CN216078621U - Pipeline hoisting device applied to I-shaped steel structure - Google Patents

Pipeline hoisting device applied to I-shaped steel structure Download PDF

Info

Publication number
CN216078621U
CN216078621U CN202122075194.XU CN202122075194U CN216078621U CN 216078621 U CN216078621 U CN 216078621U CN 202122075194 U CN202122075194 U CN 202122075194U CN 216078621 U CN216078621 U CN 216078621U
Authority
CN
China
Prior art keywords
shaped
pipeline
steel structure
erection column
locking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202122075194.XU
Other languages
Chinese (zh)
Inventor
王毅
何伦
吴奇林
金霄
郑升勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Divion Southern Construction Co Ltd
Original Assignee
China Construction Eighth Engineering Divion Southern Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Divion Southern Construction Co Ltd filed Critical China Construction Eighth Engineering Divion Southern Construction Co Ltd
Priority to CN202122075194.XU priority Critical patent/CN216078621U/en
Application granted granted Critical
Publication of CN216078621U publication Critical patent/CN216078621U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a pipeline hoisting device applied to an I-shaped steel structure, which comprises: s-shaped coupling hook, U-shaped connection piece, erection column and supporting component, S-shaped coupling hook is two, two S-shaped coupling hooks hang respectively at the both ends of I-steel roof beam, the both ends of U-shaped connection piece are locked respectively on two S-shaped coupling hook through locking Assembly, the erection column passes through installed part detachably and sets up the bottom at the U-shaped connection piece, be provided with coupling assembling on the erection column, supporting component is used for supporting the pipeline, coupling assembling and supporting component fixed connection, the problem of existence among the prior art when I-steel roof beam erection tube has been solved, current mounting means is responsible for and can destroy the problem of I-steel roof beam wholeness.

Description

Pipeline hoisting device applied to I-shaped steel structure
Technical Field
The utility model relates to the technical field of pipeline installation equipment, in particular to a pipeline hoisting device applied to an I-shaped steel structure.
Background
The traditional installation mode of the electromechanical pipeline paved by a steel structure is to directly weld on an I-shaped steel beam or mechanically drill a hole on the I-shaped beam to form an installation hole for installing the pipeline, and then use a pipeline support hanger to fix the electromechanical pipeline. The pipeline is installed in a direct welding or mechanical drilling mode, the structural integrity and the fireproof performance of the I-shaped steel beam can be damaged, the load bearing capacity of the I-shaped steel beam is influenced, and the safety risk of a steel structure is increased; meanwhile, workers have high difficulty and long construction time in welding or mechanical drilling operation in high-altitude operation, and potential safety hazards in high-altitude operation are greatly increased.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects in the prior art, the utility model provides a pipeline hoisting device applied to an I-shaped steel structure, which solves the problems that the existing installation mode is responsible for and can damage the integrity of an I-shaped steel beam when the pipeline is installed on the I-shaped steel beam in the prior art.
According to an embodiment of the present invention, a pipe hoisting device applied to an i-steel structure includes: s-shaped coupling hook, U-shaped connection piece, erection column and supporting component, S-shaped coupling hook is two, two S-shaped coupling hooks hang respectively at the both ends of I-steel roof beam, the both ends of U-shaped connection piece are locked respectively on two S-shaped coupling hook through locking Assembly, the erection column passes through installed part detachably and sets up the bottom at the U-shaped connection piece, be provided with coupling assembling on the erection column, supporting component is used for supporting the pipeline, coupling assembling and supporting component fixed connection.
Compared with the prior art, the utility model has the following beneficial effects: the S-shaped connecting hooks are arranged and hung at two ends of the I-shaped steel beam, the U-shaped connecting pieces are arranged on the two S-shaped connecting hooks, the mounting columns are arranged on the U-shaped connecting pieces, and finally the supporting assembly with the pipeline is hung and supported by arranging the connecting assembly on the mounting columns.
The locking assembly includes: the pull rod horizontally penetrates through the two S-shaped connecting hooks and the U-shaped connecting sheet, and two ends of the pull rod are locked through nuts.
One end of the mounting column vertically penetrates through the U-shaped connecting piece, the mounting piece comprises a screw and a supporting block which is slidably sleeved on the mounting column, the supporting block is attached to the top of the U-shaped connecting piece, the screw horizontally penetrates through the supporting block and the mounting column, and the screw is in threaded connection with the supporting block and the mounting column.
The support assembly includes: the staple bolt, the staple bolt is two, and two staple bolts are half-circular arc, and two staple bolts are established on the pipeline symmetrically, and the both ends of two staple bolts all are provided with the horizontally connecting block, and two adjacent connecting blocks all lock through locking bolt, and the top of one of them staple bolt is provided with the fixing base fixedly, coupling assembling and fixing base fixed connection.
The coupling assembling includes: the mounting column is provided with a through hole penetrating through the mounting column horizontally, the through hole is communicated with the sliding groove, the sliding column is provided with a plurality of locking holes, the screw rod horizontally penetrates through the through hole and the locking holes, and the screw rod is in threaded connection with the mounting column and the sliding column.
The steel beam locking device is characterized by further comprising two limiting rods, the two limiting rods vertically penetrate through the two S-shaped connecting hooks respectively and are tightly attached to the I-shaped steel beam, the limiting rods are in threaded connection with the S-shaped connecting hooks, and each limiting rod is provided with a limiting nut used for locking the limiting nut with the corresponding S-shaped connecting hook.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
In the above drawings: 1. an S-shaped connecting hook; 2. an I-beam; 3. a U-shaped connecting sheet; 4. mounting a column; 5. a pipeline; 6. a pull rod; 7. a screw; 8. a support block; 9. hooping; 10. connecting blocks; 11. a limit nut; 12. locking the bolt; 13. a fixed seat; 14. a sliding post; 15. a limiting rod.
Detailed Description
The technical solution of the present invention is further explained with reference to the drawings and the embodiments.
As shown in fig. 1, an embodiment of the present invention provides a pipeline 5 hoisting device applied to an i-shaped steel structure, including: the connecting structure comprises S-shaped connecting hooks 1, U-shaped connecting pieces 3, mounting columns 4 and supporting components, wherein the number of the S-shaped connecting hooks 1 is two, the two S-shaped connecting hooks 1 are respectively hung at two ends of an I-shaped steel beam 2, two ends of each U-shaped connecting piece 3 are respectively locked on the two S-shaped connecting hooks 1 through locking components, the mounting columns 4 are detachably arranged at the bottoms of the U-shaped connecting pieces 3 through mounting pieces, connecting components are arranged on the mounting columns 4, the supporting components are used for supporting pipelines 5, and the connecting components are fixedly connected with the supporting components.
Through setting up S-shaped coupling hook 1, hang S-shaped coupling hook 1 at the both ends of I-steel roof beam 2, then set up U-shaped connection piece 3 on two S-shaped coupling hooks 1 again, set up erection column 4 on the U-shaped connection piece 3, at last through set up coupling assembling on erection column 4 and hang the supporting component who supports pipeline 5, need not to drill on I-steel roof beam 2 and can realize the hoist and mount to pipeline 5, the integrality of I-steel roof beam has been kept, and simple to operate, the workman' S operation of being convenient for.
Further, as shown in fig. 1, the locking assembly includes: the pull rod 6 horizontally penetrates through the two S-shaped connecting hooks 1 and the U-shaped connecting sheet 3, and two ends of the pull rod 6 are locked through nuts. The two ends of the U-shaped connecting sheet 3 are respectively connected with the two S-shaped connecting hooks 1 through the pull rod 6 and the nut, so that the U-shaped connecting sheet 3 can be conveniently installed and detached.
Further, U-shaped connection piece 3 is vertically passed to the one end of erection column 4, the installed part includes, screw rod 7 and the supporting shoe 8 of cover on erection column 4 with sliding ground, and supporting shoe 8 hugs closely with the top of U-shaped connection piece 3, and screw rod 7 level passes supporting shoe 8 and erection column 4, and screw rod 7 and supporting shoe 8 and the equal threaded connection of erection column 4. Can dismantle with erection column 4 and U-shaped connection piece 3 through this mode and be connected, be convenient for come the save with erection column 4 and 3 splits of U-shaped connection piece, practice thrift the space of accomodating.
Specifically, the support assembly includes: staple bolt 9, staple bolt 9 are two, and two staple bolts 9 are half-circular arc, and two staple bolts 9 are established on pipeline 5 symmetrically, and two staple bolts 9's both ends all are provided with horizontally connecting block 10, and double-phase adjacent connecting block 10 all locks through locking bolt 12, and one of them staple bolt 9's top is provided with fixing base 13, coupling assembling and fixing base 13 fixed connection fixedly.
The supporting and fixing principle of the pipeline 5 is that the two anchor ears 9 are symmetrically sleeved on the outer wall of the pipeline 5, and then the two anchor ears 9 are fixed through the locking bolts 12, so that the two anchor ears 9 are firmly locked on the pipeline 5.
Specifically, the coupling assembling includes: the mounting column 4 is close to the one end of the fixing seat 13 and is sunken to form a sliding groove for mounting the sliding column 14, the sliding column 14 is arranged in the sliding groove in a sliding mode, a through hole penetrating through the mounting column 4 is horizontally formed in the mounting column 4 and communicated with the sliding groove, a plurality of locking holes are formed in the sliding column 14, the screw 7 horizontally penetrates through the through hole and the locking holes, and the screw 7 is in threaded connection with the mounting column 4 and the sliding column 14. Through set up a plurality of locking holes on sliding column 14, can freely adjust the length that sliding column 14 stretches out erection column 4, and then the installation height of control pipeline 5.
Preferably, in order to improve the stability of the connection between the S-shaped connecting hook 1 and the I-shaped steel beam, the connecting structure further comprises two limiting rods 15, the two limiting rods 15 vertically penetrate through the two S-shaped connecting hooks 1 respectively and are tightly attached to the I-shaped steel beam 2, the limiting rods 15 are in threaded connection with the S-shaped connecting hooks 1, and each limiting rod 15 is provided with a limiting nut 11 used for locking the limiting rod with the corresponding S-shaped connecting hook 1.
Finally, the above embodiments are only for illustrating the technical solutions of the present invention and not for limiting, although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications or equivalent substitutions may be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all of them should be covered in the claims of the present invention.

Claims (6)

1. The utility model provides a be applied to pipeline hoist device of I-steel structure which characterized in that includes: s-shaped coupling hook (1), U-shaped connection piece (3), erection column (4) and supporting component, S-shaped coupling hook (1) is two, two S-shaped coupling hook (1) hang respectively at the both ends of I-steel roof beam (2), the both ends of U-shaped connection piece (3) are locked respectively on two S-shaped coupling hook (1) through locking component, erection column (4) set up the bottom in U-shaped connection piece (3) through installed part detachably, be provided with coupling assembling on erection column (4), supporting component is used for supporting tube way (5), coupling assembling and supporting component fixed connection.
2. The pipe hoisting device applied to the I-shaped steel structure as claimed in claim 1, wherein the locking assembly comprises: the pull rod (6) horizontally penetrates through the two S-shaped connecting hooks (1) and the U-shaped connecting sheet (3), and two ends of the pull rod (6) are locked through nuts.
3. The pipeline hoisting device applied to the I-shaped steel structure is characterized in that one end of the mounting column (4) vertically penetrates through the U-shaped connecting piece (3), the mounting piece comprises a screw rod (7) and a supporting block (8) which is slidably sleeved on the mounting column (4), the supporting block (8) is tightly attached to the top of the U-shaped connecting piece (3), the screw rod (7) horizontally penetrates through the supporting block (8) and the mounting column (4), and the screw rod (7) is in threaded connection with both the supporting block (8) and the mounting column (4).
4. The pipe hoisting device applied to the I-shaped steel structure as claimed in claim 3, wherein the support assembly comprises: staple bolt (9), staple bolt (9) are two, and two staple bolts (9) are half-circular arc, and two staple bolts (9) are established on pipeline (5) symmetrically, and the both ends of two staple bolts (9) all are provided with horizontally connecting block (10), and two adjacent connecting block (10) all lock through locking bolt (12), and the top of one of them staple bolt (9) is provided with fixing base (13) fixedly, coupling assembling and fixing base (13) fixed connection.
5. The pipe hoisting device applied to the I-shaped steel structure as claimed in claim 4, wherein the connection assembly comprises: slip post (14) and screw rod (7), the sunken spout that is used for installing slip post (14) that forms of one end that is close to fixing base (13) in erection column (4), slip post (14) set up in the spout with sliding, be provided with the through-hole that runs through it on erection column (4) horizontally, through-hole and spout intercommunication, be provided with a plurality of locking holes on slip post (14), through-hole and locking hole are passed horizontally in screw rod (7), equal threaded connection of screw rod (7) and erection column (4) and slip post (14).
6. The pipeline hoisting device applied to the I-shaped steel structure according to any one of claims 1 to 5, further comprising two limiting rods (15), wherein the two limiting rods (15) vertically penetrate through the two S-shaped connecting hooks (1) respectively and are tightly attached to the I-shaped steel beam (2), the limiting rods (15) are in threaded connection with the S-shaped connecting hooks (1), and each limiting rod (15) is provided with a limiting nut (11) for locking the limiting rod with the corresponding S-shaped connecting hook (1).
CN202122075194.XU 2021-08-30 2021-08-30 Pipeline hoisting device applied to I-shaped steel structure Withdrawn - After Issue CN216078621U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122075194.XU CN216078621U (en) 2021-08-30 2021-08-30 Pipeline hoisting device applied to I-shaped steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122075194.XU CN216078621U (en) 2021-08-30 2021-08-30 Pipeline hoisting device applied to I-shaped steel structure

Publications (1)

Publication Number Publication Date
CN216078621U true CN216078621U (en) 2022-03-18

Family

ID=80673226

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122075194.XU Withdrawn - After Issue CN216078621U (en) 2021-08-30 2021-08-30 Pipeline hoisting device applied to I-shaped steel structure

Country Status (1)

Country Link
CN (1) CN216078621U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114784699A (en) * 2022-04-11 2022-07-22 广东电网有限责任公司 Hanging bracket for overhead line maintenance

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114784699A (en) * 2022-04-11 2022-07-22 广东电网有限责任公司 Hanging bracket for overhead line maintenance

Similar Documents

Publication Publication Date Title
CN205371829U (en) A multilayer pipeline gallows convenient to equipment
KR101539203B1 (en) Furnace scaffolding platform support system and lift system installation and dismantling methods
CN211736298U (en) Double-rod diagonal cantilever scaffold
CN216078621U (en) Pipeline hoisting device applied to I-shaped steel structure
CN108999394B (en) Construction process of floor type scaffold rotary cantilever type scaffold
CN110439249B (en) Overhanging bearing frame and mounting method thereof
CN201895191U (en) Round pipe component with auxiliary butt welding mechanism
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN111472531A (en) Cantilever support frame
CN216194915U (en) Quick installation mechanism of piping lane prefab
CN215101525U (en) Movable portal frame for installing power distribution cabinet
CN113863370A (en) Rapid installation mechanism and construction method for pipe gallery prefabricated member
CN210369895U (en) Indoor super-high and large template Bailey beam supporting system for building
KR101192265B1 (en) Phc long pile construction machine and method thereof
CN204311980U (en) A kind of protector for the safe dismounting of oil-well rig boring tower
CN216380520U (en) Construction platform is removed in installation of stand cantilever beam
CN109774885B (en) A fast loading and unloading scaffold device for FSRU
CN215772480U (en) Safety support of cable pit
CN212740501U (en) Movable hanging seat clamp for integrally lifting conical frustum steel truss
CN219653945U (en) Steel beam installation auxiliary equipment
CN215830054U (en) A positioning tool for I-steel roof beam
CN219570125U (en) Mining roadway support device
CN218320305U (en) Simple high-altitude hanging device
CN218467040U (en) Construction is with outer bearing structure that encorbelments
CN211596785U (en) Deep basal pit supports anti-drop fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20220318

Effective date of abandoning: 20230608

AV01 Patent right actively abandoned

Granted publication date: 20220318

Effective date of abandoning: 20230608