CN216038346U CN202122463009.4U CN202122463009U CN216038346U CN 216038346 U CN216038346 U CN 216038346U CN 202122463009 U CN202122463009 U CN 202122463009U CN 216038346 U CN216038346 U CN 216038346U
Authority
CN
China
Prior art keywords
pulley
wire rope
hoist
maintenance
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122463009.4U
Other languages
Chinese (zh)
Inventor
戴兵
刘欣
宿巧卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Shagang Steel Co ltd
Jiangsu Shagang Group Co Ltd
Original Assignee
Jiangsu Shagang Group Co Ltd
Zhangjiagang Hongchang Steel Plate Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shagang Group Co Ltd, Zhangjiagang Hongchang Steel Plate Co Ltd filed Critical Jiangsu Shagang Group Co Ltd
Priority to CN202122463009.4U priority Critical patent/CN216038346U/en
Application granted granted Critical
Publication of CN216038346U publication Critical patent/CN216038346U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a system for replacing a steel wire rope of a dry quenching hoister, which comprises a first fixed pulley, a first movable pulley, a second fixed pulley, a hoister platform, an old steel wire rope, an equipment winch, a second overhauling pulley, a trailer, a second movable pulley, a hoister bracket, a new steel wire rope and a chain block. The device is mainly used for replacing the steel wire rope of the coke dry quenching hoister, has a simple structure and strong operability, effectively controls the overhaul time, and provides powerful guarantee for the production recovery of coke dry quenching.

Description

Steel wire rope replacing system of dry quenching hoister
Technical Field
The utility model belongs to the technical field of mechanical equipment, and particularly relates to a system for replacing a steel wire rope of a dry quenching hoister.
Background
In the field of dry quenching, the special equipment for conveying the dry quenched red coke to a dry quenching furnace is a lifter, the main application of the lifter is to lift a coke tank filled with the red coke to the top of the lifter, and a steel wire rope belongs to an important part of the dry quenching lifter, and the coke tank is required to be replaced at regular intervals, but the replacement operation is complex at present, consumes long time and is not beneficial to recovery of production.
SUMMERY OF THE UTILITY MODEL
The technical problem to be solved is as follows: aiming at the technical problems, the utility model provides a steel wire rope replacing system of a dry quenching hoister, which is simple in structure, strong in operability, capable of improving the overhauling work efficiency and beneficial to guarantee production recovery.
The technical scheme is as follows: a dry quenching hoister steel wire rope replacing system comprises a first fixed pulley, a first movable pulley, a second fixed pulley, a hoister platform, an old steel wire rope, an equipment hoister, a second overhauling pulley, a trailer, a second movable pulley, a hoister bracket, a new steel wire rope and a chain block, wherein the hoister bracket is arranged on the ground, the hoister platform is arranged above the hoister bracket, the chain block, the first fixed pulley, the first movable pulley and the second fixed pulley are sequentially arranged on the hoister platform from left to right, the second movable pulley is positioned below the first movable pulley, the equipment hoister, the second overhauling pulley and the trailer are arranged on the right side of the hoister bracket, an old steel wire rope notch is fixed on the hoister platform through the chain block, the tail end of the old steel wire rope sequentially passes through the first fixed pulley, the first movable pulley and the second movable pulley, and after the old steel wire rope passes through the first movable pulley again, and the steel wire rope continuously passes through the second fixed pulley, the equipment winch and the second maintenance pulley and is finally fixed on the trailer, the joint of the new steel wire rope is connected with the notch of the old steel wire rope, and the tail end of the new steel wire rope is fixed on the elevator platform.
Preferably, still including overhauing the hoist engine, overhauing hoist engine wire rope and first maintenance pulley, overhaul the hoist engine setting in lifting machine support left side, first maintenance pulley setting is on the left lifting machine platform of first fixed pulley, and first maintenance pulley is through overhauing hoist engine wire rope and connecting.
Preferably, after the steel wire rope of the maintenance winch is connected with the new steel wire rope joint, the maintenance winch is lifted to the elevator platform.
Preferably, the first fixed pulley, the first movable pulley, the second fixed pulley and the second movable pulley are the same in size.
Preferably, the first overhauling pulley and the second overhauling pulley are fixed pulleys.
Has the advantages that: through this dry coke quenching lifting machine wire rope change system simple structure, it is strong to pull new wire rope to maneuverability, improves maintenance work efficiency, provides favourable guarantee for production recovery.
Drawings
FIG. 1 is a schematic structural view of the present invention;
number in the figure: 1. overhaul hoist engine, 2, overhaul hoist engine wire rope, 3, first maintenance pulley, 4, first fixed pulley, 5, first movable pulley, 6, second fixed pulley, 7, lifting machine platform, 8, old wire rope, 9, equipment hoist engine, 10, second maintenance pulley, 11, trailer, 12, second movable pulley, 13, lifting machine support, 14, new wire rope, 15, chain block.
Detailed Description
The technical solution of the present invention will be further described in detail with reference to the accompanying drawings.
Example 1
Referring to fig. 1, a system for replacing a steel wire rope of a coke dry quenching hoister comprises a first fixed pulley 4, a first movable pulley 5, a second fixed pulley 6, a hoister platform 7, an old steel wire rope 8, an equipment hoist 9, a second overhauling pulley 10, a trailer 11, a second movable pulley 12, a hoister support 13, a new steel wire rope 14 and a chain block 15, wherein the hoister support 13 is arranged on the ground, the hoister platform 7 is arranged above the hoister support 13, the chain block 15, the first fixed pulley 4, the first movable pulley 5 and the second fixed pulley 6 are sequentially arranged on the hoister platform 7 from left to right, the second movable pulley 12 is positioned below the first movable pulley 5, the equipment hoist 9, the second overhauling pulley 10 and the trailer 11 are arranged on the right side of the hoister support 13, an incision of the old steel wire rope 8 is fixed on the hoister platform 7 through the chain block 15, and the tail end sequentially passes through the first fixed pulley 4, the first movable pulley 5 and the second movable pulley 12, and after passing through the first movable pulley 5 again, the tail end continuously passes through the second fixed pulley 6, the equipment winch 9 and the second maintenance pulley 10 and is finally fixed on the trailer 11, the joint of the new steel wire rope 14 is connected with the notch of the old steel wire rope 8, and the tail end is fixed on the elevator platform 7.
The dry quenching hoister steel wire rope replacing system further comprises a maintenance winch 1, a maintenance winch steel wire rope 2 and a first maintenance pulley 3, wherein the maintenance winch 1 is arranged on the left side of the hoister support 13, the first maintenance pulley 3 is arranged on a hoister platform 7 on the left side of the first fixed pulley 4, and the first maintenance pulley 3 is connected through the maintenance winch steel wire rope 2.
And after the steel wire rope 2 of the maintenance winch is connected with the joint of the new steel wire rope 14, the maintenance winch is lifted to the elevator platform 7 through the maintenance winch 1.
The first fixed sheave 4, the first movable sheave 5, the second fixed sheave 6, and the second movable sheave 12 are the same in size.
The first overhauling pulley 3 and the second overhauling pulley 10 are both fixed pulleys.
When the automatic replacing device works, the joint of the new steel wire rope 14 is manually pulled to the elevator platform 7 and welded with the notch of the old steel wire rope 8, the new steel wire rope 14 and the old steel wire rope 8 are replaced in situ through traction of the trailer 11, and then the tail end of the new steel wire rope 14 is fixed on the elevator platform 7.
Or the overhauling winch 1 is utilized to pull the joint of the new steel wire rope 14 to the elevator platform 7, so that the new steel wire rope joint is not required to be manually pulled to the elevator platform 7 every time the steel wire rope is replaced, the labor intensity is reduced, and the time is saved.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered by the protection scope of the utility model.

Claims (5)

1.一种干熄焦提升机钢丝绳更换系统,其特征在于:包括第一定滑轮(4)、第一动滑轮(5)、第二定滑轮(6)、提升机平台(7)、旧钢丝绳(8)、设备卷扬机(9)、第二检修滑轮(10)、拖车(11)、第二动滑轮(12)、提升机支架(13)、新钢丝绳(14)和手拉葫芦(15),所述提升机支架(13)设置在地面上,所述提升机平台(7)设置在提升机支架(13)上方,所述提升机平台(7)上从左到右依次设置手拉葫芦(15)、第一定滑轮(4)、第一动滑轮(5)和第二定滑轮(6),所述第二动滑轮(12)位于第一动滑轮(5)下方,所述设备卷扬机(9)、第二检修滑轮(10)和拖车(11)设置在提升机支架(13)的右侧,所述旧钢丝绳(8)切口通过手拉葫芦(15)固定在提升机平台(7)上,且末端依次穿过第一定滑轮(4)、第一动滑轮(5)、第二动滑轮(12),再次穿过第一动滑轮(5)后,继续穿过第二定滑轮(6)、设备卷扬机(9)、第二检修滑轮(10),最后固定在拖车(11)上,所述新钢丝绳(14)的接头与旧钢丝绳(8)的切口连接,且末端与固定在提升机平台(7)上。1. A CDQ hoist wire rope replacement system, characterized in that it comprises a first fixed pulley (4), a first movable pulley (5), a second fixed pulley (6), a hoist platform (7), an old wire rope (8), equipment hoist (9), second maintenance pulley (10), trailer (11), second movable pulley (12), hoist bracket (13), new wire rope (14) and chain hoist (15), The hoist bracket (13) is arranged on the ground, the hoist platform (7) is arranged above the hoist bracket (13), and a chain hoist ( 15), the first fixed pulley (4), the first movable pulley (5) and the second fixed pulley (6), the second movable pulley (12) is located below the first movable pulley (5), the equipment hoist (9) , The second maintenance pulley (10) and the trailer (11) are arranged on the right side of the hoist bracket (13), and the cutout of the old wire rope (8) is fixed on the hoist platform (7) by the hand chain hoist (15), And the end passes through the first fixed pulley (4), the first movable pulley (5), the second movable pulley (12) in turn, and after passing through the first movable pulley (5) again, it continues to pass through the second fixed pulley (6), equipment The winch (9) and the second maintenance pulley (10) are finally fixed on the trailer (11). 7) on. 2.根据权利要求1所述的一种干熄焦提升机钢丝绳更换系统,其特征在于:还包括检修卷扬机(1)、检修卷扬机钢丝绳(2)和第一检修滑轮(3),所述检修卷扬机(1)设置在提升机支架(13)左侧,所述第一检修滑轮(3)设置在第一定滑轮(4)左侧的提升机平台(7)上,且第一检修滑轮(3)通过检修卷扬机钢丝绳(2)连接。2. A CDQ hoist wire rope replacement system according to claim 1, characterized in that: further comprising a maintenance winch (1), a maintenance winch wire rope (2) and a first maintenance pulley (3), the maintenance The hoist (1) is arranged on the left side of the hoist bracket (13), the first maintenance pulley (3) is arranged on the hoist platform (7) on the left side of the first fixed pulley (4), and the first maintenance pulley ( 3) Connect by overhauling the hoist wire rope (2). 3.根据权利要求2所述的一种干熄焦提升机钢丝绳更换系统,其特征在于:所述检修卷扬机钢丝绳(2)与新钢丝绳(14)接头连接后,通过检修卷扬机(1)提升至提升机平台(7)上。3. The CDQ hoist wire rope replacement system according to claim 2, characterized in that: after the maintenance hoist wire rope (2) is connected with the new wire rope (14), the maintenance hoist (1) is lifted to on the hoist platform (7). 4.根据权利要求1所述的一种干熄焦提升机钢丝绳更换系统,其特征在于:所述第一定滑轮(4)、第一动滑轮(5)、第二定滑轮(6)和第二动滑轮(12)大小相同。The wire rope replacement system for a CDQ hoist according to claim 1, characterized in that: the first fixed pulley (4), the first movable pulley (5), the second fixed pulley (6) and the first fixed pulley (4) The two moving pulleys (12) are the same size. 5.根据权利要求2所述的一种干熄焦提升机钢丝绳更换系统,其特征在于:所述第一检修滑轮(3)和第二检修滑轮(10)均为定滑轮。5 . The wire rope replacement system for a CDQ hoist according to claim 2 , wherein the first inspection pulley ( 3 ) and the second inspection pulley ( 10 ) are fixed pulleys. 6 .
CN202122463009.4U 2021-10-13 2021-10-13 Steel wire rope replacing system of dry quenching hoister Active CN216038346U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122463009.4U CN216038346U (en) 2021-10-13 2021-10-13 Steel wire rope replacing system of dry quenching hoister

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122463009.4U CN216038346U (en) 2021-10-13 2021-10-13 Steel wire rope replacing system of dry quenching hoister

Publications (1)

Publication Number Publication Date
CN216038346U true CN216038346U (en) 2022-03-15

Family

ID=80548628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122463009.4U Active CN216038346U (en) 2021-10-13 2021-10-13 Steel wire rope replacing system of dry quenching hoister

Country Status (1)

Country Link
CN (1) CN216038346U (en)

Similar Documents

Publication Publication Date Title
CN102556854A (en) Mine hydraulic hoisting traveling crane
CN216038346U (en) Steel wire rope replacing system of dry quenching hoister
CN107502690A (en) A device and method for integrally replacing blast furnace shells by sub-belts
CN108190742A (en) A kind of operating method for replacing lifting equipment steel wire rope
CN209601953U (en) A sliding spreader for complete replacement of wheels of ladle car reducer in steelmaking system
CN205034964U (en) A hoist for vertical rolling mill transmission shaft
CN209210255U (en) A kind of swivel bearing of continuous casting machine revolving platform more changing device
CN218560878U (en) Metallurgical overhead traveling crane wheel set integral replacement auxiliary device
CN104176660B (en) Tower crane amplitude variation maintenance, replacing options
CN204824948U (en) Petticoat pipe system containing simple and convenient fluid pressure type activity petticoat pipe elevating gear
CN115676648A (en) Multifunctional underground maintenance vehicle
CN211255088U (en) Crown block device with split-type main pulley
CN207330971U (en) A device for replacing the blast furnace shell as a whole by dividing the belt
CN206645746U (en) A kind of quick pulling off device of sintering pallet
CN217201681U (en) Maintenance hoisting apparatus is examined to dry coke quenching lifting shaft
CN211393670U (en) Mechanical shed beam lifting mechanism
CN218371397U (en) Hoisting device for engineering equipment
CN205442447U (en) Chemical production loading attachment
CN214989611U (en) Novel sucking disc formula lifting device
CN210655934U (en) Single-pulley type traveling block for petroleum drilling machine
CN219689085U (en) Lifting device for moving oil cylinder of underground fully-mechanized mining face of coal mine
CN222138545U (en) Steel wire rope fixing clamp for overhauling lifting mechanism of crane
CN218434518U (en) Automatic rope-releasing device for hoisting
CN215249025U (en) High performance flange heat treatment hoisting structure
CN221191367U (en) Chain belt replacing device of pig machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 215625 Zhangjiagang, Suzhou, Jiangsu, Jinjiang Fengzhen

Patentee after: Jiangsu Shagang Steel Co.,Ltd.

Country or region after: China

Patentee after: JIANGSU SHAGANG GROUP Co.,Ltd.

Address before: Shagang Group Hongchang Steel Plate Hongchang Avenue Jinfeng Town Zhangjiagang City Suzhou City Jiangsu Province