CN216078594U - Pre-buried structure of building engineering water and electricity installation pipeline - Google Patents

Pre-buried structure of building engineering water and electricity installation pipeline Download PDF

Info

Publication number
CN216078594U
CN216078594U CN202121973788.6U CN202121973788U CN216078594U CN 216078594 U CN216078594 U CN 216078594U CN 202121973788 U CN202121973788 U CN 202121973788U CN 216078594 U CN216078594 U CN 216078594U
Authority
CN
China
Prior art keywords
installation
pipeline
clamping part
buried structure
mounting seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121973788.6U
Other languages
Chinese (zh)
Inventor
何水清
钟春强
王飞广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Jianyu Liye Construction Development Co ltd
Original Assignee
Guangzhou Jianyu Liye Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jianyu Liye Construction Development Co ltd filed Critical Guangzhou Jianyu Liye Construction Development Co ltd
Priority to CN202121973788.6U priority Critical patent/CN216078594U/en
Application granted granted Critical
Publication of CN216078594U publication Critical patent/CN216078594U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a pre-buried structure of a hydroelectric installation pipeline in constructional engineering, which comprises a base, an installation seat and a pipeline installation assembly, wherein the installation seat is provided with a plurality of installation holes; the top of the base is provided with a spherical shell; the bottom of the mounting seat is provided with a spherical inner shell, and the spherical inner shell is hinged in the spherical outer shell; the pipeline installation component is arranged on the installation seat. According to the embedded structure of the hydroelectric installation pipeline in the building engineering, the spherical inner shell and the spherical outer shell are arranged to connect the base and the installation seat, so that the universal matching of the base and the installation seat can be realized, the installation seat can be conveniently adjusted to a proper position, and the pipeline installation assembly can be conveniently connected and fixed with the pipeline; the utility model has simple structure, good stability, easy fixation and easy disassembly.

Description

Pre-buried structure of building engineering water and electricity installation pipeline
Technical Field
The utility model relates to the field of constructional engineering, in particular to a pre-buried structure of a hydroelectric installation pipeline in constructional engineering.
Background
In the existing building structure, generally, few pipelines are arranged obviously. In a common cast-in-place structure, when reinforcing steel bars are bound, a hydroelectric installation pipeline is fixed on a template and the reinforcing steel bars, and pipes are arranged in a structural member after concrete is poured. The concrete is pre-buried, and is buried before concrete is poured. The subsequent threading is convenient.
The existing hydroelectric installation pipeline still has many defects in the laying process, the defect of difficulty in fixing exists, and the fixing piece used for fixing is also difficult to take down, so that inconvenience is caused, and therefore, a pre-buried structure of the hydroelectric installation pipeline in the building engineering, which can solve the problems, is needed at present.
SUMMERY OF THE UTILITY MODEL
Based on the above, the utility model aims to overcome the defects in the prior art and provide a pre-buried structure of a hydroelectric installation pipeline in constructional engineering.
A pre-buried structure of a hydroelectric installation pipeline in constructional engineering comprises a base, an installation seat and a pipeline installation assembly;
the top of the base is provided with a spherical shell;
the bottom of the mounting seat is provided with a spherical inner shell, and the spherical inner shell is hinged in the spherical outer shell;
the pipeline installation component is arranged on the installation seat.
According to the embedded structure of the hydroelectric installation pipeline in the building engineering, the spherical inner shell and the spherical outer shell are arranged to connect the base and the installation seat, so that the universal matching of the base and the installation seat can be realized, the installation seat can be conveniently adjusted to a proper position, and the pipeline installation assembly can be conveniently connected and fixed with the pipeline; the utility model has simple structure, good stability, easy fixation and easy disassembly.
Further, the mounting seat comprises an upper mounting seat and a lower mounting seat; the first bolt is further included; the upper mounting seat and the lower mounting seat are detachably connected through a first bolt.
The beneficial effects of adopting above-mentioned further scheme are that, connect mount pad and lower mount pad through first bolt, be convenient for separate mount pad and pipeline installation component down, make its whole convenient to detach installation, reduce operation personnel's intensity of labour, improve holistic use value.
Further, the upper mounting seat is arranged on the lower mounting seat in a sliding mode.
The beneficial effect who adopts above-mentioned further scheme is that, go up the mount pad and slide and set up on mount pad down, can adjust the position of mount pad according to actual need, and then adjust pipeline installation component's position, make it better fixed with the pipeline.
Further, the pipeline mounting assembly includes a retaining ring; the fixed ring is fixedly arranged on the upper mounting seat, and the axis direction of the fixed ring is perpendicular to the sliding direction of the upper mounting seat.
The pipeline fixing device has the advantages that the pipeline can penetrate through the fixing ring to be fixed by arranging the fixing ring; the axis direction of the fixing ring is perpendicular to the sliding direction of the upper mounting seat, and the position of the fixing ring can be adjusted by sliding the upper mounting seat, so that the position of the pipeline can be fixed.
Further, the clamping device also comprises an upper clamping part, a lower clamping part and an adjusting screw rod; the lower clamping part is coaxially arranged in the fixed ring; the upper clamping part is positioned above the lower clamping part, and the bottom of the adjusting screw is rotatably connected with the upper clamping part; the adjusting screw rod is in threaded connection with the fixing ring and can drive the upper clamping part to move up and down.
Adopt above-mentioned further scheme's beneficial effect is, through adding clamping part and lower clamping part in the setting, the accessible rotates adjusting screw, makes the clamping part be close to or keep away from lower clamping part on, and then realizes pressing from both sides the tight of the intra-annular pipeline of stationary ring.
Further, the device also comprises a spring; the spring is sleeved on the adjusting screw rod and is positioned on the outer side of the fixing ring.
Adopt above-mentioned further scheme's beneficial effect is, through setting up the spring, can give adjusting screw axial pulling force, make adjusting screw be difficult to not hard up.
Furthermore, the inner side surfaces of the upper clamping part and the lower clamping part are respectively provided with a plastic pad.
The beneficial effect of adopting the further scheme is that the clamped pipeline can be protected by arranging the plastic pad.
Furthermore, the outer side surface of the fixing ring is connected with the top surface of the upper mounting seat through a reinforcing plate.
Adopt above-mentioned further scheme's beneficial effect to be, through setting up the reinforcing plate, make solid fixed ring be difficult to damage or drop, strengthen solid fixed ring and last joint strength between the mount pad.
Further, a second bolt is further included; the second bolt is in threaded connection with the side face of the spherical outer shell and is used for tightly propping against the spherical inner shell.
Adopt the beneficial effect of above-mentioned further scheme to be, through setting up the second bolt, can be after the position of adjustment spherical shell and spherical inner shell, lock spherical shell and spherical inner shell, make its overall structure stable.
Furthermore, the bottom of the base is provided with a flange plate.
Adopt above-mentioned further scheme's beneficial effect is, through being provided with the ring flange, can make base and external piece carry out fixed connection, strengthen stability, simultaneously, the convenient dismantlement.
For a better understanding and practice, the utility model is described in detail below with reference to the accompanying drawings.
Drawings
FIG. 1 is a schematic view of a first structure of the present invention;
FIG. 2 is a second schematic structural diagram of the present invention;
FIG. 3 is a schematic diagram of the structure of the pipeline installation assembly of the present invention.
In the figure: 10. a base; 11. a spherical shell; 12. a flange plate; 21. an upper mounting seat; 22. a lower mounting seat; 221. a spherical inner shell; 31. a fixing ring; 32. an upper clamping portion; 33. a lower clamping portion; 34. adjusting the screw rod; 35. a spring; 36. a plastic pad; 37. a reinforcing plate; 40. a first bolt; 50. and a second bolt.
Detailed Description
The technical solutions in the embodiments of the present application will be described clearly and completely with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
It will be understood that in the description of the present application, the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientation or positional relationship indicated in the drawings for ease of description and simplicity of description, and do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be considered as limiting the present application. The terms "first", "second" are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated, i.e. a feature defined as "first", "second" may explicitly or implicitly include one or more of such features. Further, unless otherwise specified, "a plurality" means two or more.
It should be noted that, in the description of the present application, unless otherwise explicitly specified or limited, the terms "disposed," "connected," and "hollow" are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present application can be understood in a specific case by those of ordinary skill in the art.
Referring to fig. 1 to 3, the pre-buried structure of the hydroelectric installation pipeline in the present embodiment includes a base 10, an installation base, a pipeline installation component, a first bolt 40, and a second bolt 50;
specifically, a spherical shell 11 is arranged at the top of the base 10; the bottom of the base 10 is provided with a flange 12;
specifically, a spherical inner shell 221 is arranged at the bottom of the mounting seat, and the spherical inner shell 221 is hinged in the spherical outer shell 11; more specifically, the second bolt 50 is screwed with the side of the spherical outer shell 11 and is used for tightly pressing the spherical inner shell 221;
specifically, the pipeline installation component is arranged on the installation seat.
More specifically, the mount includes an upper mount 21 and a lower mount 22; the spherical inner shell 221 is arranged at the bottom of the lower mounting seat 22; the pipeline mounting assembly is arranged on the upper mounting seat 21; the upper and lower mounting seats 21 and 22 are detachably coupled by a first bolt 40.
More specifically, the upper mounting seat 21 is slidably disposed on the lower mounting seat 22; the pipeline mounting assembly comprises a fixing ring 31, an upper clamping part 32, a lower clamping part 33, an adjusting screw 34 and a spring 35; the fixing ring 31 is fixedly arranged on the upper mounting seat 21, and the axial direction of the fixing ring 31 is perpendicular to the sliding direction of the upper mounting seat 21;
the lower clamping part 33 is coaxially arranged in the fixing ring 31; the upper clamping part 32 is positioned above the lower clamping part 33, and the bottom of the adjusting screw 34 is rotatably connected with the upper clamping part 32; the adjusting screw 34 is in threaded connection with the fixing ring 31 and can drive the upper clamping portion 32 to move up and down.
The spring 35 is sleeved on the adjusting screw 34 and is positioned outside the fixing ring 31;
in a preferred embodiment, the inner side surfaces of the upper clamping portion 32 and the lower clamping portion 33 are provided with plastic pads 36;
in a preferred embodiment, the outer side surface of the fixing ring 31 is connected with the top surface of the upper mounting seat 21 through a reinforcing plate 37;
the working process of the embodiment:
a user can fix the base 10 on an external connecting piece in advance through the flange 12 according to actual working conditions, so that the positions of the base 10 and the mounting seat are adjusted to proper positions by adjusting the spherical outer shell 11 and the spherical inner shell 221, and the spherical outer shell 11 and the spherical inner shell 221 are locked through the second bolts 50; further, by sliding the upper mount 21, the fixing ring 31 is moved to a proper position so that the pipeline passes through the fixing ring 31, and then the upper mount 21 and the lower mount 22 are locked by the first bolt 40;
the pipeline is further passed through the fixing ring 31, and then the pipeline is clamped by the upper clamping portion 32 and the lower clamping portion 33 by adjusting the adjusting screw 34, so that the pipeline is fixed.
Compared with the prior art, the universal matching of the base and the mounting seat can be realized by arranging the spherical inner shell and the spherical outer shell to connect the base and the mounting seat, the mounting seat can be conveniently adjusted to a proper position, and the pipeline mounting assembly can be conveniently connected and fixed with a pipeline; the utility model has simple structure, good stability, easy fixation and easy disassembly.
The above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the utility model. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention.

Claims (10)

1. The utility model provides a pre-buried structure of building engineering water and electricity installation pipeline which characterized in that includes:
the device comprises a base (10), wherein the top of the base (10) is provided with a spherical shell (11);
the bottom of the mounting seat is provided with a spherical inner shell (221), and the spherical inner shell (221) is hinged in the spherical outer shell (11);
a pipeline mounting assembly disposed on the mount.
2. The pre-buried structure of the construction engineering hydroelectric installation pipeline according to claim 1, wherein the installation base comprises an upper installation base (21) and a lower installation base (22); the spherical inner shell (221) is arranged at the bottom of the lower mounting seat (22); the pipeline mounting assembly is arranged on the upper mounting seat (21); further comprising a first bolt (40); the upper mounting seat (21) and the lower mounting seat (22) are detachably connected through a first bolt (40).
3. The pre-buried structure of the construction engineering hydroelectric installation pipeline according to claim 2, wherein the upper installation base (21) is slidably arranged on the lower installation base (22).
4. The pre-buried structure of the construction engineering hydroelectric installation pipeline according to claim 3, wherein the pipeline installation assembly comprises a fixing ring (31); the fixing ring (31) is fixedly arranged on the upper mounting seat (21), and the axis direction of the fixing ring (31) is perpendicular to the sliding direction of the upper mounting seat (21).
5. The pre-buried structure of the construction engineering hydroelectric installation pipeline according to claim 4, further comprising an upper clamping part (32), a lower clamping part (33) and an adjusting screw (34); the lower clamping part (33) is coaxially arranged in the fixing ring (31); the upper clamping part (32) is positioned above the lower clamping part (33), and the bottom of the adjusting screw rod (34) is rotatably connected with the upper clamping part (32); the adjusting screw rod (34) is in threaded connection with the fixing ring (31) and can drive the upper clamping part (32) to move up and down.
6. The pre-buried structure of the construction engineering hydroelectric installation pipeline according to claim 5, further comprising a spring (35); the spring (35) is sleeved on the adjusting screw rod (34) and is positioned on the outer side of the fixing ring (31).
7. The pre-buried structure of the construction engineering hydroelectric installation pipeline according to claim 5, wherein the inner side surfaces of the upper clamping part (32) and the lower clamping part (33) are provided with plastic pads (36).
8. The pre-buried structure of the construction engineering hydroelectric installation pipeline according to claim 4, wherein the outer side surface of the fixing ring (31) is connected with the top surface of the upper installation seat (21) through a reinforcing plate (37).
9. The pre-buried structure of the construction engineering hydroelectric installation pipeline of claim 1, further comprising a second bolt (50); the second bolt (50) is in threaded connection with the side face of the spherical outer shell (11) and is used for tightly propping against the spherical inner shell (221).
10. The pre-buried structure of the construction engineering hydroelectric installation pipeline according to claim 1, wherein a flange (12) is arranged at the bottom of the base (10).
CN202121973788.6U 2021-08-19 2021-08-19 Pre-buried structure of building engineering water and electricity installation pipeline Active CN216078594U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121973788.6U CN216078594U (en) 2021-08-19 2021-08-19 Pre-buried structure of building engineering water and electricity installation pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121973788.6U CN216078594U (en) 2021-08-19 2021-08-19 Pre-buried structure of building engineering water and electricity installation pipeline

Publications (1)

Publication Number Publication Date
CN216078594U true CN216078594U (en) 2022-03-18

Family

ID=80671117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121973788.6U Active CN216078594U (en) 2021-08-19 2021-08-19 Pre-buried structure of building engineering water and electricity installation pipeline

Country Status (1)

Country Link
CN (1) CN216078594U (en)

Similar Documents

Publication Publication Date Title
CN212583235U (en) House building engineering adds stationary form
CN216078594U (en) Pre-buried structure of building engineering water and electricity installation pipeline
CN213710393U (en) Municipal administration road bridge construction is with novel template fastening device
CN213575951U (en) Fixing device for water conservancy and hydropower construction embedded pipe
CN211447002U (en) Combined multifunctional foundation bolt positioning template
CN209856092U (en) Horizontal centrifugal pump base capable of being arranged in sliding mode
CN215671130U (en) Pump line combination formula vertical fixing device
CN211824399U (en) Level meter for house building safety inspection
CN214739940U (en) Building engineering template fixing device
CN212561622U (en) Building construction stagnant water steel sheet fixing device
CN213837686U (en) Fixing device convenient for preventing pedal from moving out of scaffold
CN215488007U (en) Anti-seismic support and hanger with anti-shearing force device
CN211949230U (en) Deviation prevention device for steel bar formwork
CN215107353U (en) Template fixing device for building engineering construction
CN211341607U (en) Building engineering mounting structure
CN219910041U (en) Component rotating device for steel structure building
CN213655906U (en) Node support for steel structure engineering
CN216590547U (en) Pipeline positioning support for water supply and drainage engineering
CN218326838U (en) A water supply pipe support for municipal works
CN213838023U (en) Building engineering protector
CN215803166U (en) A wooden template for civil engineering construction easy to assemble and disassemble
CN216007890U (en) Positioning support for regularization limb protection
CN215925729U (en) Crack reinforcing apparatus for bridge
CN214329895U (en) Upright column template
CN219119984U (en) Pipeline fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant