CN216072813U - Construction device of assembled pier - Google Patents

Construction device of assembled pier Download PDF

Info

Publication number
CN216072813U
CN216072813U CN202122023170.XU CN202122023170U CN216072813U CN 216072813 U CN216072813 U CN 216072813U CN 202122023170 U CN202122023170 U CN 202122023170U CN 216072813 U CN216072813 U CN 216072813U
Authority
CN
China
Prior art keywords
fixedly connected
pressure spring
collision plate
assembled pier
construction equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122023170.XU
Other languages
Chinese (zh)
Inventor
黄联锋
钱国飞
韩铁军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fengfa Group Co ltd
Original Assignee
Fengfa Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fengfa Group Co ltd filed Critical Fengfa Group Co ltd
Priority to CN202122023170.XU priority Critical patent/CN216072813U/en
Application granted granted Critical
Publication of CN216072813U publication Critical patent/CN216072813U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a construction device of an assembled pier, which belongs to the field of construction devices and comprises a main body, wherein the construction device comprises a crane body, the outer surface of the upper end of the crane body is fixedly connected with a main cab, the outer surfaces of two sides of the main cab are fixedly connected with a fixed block and a telescopic fixed frame, one end of the telescopic fixed frame is detachably connected with a mounting ring, the outer surface of the upper end of the fixed block is fixedly connected with a reinforcing rod, the outer surface of one end of the reinforcing rod is fixedly connected with an anti-collision plate, and the outer surface of the upper end of the anti-collision plate is fixedly connected with a first pressure spring. The arrangement has better safety, and when the hoisted object falls off, the main cockpit can be protected, so that tragic events are avoided, and the personal safety of workers is guaranteed; this setting up stability is better, when lifting by crane heavier object, the land fertility of grabbing of automobile body and ground will be big to avoided the possibility that the lifting machine rocked, perk, the practicality is stronger.

Description

Construction device of assembled pier
Technical Field
The utility model belongs to the field of construction devices, and particularly relates to a construction device of an assembled pier.
Background
The middle supporting structure of the multi-span bridge is called as a pier, the pier is divided into a solid pier, a column pier, a bent pier and the like, the pier can be divided into a rectangular pier, a pointed pier, a round pier and the like according to the plane shape, the material for building the pier can be wood, stone, concrete, reinforced concrete, steel and the like, and a crane is needed to lift the pier due to the fact that the pier is heavy, however, a construction device of the assembly type pier on the market still has various defects and cannot meet the production requirement.
The safety of the existing crane is low, when the hoisted object drops, the main cockpit cannot be protected, so that tragic events are caused, secondly, the stability of the crane is relatively deficient, and when the crane lifts a heavy object, the ground gripping force of a vehicle body and the ground is small, so that the crane is caused to shake and tilt, the practicability is low, and therefore the construction device of the assembled pier is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a construction device of an assembly pier, and the construction device is used for solving the problems of high safety and high stability of the construction device of the assembly pier in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: a construction device of an assembled pier comprises a crane body, wherein the outer surface of the upper end of the crane body is fixedly connected with a main cab, the outer surfaces of the two sides of the main cab are fixedly connected with a fixed block and a telescopic fixed frame, one end of the telescopic fixed frame is detachably connected with a mounting ring, the outer surface of the upper end of the fixed block is fixedly connected with a reinforcing rod, the outer surface of one end of the reinforcing rod is fixedly connected with an anti-collision plate, the outer surface of the upper end of the anti-collision plate is fixedly connected with a first pressure spring, the outer surface of one end of the first pressure spring is fixedly connected with an iron plate, the inner surfaces of the two ends of the anti-collision plate are fixedly connected with cushion pads, the outer surface of one end of each cushion pad is fixedly connected with a second pressure spring, the middle part of the mounting ring is provided with a fixed hole, the outer wall of the mounting ring is fixedly connected with a supporting rod, and the outer surface of one end of the supporting rod is fixedly connected with a supporting seat, the outer surface middle part fixedly connected with telescopic link of collar, the one end external surface fixedly connected with casing of telescopic link, the lower extreme external surface fixedly connected with hydraulic stem of casing, the one end external surface fixedly connected with support ring of hydraulic stem.
Preferably, the upper end surface of fixed block and the one end surface welded connection of stiffener, the one end surface of stiffener and the lower extreme surface welded connection of crashproof board, the stiffener is convenient for support crashproof board and iron plate, and intensity is higher, and is safer.
Preferably, be provided with fixed buckle between crashproof board and the first pressure spring, crashproof board's upper end surface is connected through fixed buckle and first pressure spring's one end surface fixed, utilizes first pressure spring's elasticity, can slow down the impact force that the object dropped, reduces the spoilage.
Preferably, the outer surface of the other end of the first pressure spring is welded and connected with the outer surface of the lower end of the iron plate, an object falls accidentally, the iron plate can block the object, and personal safety of workers is guaranteed.
Preferably, be provided with stickness and fixed plate between crashproof board and the blotter, the both ends internal surface of crashproof board passes through stickness and fixed plate and the one end fixed surface of blotter, be provided with mounting groove and cardboard between blotter and the second pressure spring, the other end surface of blotter passes through the other end fixed surface of mounting groove and cardboard and second pressure spring and is connected, and blotter and the second pressure spring in the crashproof board have certain elasticity equally, and elastic potential energy offsets each other with the impact force that the object dropped to slow down impact strength, avoid the object directly to pound to main cockpit, staff's personal safety obtains effectual guarantee.
Preferably, the outer wall of collar and the one end surface welded connection of bracing piece, the one end surface of bracing piece and the upper end middle part welded connection of supporting seat support the loop wheel machine body fixedly through bracing piece and supporting seat, increase its area of contact with ground, improve stability.
Preferably, the outer surface of one end of the hydraulic rod is connected with the middle part of the upper end of the support ring in a welding mode, the hydraulic rod also operates when the telescopic fixing frame stretches out and draws back, the support ring is made to be in contact with the ground, and the stability of the crane body is further enhanced.
Compared with the prior art, the utility model has the beneficial effects that:
1. through installing the fixed block on main cockpit, crash bar supports crashproof board and iron plate, when lifting by crane the object, the object accident falls, iron plate can block the object, and utilize first pressure spring's elasticity, can slow down the impact force that the object dropped, and blotter and second pressure spring in the crash proof board have certain elasticity equally, elastic potential energy offsets each other with the impact force that the object dropped, thereby slow down impact strength, avoid the object directly to pound to main cockpit, staff's personal safety obtains effectual guarantee, this sets up the security better, when the object that lifts by crane drops, can protect main cockpit, avoid the emergence of tragic, make staff's personal safety obtain the guarantee.
2. Through installing the casing in crane body bottom, the collar is connected with flexible mount, when crane body lifts by crane the pier, flexible mount is flexible to both sides, thereby it is flexible to drive the telescopic link, flexible to the assigned position after, rethread bracing piece and supporting seat support the crane body fixedly, increase its area of contact with ground, stability is improved, and when flexible mount is flexible, the hydraulic stem also functions, make support ring and ground contact, further reinforcing crane body's stability, this sets up stability better, when lifting by crane heavier object, the automobile body will be big with the ground power of grabbing of ground, thereby avoided crane to rock, the possibility of perk, the practicality is stronger.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the fixing block of FIG. 1 according to the present invention;
FIG. 3 is a schematic view of the inner structure of the bumper plate shown in FIG. 2 according to the present invention;
FIG. 4 is a schematic view of the present invention and the mounting ring of FIG. 1;
fig. 5 is an enlarged schematic view of the structure at a in fig. 4 according to the present invention.
In the figure: 1. a crane body; 2. a main cockpit; 3. a fixed block; 4. a telescopic fixing frame; 5. a mounting ring; 6. a reinforcing bar; 7. an anti-collision plate; 8. a first pressure spring; 9. an iron plate; 10. a cushion pad; 11. a second pressure spring; 12. a fixing hole; 13. a support bar; 14. a supporting seat; 15. a telescopic rod; 16. a housing; 17. a hydraulic lever; 18. and (3) supporting the ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: a construction device of an assembled pier comprises a crane body 1, a main cab 2 is fixedly connected to the outer surface of the upper end of the crane body 1, a fixed block 3 and a telescopic fixed frame 4 are fixedly connected to the outer surfaces of two sides of the main cab 2, one end of the telescopic fixed frame 4 is detachably connected with a mounting ring 5, a reinforcing rod 6 is fixedly connected to the outer surface of the upper end of the fixed block 3, an anti-collision plate 7 is fixedly connected to the outer surface of one end of the reinforcing rod 6, a first pressure spring 8 is fixedly connected to the outer surface of the upper end of the anti-collision plate 7, an iron plate 9 is fixedly connected to the outer surface of one end of the first pressure spring 8, a cushion 10 is fixedly connected to the inner surfaces of two ends of the anti-collision plate 7, a second pressure spring 11 is fixedly connected to the outer surface of one end of the cushion 10, a fixing hole 12 is formed in the middle part of the mounting ring 5, a support rod 13 is fixedly connected to the outer surface of one end of the support rod 14, the outer surface middle part fixedly connected with telescopic link 15 of collar 5, the one end external surface fixedly connected with casing 16 of telescopic link 15, the lower extreme external surface fixedly connected with hydraulic stem 17 of casing 16, the one end external surface fixedly connected with support ring 18 of hydraulic stem 17.
In the embodiment, the fixing block 3 is arranged on the main cockpit 2, the reinforcing rod 6 supports the anti-collision plate 7 and the iron plate 9, when an object is lifted, the object accidentally falls, the iron plate 9 can block the object, the falling impact force of the object can be relieved by utilizing the elasticity of the first pressure spring 8, the buffer cushion 10 and the second pressure spring 11 in the anti-collision plate 7 also have certain elasticity, the elastic potential energy and the falling impact force of the object are mutually offset, so that the impact strength is relieved, the object is prevented from being directly hit to the main cockpit 2, and the personal safety of workers is effectively guaranteed; through installing casing 16 in crane body 1 bottom, collar 5 is connected with flexible mount 4, when crane body 1 lifts by crane the pier, flexible mount 4 is flexible to both sides, thereby it is flexible to drive telescopic link 15, flexible to the assigned position after, rethread bracing piece 13 and supporting seat 14 support crane body 1 fixedly, increase its area of contact with ground, and stability is improved, and flexible mount 4 is flexible in the time, hydraulic stem 17 also functions, make support ring 18 and ground contact, further reinforcing crane body 1's stability, this sets up stability better, when lifting by crane heavier object, the land fertility of grabbing of automobile body and ground will be big, thereby avoided the crane to rock, the possibility of perk, the practicality is stronger.
Specifically, the outer surface of the upper end of the fixing block 3 is welded to the outer surface of one end of the reinforcing rod 6, and the outer surface of one end of the reinforcing rod 6 is welded to the outer surface of the lower end of the anti-collision plate 7.
In this embodiment, the reinforcing bar 6 is convenient for supporting the crash-proof plate 7 and the iron plate 9, and has higher strength and higher safety.
Specifically, a fixing buckle is arranged between the anti-collision plate 7 and the first pressure spring 8, and the outer surface of the upper end of the anti-collision plate 7 is fixedly connected with the outer surface of one end of the first pressure spring 8 through the fixing buckle.
In this embodiment, the impact force of falling objects can be reduced by the elasticity of the first pressure spring 8, and the damage rate is reduced.
Specifically, the outer surface of the other end of the first pressure spring 8 is welded to the outer surface of the lower end of the iron plate 9.
In the embodiment, the object falls accidentally, and the iron plate 9 can block the object, so that the personal safety of the worker is guaranteed.
Specifically, be provided with stickness and fixed plate between crashproof board 7 and blotter 10, the both ends internal surface of crashproof board 7 passes through stickness and fixed plate and the one end external fixed surface of blotter 10 to be connected, is provided with mounting groove and cardboard between blotter 10 and the second pressure spring 11, and the other end surface of blotter 10 passes through mounting groove and cardboard and the other end external fixed surface of second pressure spring 11 to be connected.
In this embodiment, the cushion pad 10 and the second pressure spring 11 in the anti-collision plate 7 also have certain elasticity, and the elastic potential energy and the impact force of the object falling are offset with each other, so as to slow down the impact strength, prevent the object from directly pounding the main cockpit 2, and effectively ensure the personal safety of the staff.
Specifically, the outer wall of the mounting ring 5 is welded to the outer surface of one end of the support rod 13, and the outer surface of one end of the support rod 13 is welded to the middle of the upper end of the support seat 14.
In this embodiment, the crane body 1 is supported and fixed by the support rod 13 and the support base 14, so that the contact area between the crane body and the ground is increased, and the stability is improved.
Specifically, the outer surface of one end of the hydraulic rod 17 is welded and connected with the middle part of the upper end of the support ring 18.
In this embodiment, when the telescopic fixing frame 4 is telescopic, the hydraulic rod 17 also operates to make the support ring 18 contact with the ground, so as to further enhance the stability of the crane body 1.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a construction equipment of assembled pier, includes crane body (1), its characterized in that: the outer surface of the upper end of the crane body (1) is fixedly connected with a main cab (2), the outer surfaces of the two sides of the main cab (2) are fixedly connected with a fixed block (3) and a telescopic fixing frame (4), one end of the telescopic fixing frame (4) is detachably connected with a mounting ring (5), the outer surface of the upper end of the fixed block (3) is fixedly connected with a reinforcing rod (6), the outer surface of one end of the reinforcing rod (6) is fixedly connected with an anti-collision plate (7), the outer surface of the upper end of the anti-collision plate (7) is fixedly connected with a first pressure spring (8), the outer surface of one end of the first pressure spring (8) is fixedly connected with an iron plate (9), the inner surfaces of the two ends of the anti-collision plate (7) are fixedly connected with cushion pads (10), the outer surface of one end of the cushion pads (10) is fixedly connected with a second pressure spring (11), a fixing hole (12) is formed in the middle part of the mounting ring (5), the outer wall fixedly connected with bracing piece (13) of collar (5), the one end external surface fixedly connected with supporting seat (14) of bracing piece (13), the surface middle part fixedly connected with telescopic link (15) of collar (5), the one end external surface fixedly connected with casing (16) of telescopic link (15), the lower extreme external surface fixedly connected with hydraulic stem (17) of casing (16), the one end external surface fixedly connected with support ring (18) of hydraulic stem (17).
2. The construction equipment of an assembled pier according to claim 1, wherein: the outer surface of the upper end of the fixing block (3) is connected with the outer surface of one end of the reinforcing rod (6) in a welded mode, and the outer surface of one end of the reinforcing rod (6) is connected with the outer surface of the lower end of the anti-collision plate (7) in a welded mode.
3. The construction equipment of an assembled pier according to claim 1, wherein: a fixing buckle is arranged between the anti-collision plate (7) and the first pressure spring (8), and the outer surface of the upper end of the anti-collision plate (7) is fixedly connected with the outer surface of one end of the first pressure spring (8) through the fixing buckle.
4. The construction equipment of an assembled pier according to claim 1, wherein: the outer surface of the other end of the first pressure spring (8) is connected with the outer surface of the lower end of the iron plate (9) in a welding mode.
5. The construction equipment of an assembled pier according to claim 1, wherein: be provided with stickgum and fixed plate between crashproof board (7) and blotter (10), the both ends internal surface of crashproof board (7) passes through stickgum and fixed plate and the one end external surface fixed connection of blotter (10), be provided with mounting groove and cardboard between blotter (10) and second pressure spring (11), the other end external surface fixed connection of the other end surface of blotter (10) through mounting groove and cardboard and second pressure spring (11).
6. The construction equipment of an assembled pier according to claim 1, wherein: the outer wall of the mounting ring (5) is connected with the outer surface of one end of the supporting rod (13) in a welded mode, and the outer surface of one end of the supporting rod (13) is connected with the middle of the upper end of the supporting seat (14) in a welded mode.
7. The construction equipment of an assembled pier according to claim 1, wherein: the outer surface of one end of the hydraulic rod (17) is connected with the middle part of the upper end of the support ring (18) in a welding mode.
CN202122023170.XU 2021-08-25 2021-08-25 Construction device of assembled pier Active CN216072813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122023170.XU CN216072813U (en) 2021-08-25 2021-08-25 Construction device of assembled pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122023170.XU CN216072813U (en) 2021-08-25 2021-08-25 Construction device of assembled pier

Publications (1)

Publication Number Publication Date
CN216072813U true CN216072813U (en) 2022-03-18

Family

ID=80672158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122023170.XU Active CN216072813U (en) 2021-08-25 2021-08-25 Construction device of assembled pier

Country Status (1)

Country Link
CN (1) CN216072813U (en)

Similar Documents

Publication Publication Date Title
CN216072813U (en) Construction device of assembled pier
CN103663121A (en) Crane hook protective device
CN215666473U (en) Anti-overturning structure of traction machine
CN210286557U (en) Lifting support leg for crane
CN211594715U (en) Anti-tilting support of traction machine and machine placing beam of elevator
CN209636656U (en) Steel box-girder suspension bridge dismounts soft rope device
CN214087382U (en) Counterweight for load test of automobile crane
CN107740310A (en) A kind of novel high-elasticity vibration damping iron chair
CN214652942U (en) Safety protection structure for building crane
CN217048535U (en) Front bumper fixing seat device and mining dump truck
CN217264394U (en) Safe efficient strenghthened type lifting hook bridge crane
CN213865252U (en) Fork truck tail fly jib hangs
CN215801060U (en) Simple safety protection device for prefabricated bent cap
CN218621805U (en) Bridge guardrail that security is good
CN220011914U (en) Falling protection device for inverted electric hoist
CN215107384U (en) Instrument formula superimposed sheet overhauls protection frame
CN219669977U (en) Safe and quick replacement device for crane buffer
CN218371384U (en) AGV portal crane
CN202704884U (en) Crawling crane
CN217500375U (en) Crawler-type hydraulic shovel driver operation safety protection structure
CN215048218U (en) Crane buffering device
CN217652291U (en) Cage device for mounting bracket of internal climbing type movable arm tower crane
CN209668652U (en) A kind of anti-tower crane suspension hook is rushed to summit the safety guard that disconnected rope falls
CN216155297U (en) Special buffer gear of ocean engineering hoist and mount operation
CN211004251U (en) Crane assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant