CN216076441U - Tower crane foundation protection device - Google Patents
Tower crane foundation protection device Download PDFInfo
- Publication number
- CN216076441U CN216076441U CN202122686911.2U CN202122686911U CN216076441U CN 216076441 U CN216076441 U CN 216076441U CN 202122686911 U CN202122686911 U CN 202122686911U CN 216076441 U CN216076441 U CN 216076441U
- Authority
- CN
- China
- Prior art keywords
- wire mesh
- steel wire
- tower crane
- frame body
- protection device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model provides a tower crane foundation protection device. This technical scheme adopts and suspends the mechanism in midair and plays the guard action to constructor in the below. Specifically, the frame body is used as a main body structure, and the high-strength steel wire mesh is used as a bearing object in the frame body and used for bearing people falling carelessly; in order to avoid the possibility of breaking the steel wire mesh as much as possible, the elastic lacing wires are arranged at intervals at the lower end of the steel wire mesh, so that the structural strength of the steel wire mesh is improved, and the adjacent elastic lacing wires can form transverse resistance to a human body at the moment when the human body contacts the steel wire mesh, thereby reducing the possibility of bouncing the human body for the second time. In addition, the binding belt is adopted to limit the safety rope, so that the compactness and the stability of the structure are improved. The utility model has simple structure, more reliable protection effect and outstanding technical advantages.
Description
Technical Field
The utility model relates to the technical field of tower crane installation, in particular to a tower crane foundation protection device.
Background
The tower crane is a crane which is the most commonly used in construction sites, is called a tower crane, is connected with standard sections, is used for hoisting construction raw materials such as reinforcing steel bars, wood ridges, concrete, steel pipes and the like, and is an essential device in construction sites.
The tower body of the tower crane has a rotation function and can be divided into a lower rotation tower crane and an upper rotation tower crane. The lower slewing tower crane has the advantages that slewing bearing, counterweight main mechanisms and the like are arranged at the lower end of the lower slewing tower crane: the tower type slewing bearing has the advantages of less bending moment, low gravity center, good stability and convenient installation and maintenance, and has the defects of higher requirement on the slewing bearing and limited installation height. Go up the tower crane of gyration tower with slewing bearing, balanced heavy, main mechanism all sets up in the upper end, its advantage is because the body of the tower does not revolve, can simplify body of the tower substructure, jacking join the convenience. The disadvantages are that: when the building surpassed the body of the tower height, because the influence of balance arm, the gyration of restriction tower crane, the focus was higher simultaneously, and the wind pressure increase, the ballast weight increases, makes the total weight of complete machine increase.
The stability of the tower crane is crucial, so the installation engineering of the tower crane has relatively high technical requirements. Firstly, whether the roadbed and the track are laid meet the requirements or not is checked, the ground anchor is buried, and the position of the ground anchor is determined according to the rotating and lifting direction of the vertical tower, the total height of the tower body and the like. The ground anchor is divided into a main ground anchor and an auxiliary ground anchor. The main anchor is the key for erecting the tower body, the whole load for rotatably lifting the tower body is borne by the main anchor, and the anchor is still needed to be used when the tower is disassembled, so the anchor must be carefully buried to achieve the required bearing capacity, and the corrosion prevention treatment is performed. The center of the ground anchor wheel is consistent with the center of the track gauge so as to ensure that the tower body rotates along the central plane of the track gauge all the time without generating eccentricity in the moving process of the tower body and ensure that the portal is stressed evenly. The auxiliary ground anchor is used as the anchoring point of the safety steel wire rope to prevent the tower body from falling in the opposite direction during the rotation process. In the tower crane installation project, a large amount of suspension operation is involved, so that the safety protection of workers is very important. The bearing points of the protective equipment for working aloft can be defined as fixing points for connecting life-saving ropes, safety ropes, speed-reducing equipment or other fall braking or rescuing systems. In the prior art, a conventional protection device relies on a safety rope for braking, so that the strength is relatively low, and the conventional protection device is related to the wearing state of constructors, so that the reliability needs to be improved.
Disclosure of Invention
The utility model aims to provide a tower crane foundation protection device aiming at the technical defects in the prior art so as to solve the technical problem that the reliability of a wearable safety protection device needs to be improved.
In order to achieve the technical purpose, the utility model adopts the following technical scheme:
the utility model provides a tower crane foundation protector, the fruit pick-up device comprises a frame body, the wire net, the elasticity lacing wire, the angle steel, the through-hole, the safety rope, the fixture, the banding area, the dead lever, the lifting hook, wherein, at the inside fixedly connected with wire net of framework, a plurality of elasticity lacing wires of fixedly connected with still in the inside of framework, a plurality of elasticity lacing wires hold in the palm in the wire net lower extreme, the four corners fixedly connected with angle steel in the framework, the through-hole has been seted up on the angle steel, the fixture is located the framework, the upper end of safety rope articulates on the fixture, be provided with the banding area at the middle part of safety rope, the lower extreme of safety rope articulates at the dead lever, the lifting hook has the lifting hook at the lower extreme of dead lever, the lifting hook articulates in the through-hole.
Preferably, the frame and the angle steel are fixedly connected by welding or fastening with bolts.
Preferably, the elastic lacing wires are parallel to each other, and the distance between every two adjacent elastic lacing wires is equal.
Preferably, a fence is fixedly connected to an upper end of the frame.
Preferably, the frame body is provided with an alarm button and a wireless module, and the alarm button is electrically connected with the wireless module.
The utility model provides a tower crane foundation protection device. This technical scheme adopts and suspends the mechanism in midair and plays the guard action to constructor in the below. Specifically, the frame body is used as a main body structure, and the high-strength steel wire mesh is used as a bearing object in the frame body and used for bearing people falling carelessly; in order to avoid the possibility of breaking the steel wire mesh as much as possible, the elastic lacing wires are arranged at intervals at the lower end of the steel wire mesh, so that the structural strength of the steel wire mesh is improved, and the adjacent elastic lacing wires can form transverse resistance to a human body at the moment when the human body contacts the steel wire mesh, thereby reducing the possibility of bouncing the human body for the second time. In addition, the binding belt is adopted to limit the safety rope, so that the compactness and the stability of the structure are improved. The utility model has simple structure, more reliable protection effect and outstanding technical advantages.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a side view of the present invention;
in the figure:
1. frame body 2, steel wire mesh 3, elastic lacing wire 4 and angle steel
5. Through hole 6, safety rope 7, fixture 8 and binding belt
9. Fixed pole 10, lifting hook.
Detailed Description
Hereinafter, specific embodiments of the present invention will be described in detail. Well-known structures or functions may not be described in detail in the following embodiments in order to avoid unnecessarily obscuring the details. Approximating language, as used herein in the following examples, may be applied to identify quantitative representations that could permissibly vary in number without resulting in a change in the basic function. Unless defined otherwise, technical and scientific terms used in the following examples have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.
Example 1
The utility model provides a tower crane basis protector, as shown in figure 1, as shown in figure 2, including framework 1, the wire net 2, elasticity lacing wire 3, angle steel 4, through-hole 5, safety rope 6, fixture 7, bundling belt 8, dead lever 9, lifting hook 10, wherein, inside fixedly connected with wire net 2 at framework 1, still a plurality of elasticity lacing wires 3 of fixedly connected with in framework 1's inside, a plurality of elasticity lacing wires 3 hold in the palm in wire net 2 lower extreme, fixedly connected with angle steel 4 in framework 1's four corners position, through-hole 5 has been seted up on angle steel 4, fixture 7 is located framework 1, the upper end of safety rope 6 articulates on fixture 7, be provided with bundling belt 8 at safety rope 6's middle part, safety rope 6's lower extreme articulates at dead lever 9, lower extreme at dead lever 9 has lifting hook 10, lifting hook 10 articulates in through-hole 5.
Example 2
The utility model provides a tower crane basis protector, as shown in figure 1, as shown in figure 2, including framework 1, the wire net 2, elasticity lacing wire 3, angle steel 4, through-hole 5, safety rope 6, fixture 7, bundling belt 8, dead lever 9, lifting hook 10, wherein, inside fixedly connected with wire net 2 at framework 1, still a plurality of elasticity lacing wires 3 of fixedly connected with in framework 1's inside, a plurality of elasticity lacing wires 3 hold in the palm in wire net 2 lower extreme, fixedly connected with angle steel 4 in framework 1's four corners position, through-hole 5 has been seted up on angle steel 4, fixture 7 is located framework 1, the upper end of safety rope 6 articulates on fixture 7, be provided with bundling belt 8 at safety rope 6's middle part, safety rope 6's lower extreme articulates at dead lever 9, lower extreme at dead lever 9 has lifting hook 10, lifting hook 10 articulates in through-hole 5. Wherein, the fixed connection of the frame body 1 and the angle iron 4 is welding or fastening connection through bolts. The elastic lacing wires 3 are parallel to each other, and the distance between every two adjacent elastic lacing wires 3 is equal. The upper end of the frame body 1 is fixedly connected with a fence. Be provided with alarm button and wireless module on framework 1, alarm button with wireless module electric connection.
The embodiments of the present invention have been described in detail, but the description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model. Any modification, equivalent replacement, and improvement made within the scope of the application of the present invention should be included in the protection scope of the present invention.
Claims (5)
1. A tower crane foundation protection device is characterized by comprising a frame body (1), a steel wire mesh (2), elastic tie bars (3), angle steel (4), through holes (5), a safety rope (6), a fixture (7), a binding belt (8), a fixed rod (9) and a lifting hook (10), wherein the steel wire mesh (2) is fixedly connected inside the frame body (1), a plurality of elastic tie bars (3) are fixedly connected inside the frame body (1), the elastic tie bars (3) are supported at the lower end of the steel wire mesh (2), the angle steel (4) is fixedly connected at the four corners of the frame body (1), the through holes (5) are formed in the angle steel (4), the fixture (7) is positioned on the frame body (1), the upper end of the safety rope (6) is hung on the fixture (7), the binding belt (8) is arranged in the middle of the safety rope (6), the lower end of the safety rope (6) is hung on the fixed rod (9), the lower end of the fixed rod (9) is provided with a lifting hook (10), and the lifting hook (10) is hung in the through hole (5).
2. The tower crane foundation protection device according to claim 1, wherein the frame body (1) and the angle steel (4) are fixedly connected by welding or fastening through bolts.
3. The tower crane foundation protection device according to claim 1, wherein the elastic tie bars (3) are parallel to each other, and the distance between every two adjacent elastic tie bars (3) is equal.
4. The tower crane foundation protection device according to claim 1, wherein a fence is fixedly connected to the upper end of the frame body (1).
5. The tower crane foundation protection device according to claim 1, wherein an alarm button and a wireless module are arranged on the frame body (1), and the alarm button is electrically connected with the wireless module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122686911.2U CN216076441U (en) | 2021-11-04 | 2021-11-04 | Tower crane foundation protection device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122686911.2U CN216076441U (en) | 2021-11-04 | 2021-11-04 | Tower crane foundation protection device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216076441U true CN216076441U (en) | 2022-03-18 |
Family
ID=80659137
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122686911.2U Active CN216076441U (en) | 2021-11-04 | 2021-11-04 | Tower crane foundation protection device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216076441U (en) |
-
2021
- 2021-11-04 CN CN202122686911.2U patent/CN216076441U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215717106U (en) | Hanging basket with protective structure | |
CN216076441U (en) | Tower crane foundation protection device | |
CN201530686U (en) | Super high-rise building top weight lifting equipment | |
CN205873594U (en) | Special construction elevator of cooling tower section of thick bamboo wall | |
CN104787687A (en) | Complex building tower crane adhesion device | |
CN210313196U (en) | Climbing cable hoisting system | |
CN202880719U (en) | Olecranon-shaped arm head of hoisting multiplying power winding rope of movable arm tower-type crane | |
CN210528311U (en) | Movable tower crane with damper | |
CN203794505U (en) | Internal climbing steel beam conveying device of internal climbing movable arm tower crane | |
CN108316732B (en) | A kind of T shape H profile steel prestressing force Self-resetting friction damped braced | |
CN205527415U (en) | Roofing hoist | |
CN210458987U (en) | Soft temporary pocket hoisting device is changed to jib | |
CN207276087U (en) | A kind of boom structure for building loop wheel machine | |
CN207243303U (en) | A kind of lifting tower crane based on engineering mechanics | |
CN206752292U (en) | One kind provides prestressed tension string beam structure using deadweight | |
CN202245789U (en) | Special typhoon prevention device for gantry crane | |
CN206571184U (en) | A kind of high rise elevator well construction safety device | |
CN213294466U (en) | Tower crane for building engineering | |
CN110359756A (en) | 750kV booster stations framework installation method | |
CN214423707U (en) | Suspension type pre-compaction device of roofing steel construction in large-span curtain construction | |
CN210828271U (en) | Convenient safe stores pylon of assembled | |
CN110158488A (en) | A kind of soft interim pocket device for hoisting of suspender replacement and construction method | |
CN215055167U (en) | Walking type steel platform | |
CN209583388U (en) | A kind of crawler crane component promoted for high-altitude long-span steel truss vestibule | |
CN106081913B (en) | Gin-pole truck control method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |