CN216076635U - Railing is prevented with combination formula to construction - Google Patents
Railing is prevented with combination formula to construction Download PDFInfo
- Publication number
- CN216076635U CN216076635U CN202122204713.8U CN202122204713U CN216076635U CN 216076635 U CN216076635 U CN 216076635U CN 202122204713 U CN202122204713 U CN 202122204713U CN 216076635 U CN216076635 U CN 216076635U
- Authority
- CN
- China
- Prior art keywords
- protective
- guard
- railing
- protective guard
- rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title description 3
- 230000001681 protective effect Effects 0.000 claims abstract description 67
- 238000009435 building construction Methods 0.000 claims abstract description 9
- 238000009434 installation Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a combined protective railing for building construction, which comprises a first protective railing and a second protective railing, wherein the first protective railing and the second protective railing are connected in a sliding manner; the first protective guard and the second protective guard respectively comprise two stand columns which are symmetrically arranged, two cross rods which are vertically arranged are fixedly connected between the stand columns, and two vertical rods are uniformly and fixedly connected between the upper cross rods and the lower cross rods. According to the utility model, the first protective guard and the second protective guard can slide relatively by arranging the slide rail, so that the length of the protective guard can be adjusted, the structure is simple, and the operation is convenient.
Description
Technical Field
The utility model belongs to the technical field of safety protective guards, and particularly relates to a combined protective guard for building construction.
Background
The protective fence is mainly used as a separator for separating, separating or temporarily handling accidents, and can be widely used in places such as traffic safety, urban roads, engineering construction, accident sites and the like; the existing guard rail is fixed in structure, the length of the existing guard rail cannot be adjusted according to use requirements, and a plurality of guard rails need to be spliced, so that the use limitation of the guard rail is caused.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a combined protective railing for building construction, which solves the problem that the use length of a protective railing cannot be adjusted in the prior art.
In order to solve the technical problems, the utility model adopts the technical scheme that: a combined protective railing for building construction comprises a first protective railing and a second protective railing, wherein the first protective railing and the second protective railing are connected in a sliding manner; the first protective guard and the second protective guard respectively comprise two stand columns which are symmetrically arranged, two cross rods which are vertically arranged are fixedly connected between the stand columns, and two vertical rods are uniformly and fixedly connected between the upper cross rods and the lower cross rods.
The sliding rail is arranged on the cross rod of the first protective guard and comprises a guide rail and a sliding block, and the cross rod of the second protective guard is provided with a connecting block which is connected with the sliding block.
The upright columns and the vertical rods of the second protective guard and the first protective guard are respectively provided with a mounting hole, and the second protective guard and the first protective guard are fixed through bolts.
Compared with the prior art, the utility model has the following advantages:
according to the utility model, the first protective guard and the second protective guard can slide relatively by arranging the slide rail, so that the length of the protective guard can be adjusted, the structure is simple, and the operation is convenient.
Drawings
Fig. 1 is a schematic view of a combined guard rail according to the present invention;
fig. 2 is a schematic view of a first guard rail according to the present invention;
fig. 3 is a schematic view of a second guard rail according to the present invention;
FIG. 4 is a schematic view of a slide rail according to the present invention;
fig. 5 is a top view of fig. 1.
In the figure, 1 a second protective guard, 2 bolts, 2-1 mounting holes, 3 sliding rails, 3-1 guide rails, 3-2 sliding blocks, 4 connecting blocks, 5 a first protective guard, 6 vertical rods, 7 vertical columns and 8 transverse rods.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in fig. 1, a combined guard rail for building construction comprises a first guard rail 5 and a second guard rail 1, wherein the first guard rail 5 and the second guard rail 1 are slidably connected; the first guard rail 5 and the second guard rail 1 respectively comprise two upright posts 7 which are symmetrically arranged, two cross rods 8 which are vertically arranged are fixedly connected between the upright posts 7, and two vertical rods 6 are uniformly and fixedly connected between the cross rods 8.
As shown in fig. 2, 3 and 4, in this embodiment, during actual installation, the vertical columns, the cross bars and the vertical bars are welded together, the cross bar of the first protective guard 5 is provided with a slide rail 3, the model of the slide rail 3 is LGDM1, the slide rail 3 includes at least two slide blocks 3-1 and 3-2, the slide block 3-2 on the guide rail 3-1 is provided with at least two slide blocks, the cross bar 8 of the second protective guard 1 is provided with a connecting block 4, the connecting block 4 is connected with the cross bar 8 through a bolt, and the connecting block 4 is connected with the slide block 3-2 through a bolt, so that the second protective guard 1 slides on the first protective guard 5, and the purpose of adjusting the use length of the protective guard is achieved; the upright post 7 and the vertical post 6 of the second protective guard 1 and the first protective guard 5 are respectively provided with a plurality of mounting holes 2-1, the mounting holes 2-1 are respectively arranged along the length direction of the upright post 7 and the length direction of the vertical post 6, the second protective guard 1 and the first protective guard 5 are fixed through bolts 2, and the length of the first protective guard 5 and the length of the second protective guard 1 after extension are fixed.
When the combined protective guard is used specifically, the combined protective guard is installed on a building construction site, the sliding rail 3 is started, the sliding block 3-2 slides on the sliding rail 3-1, the second protective guard 1 is further driven to slide along the length direction of the first protective guard 5, when the second protective guard 1 slides to a required length, the sliding rail 3 is closed, the sliding block 3-2 stops sliding, and the second protective guard 1 is fixed on the vertical rod 6 or the upright post 7 of the first protective guard 5 through the bolt 2.
According to the utility model, the first protective guard 5 and the second protective guard 1 can slide relatively by arranging the slide rail 3, so that the length of the protective guard can be adjusted, and the device has a simple structure and is convenient to operate.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and all simple modifications, changes and equivalent structural changes made to the above embodiment according to the technical spirit of the present invention still fall within the protection scope of the technical solution of the present invention.
Claims (3)
1. The combined protective railing for building construction is characterized by comprising a first protective railing (5) and a second protective railing (1), wherein the first protective railing (5) is connected with the second protective railing (1) in a sliding manner; first rail guard (5) and second rail guard (1) include stand (7) that two symmetries set up respectively, two cross rod (8) that fixedly connected with set up about two between stand (7), two about even fixedly connected with montant (6) between cross rod (8).
2. The combined type protective railing for building construction according to claim 1, characterized in that: the sliding rail (3) is arranged on a cross rod (8) of the first protective guard (5), the sliding rail (3) comprises a guide rail (3-1) and a sliding block (3-2), a connecting block (4) is arranged on the cross rod (8) of the second protective guard (1), and the connecting block (4) is connected with the sliding block (3-2).
3. The combined type protective railing for building construction according to claim 1, characterized in that: the upright post (7) and the upright post (6) of the second protective guard (1) and the first protective guard (5) are respectively provided with a mounting hole (2-1), and the second protective guard (1) and the first protective guard (5) are fixed through a bolt (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122204713.8U CN216076635U (en) | 2021-09-13 | 2021-09-13 | Railing is prevented with combination formula to construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122204713.8U CN216076635U (en) | 2021-09-13 | 2021-09-13 | Railing is prevented with combination formula to construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216076635U true CN216076635U (en) | 2022-03-18 |
Family
ID=80675943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122204713.8U Expired - Fee Related CN216076635U (en) | 2021-09-13 | 2021-09-13 | Railing is prevented with combination formula to construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216076635U (en) |
-
2021
- 2021-09-13 CN CN202122204713.8U patent/CN216076635U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110512517B (en) | Bridge engineering construction platform | |
CN216076635U (en) | Railing is prevented with combination formula to construction | |
CN215052475U (en) | Traffic road protective fence | |
CN112726426A (en) | Novel movable protective shed of bracket and steel pipe column combined gantry type | |
CN209799559U (en) | Safety guardrail of transformer substation | |
CN210529571U (en) | Road and bridge rail guard | |
CN214497216U (en) | Novel movable protective shed of bracket and steel pipe column combined gantry type | |
CN109209014B (en) | Guardrail structure of gate maintenance platform | |
CN212270702U (en) | Truss integral lifting type bridge high pier creeping formwork device | |
CN212670286U (en) | Anti-collision guardrail for highway bridge | |
CN210027398U (en) | Be applied to safety isolation protection shed structure in subway station rail line area | |
CN210658139U (en) | Road protective fence | |
CN209652820U (en) | A kind of anticollision highway barrier | |
CN220684477U (en) | Be used for hoisting machinery platform truck to face limit safety device | |
CN206767512U (en) | A kind of overhead prestressed tensioning suspender | |
CN218616677U (en) | Railway protective fence shocks resistance | |
CN217205818U (en) | Combined type road bed construction warning rail | |
CN216553335U (en) | Municipal construction rail guard | |
CN221298824U (en) | Bent cap support guardrail | |
CN210507231U (en) | Multistage highway safety protective guard | |
CN221400064U (en) | Protection device for traffic road construction | |
CN220099665U (en) | Outer mold climbing frame of column type pier | |
CN216840964U (en) | Safety device for municipal works management | |
CN217106463U (en) | Protection rail with cushioning effect for construction | |
CN216474546U (en) | Prefabricated box girder longitudinal prestress steel strand stretching protection frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220318 |