CN216103510U - Pipeline transportation device for energy-saving construction of air conditioner - Google Patents

Pipeline transportation device for energy-saving construction of air conditioner Download PDF

Info

Publication number
CN216103510U
CN216103510U CN202122255940.3U CN202122255940U CN216103510U CN 216103510 U CN216103510 U CN 216103510U CN 202122255940 U CN202122255940 U CN 202122255940U CN 216103510 U CN216103510 U CN 216103510U
Authority
CN
China
Prior art keywords
frame
support frame
transportation device
saving construction
air conditioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122255940.3U
Other languages
Chinese (zh)
Inventor
赵峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Xinsheng Electric Refrigeration Technology Co ltd
Original Assignee
Shenzhen Xinsheng Electric Refrigeration Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Xinsheng Electric Refrigeration Technology Co ltd filed Critical Shenzhen Xinsheng Electric Refrigeration Technology Co ltd
Priority to CN202122255940.3U priority Critical patent/CN216103510U/en
Application granted granted Critical
Publication of CN216103510U publication Critical patent/CN216103510U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the technical field of pipeline transportation devices, in particular to a pipeline transportation device for air conditioner energy-saving construction, which comprises a hanging frame and an adjusting structure, wherein a conveying structure is clamped on one side of the hanging frame, a movable supporting structure is fixedly arranged on one side of the adjusting structure, a supporting frame for supporting is fixedly arranged on the top of the hanging frame, sleeve rods with changeable intervals are fixedly arranged on two sides of the upper surface of the supporting structure, and a movable frame capable of being arranged on the lower surface of the supporting frame is clamped on the top of each sleeve rod. This pipeline transportation device is used in energy-conserving construction of air conditioner, through conveying structure, support frame, limit structure and the cooperation setting between the screw rod of sealing, the staff can push away the surface of support frame with the pipeline through conveying structure, place the limit structure joint in the support frame to rotate limit structure, it is spacing to carry out the centre gripping to the pipeline on support frame surface, avoid dropping at the in-process that removes, and can many times at the single, improve staff's work efficiency.

Description

Pipeline transportation device for energy-saving construction of air conditioner
Technical Field
The utility model relates to the technical field of pipeline transportation devices, in particular to a pipeline transportation device for air conditioner energy-saving construction.
Background
After the construction of the basement structure is completed, heavy pipelines need to be installed at the basement floors, the air conditioner rooms and the like, so that the heavy pipelines are transported into the basement, the air conditioner rooms and the like, and the work required before installation is achieved.
Chinese patent publication No. CN207496748U discloses a portable air-conditioning pipeline transportation tool, which belongs to the field of mechanical tools and comprises a trolley, a boosting device and an auxiliary brake device, wherein a support rod of the trolley is vertically fixed on the bottom surfaces of two sides of a horizontal square frame, a roller is arranged at the bottom of the support rod, wheels are arranged on the roller, a boosting pipe of the boosting device is fixed in the middle of the square frame along the traveling direction of a vehicle, a brake roller of the brake device is arranged on the outer side surface of the support rod and is positioned above the wheels, a positioning rod is fixed on the outer side surface of the support rod, the bottom end of the positioning rod is connected with the brake roller, a brake plate is fixed on the brake roller and can rotate around the brake roller, the brake rod is fixed at the joint of the brake plate and the brake roller and is positioned between the brake plate and the positioning rod, the support rod is connected between the brake plate and the positioning rod, a spring is connected between the brake rod and the positioning rod, and the air-conditioning pipeline transportation tool can be transported in a basement at short distance, the method is particularly suitable for heavy materials such as air-conditioning pipelines, and can save manpower, shorten the construction period, improve the working efficiency and reduce the construction cost.
At present under the condition that the staff transported the pipeline, when using the dolly, it is more troublesome under the spacing condition to carry out the pipeline to when between barriers such as door frame, it is more difficult, time-wasting influences staff's work efficiency, provides a pipeline transportation device for the energy-conserving construction of air conditioner for this reason.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a pipeline transportation device for air conditioner energy-saving construction, which solves the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the utility model is realized by the following technical scheme: the utility model provides an energy-conserving construction of air conditioner is with pipeline transportation device, has the frame that articulates of conveying structure and one side fixed mounting has mobilizable bearing structure's regulation structure including one side joint, the top fixed mounting who articulates the frame has the first support frame that is used for supporting, the equal fixed mounting in both sides of bearing structure upper surface has the loop bar that can change the interval, the top joint of loop bar have can with first support frame lower surface mounting's adjustable shelf, the inside wall joint of first support frame upper surface has mobilizable limit structure, limit structure's top is run through and is sealed the screw rod, the equal fixed mounting in both sides of first support frame has the handle of lifting that is used for the application of force, the last fixed surface that adjusts structure one side is connected with the push rod.
Optionally: the conveying structure comprises a triangular seat which can be clamped with the surface of the hanging frame, and a rotatable transmission rod is clamped on the inner side wall of the triangular seat.
Optionally: the supporting structure comprises a second supporting frame which can be fixedly installed at the bottom of the adjusting structure, and moving wheels which can horizontally rotate are installed at four corners of the lower surface of the second supporting frame.
Optionally: the two sides of the top of the movable frame are connected with the lower surface of the first support frame through connecting bolts, and threaded grooves capable of penetrating through the connecting bolts are formed in the two sides of the top of the movable frame.
Optionally: the surface of the movable frame is clamped with a loop bar with a changeable angle, so that the loop bar can rotate on the surface of the movable frame.
Optionally: the adjusting structure comprises a top frame which can be sleeved with the bottom of the first supporting frame, and a bottom plate which can be provided with a supporting structure is inserted into the bottom of the top frame.
Optionally: the limiting structure comprises a side ring which can be clamped with the inner side wall of the first support frame and moves, a movable plate is attached to the inner side wall of the side ring, and a movable moving rod is fixedly mounted in the middle of the surface of the movable plate.
Optionally: the middle part fixed mounting of side ring one side has the side pipe that is used for cup jointing the carriage release lever, the inside wall fixed mounting of side pipe has extrudable reset spring.
Optionally: the top of the side ring is provided with a through groove which can penetrate through the sealing screw rod, so that the sealing screw rod can be connected with the two side rings.
Optionally: the upper surface of the first support frame is clamped with two sliding grooves of a movable limiting structure, so that the limiting structure can move in the first support frame.
(III) advantageous effects
The utility model provides a pipeline transportation device for energy-saving construction of an air conditioner, which has the following beneficial effects:
1. this pipeline transportation device is used in energy-conserving construction of air conditioner, through conveying structure, support frame, limit structure and the cooperation setting between the screw rod of sealing, the staff can push away the surface of support frame with the pipeline through conveying structure, place the limit structure joint in the support frame to rotate limit structure, it is spacing to carry out the centre gripping to the pipeline on support frame surface, avoid dropping at the in-process that removes, and can many times at the single, improve staff's work efficiency.
2. This pipeline transportation device is used in energy-conserving construction of air conditioner, through support frame, bearing structure, regulation structure, loop bar, adjustable shelf with lift the cooperation setting between the handle, the staff is under the regional condition of being equipped with the barrier, to lifting the application of force and change the angle of support frame, conveniently passes from between the barrier, improves the convenience that the staff transported, reduces inconveniently.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic diagram of an explosion structure at a limit structure of the present invention;
FIG. 3 is an enlarged view of the structure at A in FIG. 1 according to the present invention;
FIG. 4 is a schematic view of the support structure of the present invention.
In the figure: 1. a transfer structure; 101. a triangular base; 102. a transmission rod; 2. a hanging frame; 3. a support structure; 301. a first support frame; 302. a moving wheel; 4. an adjustment structure; 401. a top frame; 402. a base plate; 5. a second support frame; 6. a loop bar; 7. a movable frame; 8. a limiting structure; 801. a side ring; 802. a movable plate; 803. a travel bar; 804. a side tube; 805. a return spring; 9. a sealing screw rod; 10. a chute; 11. lifting the handle; 12. a push rod.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: a pipeline transportation device for energy-saving construction of an air conditioner comprises a hanging frame 2 with a conveying structure 1 clamped on one side and an adjusting structure 4 with a movable supporting structure 3 fixedly mounted on one side, wherein the adjusting structure 4 comprises a top frame 401 capable of being sleeved with the bottom of a second supporting frame 5, a bottom plate 402 capable of mounting the supporting structure 3 is inserted into the bottom of the top frame 401, the conveying structure 1 comprises a triangular seat 101 capable of being clamped with the surface of the hanging frame 2, a rotatable transmission rod 102 is clamped on the inner side wall of the triangular seat 101, a second supporting frame 5 for supporting is fixedly mounted on the top of the hanging frame 2, the surface of the hanging frame 2 with the conveying structure 1 hung on one side of the second supporting frame 5 is arranged through the conveying structure 1, a pipeline is pushed to the surface of the second supporting frame 5 through the conveying structure 1, and a limiting structure 8 is clamped and placed in the second supporting frame 5;
the two sides of the upper surface of the supporting structure 3 are fixedly provided with loop bars 6 with changeable intervals, the supporting structure 3 comprises a second supporting frame 301 which can be fixedly arranged at the bottom of the adjusting structure 4, the four corners of the lower surface of the second supporting frame 301 are respectively provided with a movable wheel 302 which can horizontally rotate, and the device can be conveniently moved through the arrangement of the supporting structure 3;
the top of the loop bar 6 is clamped with a movable frame 7 which can be installed on the lower surface of the second support frame 5, two sides of the top of the movable frame 7 are connected with the lower surface of the second support frame 5 through connecting bolts, two sides of the top of the movable frame 7 are both provided with threaded grooves which can penetrate through the connecting bolts, the surface of the movable frame 7 is clamped with a loop bar 6 which can change the angle, so that the loop bar 6 can rotate on the surface of the movable frame 7, through the arrangement of the movable frame 7 and the loop bar 6, a worker lifts the second support frame 5, under the condition of changing the angle of the second support frame 5, the second support frame 5 can drive the movable frame 7 to rotate on the surface of the loop bar 6, the loop bar 6 is telescopic, and is sleeved with two bars in total, so that the overall height of the loop bar 6 can be changed;
the inner side wall of the upper surface of the second support frame 5 is clamped with a movable limiting structure 8, the limiting structure 8 comprises a side ring 801 which can be clamped with the inner side wall of the second support frame 5 and can move, a movable plate 802 is attached to the inner side wall of the side ring 801, a movable moving rod 803 is fixedly mounted in the middle of the surface of the movable plate 802, a side pipe 804 which is used for being sleeved with the moving rod 803 is fixedly mounted in the middle of one side of the side ring 801, an extrudable reset spring 805 is fixedly mounted on the inner side wall of the side pipe 804, through the arrangement of the limiting structure 8, the limiting structure 8 can be clamped with the second support frame 5, the limiting structure 8 can be rotatably placed in the sliding groove 10 and then rotates ninety degrees to be clamped with the second support frame 5, can move in the sliding groove 10 and can clamp a pipeline;
the top of each side ring 801 is provided with a through groove capable of penetrating through the sealing screw 9, so that the sealing screw 9 can be connected with the two side rings 801, the sealing screw 9 penetrates through the top of the limiting structure 8, the two sides of the second support frame 5 are both fixedly provided with lifting handles 11 for applying force, and through the arrangement of the sealing screw 9, after a pipeline is placed, the sealing screw 9 can be used for connecting the top of the limiting structure 8, clamping the pipeline and avoiding looseness;
the upper surface of one side of the adjusting structure 4 is fixedly connected with a push rod 12, and the upper surface of the second support frame 5 is provided with two sliding grooves 10 capable of moving the limiting structure 8, so that the limiting structure 8 can move in the second support frame 5.
In the utility model, the working steps of the device are as follows:
1. firstly, a worker hangs the conveying structure 1 on the surface of the hanging frame 2 on one side of the second support frame 5, pushes the pipeline to the surface of the second support frame 5 through the conveying structure 1, and clamps and places the limiting structure 8 in the second support frame 5;
2. secondly, the worker can rotate the limiting structure 8, clamp and place the limiting structure 8 in the sliding groove 10, clamp and limit the pipeline on the surface of the second support frame 5, and connect the pipeline by using the sealing screw 9;
3. then, under the condition that the worker passes through the area provided with the barrier, the worker applies force to the lifting handle 11 to change the angle of the second support frame 5;
4. finally, the operator applies force to the push rod 12, pushing the device and moving the pipe.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. The utility model provides an energy-conserving construction of air conditioner is with pipeline transportation device, has articulate frame (2) and one side fixed mounting that transfer structure (1) has regulation structure (4) of mobilizable bearing structure (3) including one side joint, its characterized in that: the top fixed mounting of hanging-connection frame (2) has first support frame (5) that are used for the support, the equal fixed mounting in both sides of bearing structure (3) upper surface has loop bar (6) that can change the interval, the top joint of loop bar (6) has can with first support frame (5) surface mounting's adjustable shelf (7), the inside wall joint of first support frame (5) upper surface has mobilizable limit structure (8), seal screw rod (9) have been run through at the top of limit structure (8), the equal fixed mounting in both sides of first support frame (5) has lifting (11) that are used for the application of force, the last fixed surface who adjusts structure (4) one side is connected with push rod (12).
2. The pipe transportation device for air conditioning energy saving construction as claimed in claim 1, wherein: conveying structure (1) including can with the triangle seat (101) of the surface joint that articulates frame (2), the inside wall joint of triangle seat (101) has rotatable transfer line (102).
3. The pipe transportation device for air conditioning energy saving construction as claimed in claim 1, wherein: the supporting structure (3) comprises a second supporting frame (301) which can be fixedly installed at the bottom of the adjusting structure (4), and moving wheels (302) which can horizontally rotate are installed at four corners of the lower surface of the second supporting frame (301).
4. The pipe transportation device for air conditioning energy saving construction as claimed in claim 1, wherein: the two sides of the top of the movable frame (7) are connected with the lower surface of the first support frame (5) through connecting bolts, and threaded grooves capable of penetrating through the connecting bolts are formed in the two sides of the top of the movable frame (7).
5. The pipe transportation device for air conditioning energy saving construction as claimed in claim 1, wherein: the surface of the movable frame (7) is clamped with a loop bar (6) with a changeable angle, so that the loop bar (6) can rotate on the surface of the movable frame (7).
6. The pipe transportation device for air conditioning energy saving construction as claimed in claim 1, wherein: the adjusting structure (4) comprises a top frame (401) which can be sleeved with the bottom of the first supporting frame (5), and a bottom plate (402) which can be provided with the supporting structure (3) is inserted into the bottom of the top frame (401).
7. The pipe transportation device for air conditioning energy saving construction as claimed in claim 1, wherein: limiting structure (8) including can with the inside wall joint of first support frame (5) and side ring (801) that remove, the inside wall laminating of side ring (801) has mobilizable fly leaf (802), the middle part fixed mounting on fly leaf (802) surface has mobilizable carriage release lever (803).
8. The pipe transportation device for air conditioning energy saving construction as claimed in claim 7, wherein: the middle part of one side of the side ring (801) is fixedly provided with a side pipe (804) which is used for being sleeved with a moving rod (803), and the inner side wall of the side pipe (804) is fixedly provided with a compressible return spring (805).
9. The pipe transportation device for air conditioning energy saving construction as claimed in claim 8, wherein: the top of the side ring (801) is provided with a through groove which can penetrate through the sealing screw (9), so that the sealing screw (9) can be connected with the two side rings (801).
10. The pipe transportation device for air conditioning energy saving construction as claimed in claim 1, wherein: the upper surface of the first support frame (5) is provided with two sliding chutes (10) capable of moving the limiting structures (8) in a clamping manner, so that the limiting structures (8) can move in the first support frame (5).
CN202122255940.3U 2021-09-16 2021-09-16 Pipeline transportation device for energy-saving construction of air conditioner Active CN216103510U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122255940.3U CN216103510U (en) 2021-09-16 2021-09-16 Pipeline transportation device for energy-saving construction of air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122255940.3U CN216103510U (en) 2021-09-16 2021-09-16 Pipeline transportation device for energy-saving construction of air conditioner

Publications (1)

Publication Number Publication Date
CN216103510U true CN216103510U (en) 2022-03-22

Family

ID=80734345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122255940.3U Active CN216103510U (en) 2021-09-16 2021-09-16 Pipeline transportation device for energy-saving construction of air conditioner

Country Status (1)

Country Link
CN (1) CN216103510U (en)

Similar Documents

Publication Publication Date Title
CN216103510U (en) Pipeline transportation device for energy-saving construction of air conditioner
CN215318016U (en) Multi-station positioning and clamping device for machining heat preservation pipe
CN110863660A (en) Indoor wallboard installation device
CN210822344U (en) Heavy cylinder cargo handling device for building
CN115012675A (en) Assembling type building sample plate wall body installation device and method
CN214217062U (en) Manual template carrying device
CN212656513U (en) Simple auxiliary manual device for installing plate
CN220844112U (en) Splayed structure for blanking of rotary lifting pipe of circular pipe
CN214218085U (en) Supporting equipment for mounting metal door and window glass
CN219217266U (en) Hoisting clamp for H-shaped steel
CN216380473U (en) Floor tile laminating auxiliary device
CN218950952U (en) A dalle hoisting device for fork truck
CN205034770U (en) Work piece conveying mechanism for reducing mill
CN215287760U (en) Building material hoist device
CN219885036U (en) Pipe material collecting device
CN205702917U (en) A kind of grabbing workpiece automation equipment
CN218561550U (en) High-speed steel roll quenching positioner
CN220150782U (en) Installation device suitable for multi-layer building window
CN215706591U (en) Steel pipe conveyer for construction technology convenient to move
CN215107846U (en) Steel structure column installation device
CN214091074U (en) Quick positioner of steel construction installation
CN220427307U (en) Box component cover plate pressing device
CN218371654U (en) Lifting platform convenient to move
CN214827182U (en) Unloader is used in heated board production
CN221088935U (en) A support for tuber pipe maintenance for central air conditioning

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant