CN216081189U - Blast hole protective structure - Google Patents

Blast hole protective structure Download PDF

Info

Publication number
CN216081189U
CN216081189U CN202122066535.7U CN202122066535U CN216081189U CN 216081189 U CN216081189 U CN 216081189U CN 202122066535 U CN202122066535 U CN 202122066535U CN 216081189 U CN216081189 U CN 216081189U
Authority
CN
China
Prior art keywords
blast hole
protection network
explosive
blasting
protective structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122066535.7U
Other languages
Chinese (zh)
Inventor
赵红霞
赵小强
达皓
李宝顺
王刚金
谢文春
姜坤
刘璇
覃鹤
左海宏
周雨婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Original Assignee
No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group filed Critical No 1 Construction Engineering Co Ltd of Guizhou Construction and Engineering Group
Priority to CN202122066535.7U priority Critical patent/CN216081189U/en
Application granted granted Critical
Publication of CN216081189U publication Critical patent/CN216081189U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The utility model discloses a blast hole protection structure, which comprises: lay the flexible protection network on the construction massif, the protection network is made for flexible rubber net more than two-layer, and the protection network covers the drill way that is located the blast hole in the construction massif, between the top in blast hole and protection network lower part, installs the protruding support piece that presents protruding state to the protection network jack-up that is located the blast hole top. When the protection network that produces debris and roll and fall to blast hole top near, because the protection network presents protruding state by the jack-up, make debris can't roll and fall to blast hole top position, after detonating, debris only can vibrate on the protection network around the blast hole, and can not be impacted by the explosive force and produce and splash, because the protection network presents protruding state by the jack-up, need not clear up a plurality of blast hole top position protection networks by the manual work before the blasting, and the labor intensity is reduced, the problem that present debris can be splashed and increase labor intensity by the explosion is solved.

Description

Blast hole protective structure
Technical Field
The utility model relates to a blast hole protection structure, and belongs to the technical field of blast protection.
Background
When a mine is excavated, the rapid excavation of the mine cannot be realized by using engineering equipment such as an excavator, the mine needs to be firstly blasted to enable a mountain to generate cracks and loosen, and then the rapid excavation is performed by using engineering equipment such as the excavator; when blasting the mine, in order to realize safe, green construction, need protect the blast hole drill way, appear the flyrock when avoiding blasting.
A controlled blasting protection device disclosed in Chinese patent publication No. CN203037157U discloses a regular rubber net made of rubber leather strips by overlapping and cross-weaving to protect blasting holes from flying stones, although the rubber net can play a role of protecting the flying stones generated during blasting, after the rubber net is laid on a construction site, under the action of natural environment strong wind and the like, sundries generated on the construction site roll down and are collected on the rubber net at the top of the blasting holes, and after blasting, the sundries can be blasted and splashed; after the rubber leather net is laid, sundries on the top of the rubber leather net at the blasting hole are manually cleaned, and due to the fact that the number of the blasting holes is large, labor intensity is increased, and omission can be generated.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a blast hole protection structure.
The utility model is realized by the following technical scheme.
The utility model provides a blast hole protection structure, which comprises:
lay the flexible protection network on the construction massif, the protection network is made for flexible rubber net more than two-layer, and the protection network covers the drill way that is located the blast hole in the construction massif, between the top in blast hole and protection network lower part, installs the protruding support piece that presents protruding state to the protection network jack-up that is located the blast hole top.
The raised support piece jacks the protective net to be in a circular arc raised state, so that sundries can be collected from the circular arc raised of the protective net to two sides, and the top near the blast hole can be avoided.
The raised support part adopts a water bag or an air bag supported by rubber.
The raised support may also be a water bag or bladder made of a thick skin balloon.
After blasting, the fine stone near the blasting hole can break the convex supporting piece to enable water or air to be released and shriveled, the situation that the convex supporting piece made of rigid materials is vibrated or broken to puncture the protective net to splash can be avoided, and the construction safety is improved.
And explosive for blasting is arranged in the blasting hole, and a plugging layer is arranged at the top of the explosive.
The plugging layer material uses clay or sand plus clay.
The explosive is an emulsion explosive.
Install the detonator in the explosive, the detonator is connected with the lead wire, and the lead wire runs through explosive, plugging layer, protruding support piece, protection network and extends to the external world, is convenient for make the explosive explosion blast the construction massif through lead wire detonation detonator.
The utility model has the beneficial effects that: when the protection network that produces debris and roll and fall to blast hole top near, because the protection network presents protruding state by the jack-up, make debris can't roll and fall to blast hole top position, after detonating, debris only can vibrate on the protection network around the blast hole, and can not be impacted by the explosive force and produce and splash, because the protection network presents protruding state by the jack-up, need not clear up a plurality of blast hole top position protection networks by the manual work before the blasting, and the labor intensity is reduced, the problem that present debris can be splashed and increase labor intensity by the explosion is solved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
in the figure: 11-constructing a mountain; 12-blast holes; 21-a protective net; 22-raised support members; 23-an explosive; 24-a blocking layer; 25-a lead; 26-detonator.
Detailed Description
The technical solution of the present invention is further described below, but the scope of the claimed invention is not limited to the described.
As shown in fig. 1.
The utility model relates to a blast hole protection structure, which comprises:
the flexible protective net 21 is laid on the construction mountain 11, the protective net 21 is made of more than two layers of flexible rubber nets, the protective net 21 covers the hole opening of the blast hole 12 in the construction mountain 11, and a protruding support piece 22 which is used for jacking the protective net 21 at the top of the blast hole 12 and is in a protruding state is arranged between the top of the blast hole 12 and the lower portion of the protective net 21.
After the protection net 21 is installed, the protruding support piece 22 jacks up the protection net 21 to be in a protruding state, when sundries roll to be near the protection net 21 at the top of the blast hole 12, the protection net 21 is jacked up to be in a protruding state, so that the sundries cannot roll to be in the top of the blast hole 12, after detonation, the sundries only vibrate on the protection net 21 around the blast hole 12 and cannot be splashed due to blast force impact, the protection net 21 is jacked up to be in a protruding state, the protection net 21 at the top of the blast hole 12 does not need to be manually cleaned before blasting, the labor intensity is reduced, and the problems that the sundries can be splashed by explosion and the labor intensity is increased are solved.
The raised support 22 is raised up from the protection net 21 to present a circular arc raised state, which is more beneficial for sundries to gather from the circular arc raised up from the protection net 21 to two sides, and the top near the blast hole 12 is not existed.
The convex support part 22 is a water bag or an air bag supported by rubber, the convex support part 22 can also be a water bag or an air bag made of a thick-skin balloon, after blasting, a fine stone near the blasting hole 12 can burst the convex support part 22 to enable water or air to be released and shriveled, the situation that the convex support part 22 made of a rigid material is vibrated or broken to puncture the protective screen 21 to splash can be avoided, and the construction safety is improved.
The explosive 23 for blasting is arranged in the blasting hole 12, the explosive 23 is emulsion explosive, and the top of the explosive 23 is provided with a plugging layer 24; the plugging layer 24 is made of clay or sand and clay.
A detonator 26 is installed in the explosive 23, the detonator 26 is connected with a lead 25, the lead 25 penetrates through the explosive 23, the plugging layer 24, the protruding support member 22 and the protective net 21 and extends to the outside, and the detonator 26 is conveniently detonated through the lead 25 so that the explosive 23 explodes to blast the construction mountain body 11.

Claims (8)

1. A blast hole protective structure, comprising:
the flexible protective net (21) is laid on the construction mountain body (11), the protective net (21) covers the hole opening of the blasting hole (12) in the construction mountain body (11), and a protruding support piece (22) which is used for jacking the protective net (21) at the top of the blasting hole (12) to be in a protruding state is arranged between the top of the blasting hole (12) and the lower part of the protective net (21).
2. The blast hole protective structure according to claim 1, wherein: the protective net (21) is made of more than two layers of flexible rubber nets.
3. The blast hole protective structure according to claim 1, wherein: the convex support (22) jacks up the protective net (21) to form a circular arc convex state.
4. The blast hole protective structure according to claim 3, wherein: the raised support (22) is a water bag or an air bag supported by rubber.
5. The blast hole protective structure according to claim 3, wherein: the raised support (22) is a water bag or bladder made of a thick skin balloon.
6. The blast hole protective structure according to claim 1 or 3, wherein: explosive (23) for blasting is installed in the blasting hole (12), and a plugging layer (24) is arranged at the top of the explosive (23).
7. The blast hole protective structure according to claim 6, wherein: the explosive (23) is an emulsion explosive.
8. The blast hole protective structure according to claim 7, wherein: install detonator (26) in explosive (23), detonator (26) are connected with lead wire (25), and lead wire (25) run through explosive (23), blocking layer (24), protruding support piece (22), protection network (21) and extend to the external world.
CN202122066535.7U 2021-08-30 2021-08-30 Blast hole protective structure Active CN216081189U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122066535.7U CN216081189U (en) 2021-08-30 2021-08-30 Blast hole protective structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122066535.7U CN216081189U (en) 2021-08-30 2021-08-30 Blast hole protective structure

Publications (1)

Publication Number Publication Date
CN216081189U true CN216081189U (en) 2022-03-18

Family

ID=80673101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122066535.7U Active CN216081189U (en) 2021-08-30 2021-08-30 Blast hole protective structure

Country Status (1)

Country Link
CN (1) CN216081189U (en)

Similar Documents

Publication Publication Date Title
JP2002005600A (en) Relaxed blasting method and structure of blasting mat
CN103629980A (en) Adjacent existing railway steep mountain loosen control blast construction method
CN110469340A (en) A kind of rock burst tunnel double-shielded TBM card machine is got rid of poverty construction method
CN103174425A (en) Method suitable for preventing rock burst of hard huge thick top plate
CN111022051B (en) Forced caving method for central hard top plate of working face
CN108981514A (en) A kind of Close in blasting bag pressing covers net blasting method
CN106595410A (en) Deep foundation pit earth pressure controlled blasting method
CN216081189U (en) Blast hole protective structure
CN113187480A (en) Comprehensive protection method for coal mine rock burst
CN112880501B (en) Flight-limited hole drilling and blasting method for controlling tunnel blasting flyrock
KR101185154B1 (en) Blasting methods for preventing formation of boulder
CN113739656B (en) Stone blasting excavation method under deep foundation pit supporting beam
CN111706386B (en) Underground roadway rock burst active protection method and underground roadway tunneling method
RU2317521C1 (en) Method for blasting of benches in hindered conditions
CN105300204B (en) A kind of beded rock mass bench blasting hole-by-hole initiation method
CN112964143B (en) Three-time blasting method for hollow hole straight-hole cut
CN107228608A (en) The blasting method of rock directional splitting
CN214701975U (en) Flexible blasting flyrock protector
CN217560490U (en) Tunnel reinforced concrete two-lining controlled blasting demolition charging structure
CN104034219A (en) Control technology for preventing damage caused by blasting of rolling stones
CN216205736U (en) Pile well blasting safety protection structure under complex environment
KR20000047500A (en) V-cut blasting method with stage advanced blasting
CN115493467B (en) Underwater loose blasting construction method for bored pile
CN112412468B (en) Multifunctional anti-blocking dredging method for blasting excavation of tunnel ventilation vertical shaft
CN219910160U (en) Flexible protection structure for ring incision blasting demolition chimney

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant