CN216062529U - Dust device is used in highway construction - Google Patents
Dust device is used in highway construction Download PDFInfo
- Publication number
- CN216062529U CN216062529U CN202122512889.XU CN202122512889U CN216062529U CN 216062529 U CN216062529 U CN 216062529U CN 202122512889 U CN202122512889 U CN 202122512889U CN 216062529 U CN216062529 U CN 216062529U
- Authority
- CN
- China
- Prior art keywords
- water tank
- embedded
- strip
- spraying
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
Abstract
The utility model relates to the technical field of highway engineering, and discloses a dust-settling device for highway construction, which comprises a water tank and a frame arranged at the lower end of the water tank, wherein a lifting component is arranged inside the upper end of the water tank, the water tank comprises a component groove arranged inside the upper end of the water tank and first embedded grooves arranged at two sides of the water tank, the water tank also comprises an embedded plate embedded inside the first embedded groove and a water cavity arranged inside the water tank, the lifting component is embedded inside the component groove, as the first U-shaped pipe is communicated with the water cavity through a water pipe, water inside the water cavity can enter the first U-shaped pipe, downward atomization spraying is carried out through a lower atomization spray head, as the frame is arranged at the lower end of the water tank, the frame can be pushed to move, so as to carry out movable atomization spraying dust-settling, an electric telescopic rod is driven to drive a lifting strip and a spraying strip to rise, and the upper atomization spray head can carry out upward atomization spraying, the movable type is convenient to spray dust fall to high-low position.
Description
Technical Field
The utility model relates to the technical field of highway engineering, in particular to a dust falling device for highway construction.
Background
Highway engineering refers to works such as reconnaissance, measurement, design, construction, maintenance, management of highway structure, and highway engineering structure includes: roadbeds, pavements, bridges, culverts, tunnels, drainage systems, safety protection facilities, greening and traffic monitoring facilities, and houses, workshops and other service facilities used for construction, maintenance and monitoring.
When being under construction to the highway, under mechanical action or artificial action, all can produce a large amount of dust suspensions aloft, easily influence the construction field of vision, and can threaten personnel healthy, and the dust device carries out the dust fall to height department position that traditional for highway construction is not convenient for portable, leads to the dust of suspension to be difficult to handle, and traditional for highway construction is not convenient for increase the dust fall scope, leads to dust fall efficiency lower.
In order to solve the problem, a dust falling device for highway construction is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a dust-settling device for highway construction, which comprises a water tank and a rack arranged at the lower end of the water tank, wherein a lifting assembly is arranged in the upper end of the water tank, the improved dust-settling device for highway construction is convenient for movably settling dust at high and low positions, and the improved dust-settling device for highway construction is convenient for increasing the dust-settling range, so that the problems in the background technology are solved.
In order to achieve the purpose, the utility model provides the following technical scheme: a dust-settling device for highway construction comprises a water tank and a rack arranged at the lower end of the water tank, wherein a lifting assembly is arranged inside the upper end of the water tank, the water tank comprises a component groove formed inside the upper end of the water tank and first embedded grooves formed in two sides of the water tank, the water tank further comprises an embedded plate embedded inside the first embedded groove and a water cavity formed inside the water tank, and the lifting assembly is embedded inside the component groove;
the lifting assembly comprises a lifting strip and an electric telescopic rod, wherein the lifting strip is embedded in the component groove, the electric telescopic rod is arranged at the lower end of the lifting strip, the lifting strip is arranged in two groups, the electric telescopic rod is arranged in four groups, one end of the electric telescopic rod is connected with the side face of the lifting strip, the other end of the electric telescopic rod is connected with the component groove, and the lifting assembly further comprises a clamping groove formed in the upper end of the lifting strip and a spraying strip embedded in the clamping groove.
Preferably, the water cavity comprises first connecting folding pipes arranged on two sides of the upper end of the water cavity and first U-shaped pipes arranged at the lower end of the water tank, the first connecting folding pipes are located inside the first embedded grooves, one ends of the first connecting folding pipes are connected with the embedded plates, and the first U-shaped pipes are communicated with the water cavity through water pipes.
Preferably, the tabling plate comprises a liquid storage cavity arranged inside the tabling plate and a second U-shaped pipe arranged at the lower end of the tabling plate, the second U-shaped pipe is communicated with the inside of the liquid storage cavity, and the liquid storage cavity is communicated with the first connecting folding pipe.
Preferably, the lower ends of the first U-shaped pipes are provided with three groups of lower atomizing nozzles, and the first U-shaped pipes and the second U-shaped pipes are members made of the same structure.
Preferably, the spraying strip comprises an embedding piece arranged at two ends of the spraying strip in an embedding manner and an upper atomizing nozzle arranged at the upper end of the spraying strip, the spraying strip further comprises a second connecting folding pipe arranged at the lower end of the spraying strip, and the second connecting folding pipe is communicated with the water cavity.
Preferably, the spraying bar further comprises a bar inner cavity arranged inside the spraying bar and second embedding grooves formed in two ends of the spraying bar, and the embedding pieces are embedded inside the second embedding grooves.
Preferably, a third connecting folding tube is arranged at the upper end of the inner cavity of the strip, the embedded piece comprises a movable atomizing nozzle arranged at the upper end and a piece inner cavity arranged inside the embedded piece, and one end of the third connecting folding tube is communicated with the piece inner cavity.
Preferably, the frame comprises a universal wheel arranged at the lower end of the frame and an expansion joint arranged inside the frame.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the dust-settling device for highway construction, the first U-shaped pipe is communicated with the inside of the water cavity through the water pipe, water in the water cavity can enter the first U-shaped pipe and is atomized and sprayed downwards through the lower atomizing spray head, the rack is arranged at the lower end of the water tank and can be pushed to move, so that movable atomization spraying dust settling is performed, the telescopic joint is arranged, the ground clearance of the first U-shaped pipe can be increased to a certain extent, namely the spraying height of the first U-shaped pipe is changed, the electric telescopic rod is driven to drive the lifting strip and the spraying strip to ascend, the strip inner cavity is communicated with the water cavity through the second connecting folding pipe, the upper atomizing spray head is communicated with the strip inner cavity, the upper atomizing spray head can perform upward atomization spraying, and high-low position spraying dust settling can be conveniently performed in a movable mode.
2. When the spraying range needs to be increased, the embedded plate is taken to move towards the outer side of the water tank, the distance between the second U-shaped pipe and the water tank is increased, the liquid storage cavity is communicated with the water cavity through the first connecting folding pipe, namely, the second U-shaped pipe can atomize and spray water in the liquid storage cavity, the atomization spraying range of the water tank is increased, the embedded plate is taken to move towards the outer side of the spraying strip, namely, the distance between the movable atomization nozzle and the spraying strip is increased, the inner cavity of the plate is communicated with the inner cavity of the strip through the third connecting folding pipe, the movable atomization nozzle atomizes and sprays water in the inner cavity of the plate, and the atomization spraying range of the lifting assembly is increased.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic perspective view of the water tank of the present invention;
FIG. 3 is a schematic view of the plan structure of the water tank of the present invention;
FIG. 4 is a schematic structural view of a first U-shaped tube according to the present invention;
FIG. 5 is a schematic view of the lifting assembly of the present invention;
fig. 6 is a schematic plan view of the spray bar of the present invention.
In the figure: 1. a water tank; 11. a component slot; 12. a first fitting groove; 13. a tabling plate; 131. a liquid storage cavity; 132. a second U-shaped tube; 14. a water chamber; 141. a first connecting folding tube; 142. a first U-shaped pipe; 1421. a lower atomizing spray head; 2. a lifting assembly; 21. an electric telescopic rod; 22. a lifting bar; 23. a clamping groove; 24. spraying strips; 241. a tabling piece; 242. an upper atomizer; 243. a second connecting folding tube; 244. a movable atomizing spray head; 245. a strip lumen; 246. a second fitting groove; 247. a third connecting folding tube; 248. a patch cavity; 3. a frame; 31. a universal wheel; 32. an expansion joint.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In order to solve the technical problem that the traditional dust settling device for highway construction is inconvenient to move and is used for settling dust at high and low positions, the following preferable technical scheme is provided as shown in figures 1 to 6:
a dust-settling device for highway construction comprises a water tank 1 and a frame 3 arranged at the lower end of the water tank 1, wherein a lifting assembly 2 is arranged in the upper end of the water tank 1, the water tank 1 comprises a component groove 11 arranged in the upper end of the water tank 1 and first embedding grooves 12 arranged at two sides of the water tank 1, the water tank 1 further comprises an embedding plate 13 embedded in the first embedding groove 12 and a water cavity 14 arranged in the water tank 1, the lifting assembly 2 is embedded in the component groove 11, the lifting assembly 2 comprises a lifting strip 22 embedded in the component groove 11 and electric telescopic rods 21 arranged at the lower ends of the lifting strip 22, the lifting strips 22 are arranged in two groups, the electric telescopic rods 21 are arranged in four groups, one end of each electric telescopic rod 21 in the two groups is connected with the side surface of the lifting strip 22, the other end of each electric telescopic rod is connected with the inside of the component groove 11, the lifting assembly 2 further comprises a clamping groove 23 arranged in the lifting strip 22 and a spraying strip 24 embedded in the clamping groove 23 at the upper end of the lifting strip, the water chamber 14 includes the first connection folding pipe 141 that sets up in water chamber 14 upper end both sides and sets up the first U type pipe 142 in the water tank 1 lower extreme, first connection folding pipe 141 position is in inside first gomphosis groove 12, and first connection folding pipe 141 one end is connected with gomphosis board 13, first U type pipe 142 leads to pipe and is linked together with water chamber 14, it sets up the gomphosis piece 241 and the last atomizer 242 that sets up in the upper end of spraying strip 24 at the strip 24 both ends to spray strip 24, it still connects folding pipe 243 including the second that sets up in the strip 24 lower extreme that sprays, and the second is connected folding pipe 243 and is linked together with water chamber 14, frame 3 is including setting up universal wheel 31 and the telescopic joint 32 of setting in frame 3 inside at the frame 3 lower extreme.
Specifically, because of first U type pipe 142 leads to pipe and the inside intercommunication of water cavity 14, the inside water in water cavity 14 can get into inside first U type pipe 142, it sprays to carry out decurrent atomizing through lower atomizer 1421, be provided with frame 3 because of water tank 1 lower extreme, can promote frame 3 and remove, thereby it sprays the dust fall to carry out portable atomizing, and telescopic joint 32's setting, but the ground clearance of first U type pipe 142 is increased to a certain extent, first U type pipe 142 sprays the height promptly, drive electric telescopic handle 21 drives lift strip 22 and sprays strip 24 and rise, be linked together through second connection folding tube 243 and water cavity 14 because of strip inner chamber 245, and it is linked together with strip inner chamber 245 to go up atomizer 242, it can spray to go up the atomizing shower 242 and spray to carry out ascending atomizing.
In order to solve the technical problem that the traditional road construction dust fall device is inconvenient to increase the dust fall range, as shown in fig. 2-3 and fig. 5-6, the following preferred technical scheme is provided:
the embedded plate 13 comprises a liquid storage cavity 131 arranged inside the embedded plate 13 and second U-shaped pipes 132 arranged at the lower end of the embedded plate 13, the second U-shaped pipes 132 are communicated with the inside of the liquid storage cavity 131, the liquid storage cavity 131 is communicated with the first connecting folding pipes 141, lower atomizing spray heads 1421 are arranged at the lower ends of the first U-shaped pipes 142, three groups of lower atomizing spray heads 1421 are arranged, the first U-shaped pipes 142 and the second U-shaped pipes 132 are members made of the same structure, the spraying bar 24 further comprises a bar inner cavity 245 arranged inside the spraying bar 24 and second 241 embedding grooves 246 arranged at two ends of the spraying bar 24, the embedded pieces are embedded inside the second embedding grooves 246, a third connecting folding pipe 247 is arranged at the upper end of the bar inner cavity 245, the embedded pieces 241 comprise movable atomizing spray heads 244 arranged at the upper end and sheet inner cavities 247 arranged inside the embedded pieces 241, and one end of the third connecting folding pipes is communicated with the sheet inner cavities 248.
Specifically, when the spraying range needs to be increased, the mosaic plate 13 is taken to enable the mosaic plate to move to the outer side of the water tank 1, at the moment, the distance between the second U-shaped pipe 132 and the water tank 1 is increased, the liquid storage cavity 131 is communicated with the water cavity 14 through the first connecting folding pipe 141, namely, the second U-shaped pipe 132 can atomize and spray the water in the liquid storage cavity 131, the atomization spraying range of the water tank 1 is increased, the mosaic plate 241 is taken to move to the outer side of the spraying strip 24, namely, the distance between the movable atomization nozzle 244 and the spraying strip 24 is increased, the inner cavity 248 is communicated with the inner cavity 245 through the third connecting folding pipe 247, and the movable atomization nozzle 244 atomizes and sprays the water in the inner cavity 248.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (8)
1. The utility model provides a dust device for highway construction, includes water tank (1) and frame (3) of setting at water tank (1) lower extreme, its characterized in that: the water tank (1) comprises a water tank (1), a lifting component (2) is arranged inside the upper end of the water tank (1), the water tank (1) comprises a component groove (11) formed inside the upper end of the water tank (1) and first embedding grooves (12) formed in two sides of the water tank (1), the water tank (1) further comprises an embedding plate (13) embedded inside the first embedding groove (12) and a water cavity (14) arranged inside the water tank (1), and the lifting component (2) is embedded inside the component groove (11);
lifting unit (2) set up lifting strip (22) and electric telescopic handle (21) of setting at lifting strip (22) lower extreme in component groove (11) inside including the gomphosis, and lifting strip (22) set up two sets ofly, and electric telescopic handle (21) set up four groups, two sets of electric telescopic handle (21) one end be connected with lifting strip (22) side, the other end is connected with component groove (11) inside, lifting unit (2) still including seting up at clamping groove (23) of lifting strip (22) upper end and gomphosis at clamping groove (23) inside spraying strip (24).
2. The dust suppression device for road construction according to claim 1, characterized in that: the water cavity (14) comprises first connecting folding pipes (141) arranged on two sides of the upper end of the water cavity (14) and first U-shaped pipes (142) arranged at the lower end of the water tank (1), the first connecting folding pipes (141) are located inside the first embedded groove (12), one ends of the first connecting folding pipes (141) are connected with the embedded plate (13), and the first U-shaped pipes (142) are communicated with the water cavity (14) through water pipes.
3. The dust device for road construction of claim 2, characterized in that: the embedded plate (13) comprises a liquid storage cavity (131) arranged inside the embedded plate (13) and a second U-shaped pipe (132) arranged at the lower end of the embedded plate (13), the second U-shaped pipe (132) is communicated with the inside of the liquid storage cavity (131), and the liquid storage cavity (131) is communicated with the first connecting folding pipe (141).
4. The dust device for road construction of claim 3, characterized in that: the lower ends of the first U-shaped pipes (142) are provided with lower atomizing nozzles (1421), the lower atomizing nozzles (1421) are arranged in three groups, and the first U-shaped pipes (142) and the second U-shaped pipes (132) are members made of the same structure.
5. The dust suppression device for road construction according to claim 1, characterized in that: the spraying strip (24) comprises embedding pieces (241) which are embedded at two ends of the spraying strip (24) and an upper atomizing nozzle (242) which is arranged at the upper end of the spraying strip (24), the spraying strip (24) further comprises a second connecting folding pipe (243) which is arranged at the lower end of the spraying strip (24), and the second connecting folding pipe (243) is communicated with the water cavity (14).
6. The dust device for road construction of claim 5, characterized in that: the spraying bar (24) further comprises a bar inner cavity (245) arranged in the spraying bar (24) and second embedding grooves (246) formed in two ends of the spraying bar (24), and the embedding pieces (241) are embedded in the second embedding grooves (246).
7. The dust device for road construction of claim 6, characterized in that: the upper end of the strip inner cavity (245) is provided with a third connecting folding tube (247), the embedded sheet (241) comprises a movable atomizing nozzle (244) arranged at the upper end and a sheet inner cavity (248) arranged in the embedded sheet (241), and one end of the third connecting folding tube (247) is communicated with the sheet inner cavity (248).
8. The dust suppression device for road construction according to claim 1, characterized in that: the frame (3) comprises a universal wheel (31) arranged at the lower end of the frame (3) and an expansion joint (32) arranged inside the frame (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122512889.XU CN216062529U (en) | 2021-10-19 | 2021-10-19 | Dust device is used in highway construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122512889.XU CN216062529U (en) | 2021-10-19 | 2021-10-19 | Dust device is used in highway construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216062529U true CN216062529U (en) | 2022-03-18 |
Family
ID=80639894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122512889.XU Active CN216062529U (en) | 2021-10-19 | 2021-10-19 | Dust device is used in highway construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216062529U (en) |
-
2021
- 2021-10-19 CN CN202122512889.XU patent/CN216062529U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205424784U (en) | Dust fall, antifog haze street lamp | |
CN207073095U (en) | A kind of bridge beam gap residue remove device with dust exhaust apparatus | |
CN216062529U (en) | Dust device is used in highway construction | |
CN211772681U (en) | Sprinkler is used in maintenance of municipal administration road bridge | |
CN107155824A (en) | A kind of agricultural Multifunctional sprinkler irrigation device | |
CN207244516U (en) | A kind of more nozzle washers of high pressure | |
CN214006100U (en) | Green wall structure for building | |
CN113183298B (en) | Spraying device and method for improving surface strength of PC (polycarbonate) brick | |
CN214261177U (en) | Dust collector for building site waste disposal | |
CN212175644U (en) | Dust fall equipment for construction | |
CN205546793U (en) | Greenbelt irrigator | |
CN211395262U (en) | Road surface leveling device for highway engineering operation | |
CN212478772U (en) | Safety protective guard is used in civil construction | |
CN215165150U (en) | Highway construction is with watering dust device | |
CN216856117U (en) | Indoor building construction dust collecting equipment | |
CN110820649A (en) | Highway tunnel cleaning system | |
CN216653895U (en) | Highway is with removing raise dust device fast | |
CN215692725U (en) | Over-and-under type atomizing dust keeper for civil engineering | |
CN211864351U (en) | Dust collector for building engineering | |
CN214530426U (en) | Watering dust removal type urban road cleaning device | |
CN212582479U (en) | Municipal works are with construction warning tablet | |
CN221536079U (en) | Dust collector is used in civil engineering | |
CN218715678U (en) | Fence for highway engineering construction | |
CN220133673U (en) | Road bridge construction encloses fender | |
CN217518371U (en) | Safety device is used in building engineering management construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |