CN216075298U CN202121857829.5U CN202121857829U CN216075298U CN 216075298 U CN216075298 U CN 216075298U CN 202121857829 U CN202121857829 U CN 202121857829U CN 216075298 U CN216075298 U CN 216075298U
Authority
CN
China
Prior art keywords
plate
foundation
bulldozer
splice plate
splice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121857829.5U
Other languages
Chinese (zh)
Inventor
于海龙
王飞
王嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121857829.5U priority Critical patent/CN216075298U/en
Application granted granted Critical
Publication of CN216075298U publication Critical patent/CN216075298U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Soil Working Implements (AREA)

Abstract

The utility model belongs to the technical field of basic buildings, in particular to a building device for a basic building, which comprises a bulldozing plate and a groove plate guide rail, wherein an adjusting component is arranged on the groove plate guide rail; the adjusting assembly comprises sliding frames, driving assemblies, connecting sleeves, supporting columns and splicing plates, the sliding frames are arranged on the groove plate guide rails in a sliding mode, the connecting sleeves are fixedly connected between the two groups of sliding frames, the supporting columns are arranged inside the connecting sleeves, the bottom ends of the supporting columns are fixedly connected with one side of the bulldozing plate, and the splicing plates are arranged on two sides of the bulldozing plate; the adjusting assembly is added to the device, the multiple groups of splicing plates are installed, the soil pushing area can be increased, the foundation pits with different sizes can be conveniently used, the universality is high, meanwhile, the fixing assembly is added, the splicing plates and the soil pushing plates can be fixed, the soil in the foundation pits can be conveniently leveled, and the operation is simple.

Description

Building equipment for foundation building
Technical Field
The utility model belongs to the technical field of foundation buildings, and particularly relates to building equipment for foundation buildings.
Background
The foundation refers to the soil body or rock mass of the supporting foundation under the building, the soil layer as building foundation divide into rock, rubble soil, sand, silt, stickness soil and artifical filler soil, the foundation has natural foundation and artifical foundation (composite foundation) two types, natural foundation is the natural soil layer that does not need the people to consolidate, artifical foundation needs people to consolidate and handles, there is the stone chip bed course commonly, the sand bed course, mix the lime-soil and backfill tamp etc. again, be difficult to carry out convenient excavation to the foundation hole in the in-process of carrying out the foundation excavation, in the in-process of using, ground groove unevenness excavation, should not push away the tie during excavation, fashioned effect is not good, current mostly uses the bull-dozer board to push away the soil of inside the foundation ditch, but can't adjust according to the size of foundation ditch, can't use to the foundation ditch of equidimension not, the commonality is lower, be not convenient to use.
In order to solve the above problems, a construction equipment for foundation construction is proposed in the present application.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a building device for a foundation building, which has the characteristics of convenient size adjustment and simple operation.
In order to achieve the purpose, the utility model provides the following technical scheme: a building device for foundation construction comprises a bulldozing plate and a groove plate guide rail, wherein an adjusting component is arranged on the groove plate guide rail;
the adjusting part comprises a sliding frame, a driving part, a connecting sleeve, a supporting column and a splicing plate, wherein the sliding frame is arranged on the groove plate guide rail in a sliding mode, the sliding frame is arranged in a two-group mode, the connecting sleeve is fixedly connected between the sliding frames, the inside of the connecting sleeve is provided with the supporting column, the bottom end of the supporting column is fixedly connected with one side of the bulldozing plate, the two sides of the bulldozing plate are provided with the splicing plate, the groove plate guide rail is provided with the driving part, and the output end of the driving part is fixedly connected with one side of the sliding frame.
Preferably, the adjusting assembly further comprises a limiting rod, the supporting column is provided with a plurality of groups of limiting holes, and one end of the limiting rod penetrates through the connecting sleeve and extends into one group of limiting holes.
Preferably, the first mounting grooves are formed in both sides of the bulldozer blade.
Preferably, one side of each splice plate is fixedly connected with an installation block matched with the first installation groove, and one side of each splice plate, which is far away from the bulldozer, is provided with a second installation groove.
Preferably, the first installation groove and the second installation groove have the same size.
Preferably, the bulldozer and the splice plate are both provided with a plurality of groups of through holes.
Preferably, a fixing assembly is arranged between the bulldozing plate and the splicing plates and comprises a fixing plate and fastening bolts, one side of the bulldozing plate and one side of the splicing plates are provided with the fixing plate, four groups of fastening bolts are arranged on the fixing plate, and the bulldozing plate is fixedly connected with the splicing plates through the fastening bolts.
Compared with the prior art, the utility model has the beneficial effects that: the adjusting assembly is added to the device, the multiple groups of splicing plates are installed, the soil pushing area can be increased, the foundation pits with different sizes can be conveniently used, the universality is high, meanwhile, the fixing assembly is added, the splicing plates and the soil pushing plates can be fixed, the soil in the foundation pits can be conveniently leveled, and the operation is simple.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the principles of the utility model and not to limit the utility model. In the drawings:
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a side view of the slot plate guide of the present invention;
FIG. 3 is a side view of the connection of the support post and the dozer plate of the present invention;
FIG. 4 is a schematic view of the connection of the blade and the splice plate of the present invention;
FIG. 5 is an enlarged schematic view of the blade and splice plate of the present invention;
FIG. 6 is a side view of the connection of the blade and the splice bar of the present invention;
in the figure:
10. a channel plate guide rail; 11. a bulldozer plate;
20. an adjustment assembly; 21. a carriage; 22. a drive assembly; 23. connecting sleeves; 24. a support pillar; 241. a limiting hole; 25. a limiting rod; 26. splicing plates; 261. mounting blocks; 262. a second mounting groove; 27. perforating; 28. a first mounting groove;
30. a fixing assembly; 31. a fixing plate; 32. and fastening the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
As shown in fig. 1:
a construction equipment for foundation construction comprises a dozer plate 11 and a slot plate guide 10.
In this embodiment: the bull dozer 11 through promoting the setting removes in the inside of foundation ditch, can push away the level with the soil in the foundation ditch, but can't adjust according to the size of foundation ditch, can not be to the not foundation ditch use of equidimension, the commonality is lower, be not convenient for use, for this reason, increase adjusting part 20 and fixed subassembly 30 on current wall cleaning device, adopt this mode, through installing multiunit splice plate 26, and then can increase the area of bulldozing, be convenient for use at the not foundation ditch of equidimension, the commonality is higher, can fix splice plate 26 and bull dozer 11, be convenient for with the soil flattening in the foundation ditch, and is easy to operate.
Further, the method comprises the following steps:
as shown in fig. 1, 2, 3, 4 and 5:
an adjusting component 20 is arranged on the groove plate guide rail 10; the adjusting component 20 comprises a sliding frame 21, a driving component 22, a connecting sleeve 23, a supporting column 24 and a splicing plate 26, the sliding frame 21 is arranged on the trough plate guide rail 10 in a sliding mode, the connecting sleeve 23 is fixedly connected between the two groups of sliding frames 21, the supporting column 24 is arranged inside the connecting sleeve 23, the bottom end of the supporting column 24 is fixedly connected with one side of the bulldozer blade 11, the splicing plates 26 are arranged on two sides of the bulldozer blade 11, the driving component 22 is arranged on the trough plate guide rail 10, and the output end of the driving component 22 is fixedly connected with one side of the sliding frame 21.
In this embodiment: when using, at first place two sets of frid guide rails 10 respectively in the both sides of foundation ditch and fix, the rethread starts the drive assembly 22 that sets up, and then can make carriage 21 remove on frid guide rails 10, further can drive the bull dozer 11 that sets up and remove and push away the tie at the inside of foundation ditch, can install multiunit splice plate 26 in the both sides of bull dozer 11 according to the size of foundation ditch, and then be applicable to the foundation ditch of equidimension not.
It should be noted that: the arranged bulldozer plate 11 and the splice plate 26 both have certain bending radians, so that soil can be pushed flat conveniently.
In an alternative embodiment: the adjusting assembly 20 further includes a limiting rod 25, the supporting column 24 is provided with a plurality of sets of limiting holes 241, and one end of the limiting rod 25 penetrates through the connecting sleeve 23 and extends into the set of limiting holes 241.
In this embodiment: through adjusting the vertical distance of adapter sleeve 23 and support column 24, and then can use to the foundation ditch of the different degree of depth, the bottom of the bull dozer 11 that until setting up is located the bottom of foundation ditch, installs the gag lever post 25 that sets up again in the inside of the spacing hole 241 that corresponds, and then can fix adapter sleeve 23 and support column 24.
In an alternative embodiment: the first mounting grooves 28 are formed on both sides of the blade 11.
In this embodiment: through having all seted up first mounting groove 28 in the both sides of bull dozer 11, be convenient for install the installation piece 261 of splice plate 26 one side in the inside of first mounting groove 28, be convenient for install splice plate 26 and bull dozer 11.
In an alternative embodiment: the mounting block 261 matched with the first mounting groove 28 is fixedly connected to one side of the splice plate 26, and the second mounting groove 262 is formed in one side, away from the bulldozer blade 11, of the splice plate 26.
In this embodiment: cooperate through the installation piece 261 that sets up with first mounting groove 28, be convenient for install splice plate 26 and bull dozer 11, through having seted up second mounting groove 262 in one side of splice plate 26, be convenient for install another group splice plate 26 in one side of a set of splice plate 26, be convenient for splice the installation with two sets of splice plates 26 that are adjacent, be convenient for through installing multiunit splice plate 26, and then can be applicable to the not foundation ditch of equidimension.
In an alternative embodiment: the first mounting groove 28 is the same size as the second mounting groove 262.
In this embodiment: through the first mounting groove 28 and the second mounting groove 262 that set up the size the same, be convenient for install the installation piece 261 in the inside of corresponding first mounting groove 28 or second mounting groove 262, be convenient for carry out the concatenation installation.
In an alternative embodiment: the bulldozer blade 11 and the splice plate 26 are both provided with a plurality of groups of through holes 27.
In this embodiment: all seted up multiunit perforation 27 on the bull dozer 11 through setting up and splice plate 26, can sieve the clod for great clod and little clod separation are convenient for to the foundation ditch flattening.
Further, the method comprises the following steps:
as shown in fig. 1 and 6:
a fixing assembly 30 is arranged between the bulldozer plate 11 and the splice plate 26, the fixing assembly 30 comprises a fixing plate 31 and fastening bolts 32, the fixing plate 31 is arranged on one side of the bulldozer plate 11 and the splice plate 26, four groups of fastening bolts 32 are arranged on the fixing plate 31, and the bulldozer plate 11 is fixedly connected with the splice plate 26 through the fastening bolts 32.
In this embodiment: for further fixing the bulldozer blade 11 and the splice plate 26, a fixing plate 31 can be installed between the bulldozer blade 11 and the splice plate 26 through a fastening bolt 32, the fixing plate 31 to be set is fixed on one side of the bulldozer blade 11 and the splice plate 26, and then the bulldozer blade 11 and the splice plate 26 can be fixed, so that the stability is improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the utility model. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. Construction equipment for foundation construction, comprising a dozer plate (11) and a channel plate guide (10), characterized in that: an adjusting component (20) is arranged on the groove plate guide rail (10);
adjusting part (20) include carriage (21), drive assembly (22), adapter sleeve (23), support column (24) and splice plate (26), it is provided with all to slide on frid guide rail (10) carriage (21), two sets of fixedly connected with between carriage (21) adapter sleeve (23), the inside of adapter sleeve (23) is provided with support column (24), the bottom of support column (24) with one side fixed connection of bull dozer (11), the both sides of bull dozer (11) all are provided with splice plate (26), be provided with on frid guide rail (10) drive assembly (22), the output of drive assembly (22) with one side fixed connection of carriage (21).
2. Construction equipment for foundation construction according to claim 1, characterized in that: the adjusting component (20) further comprises a limiting rod (25), a plurality of groups of limiting holes (241) are formed in the supporting column (24), and one end of the limiting rod (25) penetrates through the connecting sleeve (23) and extends to one group of the limiting holes (241).
3. Construction equipment for foundation construction according to claim 1, characterized in that: first mounting grooves (28) are formed in the two sides of the bulldozer plate (11).
4. Construction equipment for foundation construction according to claim 3, characterized in that: and one side of the splice plate (26) is fixedly connected with an installation block (261) matched with the first installation groove (28), and one side of the splice plate (26) far away from the bulldozer (11) is provided with a second installation groove (262).
5. Construction equipment for foundation construction according to claim 4, characterized in that: the first mounting groove (28) is the same size as the second mounting groove (262).
6. Construction equipment for foundation construction according to claim 1, characterized in that: the bulldozer (11) and the splice plate (26) are both provided with a plurality of groups of through holes (27).
7. Construction equipment for foundation construction according to claim 1, characterized in that: a fixing assembly (30) is arranged between the bulldozer plate (11) and the splice plate (26), the fixing assembly (30) comprises a fixing plate (31) and fastening bolts (32), the fixing plate (31) is arranged on one side of the bulldozer plate (11) and one side of the splice plate (26), four groups of the fastening bolts (32) are arranged on the fixing plate (31), and the bulldozer plate (11) is fixedly connected with the splice plate (26) through the fastening bolts (32).
CN202121857829.5U 2021-08-10 2021-08-10 Building equipment for foundation building Expired - Fee Related CN216075298U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121857829.5U CN216075298U (en) 2021-08-10 2021-08-10 Building equipment for foundation building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121857829.5U CN216075298U (en) 2021-08-10 2021-08-10 Building equipment for foundation building

Publications (1)

Publication Number Publication Date
CN216075298U true CN216075298U (en) 2022-03-18

Family

ID=80668981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121857829.5U Expired - Fee Related CN216075298U (en) 2021-08-10 2021-08-10 Building equipment for foundation building

Country Status (1)

Country Link
CN (1) CN216075298U (en)

Similar Documents

Publication Publication Date Title
CN216075298U (en) Building equipment for foundation building
CN213329104U (en) Utility tunnel node position road subtracts heavy device
CN211922135U (en) Prevent subsiding highway subgrade
CN219410885U (en) Combined reinforcing structure for pit wall of deep foundation pit
CN110030004B (en) Method for excavating barrier lake drainage tunnel
CN112112242A (en) Roadbed structure based on rainwater storage and regulation system and construction method thereof
CN213681532U (en) Town road roadbed structure
CN206034460U (en) Subway foundation pit liftable support system
CN214301783U (en) Civil engineering foundation pit slope protection structure
CN211228521U (en) Frame bridge supporting construction
CN209083291U (en) A kind of suspension device for Used in Shallow Mining Tunnel with Large Span
CN111926834A (en) Non-excavation type micro pile group/pile bundle plate wall supporting structure and construction method
CN111455932A (en) Laying method of separated building blocks applied to reservoir protection slope
CN217105162U (en) Be applicable to municipal construction ground-based support strengthening mechanism
CN219690536U (en) Foundation pit does not have waist rail stake anchor supporting construction
CN217840021U (en) Underground foundation pit supporting device for building construction
CN217681792U (en) Arch foot supporting pad device for mechanical excavation of hard rock tunnel
CN217204236U (en) Even arch form assembled ecological retaining wall structure
CN221320545U (en) Soft soil roadbed and normal roadbed juncture anti-sedimentation structure
CN113403902B (en) Splicing widening structure for light soil of new and old roadbed based on assembled template
CN219060090U (en) Collapsible highway section side slope support group frame
CN217419669U (en) Trench reservation system for cast-in-situ lining of canal
CN219195997U (en) Ecological slope protection structure applied to mud flat
CN213867760U (en) Composite plastic drainage plate
CN211228668U (en) Convenient fixed grooving device for ballast at bottom of ballast railway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220318

CF01 Termination of patent right due to non-payment of annual fee