CN216108138U - Bridge cantilever pouring construction hanging basket with high stability - Google Patents

Bridge cantilever pouring construction hanging basket with high stability Download PDF

Info

Publication number
CN216108138U
CN216108138U CN202122720088.2U CN202122720088U CN216108138U CN 216108138 U CN216108138 U CN 216108138U CN 202122720088 U CN202122720088 U CN 202122720088U CN 216108138 U CN216108138 U CN 216108138U
Authority
CN
China
Prior art keywords
hanging basket
wall
positioning
basket body
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122720088.2U
Other languages
Chinese (zh)
Inventor
于祥坤
袁玉波
赵伟
王建军
申港
代明山
卜鸿源
宋军
董旭
董振伟
朱荣浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rizhao Highway Construction Co ltd
Shandong Jiaotong University
Original Assignee
Rizhao Highway Construction Co ltd
Shandong Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rizhao Highway Construction Co ltd, Shandong Jiaotong University filed Critical Rizhao Highway Construction Co ltd
Priority to CN202122720088.2U priority Critical patent/CN216108138U/en
Application granted granted Critical
Publication of CN216108138U publication Critical patent/CN216108138U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a high-stability hanging basket for bridge cantilever pouring construction, which comprises a fixed plate, wherein a support frame is welded at the top of the fixed plate, a cross rod is arranged in a groove in the middle of the top of the support frame, a connecting rope is arranged on the outer wall of the cross rod, a positioning block is arranged on the outer wall of the connecting rope, and the outer wall of the positioning block is arranged in a positioning groove. According to the utility model, the supporting frame is fixed on the top of the bridge through the fixing plate before the bridge is poured through the arranged positioning block, then the positioning block is placed at the bottom of the bridge, the connecting rope is fixed at the bottom of the bridge, and then the roller on the outer wall of the hanging basket is attached to the positioning groove on the outer wall of the positioning block, so that the hanging basket body has certain constraint force in the lifting process, the hanging basket body can be kept stable, and meanwhile, the bottoms of the four positioning ropes are divided into eight pieces, so that four sides of the hanging basket body can be simultaneously fixed, and the stability of the hanging basket body in the lifting process is kept.

Description

Bridge cantilever pouring construction hanging basket with high stability
Technical Field
The utility model relates to the field of building construction, in particular to a bridge cantilever pouring construction hanging basket with strong stability.
Background
The construction is a production activity in the construction implementation stage of engineering, is a construction process of various buildings, and can also be a process of changing various lines on a design drawing into a real object at a specified place.
However, when the hanging basket is actually used, the hanging basket is hung in the air and is easily blown by wind to move, so that deviation occurs in the grain robbery pouring process.
Therefore, it is necessary to provide a stable hanging basket for bridge cantilever casting construction to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a bridge cantilever pouring construction hanging basket with strong stability, and aims to solve the problem that the construction hanging basket is hung in the air and is easily moved by wind, so that deviation occurs in the grain robbing pouring process.
In order to achieve the above purpose, the utility model provides the following technical scheme: a bridge cantilever pouring construction hanging basket with strong stability comprises a fixed plate, wherein a supporting frame is welded at the top of the fixed plate, a transverse rod is arranged in a groove in the middle of the top of the supporting frame, a connecting rope is arranged on the outer wall of the transverse rod, a positioning block is arranged on the outer wall of the connecting rope, the outer wall of the positioning block is arranged in a positioning groove, a servo motor is arranged on one side of the top of the supporting frame, a driving gear is arranged at the output end of the servo motor, a transmission rod is arranged on one side of the top of the fixed plate, a driven gear is arranged on the outer wall of the transmission rod, driving wheels are arranged at two ends of the driven gear, a transmission belt is arranged on the outer wall of the driving wheels, an accommodating wheel is arranged in the groove of the top of the fixed plate, a positioning rope is arranged on the outer wall of a hanging basket body, a fixed block is arranged at one end of the positioning rope, hang basket body outer wall welding and have the locating lever, the locating lever outer wall is provided with the gyro wheel.
Preferably, the support frame is made of alloy materials and is of a frame type structure.
Preferably, the number of the positioning blocks is set to be a plurality, and the positioning blocks are distributed on the outer wall of the connecting rope at equal intervals.
Preferably, the number of the positioning grooves is two, and the two positioning grooves are symmetrically distributed on two sides of the vertical center line of the positioning block.
Preferably, the number of the transmission belts is two, the two transmission belts are symmetrically distributed on two sides of a horizontal center line of the support frame, and the transmission belts are arranged in a crossed manner.
Preferably, the fixed block is connected with the basket body in a clamping mode, and the inner wall of the fixed block is attached to the outer wall of the basket body.
Preferably, the number of the fixed blocks is four, and the four fixed blocks are symmetrically distributed on two sides of the horizontal center line of the hanging basket body.
Preferably, the roller is connected with the positioning block in a sliding mode, and the outer wall of the roller is attached to the inner wall of the positioning block.
Has the advantages that:
according to the utility model, the supporting frame is fixed on the top of the bridge through the fixing plate before the bridge is poured through the arranged positioning block, then the positioning block is placed at the bottom of the bridge, the connecting rope is fixed at the bottom of the bridge, and then the roller on the outer wall of the hanging basket is attached to the positioning groove on the outer wall of the positioning block, so that the hanging basket body has certain constraint force in the lifting process, the hanging basket body can be kept stable, and meanwhile, the bottoms of the four positioning ropes are divided into eight pieces, so that four sides of the hanging basket body can be simultaneously fixed, and the stability of the hanging basket body in the lifting process is kept.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a cross-sectional perspective view of the present invention;
FIG. 3 is a perspective view of a locating block of the present invention;
FIG. 4 is a perspective view of the drive wheel of the present invention;
fig. 5 is a perspective view of the fixing block of the present invention.
Description of reference numerals:
1. a fixing plate; 2. a support frame; 3. a cross bar; 4. connecting ropes; 5. positioning blocks; 6. positioning a groove; 7. a servo motor; 8. a driving gear; 9. a transmission rod; 10. a driven gear; 11. a driving wheel; 12. a transmission belt; 13. a storage wheel; 14. positioning the rope; 15. a fixed block; 16. a hanging basket body; 17. positioning a rod; 18. and a roller.
Detailed Description
In order to make the technical solutions of the present invention better understood, those skilled in the art will now describe the present invention in further detail with reference to the accompanying drawings.
The utility model provides a high-stability hanging basket for bridge cantilever pouring construction, which comprises a fixed plate 1, wherein a support frame 2 is welded at the top of the fixed plate 1, a cross rod 3 is arranged in a groove in the middle of the top of the support frame 2, a connecting rope 4 is arranged on the outer wall of the cross rod 3, a positioning block 5 is arranged on the outer wall of the connecting rope 4, the outer wall of the positioning block 5 is arranged in a positioning groove 6, a servo motor 7 is arranged on one side of the top of the support frame 2, a driving gear 8 is arranged at the output end of the servo motor 7, a transmission rod 9 is arranged on one side of the top of the fixed plate 1, a driven gear 10 is arranged on the outer wall of the transmission rod 9, driving wheels 11 are arranged at two ends of the driven gear 10, a transmission belt 12 is arranged on the outer wall of the driving wheels 11, an accommodating wheel 13 is arranged in the groove of the top of the fixed plate 1, and a positioning rope 14 is arranged on the outer wall of the accommodating wheel 13, positioning rope 14 one end is provided with fixed block 15, fixed block 15 sets up in the outer wall of hanging basket body 16, the outer wall welding of hanging basket body 16 has locating lever 17, the locating lever 17 outer wall is provided with gyro wheel 18.
As shown in fig. 1-2, the supporting frame 2 is made of an alloy material, the supporting frame 2 is of a frame-type structure, the supporting frame 2 made of the alloy material has high stability, and meanwhile, the supporting frame 2 arranged in the frame-type structure can reduce the shaking of the supporting frame 2 caused by wind power.
As shown in fig. 1 to 3, the number of the positioning blocks 5 is set to be a plurality of, the positioning blocks 5 are equidistantly distributed on the outer wall of the connecting rope 4, and the positioning blocks 5 can keep the basket body 16 stable in the lifting process, so as to prevent the basket body 16 from shaking.
As shown in fig. 1-3, the number of the positioning grooves 6 is two, the two positioning grooves 6 are symmetrically distributed on two sides of the vertical center line of the positioning block 5, and the roller 18 can roll in the positioning grooves 6 through the positioning grooves 6, so that the roller 18 can only vertically move.
As shown in fig. 1-4, the number of the transmission belts 12 is two, two of the transmission belts 12 are symmetrically distributed on two sides of the horizontal center line of the support frame 2, the transmission belts 12 are arranged in a cross manner, and the transmission belts 12 arranged in a cross manner can simultaneously drive a plurality of storage wheels 13 to rotate, so that the storage wheels 13 rotate in opposite directions, and the positioning rope 14 is conveniently lifted.
As shown in fig. 1 to 5, the fixing block 15 is connected with the basket body 16 in a clamping manner, the inner wall of the fixing block 15 is attached to the outer wall of the basket body 16, and the fixing block 15 is in an L-shaped arrangement, so that two edges of the basket body 16 can be fixed at the same time, and the stability of the basket body 16 in the lifting process is improved.
As shown in fig. 1 to 5, the number of the fixed blocks 15 is four, the four fixed blocks 15 are symmetrically distributed on two sides of the horizontal center line of the basket body 16, and the four fixed blocks 15 can fix four corners of the basket body 16 at the same time.
As shown in fig. 1 to 3, the rollers 18 are slidably connected to the positioning block 5, the outer walls of the rollers 18 are attached to the inner wall of the positioning block 5, and the basket body 16 can be engaged with the positioning block 5 through the two rollers 18, so that the basket body 16 can be lifted and lowered conveniently.
Referring to the attached drawings 1-5 of the specification, when a construction hanging basket is required in the bridge pouring process, fixing a fixing plate 1 and a support frame 2 at the top of a bridge through bolts, selecting connecting ropes 4 with different lengths according to the height of the bridge, fixing a cross rod 3 in a groove at the top of the support frame 2, putting down the connecting ropes 4 on the outer wall of the cross rod 3 from the groove to enable the connecting ropes 4 to be perpendicular to the bottom of the bridge, fixing the connecting ropes 4 through the bolts, and attaching rollers 18 on the outer wall of a hanging basket body 16 to positioning blocks 5 on the outer wall of the connecting ropes 4 so as to fix the hanging basket body 16;
when the cradle body 16 needs to be lifted, the servo motor 7 is started, the output end of the servo motor 7 drives the driving gear 8 to rotate, then the driving gear 8 drives the meshed driven gear 10 to rotate, the driven gear 10 drives the transmission rod 9 to rotate, the transmission rod 9 drives the transmission wheels 11 at two ends to rotate, then the transmission wheels 11 drive the other transmission wheel 11 to rotate through the transmission belt 12, the transmission belt 12 is arranged in a crossed mode, so that the rotation directions of the two transmission wheels 11 are opposite, then the transmission wheels 11 drive the coaxial containing wheels 13 to rotate, the containing wheels 13 put down the positioning ropes 14, the cradle body 16 moves downwards, in the process that the cradle body 16 moves downwards, the rollers 18 slide on the inner wall of the positioning block 5 to limit the left and right movement of the cradle body 16, and the cradle body 16 can only move upwards and downwards;
when hanging basket body 16 and hanging in the air, the fixed block 15 of location rope 14 bottom is fixed two limits of hanging basket body 16, prevents to hang basket body 16 and produces and rock, has improved the stability of hanging basket body 16 in the work progress.
While certain exemplary embodiments of the present invention have been described above by way of illustration only, it will be apparent to those of ordinary skill in the art that the described embodiments may be modified in various different ways without departing from the spirit and scope of the utility model. Accordingly, the drawings and description are illustrative in nature and should not be construed as limiting the scope of the utility model.

Claims (8)

1.一种稳定性强的桥梁悬臂浇筑施工挂篮,包括固定板(1),其特征在于:所述固定板(1)顶部焊接有支撑架(2),所述支撑架(2)顶部的中间的凹槽内设置有横杆(3),所述横杆(3)外壁设置有连接绳(4),所述连接绳(4)外壁设置有定位块(5),所述定位块(5)外壁开设于定位槽(6),所述支撑架(2)顶部的一侧设置有伺服电机(7),所述伺服电机(7)输出端设置有主动齿轮(8),所述固定板(1)顶部的一侧设置有传动杆(9),所述传动杆(9)外壁设置有从动齿轮(10),所述从动齿轮(10)两端设置有传动轮(11),所述传动轮(11)外壁设置有传动带(12),所述固定板(1)顶部的凹槽内设置有收纳轮(13),所述收纳轮(13)外壁设置有定位绳(14),所述定位绳(14)一端设置有固定块(15),所述固定块(15)设置于挂篮本体(16)的外壁,所述挂篮本体(16)外壁焊接有定位杆(17),所述定位杆(17)外壁设置有滚轮(18)。1. A bridge cantilever pouring construction hanging basket with strong stability, comprising a fixed plate (1), characterized in that: a support frame (2) is welded on the top of the fixed plate (1), and the top of the support frame (2) A crossbar (3) is provided in the middle groove of the crossbar (3), the outer wall of the crossbar (3) is provided with a connecting rope (4), and the outer wall of the connecting rope (4) is provided with a positioning block (5), and the positioning block (5) The outer wall is opened in the positioning groove (6), the top side of the support frame (2) is provided with a servo motor (7), and the output end of the servo motor (7) is provided with a driving gear (8). A transmission rod (9) is provided on one side of the top of the fixed plate (1), a driven gear (10) is provided on the outer wall of the transmission rod (9), and transmission wheels (11) are provided at both ends of the driven gear (10). ), the outer wall of the transmission wheel (11) is provided with a transmission belt (12), the groove on the top of the fixing plate (1) is provided with a storage wheel (13), and the outer wall of the storage wheel (13) is provided with a positioning rope ( 14), one end of the positioning rope (14) is provided with a fixing block (15), the fixing block (15) is arranged on the outer wall of the hanging basket body (16), and the outer wall of the hanging basket body (16) is welded with a positioning rod (17), the outer wall of the positioning rod (17) is provided with a roller (18). 2.根据权利要求1所述的一种稳定性强的桥梁悬臂浇筑施工挂篮,其特征在于:所述支撑架(2)为合金材质制成,所述支撑架(2)为框架式结构。2. A kind of bridge cantilever pouring construction hanging basket with strong stability according to claim 1, characterized in that: the support frame (2) is made of alloy material, and the support frame (2) is a frame structure . 3.根据权利要求1所述的一种稳定性强的桥梁悬臂浇筑施工挂篮,其特征在于:所述定位块(5)的数量设置为多个,多个所述定位块(5)等间距分布于连接绳(4)的外壁。3. A kind of bridge cantilever pouring construction hanging basket with strong stability according to claim 1, characterized in that: the number of the positioning blocks (5) is set to a plurality, a plurality of the positioning blocks (5) etc. The spacing is distributed on the outer wall of the connecting rope (4). 4.根据权利要求1所述的一种稳定性强的桥梁悬臂浇筑施工挂篮,其特征在于:所述定位槽(6)的数量设置为两个,两个所述定位槽(6)对称分布于定位块(5)的垂直中心线的两侧。4. A kind of bridge cantilever casting construction hanging basket with strong stability according to claim 1, characterized in that: the number of the positioning grooves (6) is set to two, and the two positioning grooves (6) are symmetrical Distributed on both sides of the vertical centerline of the positioning block (5). 5.根据权利要求1所述的一种稳定性强的桥梁悬臂浇筑施工挂篮,其特征在于:所述传动带(12)的数量设置为两个,两个所述传动带(12)对称分布于支撑架(2)的水平中心线两侧,所述传动带(12)为交叉设置。5. A kind of bridge cantilever casting construction hanging basket with strong stability according to claim 1, characterized in that: the number of the transmission belts (12) is set to two, and the two transmission belts (12) are symmetrically distributed on the On both sides of the horizontal center line of the support frame (2), the transmission belts (12) are arranged to cross. 6.根据权利要求1所述的一种稳定性强的桥梁悬臂浇筑施工挂篮,其特征在于:所述固定块(15)与挂篮本体(16)卡合连接,所述固定块(15)内壁与挂篮本体(16)的外壁贴合。6. A kind of bridge cantilever pouring construction hanging basket with strong stability according to claim 1, characterized in that: the fixing block (15) is connected with the hanging basket body (16) by engaging, and the fixing block (15) ) and the inner wall of the hanging basket body (16) fit together. 7.根据权利要求1所述的一种稳定性强的桥梁悬臂浇筑施工挂篮,其特征在于:所述固定块(15)的数量设置为四个,四个所述固定块(15)对称分布于挂篮本体(16)的水平中心线的两侧。7. A kind of bridge cantilever casting construction hanging basket with strong stability according to claim 1, characterized in that: the number of the fixing blocks (15) is set to four, and the four fixing blocks (15) are symmetrical Distributed on both sides of the horizontal center line of the hanging basket body (16). 8.根据权利要求1所述的一种稳定性强的桥梁悬臂浇筑施工挂篮,其特征在于:所述滚轮(18)与定位块(5)滑动连接,所述滚轮(18)的外壁与定位块(5)的内壁贴合。8. A kind of bridge cantilever casting construction hanging basket with strong stability according to claim 1, characterized in that: the roller (18) is slidably connected with the positioning block (5), and the outer wall of the roller (18) is connected to The inner wall of the positioning block (5) is fitted.
CN202122720088.2U 2021-11-08 2021-11-08 Bridge cantilever pouring construction hanging basket with high stability Active CN216108138U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122720088.2U CN216108138U (en) 2021-11-08 2021-11-08 Bridge cantilever pouring construction hanging basket with high stability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122720088.2U CN216108138U (en) 2021-11-08 2021-11-08 Bridge cantilever pouring construction hanging basket with high stability

Publications (1)

Publication Number Publication Date
CN216108138U true CN216108138U (en) 2022-03-22

Family

ID=80714356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122720088.2U Active CN216108138U (en) 2021-11-08 2021-11-08 Bridge cantilever pouring construction hanging basket with high stability

Country Status (1)

Country Link
CN (1) CN216108138U (en)

Similar Documents

Publication Publication Date Title
CN216108138U (en) Bridge cantilever pouring construction hanging basket with high stability
CN108275582B (en) Movable device based on material transportation and hoisting and operation method thereof
CN114275700B (en) A lifting device for double trolleys on beams and a lifting method thereof
CN209456015U (en) Width-adjustable mobile lifting equipment
CN211616006U (en) Plane overturning die table
CN212867576U (en) Tunnel trolley with safety and stability
CN213234214U (en) Lifting device for lifting scaffold
CN212403246U (en) Multifunctional combined positioning lifting appliance tooling frame used on PC (personal computer) mold
CN210286583U (en) Material hoisting machine tool for subway construction
CN207999067U (en) The steel column mould of liftable operation platform
CN219470157U (en) A kind of galvanized turning mechanism for cross-bar of buckle scaffolding
CN217747433U (en) Movable hanging bracket for producing crusher
CN118373322B (en) Monomer fluid reservoir hoist device with prevent shaking function
CN220265115U (en) Detachable movable material lifting machine device
CN215558425U (en) Stable and anti-shaking lifting device for building construction
CN210214610U (en) Lifting frame
CN214397909U (en) Lifting device for transporting steel pipes
CN222079613U (en) A sleeper mold flip demoulding mechanism
CN219509112U (en) Scaffold for construction
CN112744718A (en) Small-sized gantry crane for mechanical equipment transportation
CN110712277A (en) Plane overturning die table
CN211998541U (en) Mobile mounting rack for building construction
CN220376112U (en) Hanger for scaffold removal
CN213976695U (en) Bridge crane with hanging beam
CN221971101U (en) Simple maintenance lifting device for the decanter of sewage treatment tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant