CN108190742A - A kind of operating method for replacing lifting equipment steel wire rope - Google Patents

A kind of operating method for replacing lifting equipment steel wire rope Download PDF

Info

Publication number
CN108190742A
CN108190742A CN201711496462.7A CN201711496462A CN108190742A CN 108190742 A CN108190742 A CN 108190742A CN 201711496462 A CN201711496462 A CN 201711496462A CN 108190742 A CN108190742 A CN 108190742A
Authority
CN
China
Prior art keywords
wire rope
steel wire
old
new
drum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711496462.7A
Other languages
Chinese (zh)
Inventor
王焕云
郑汉新
蔡建华
朱广武
李建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Bayi Iron and Steel Co Ltd
Original Assignee
Xinjiang Bayi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Bayi Iron and Steel Co Ltd filed Critical Xinjiang Bayi Iron and Steel Co Ltd
Priority to CN201711496462.7A priority Critical patent/CN108190742A/en
Publication of CN108190742A publication Critical patent/CN108190742A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/04Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage
    • B66D3/06Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage with more than one pulley

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

本发明公开了一种更换起重设备钢丝绳的操作方法,在更换报废的钢丝绳前将升降机构卷筒转动下降,将卷筒上旧钢丝绳放下到最低位,将升降机构卷筒一侧钢丝绳一端A1点压板松开,将旧钢丝绳A1端放下并连接需要更换的新钢丝绳A端;连接牢固后启动起升机构,利用起升机构将新钢丝绳从地滑轮、天滑轮中逐级穿装,待新钢丝绳一头A端提到升降机构卷筒位置时,解除新旧钢丝绳A1与A端连接件,临时固定新钢丝绳A端点;放下旧钢丝绳一头A1点,连接旧钢丝绳A1端与新钢丝绳B端,将新钢丝绳B端升到卷筒高度,解除A1端与B端连接件,临时固定B端,将旧钢丝绳全部松下,调整卷筒钢丝绳压板位置;分别安装新钢丝绳A、B端,新钢丝绳即可投入使用。

This invention discloses a method for replacing wire ropes in lifting equipment. Before replacing the worn-out wire rope, the hoisting mechanism drum is rotated and lowered to its lowest position. The old wire rope on the drum is lowered to its lowest position. The pressure plate at point A1 on one side of the wire rope on the hoisting mechanism drum is loosened, and the old wire rope at point A1 is lowered and connected to the new wire rope at point A to be replaced. After the connection is secure, the hoisting mechanism is started, and the new wire rope is threaded through the ground pulley and the top pulley step by step using the hoisting mechanism. When end A is raised to the position of the lifting mechanism drum, disconnect the connection between the old and new wire ropes A1 and end A, and temporarily fix end A of the new wire rope; lower one end A1 of the old wire rope, connect end A1 of the old wire rope to end B of the new wire rope, raise end B of the new wire rope to the drum height, disconnect the connection between end A1 and end B, temporarily fix end B, loosen the old wire rope completely, and adjust the position of the drum wire rope pressure plate; install ends A and B of the new wire rope respectively, and the new wire rope can be put into use.

Description

一种更换起重设备钢丝绳的操作方法An operation method for replacing steel wire ropes of hoisting equipment

技术领域technical field

本发明涉及一种更换起重设备钢丝绳的操作方法。The invention relates to an operation method for replacing steel wire ropes of lifting equipment.

背景技术Background technique

国内起重设备(门吊/行车)升降机构钢丝绳更换,是设备维护单位日常工作之一,由于设备使用率高,造成升降机构钢丝绳磨损等原因致使更换作业,传统更换方法是全过程采取人工拆取及安装,为了在地轮组和天滑轮之间拆卸、穿装钢丝绳,需要4名职工手工一道道从各级次滑轮中穿插,利用麻绳上下提升到位,劳动效率低,耗时时间长。Domestic hoisting equipment (door crane/travel) lifting mechanism steel wire rope replacement is one of the daily tasks of equipment maintenance units. Due to the high utilization rate of equipment, the wire rope of the lifting mechanism is worn and other reasons lead to the replacement operation. The traditional replacement method is manual dismantling in the whole process. Picking and installation, in order to disassemble and install the steel wire rope between the ground wheel set and the sky pulley, 4 workers are required to manually pass through the pulleys of each level one by one, and use the hemp rope to lift up and down in place. The labor efficiency is low and the time is long. .

发明内容Contents of the invention

本发明的目的在于提供一种更换起重设备钢丝绳的操作方法,利用原有设备起升机构转动,将旧钢丝绳与新钢丝绳连接,利用设备起升机构将新钢丝绳提拉穿装在滑轮组间,实现钢丝绳半自动安装。The object of the present invention is to provide an operation method for replacing the steel wire rope of the lifting equipment. The original equipment hoisting mechanism is used to rotate, the old steel wire rope is connected to the new steel wire rope, and the new steel wire rope is pulled and worn between the pulley blocks by the equipment hoisting mechanism. Realize semi-automatic installation of wire rope.

本发明的目的是这样实现的,一种更换起重设备钢丝绳的操作方法,在更换报废的钢丝绳前将升降机构卷筒转动下降,将卷筒上旧钢丝绳放下到最低位,将升降机构卷筒一侧钢丝绳一端A1点压板松开,将旧钢丝绳A1端放下并连接需要更换的新钢丝绳A端;连接牢固后启动起升机构,利用起升机构将新钢丝绳从地滑轮、天滑轮中逐级穿装,待新钢丝绳一头A端提到升降机构卷筒位置时,解除新旧钢丝绳A1与A端连接件,临时固定新钢丝绳A端点;放下旧钢丝绳一头A1点,连接旧钢丝绳A1端与新钢丝绳B端,连接牢固后将新钢丝绳B端利用升降机构起升到卷筒高度,解除A1端与B端连接件,临时固定B端,利用升降机构卷筒将旧钢丝绳全部松下,调整卷筒钢丝绳压板位置;分别安装新钢丝绳A、B端,新钢丝绳安装完毕试车运行投入使用。The purpose of the present invention is achieved in this way, an operation method for replacing the steel wire rope of the lifting equipment, before replacing the scrapped steel wire rope, the lifting mechanism reel is rotated and lowered, the old steel wire rope on the reel is put down to the lowest position, and the lifting mechanism reel Loosen the pressure plate at one end A1 of the steel wire rope on one side, put down the A1 end of the old steel wire rope and connect the A1 end of the new steel wire rope that needs to be replaced; start the lifting mechanism after the connection is firm, and use the lifting mechanism to lift the new steel wire rope step by step from the ground pulley and sky pulley Putting on, when the end A of the new steel wire rope reaches the position of the lifting mechanism drum, remove the connecting piece between the old and new steel wire rope A1 and the A end, and temporarily fix the A end of the new steel wire rope; put down the A1 point of the old steel wire rope, and connect the A1 end of the old steel wire rope with the new steel wire rope End B, after the connection is firm, use the lifting mechanism to lift the B end of the new steel wire rope to the height of the drum, release the connecting piece between the A1 end and the B end, temporarily fix the B end, use the lifting mechanism drum to loosen all the old wire ropes, and adjust the drum wire rope Position of the pressure plate: Install the A and B ends of the new steel wire ropes respectively, and the new steel wire ropes are installed and put into use for trial run.

经过起重设备升降钢丝绳现场更换实际操作,更换一台35吨起重设备钢丝绳仅需40分钟,相比以往更换起重设备钢丝绳90分钟,时间缩短了一半时间,工作效率明显提升,同时员工劳动强度得到降低,员工评价良好。半自动更换起重设备钢丝绳工作法,适用于起重设备升降钢丝绳更换工作,应用前景广泛。After the actual operation of on-site replacement of the lifting wire rope of the lifting equipment, it only takes 40 minutes to replace the wire rope of a 35-ton lifting equipment. Intensity is reduced and employee reviews are good. The working method for semi-automatically replacing the steel wire rope of the hoisting equipment is suitable for the replacement work of the lifting wire rope of the hoisting equipment, and has wide application prospects.

附图说明Description of drawings

下面将结合附图对本发明作进一步详细的说明。The present invention will be described in further detail below in conjunction with the accompanying drawings.

图1为本发明方法更换钢丝绳的工作状态图。Fig. 1 is the working state figure that the method of the present invention replaces steel wire rope.

具体实施方式Detailed ways

一种更换起重设备钢丝绳的操作方法,如图1所示,在更换报废的钢丝绳前将升降机构卷筒1转动下降,将卷筒1上旧钢丝绳放下到最低位,将升降机构卷筒1一侧钢丝绳一端A1点压板松开,将旧钢丝绳A1端放下并连接需要更换的新钢丝绳5 的A端;连接牢固后启动起升机构,利用起升机构将新钢丝绳从地滑轮3、天滑轮2中逐级穿装,待新钢丝绳一头A端提到升降机构卷筒1位置时,解除新旧钢丝绳A1与A端连接件4,临时固定新钢丝绳A端点;放下旧钢丝绳一头A1点,连接旧钢丝绳A1端与新钢丝绳B端,连接牢固后将新钢丝绳B端利用升降机构起升到卷筒1高度,解除A1端与B端连接件4,临时固定B端,利用升降机构卷筒1将旧钢丝绳全部松下,调整卷筒钢丝绳压板位置;分别安装新钢丝绳A、B端,新钢丝绳5安装完毕试车运行投入使用。An operation method for replacing steel wire ropes of lifting equipment, as shown in Figure 1, before replacing scrapped steel wire ropes, the lifting mechanism drum 1 is rotated and lowered, the old steel wire rope on the drum 1 is lowered to the lowest position, and the lifting mechanism drum 1 Loosen the pressure plate at one end A1 of the wire rope on one side, put down the A1 end of the old wire rope and connect the A end of the new wire rope 5 that needs to be replaced; start the lifting mechanism after the connection is firm, and use the lifting mechanism to pull the new wire rope from the ground pulley 3 and sky pulley 2. Dress up step by step. When the end A of the new steel wire rope reaches the position of the drum 1 of the lifting mechanism, remove the connecting piece 4 between the old and new steel wire rope A1 and the A end, and temporarily fix the end point A of the new steel wire rope; put down the A1 point of the old steel wire rope, and connect the old one. Wire rope A1 end and new wire rope B end, after the connection is firm, use the lifting mechanism to raise the new wire rope B end to the height of drum 1, remove the connecting piece 4 between A1 end and B end, temporarily fix B end, and use the lifting mechanism drum 1 to lift All the old steel wire ropes are loosened, adjust the position of the drum steel wire rope pressure plate; install the new steel wire ropes A and B ends respectively, and the new steel rope 5 is installed and put into use for trial run.

Claims (1)

1.一种更换起重设备钢丝绳的操作方法,其特征在于在更换报废的钢丝绳前将升降机构卷筒转动下降,将卷筒上旧钢丝绳放下到最低位,将升降机构卷筒一侧钢丝绳一端A1点压板松开,将旧钢丝绳A1端放下并连接需要更换的新钢丝绳A端;连接牢固后启动起升机构,利用起升机构将新钢丝绳从地滑轮、天滑轮中逐级穿装,待新钢丝绳一头A端提到升降机构卷筒位置时,解除新旧钢丝绳A1与A端连接件,临时固定新钢丝绳A端点;放下旧钢丝绳一头A1点,连接旧钢丝绳A1端与新钢丝绳B端,连接牢固后将新钢丝绳B端利用升降机构起升到卷筒高度,解除A1端与B端连接件,临时固定B端,利用升降机构卷筒将旧钢丝绳全部松下,调整卷筒钢丝绳压板位置;分别安装新钢丝绳A、B端,新钢丝绳安装完毕试车运行投入使用。1. An operation method for replacing wire ropes of hoisting equipment, which is characterized in that before replacing scrapped wire ropes, the reel of the lifting mechanism is rotated and lowered, the old wire rope on the reel is lowered to the lowest position, and the wire rope on one side of the reel of the lifting mechanism is lowered. Loosen the pressure plate at point A1, put down the A1 end of the old wire rope and connect the A end of the new wire rope that needs to be replaced; start the lifting mechanism after the connection is firm, and use the lifting mechanism to put the new wire rope through the ground pulley and sky pulley step by step. When end A of one end of the new steel wire rope reaches the position of the drum of the lifting mechanism, remove the connector A1 and end A of the old and new steel wire rope, and temporarily fix the end point A of the new steel wire rope; put down point A1 of one end of the old steel wire rope, connect end A1 of the old steel wire rope to end B of the new steel wire rope, and connect After it is firm, use the lifting mechanism to raise the B end of the new steel wire rope to the height of the drum, release the connecting piece between the A1 end and the B end, temporarily fix the B end, use the lifting mechanism drum to loosen all the old wire ropes, and adjust the position of the drum wire rope pressure plate; Install the A and B ends of the new steel wire rope. After the installation of the new steel wire rope, the trial run is put into use.
CN201711496462.7A 2017-12-31 2017-12-31 A kind of operating method for replacing lifting equipment steel wire rope Pending CN108190742A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711496462.7A CN108190742A (en) 2017-12-31 2017-12-31 A kind of operating method for replacing lifting equipment steel wire rope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711496462.7A CN108190742A (en) 2017-12-31 2017-12-31 A kind of operating method for replacing lifting equipment steel wire rope

Publications (1)

Publication Number Publication Date
CN108190742A true CN108190742A (en) 2018-06-22

Family

ID=62587560

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711496462.7A Pending CN108190742A (en) 2017-12-31 2017-12-31 A kind of operating method for replacing lifting equipment steel wire rope

Country Status (1)

Country Link
CN (1) CN108190742A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110255376A (en) * 2019-05-29 2019-09-20 邯郸钢铁集团有限责任公司 A method of replacement metallurgical bridge crane wirerope
CN110759170A (en) * 2019-10-29 2020-02-07 神华粤电珠海港煤炭码头有限责任公司 Main steel wire rope replacing device of grab ship unloader
CN110980520A (en) * 2019-08-26 2020-04-10 广州环投增城环保能源有限公司 Method for quickly replacing steel wire rope
CN115072602A (en) * 2022-06-01 2022-09-20 山东莱钢永锋钢铁有限公司 Method for prolonging service life of steel wire rope of hoisting equipment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001354391A (en) * 2000-06-14 2001-12-25 Sumitomo Metal Ind Ltd Wire rope replacement device
CN2804048Y (en) * 2005-05-27 2006-08-09 新疆八一钢铁股份有限公司 Slot stripping proof device for hoisting cable wire of converter oxygen gun
CN101628696A (en) * 2008-07-18 2010-01-20 卫华集团有限公司 Automatic rope-replacing device movable on ground
CN101700858A (en) * 2008-12-29 2010-05-05 攀枝花钢城集团瑞钢工业有限公司 Wound steel rope replacing method
CN202671090U (en) * 2012-04-12 2013-01-16 杭州华新机电工程有限公司 Rope-breaking and rope-winding prevention device of bridge-type crane
CN203006760U (en) * 2012-12-10 2013-06-19 甘肃酒钢集团宏兴钢铁股份有限公司 A crane wire rope adjustment device
CN204400415U (en) * 2014-11-24 2015-06-17 登封市君鑫煤业有限责任公司 A kind of down-hole steel wire rope of windlass more changing device
CN105800490A (en) * 2016-06-06 2016-07-27 山东钢铁股份有限公司 Method for replacing crane main hook steel wire rope

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001354391A (en) * 2000-06-14 2001-12-25 Sumitomo Metal Ind Ltd Wire rope replacement device
CN2804048Y (en) * 2005-05-27 2006-08-09 新疆八一钢铁股份有限公司 Slot stripping proof device for hoisting cable wire of converter oxygen gun
CN101628696A (en) * 2008-07-18 2010-01-20 卫华集团有限公司 Automatic rope-replacing device movable on ground
CN101700858A (en) * 2008-12-29 2010-05-05 攀枝花钢城集团瑞钢工业有限公司 Wound steel rope replacing method
CN202671090U (en) * 2012-04-12 2013-01-16 杭州华新机电工程有限公司 Rope-breaking and rope-winding prevention device of bridge-type crane
CN203006760U (en) * 2012-12-10 2013-06-19 甘肃酒钢集团宏兴钢铁股份有限公司 A crane wire rope adjustment device
CN204400415U (en) * 2014-11-24 2015-06-17 登封市君鑫煤业有限责任公司 A kind of down-hole steel wire rope of windlass more changing device
CN105800490A (en) * 2016-06-06 2016-07-27 山东钢铁股份有限公司 Method for replacing crane main hook steel wire rope

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵明文: ""龙门起重机快速更换钢丝绳的探究"", 《机电工程技术》, vol. 39, no. 10, 31 October 2010 (2010-10-31), pages 105 - 106 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110255376A (en) * 2019-05-29 2019-09-20 邯郸钢铁集团有限责任公司 A method of replacement metallurgical bridge crane wirerope
CN110980520A (en) * 2019-08-26 2020-04-10 广州环投增城环保能源有限公司 Method for quickly replacing steel wire rope
CN110980520B (en) * 2019-08-26 2024-01-30 广州环投增城环保能源有限公司 Quick replacement method for steel wire rope
CN110759170A (en) * 2019-10-29 2020-02-07 神华粤电珠海港煤炭码头有限责任公司 Main steel wire rope replacing device of grab ship unloader
CN115072602A (en) * 2022-06-01 2022-09-20 山东莱钢永锋钢铁有限公司 Method for prolonging service life of steel wire rope of hoisting equipment

Similar Documents

Publication Publication Date Title
CN108190742A (en) A kind of operating method for replacing lifting equipment steel wire rope
CN205577896U (en) Novel high -efficient mechatronic workover machine
CN203295132U (en) Lifting device for high-rise operation
CN101929443A (en) Blade self-replacement device of wind driven generator set and working method thereof
CN105715028A (en) Successive lifting device and lifting scaffold with same
CN209243086U (en) The device of the quick handling cleaning cupola well of overhaul 2500m3 blast furnace
CN209601953U (en) A sliding spreader for complete replacement of wheels of ladle car reducer in steelmaking system
CN102344086B (en) Method for replacing lifting ropes of multi-rope frictional geared winch
CN111332943B (en) Hoisting type pipeline weld joint protection device
CN207719714U (en) A kind of ground wire auxiliary mounting tool
CN214570117U (en) Crank disassembling tool of oil pumping unit
CN205662215U (en) Main hoisting rope adjusting device of vertical shaft hoisting system
CN104176660B (en) Tower crane amplitude variation maintenance, replacing options
CN202596680U (en) Fixed type oil fishing machine
CN201268563Y (en) Crank pin hoisting apparatus
CN202474680U (en) Ground wire lifting pulley yoke used on intermediate support of power transmission line
CN103850658A (en) Intelligent electric drifting device and intelligent electric drifting method
CN203660838U (en) Hoisting apparatus for motor end cap
CN205117246U (en) Oil pipe lifted and puts device under rose in oil field
CN204508570U (en) Medium-speed pulverizer mill hoisting mechanism
CN205709471U (en) The stone tongs of well lid milling machine
CN202054522U (en) Automatic fixture for crane
CN205076654U (en) C type catches hold of roller device with a hook
CN204019057U (en) Plug-in type steel pipe detaching device
CN205740037U (en) It is suitable for the boom hoisting of various working

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180622

WD01 Invention patent application deemed withdrawn after publication