pneumatic sealing device is used, the handle 2 is held by hands, the pointing rod 6 is aligned with the mortar joint of the air-entraining block, the roller 12 is vertical to the air-entraining block, and then the pneumatic sealing device is uniform in force and moves forwards horizontally. Excessive force may cause the wall to move, resulting in adverse effects. Too small a size will not effectively compact the mortar, and the cleaning plate 9 will clean the excess mortar on the wall surface.
Example 2
As shown in figures 3 and 4, the construction tool for quick jointing of the block wall comprises a connecting beam 1 positioned in the horizontal direction, a handle 2 fixedly connected with the upper surface of the connecting beam 1 through welding, a roller mechanism 4 connected with the left end and the right end of the connecting beam 1, a jointing mechanism 3 fixedly connected with the middle part of the connecting beam 1 and positioned below the connecting beam 1, and a cleaning mechanism 5 positioned on the left side and the right side of the jointing mechanism 3 and fixedly connected with the connecting beam 1, wherein the jointing mechanism 3 joints the mortar joint of the aerated block, reduces the probability of spalling under the state of mortar layer crack and empty drum, greatly improves the sensory quality of the masonry, and is provided with the cleaning mechanism for scraping residual mortar after the jointing of the wall and quickly jointing, the wall surface can be ensured not to be polluted, the cost is low, the materials are easy to obtain, the effect is obvious, the popularization is easy, and the economic and social benefits are good.
Pointing mechanism 3 includes that the bottom is located the linking pole 6 of horizontal direction, is used for making linking pole 6 and the first fixed establishment that tie-beam 1 is fixed, and pointing pole 6 is the ascending U type of opening, first fixed establishment including being located tie-beam 1 and making about the linking pole both ends pass first fixed orifices, be located tie-beam 1 upside and downside and with pointing pole threaded connection's first fixation nut 7, pointing pole 6's lower surface is located the below of 4 lower surfaces of gyro wheel mechanism, through not hard up first fixation nut 7, can adjust the distance of pointing between 6 lower surfaces of pole and tie-beam 1.
The cleaning mechanism 5 comprises cleaning discs 9 positioned on the left side and the right side of the pointing mechanism 3, a connecting rod 8 fixedly connected with the top of the cleaning disc 9 and a second fixing mechanism used for fixedly connecting the connecting rod 8 with the connecting beam 1, and the cleaning discs 9 are positioned in the horizontal direction. Second fixed establishment including being located the second fixed orifices on tie-beam 1, the upside and the downside that are located tie-beam 1 and with 8 threaded connection's of connecting rod second fixation nut 10, the lower surface of clearance dish 9 and the lower surface of gyro wheel mechanism 4 are on the coplanar, the lower surface of clearance dish 9 is the stereoplasm brush, is convenient for brush the mortar on wall body surface, when pointing rod 6 carries out the pointing, clearance dish 9 clears up the unnecessary mortar on wall body surface.
The roller mechanism 4 comprises a connecting shaft 11 fixedly connected with the left end and the right end of the connecting beam 1 in a welding mode and located on the horizontal plane, and rollers 12 connected with the front end and the rear end of the connecting shaft 11, wherein the rollers 12 rotate relative to the connecting shaft 11, the connecting beam 1 is perpendicular to the connecting shaft 11, the rollers 12 are made of rubber materials, friction force between the rollers and the surface of a wall is increased, and slipping is prevented.
Also comprises an aggregate mechanism 13 for collecting residual mortar after jointing, the arrangement of the aggregate mechanism 13 can collect the blanking at the jointing part and the blanking cleaned by the cleaning mechanism in time to avoid falling on the ground, the material collecting mechanism 13 comprises a material collecting bin 14 which is fixedly connected with the lower surface of the connecting beam 1 and has an opening facing the cleaning mechanism, and a moving wheel 15 which is positioned on the material collecting bin 14, the lower surface of the moving wheel 15 and the lower surface of the roller 12 are on the same plane, the distance between the lower surface of the material collecting bin 14 and the lower surface of the roller moving wheel 15 is 5mm, that is, the lower surface of aggregate bin 14 does not contact with the wall surface, prevents that friction from making aggregate bin 14 impaired, and aggregate bin 14 sets up two, and two aggregate bins 14 are located the left and right sides of tie-beam 1 respectively, and the opening of two aggregate bins 14 is relative and towards cleaning disc 9, is convenient for collect the mortar of cleaning disc 9 clearance, avoids mortar to pollute the wall and the ground that drops. The mortar that collects is directly built by laying bricks or stones the use, has avoided the waste of material, has saved the artifical input of clearance ash of falling to the ground again, when guaranteeing the pointing quality, has improved work efficiency again.
When the pneumatic sealing device is used, the handle 2 is held by hands, the pointing rod 6 is aligned with the mortar joint of the air-entraining block, the roller 12 is vertical to the air-entraining block, and then the pneumatic sealing device is uniform in force and moves forwards horizontally. Excessive force may cause the wall to move, resulting in adverse effects. Too small a size will not effectively compact the mortar, and the cleaning plate 9 will clean the excess mortar on the wall surface.
The utility model has simple structure, the pointing mechanism performs pointing to the air-adding block mortar joint, reduces the probability of peeling off under the states of plastering layer crack and hollowing, greatly improves the sensory quality of the masonry, and the arrangement of the cleaning mechanism scrapes the residual slurry after wall pointing, ensures no pollution to the wall surface while performing fast pointing, and the arrangement of the collecting mechanism can collect the blanking at the pointing position and the blanking cleaned by the cleaning mechanism in time, avoid falling on the ground, has low cost, easily obtained materials, obvious effect and easy popularization, and has good economic and social benefits.

Claims (7)

1. The utility model provides a construction tool of quick pointing of block wall, including the tie-beam that is located the horizontal direction, with the handle of the last fixed surface of tie-beam connection, its characterized in that: the device also comprises a roller mechanism connected with the left end and the right end of the connecting beam, a pointing mechanism fixedly connected with the middle part of the connecting beam and positioned below the connecting beam, and cleaning mechanisms positioned on the left side and the right side of the pointing mechanism and fixedly connected with the connecting beam.
2. The construction tool for rapid pointing of block walls according to claim 1, characterized in that: the pointing mechanism comprises a pointing rod with the bottom located in the horizontal direction and a first fixing mechanism used for fixing the pointing rod and the connecting beam, and the pointing rod is U-shaped with an upward opening.
3. The construction tool for rapid pointing of block walls according to claim 2, characterized in that: first fixed establishment including be located the tie-beam and make the first fixed orifices that both ends passed about the linking pole, be located the upside and the downside of tie-beam and with linking pole threaded connection's first fixation nut.
4. The construction tool for rapid pointing of block walls according to claim 1, characterized in that: the cleaning mechanism comprises cleaning discs positioned on the left side and the right side of the pointing mechanism, a connecting rod fixedly connected with the top of the cleaning discs, and a second fixing mechanism used for fixedly connecting the connecting rod with the connecting beam.
5. The construction tool for rapid pointing of block walls according to claim 4, characterized in that: the second fixing mechanism comprises a second fixing hole positioned on the connecting beam, and a second fixing nut positioned on the upper side and the lower side of the connecting beam and connected with the connecting rod through threads.
6. The construction tool for rapid pointing of block walls according to claim 1, characterized in that: the roller mechanism comprises a connecting shaft fixedly connected with the left end and the right end of the connecting beam and positioned on the horizontal plane, and rollers connected with the front end and the rear end of the connecting shaft, and the connecting beam is perpendicular to the connecting shaft.
7. The construction tool for rapid pointing of block walls according to claim 1, characterized in that: still including the mechanism that gathers materials that is used for collecting remaining mortar behind the pointing, the mechanism that gathers materials includes the collection feed bin that is connected and the opening orientation clearance mechanism with the lower fixed surface of tie-beam, is located the removal wheel on the collection feed bin, and collection feed bin sets up two, and two collection feed bins are located the left and right sides of tie-beam respectively.
CN202122540227.3U 2021-10-21 2021-10-21 Construction tool for quick pointing of building block wall Active CN216109568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122540227.3U CN216109568U (en) 2021-10-21 2021-10-21 Construction tool for quick pointing of building block wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122540227.3U CN216109568U (en) 2021-10-21 2021-10-21 Construction tool for quick pointing of building block wall

Publications (1)

Publication Number Publication Date
CN216109568U true CN216109568U (en) 2022-03-22

Family

ID=80695081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122540227.3U Active CN216109568U (en) 2021-10-21 2021-10-21 Construction tool for quick pointing of building block wall

Country Status (1)

Country Link
CN (1) CN216109568U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114658238A (en) * 2022-03-30 2022-06-24 中冶天工集团有限公司 Device for improving appearance quality of pointing and using method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114658238A (en) * 2022-03-30 2022-06-24 中冶天工集团有限公司 Device for improving appearance quality of pointing and using method

Similar Documents

Publication Publication Date Title
CN216109568U (en) Construction tool for quick pointing of building block wall
CN109208924B (en) Brick joint filling and pointing device and construction method
CN212802395U (en) Plastering mortar of recoverable clout instrument of strickleing off
CN217175845U (en) Device for improving appearance quality of pointing
CN212249287U (en) Automatic mortar plastering device
CN212406175U (en) Ash spreading tool for wall masonry
CN212561051U (en) Gap filling device for curbstone and flat stone
CN210002812U (en) mortar joint pointing control device for masonry
CN212078737U (en) Device is paintd to building wall body concrete high efficiency
CN212176454U (en) Wall cement patching machine
CN210067369U (en) Wall and floor tile joint pressing device for civil engineering construction
WO2021142990A1 (en) Imprinting material, and roughening construction method for new and old concrete joint surface
CN112549257A (en) Building rubbish recycling and reusing brick making equipment
CN207206706U (en) Aerated concrete building block green bodies side sweeper
CN206903162U (en) A kind of building wall jointing device
CN218091859U (en) Automatic plastering device for wall surface
CN221046770U (en) Clean dust collector of rubble
CN111364738A (en) Surplus lime material of wall brick of construction clears away recovery unit
CN220747734U (en) Portable wall plastering tool with building blocks
CN212249288U (en) Automatic mortar plastering device
CN214078024U (en) Brush roll device for building bricklaying
CN211058252U (en) Mortar collector for jointing masonry engineering
CN217141590U (en) Residual garbage cleaning device for pavement construction
CN220058677U (en) Novel hand-held seam retracting knife
CN217326500U (en) Concrete automatic feeding device based on construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant