CN216010169U - Civil engineering cost progress supervision device - Google Patents

Civil engineering cost progress supervision device Download PDF

Info

Publication number
CN216010169U
CN216010169U CN202122513170.8U CN202122513170U CN216010169U CN 216010169 U CN216010169 U CN 216010169U CN 202122513170 U CN202122513170 U CN 202122513170U CN 216010169 U CN216010169 U CN 216010169U
Authority
CN
China
Prior art keywords
fixing
fixed
device body
civil engineering
engineering cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122513170.8U
Other languages
Chinese (zh)
Inventor
仲天辉
仇倩霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122513170.8U priority Critical patent/CN216010169U/en
Application granted granted Critical
Publication of CN216010169U publication Critical patent/CN216010169U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Alarm Devices (AREA)

Abstract

The utility model discloses a civil engineering cost progress supervision device, including supervising the device body, supervise the device body and install the right-hand member that is vertical fixed plate, and the equal fixedly connected with in upper and lower both ends on fixed plate right side is "L" shape structure and the surface sets up the screwed fixed column, be connected through the threaded mode between fixed column and the fixed cover, the stop gear symmetry sets up the upper and lower both ends at the fixed plate, the left end fixedly connected with connecting block of mount, and the middle part of connecting block is pegged graft and is had the spliced pole that is "worker" font structure. This civil engineering cost progress supervise device is convenient for adjust the supervision angle of supervising the device body when using, and the practicality is high, and through the setting of stop gear and fixed plate, be convenient for install and dismantle the supervision device body moreover to be convenient for when supervising the device body and breaking down, dismantle the maintenance to the supervision device body.

Description

Civil engineering cost progress supervision device
Technical Field
The utility model relates to a civil engineering cost correlation technique field specifically is a civil engineering cost progress supervision device.
Background
The project cost refers to the total cost of the construction of a project, which is expected or actually required, and on the actual construction site, a constructor usually uses a corresponding progress monitoring device to monitor the whole construction process, and the progress monitoring device can provide better guarantee for the project plan;
however, the commonly used engineering cost progress monitoring device is inconvenient to adjust the monitoring angle of the monitoring device according to the use condition of an actual field in the actual use process, has low practicability, is inconvenient to install the monitoring device, and is inconvenient to disassemble and overhaul when the monitoring device fails;
therefore, a monitoring device for the construction cost progress of the civil engineering is provided for solving the problems.
Disclosure of Invention
An object of the utility model is to provide a civil engineering cost progress supervise device to solve the engineering cost progress supervision device that uses usually that proposes in the above-mentioned background art, in the in-service use, inconvenient in accordance with the in service behavior in actual field is adjusted the supervision angle of supervising the device, and the practicality is not high, and is not convenient to the installation of supervising the device, and inconvenient when supervising the device and breaking down, dismantles the problem of overhauing it.
In order to achieve the above object, the utility model provides a following technical scheme: the monitoring device body is arranged at the right end of a vertical fixing plate, and the upper end and the lower end of the right side of the fixing plate are fixedly connected with fixing columns which are in L-shaped structures and are provided with threads on the outer surfaces;
the fixed column is connected with the fixed sleeve in a threaded manner;
the limiting mechanisms are symmetrically arranged at the upper end and the lower end of the fixing plate;
the mount, the left end fixedly connected with connecting block of mount, and the middle part of connecting block is pegged graft and is had the spliced pole that is "worker" font structure.
Preferably, stop gear is including the mounting panel, the fixed connection that are the horizontality be in the pull ring and the fixed connection that the horizontal axis one end of fixed plate was kept away from to the mounting panel are in the fixed block of fixed plate left end, the connecting rod and the cover that are "T" font structure are established the spring of connecting rod surface.
Preferably, a sliding structure is formed between the connecting rod and the mounting plate, the mounting plate is fixedly connected with the movable end of the spring, and the right end of the mounting plate is connected with a fixing column in a penetrating manner;
wherein, be the laminating setting between mounting panel and the fixed cover.
Preferably, the fixing block is inserted in the middle of a fixing groove with a limiting effect, the fixing groove is formed in the upper end and the lower end of the right side of the fixing frame, and the fixing frame drives the monitoring device body to form a rotating structure through the connecting block and the connecting column;
wherein, the supervision device body forms a disassembly structure through the spacing mechanism and the fixing frame.
Preferably, the left end threaded connection of connecting block has the connecting bolt that has the fixed action, and the right-hand member laminating setting of connecting bolt is on the spliced pole to the lower extreme fixedly connected with of spliced pole is the manual telescopic link of vertical state.
Preferably, the lower extreme fixed connection of manual telescopic link is on the unable adjustment base who is the horizontality, and unable adjustment base's lower extreme installs and removes the wheel to unable adjustment base's edge is pegged graft and is had the locating lever that has the positioning action and be "T" font structure.
Compared with the prior art, the beneficial effects of the utility model are that: the civil engineering construction cost progress monitoring device has the advantages that in the actual use process, the whole stability of the equipment is enhanced by inserting the positioning rods into the ground, the fixing frame drives the monitoring device body to form a rotating structure through the connecting columns and the connecting blocks, the monitoring angle of the monitoring device body can be conveniently adjusted in use, the practicability is high, and the monitoring device body can be conveniently installed and disassembled by arranging the limiting mechanism and the fixing plate, so that the monitoring device body can be conveniently disassembled and overhauled when the monitoring device body breaks down, the operation is convenient, and the use is very convenient;
1. the monitoring device is provided with a limiting mechanism and a fixing plate, wherein the limiting mechanism comprises a mounting plate, a pull ring, a fixing block, a connecting rod and a spring, the monitoring device body is mounted on the right side of the fixing plate, and the fixing plate and the monitoring device body can be mounted and dismounted very conveniently through the limiting mechanism, so that the monitoring device body can be dismounted and overhauled conveniently when the monitoring device body breaks down, the operation is convenient, and the use is very convenient;
2. the monitoring device is provided with a fixing frame, a connecting block and a connecting column, wherein the connecting column is rotatably connected to the middle part of the connecting block, and the fixing frame drives the monitoring device body to rotate with the middle part of the connecting column through the connecting column, so that the monitoring angle of the monitoring device body can be adjusted in the actual use process, the practicability of the equipment is improved, and when the monitoring device body is adjusted to a proper angle, the connecting column is extruded and limited by rotating a connecting bolt which is in threaded connection with the connecting block, and the stability of the equipment is enhanced;
3. be equipped with locating lever, fixed column and fixed cover, through inject the locating lever ground, increased the holistic stability of equipment, simultaneously through the surface of fixed cover threaded connection at the fixed column, fixed cover laminating sets up on the mounting panel, can lock the mounting panel to increase the stability of supervising the installation of device body, simple structure, the practicality is high.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A of FIG. 1 according to the present invention;
FIG. 3 is a front view of the fixing frame, the fixing plate and the mounting plate of the present invention;
FIG. 4 is an enlarged schematic view of the structure of FIG. 1 at B according to the present invention;
FIG. 5 is a front view of the connecting structure of the connecting column and the connecting block of the present invention;
fig. 6 is a schematic view of the three-dimensional structure of the hand-operated telescopic rod, the fixing base and the positioning rod of the present invention.
In the figure: 1. monitoring the device body; 2. a fixing plate; 3. fixing a column; 4. fixing a sleeve; 5. a limiting mechanism; 6. mounting a plate; 7. a pull ring; 8. a fixed block; 9. a connecting rod; 10. a spring; 11. a fixed mount; 12. fixing grooves; 13. connecting blocks; 14. connecting columns; 15. a connecting bolt; 16. a manual telescopic rod; 17. a fixed base; 18. a moving wheel; 19. and (5) positioning the rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution: the utility model provides a building engineering cost progress monitoring device, includes monitoring device body 1, fixed plate 2, fixed column 3, fixed cover 4, stop gear 5, mounting panel 6, pull ring 7, fixed block 8, connecting rod 9, spring 10, mount 11, fixed slot 12, connecting block 13, spliced pole 14, connecting bolt 15, manual telescopic link 16, unable adjustment base 17, removes wheel 18 and locating lever 19.
When the civil engineering construction cost progress monitoring device is used, as shown in fig. 1, fig. 2 and fig. 3, firstly, the monitoring device body 1 is arranged on the right side of a fixing plate 2 in a vertical state, the fixing plate 2 is arranged on the right side of a fixing frame 11 through a limiting mechanism 5, the limiting mechanism 5 comprises a mounting plate 6 in a horizontal state, a pull ring 7 fixedly connected to one end of the mounting plate 6 far away from the horizontal central axis of the fixing plate 2, a fixing block 8 fixedly connected to the left end of the fixing plate 2, a connecting rod 9 in a T-shaped structure and a spring 10 sleeved on the outer surface of the connecting rod 9;
firstly, the mounting plate 6 is driven to slide on the connecting rod 9 in a T-shaped structure by pulling the pull ring 7, the mounting plate 6 extrudes the spring 10, so that the spring 10 generates elastic deformation, the fixed block 8 is aligned to the fixed groove 12 with a limiting effect, the pull ring 7 is loosened, the spring 10 recovers the elastic deformation, the mounting plate 6 is driven to slide on the connecting rod 9, the fixed block 8 is driven to be inserted into the fixed groove 12, the fixed plate 2 is limited, the right sides of the upper end and the lower end of the fixed plate 2 are fixedly connected with the fixed column 3 with threads on the outer surface, the fixed column 3 is inserted at the right end of the mounting plate 6, the fixed sleeve 4 is connected to the right side of the fixed column 3 through rotating threads, so that the fixed sleeve 4 is attached to the mounting plate 6, the mounting plate 6 is convenient to be further limited, the mounting plate 6 is prevented from being loosened in the using process, the fixing effect on the fixed plate 2 is good, completing the installation of the monitoring device body 1;
as shown in fig. 1 and 6, the lower end of the fixed base 17 is provided with a movable wheel 18, the equipment is moved to a corresponding position through the movable wheel 18, then a positioning rod 19 in a T-shaped structure is inserted into the ground to fix the equipment, so that the stability of the whole equipment is enhanced, the equipment is fixed, then the manual telescopic rod 16 is adjusted to a proper height, the construction site of the construction cost is supervised through the supervision device body 1, and a better guarantee is provided for the engineering plan;
in the monitoring process, as shown in fig. 1, 4 and 5, the connecting bolt 15 in threaded connection with the left end of the connecting block 13 is rotated to separate the connecting bolt 15 from the connecting column 14 in the I-shaped structure, then the connecting column 14 is rotated, the connecting column 14 drives the monitoring device body 1 to rotate through the fixing frame 11, so that the actual monitoring angle can be adjusted, a better monitoring effect is achieved, the practicability of the device is increased, when the connecting bolt 15 in threaded connection with the left end of the connecting block 13 is rotated to a proper angle, the connecting bolt 15 extrudes and fixes the connecting column 14, and the connecting column 14 is limited and fixed;
in addition, when supervising device body 1 and breaking down, accessible antiport is at fixed cover 4 of fixed column 3 outside as shown in fig. 2 and fig. 3 threaded connection for fixed cover 4 breaks away from with fixed column 3, fixed cover 4 loosens spacing to mounting panel 6, then pulling pull ring 7 drives mounting panel 6 and slides on connecting rod 9, mounting panel 6 drives fixed block 8 and breaks away from with fixed slot 12, thereby be convenient for dismantle the maintenance to supervising device body 1, moreover, the steam generator is simple in structure, and the simple operation is convenient, and it is very convenient to use.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a civil engineering cost progress monitoring device which characterized in that includes:
the monitoring device comprises a monitoring device body (1), wherein the monitoring device body (1) is installed at the right end of a vertical fixing plate (2), and the upper end and the lower end of the right side of the fixing plate (2) are fixedly connected with fixing columns (3) which are L-shaped structures and are provided with threads on the outer surfaces;
the fixing column (3) is connected with the fixing sleeve (4) in a threaded manner;
the limiting mechanisms (5), the limiting mechanisms (5) are symmetrically arranged at the upper end and the lower end of the fixing plate (2);
the fixing frame (11), the left end fixedly connected with connecting block (13) of fixing frame (11), and the middle part of connecting block (13) is pegged graft and is had spliced pole (14) that are "worker" font structure.
2. The civil engineering cost progress supervision device of claim 1, characterized in that: stop gear (5) including mounting panel (6), the fixed connection that is the horizontality pull ring (7) and the fixed connection that fixed plate (2) horizontal axis one end was kept away from in mounting panel (6) fixed block (8) of fixed plate (2) left end, connecting rod (9) and the cover that are "T" font structure are established spring (10) at connecting rod (9) surface.
3. The civil engineering cost progress supervision device of claim 2, characterized in that: a sliding structure is formed between the connecting rod (9) and the mounting plate (6), the mounting plate (6) is fixedly connected with the movable end of the spring (10), and the right end of the mounting plate (6) is connected with the fixing column (3) in a penetrating manner;
wherein, be the laminating setting between mounting panel (6) and fixed cover (4).
4. The civil engineering cost progress supervision device of claim 2, characterized in that: the fixing block (8) is inserted in the middle of a fixing groove (12) with a limiting effect, the fixing groove (12) is formed in the upper end and the lower end of the right side of the fixing frame (11), and the fixing frame (11) drives the monitoring device body (1) to form a rotating structure with the connecting column (14) through a connecting block (13);
wherein, the supervision device body (1) forms a dismounting structure with the fixed mount (11) through the limiting mechanism (5).
5. The civil engineering cost progress supervision device of claim 4, characterized in that: the left end threaded connection of connecting block (13) has connecting bolt (15) that have the fixed action, and the right-hand member laminating of connecting bolt (15) sets up on spliced pole (14) to the lower extreme fixedly connected with of spliced pole (14) is manual telescopic link (16) of vertical state.
6. The civil engineering cost progress supervision device of claim 5, characterized in that: the lower extreme fixed connection of manual telescopic link (16) is on unable adjustment base (17) that is the horizontality, and unable adjustment base's (17) lower extreme installs and removes wheel (18) to the edge of unable adjustment base (17) is pegged graft and is had positioning lever (19) that have the positioning action and be "T" font structure.
CN202122513170.8U 2021-10-19 2021-10-19 Civil engineering cost progress supervision device Active CN216010169U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122513170.8U CN216010169U (en) 2021-10-19 2021-10-19 Civil engineering cost progress supervision device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122513170.8U CN216010169U (en) 2021-10-19 2021-10-19 Civil engineering cost progress supervision device

Publications (1)

Publication Number Publication Date
CN216010169U true CN216010169U (en) 2022-03-11

Family

ID=80583802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122513170.8U Active CN216010169U (en) 2021-10-19 2021-10-19 Civil engineering cost progress supervision device

Country Status (1)

Country Link
CN (1) CN216010169U (en)

Similar Documents

Publication Publication Date Title
CN216010169U (en) Civil engineering cost progress supervision device
CN204940133U (en) Hydraulic pressure sliding sash climbing frame
CN111827164A (en) Buffer structure of access control barrier gate release rod
CN218991113U (en) Temporary protection device convenient to construct and used for building construction
CN210562633U (en) A steel construction for quick assembly disassembly for construction
CN219569506U (en) Construction frame for constructional engineering
CN221372873U (en) Steel frame with protection function
CN221124952U (en) Optical cable fiber distribution box capable of being rapidly positioned and installed
CN221031286U (en) Safe support is built in room convenient to dismantle
CN213900491U (en) Assembly type structure observation platform based on BIM
CN221422899U (en) Novel face limit protection
CN221298818U (en) Safety construction protection equipment for electric power construction site
CN219201659U (en) Fixing mechanism based on electric power detection device for hydraulic and hydroelectric engineering
CN221546041U (en) Curtain wall connecting piece convenient to install
CN219387104U (en) Upright rod connecting device on cantilever scaffold I-steel
CN216238233U (en) Safety warning device for building engineering management
CN219864476U (en) Building baffle with reinforced structure
CN219107935U (en) Data acquisition device for energy consumption on-line monitoring equipment
CN220889757U (en) Electrical construction safety device
CN215118026U (en) Simulation sand table for city planning
CN215629547U (en) Warning device for garden engineering with adjustable
CN221742235U (en) Safety fence for building engineering management convenient to installation
CN208379626U (en) A kind of power transmission sequence anchor rod foundation arrangement of reinforcement device
CN216571340U (en) Quick extinguishing device for building engineering technology
CN220247814U (en) Safety barrier for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant