CN210562633U - A steel construction for quick assembly disassembly for construction - Google Patents

A steel construction for quick assembly disassembly for construction Download PDF

Info

Publication number
CN210562633U
CN210562633U CN201920784319.6U CN201920784319U CN210562633U CN 210562633 U CN210562633 U CN 210562633U CN 201920784319 U CN201920784319 U CN 201920784319U CN 210562633 U CN210562633 U CN 210562633U
Authority
CN
China
Prior art keywords
stand
backup pad
recess
groove
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920784319.6U
Other languages
Chinese (zh)
Inventor
赖建林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Zhongtian Steel Structure Co Ltd
Original Assignee
Jiangxi Zhongtian Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Zhongtian Steel Structure Co Ltd filed Critical Jiangxi Zhongtian Steel Structure Co Ltd
Priority to CN201920784319.6U priority Critical patent/CN210562633U/en
Application granted granted Critical
Publication of CN210562633U publication Critical patent/CN210562633U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a steel construction for quick assembly disassembly for construction relates to construction technical field, the top surface including base and base is provided with the stand, and one side movable mounting on stand top has the backup pad, and the another side on stand top is provided with locking mechanism, and a side of stand bottom is provided with strengthening mechanism, and the central point department of putting of backup pad both sides face corresponds and has seted up the third recess, and the stand top is close to one side of backup pad and has seted up the second recess, and the inside on stand top is provided with first recess. Use the utility model discloses the time, reinforcing mechanism can fix the position of backup pad once more, plays the effect of protection simultaneously, slows down the impact force that external effort brought the backup pad, and locking mechanism can fix the position of backup pad, avoids the utility model discloses landing is pounded other equipment or staff in the backup pad follow second recess in the use, endangers people's life safety.

Description

A steel construction for quick assembly disassembly for construction
Technical Field
The utility model relates to a construction technical field specifically is a steel construction for quick assembly disassembly for construction.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, and all the members or parts are usually connected by welding seams, bolts or rivets. Because of its light dead weight, and construction is simple and convenient, widely apply to fields such as large-scale factory building, venue, superelevation layer.
However, the steel structure is built and is mainly adopted the welding, need build some interim steel constructions in some interim engineering, adopt the welded mode under this kind of circumstances, the later stage is dismantled the degree of difficulty too big, is not conform to market demand, is dismantling the in-process moreover, can cause the damage to the support body of steel construction, influences the secondary use of steel construction. Accordingly, those skilled in the art have provided a quick-release steel structure for construction work to solve the problems set forth in the background art as described above.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a steel construction for quick assembly disassembly for construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a steel structure for quick assembly and disassembly for building construction comprises a base and a stand column arranged on the top surface of the base, wherein a support plate is movably arranged on one side of the top end of the stand column, a locking mechanism is arranged on the other side surface of the top end of the stand column, a reinforcing mechanism is arranged on one side surface of the bottom of the stand column, a third groove is correspondingly formed in the central position of the two side surfaces of the support plate, a second groove is formed in one side, close to the support plate, of the top end of the stand column, a first groove is formed in the top end of the stand column, a handle is arranged at one end of the locking mechanism, an inserting rod is fixedly connected to the central position, close to one side surface of the stand column, a spring is arranged in the first groove, a limiting block is arranged on one side of the inner part of the first groove, the bottom of collar is provided with the unthreaded through-hole, the top of installation piece is provided with the head rod, the intermediate position department of head rod is provided with the elasticity nut, the below of collar is provided with the second connecting rod.
As a further aspect of the present invention: the handle and the inserted bar are of an integrated structure, one end of the inserted bar penetrates through the stand column to be inserted into a third groove in the side face of the supporting plate, and the inserted bar is matched with the third groove.
As a further aspect of the present invention: one end of the spring is connected to one side surface inside the first groove, and the other end of the spring is connected to one side surface of the limiting block.
As a further aspect of the present invention: the mounting blocks are arranged on two sides, the two ends of the first connecting rod and the two ends of the second connecting rod are rotatably connected with the mounting ring through clamping pins in the unthreaded through hole respectively, and the first connecting rod and the second connecting rod are rotatably connected through the elastic nuts in the center positions of the first connecting rod and the second connecting rod.
As a further aspect of the present invention: the mounting rings are arranged in four, two of the mounting rings are correspondingly and fixedly arranged on the bottom surface of the supporting plate, the other two mounting rings are correspondingly and fixedly arranged on the top surface of the mounting block, and the reinforcing mechanism is arranged in four positions and is respectively arranged on four side surfaces of the supporting plate.
As a further aspect of the present invention: the central axes of the first groove, the second groove and the third groove are on the same straight line, and the second groove is matched with the support plate.
As a further aspect of the present invention: the base and the stand formula structure as an organic whole, the both sides of base top surface are provided with the screw thread through-hole, and the base through with screw thread through-hole assorted rag bolt fixed mounting on the earth's surface.
Compared with the prior art, the beneficial effects of the utility model are that: the staff is in the installation the utility model discloses the time, can be very light through rag bolt will the utility model discloses install on the earth's surface, make things convenient for the staff to be right the utility model discloses an installation and dismantlement work have improved staff's work efficiency, have very high practicality and wide development space, also are favorable to simultaneously the utility model discloses a secondary is used, and reinforcing mechanism can fix the position of backup pad once more, plays the effect of protection simultaneously, slows down the impact force that external effort brought the backup pad, and locking mechanism can fix the position of backup pad, avoids the utility model discloses other equipment or staff are pounded to the landing in the backup pad follows the second recess in the use to cause people's loss of property, still can harm staff's life safety when serious.
Drawings
FIG. 1 is a schematic structural view of a quick-release steel structure for construction;
FIG. 2 is a schematic structural view of a locking mechanism in a quick-release steel structure for construction;
fig. 3 is a schematic structural view of a reinforcing mechanism in a steel structure for quick assembly and disassembly for building construction.
In the figure: 1. a base; 2. a column; 3. a support plate; 4. a locking mechanism; 5. a reinforcement mechanism; 6. a threaded through hole; 201. a first groove; 202. a second groove; 301. a third groove; 401. a spring; 402. a handle; 403. a limiting block; 404. inserting a rod; 501. mounting blocks; 502. a first connecting rod; 503. a mounting ring; 504. a threadless through hole; 505. a second connecting rod; 506. and (5) loosening and tightening the nut.
Detailed Description
Referring to fig. 1 to 3, in the embodiment of the present invention, a steel structure for quick assembly and disassembly for building construction comprises a base 1 and a column 2 disposed on the top surface of the base 1, a support plate 3 movably disposed on one side of the top end of the column 2, a locking mechanism 4 disposed on the other side of the top end of the column 2, a reinforcing mechanism 5 disposed on one side of the bottom of the column 2, a third groove 301 disposed at the center of the two sides of the support plate 3, a second groove 202 disposed on one side of the top end of the column 2 near the support plate 3, a first groove 201 disposed inside the top end of the column 2, a handle 402 disposed at one end of the locking mechanism 4, an inserting rod 404 fixedly connected to the handle 402 near the center of one side of the column 2, a spring 401 disposed inside the first groove 201, a limiting block 403 disposed on one side of the inside of the first groove 201, and a mounting ring, and the two sides of the bottom of the reinforcing mechanism 5 are correspondingly provided with mounting blocks 501, the bottom end of the mounting ring 503 is provided with a non-threaded through hole 504, a first connecting rod 502 is arranged above the mounting blocks 501, an elastic nut 506 is arranged in the middle of the first connecting rod 502, and a second connecting rod 505 is arranged below the mounting ring 503.
In fig. 2: handle 402 and inserted bar 404 formula structure as an organic whole, the one end of inserted bar 404 runs through in stand 2 inserts the third recess 301 of backup pad 3 side, and inserted bar 404 and third recess 301 match each other, the one end of spring 401 is connected in the inside side of first recess 201, and the other end of spring 401 connects the side at stopper 403, first recess 201, second recess 202 is on same straight line with the axis of third recess 301, second recess 202 matches each other with backup pad 3, locking mechanism 4 can fix the position of backup pad 3, avoid the utility model discloses other equipment or staff are pounded to the landing in backup pad 3 follow second recess 202 in the use to cause people's property loss, still can harm staff's life safety when serious.
In fig. 3: the mounting blocks 501 are arranged in two, the two ends of the first connecting rod 502 and the second connecting rod 505 are rotatably connected with the mounting rings 503 through clamping pins at the positions of the unthreaded through holes 504 respectively, the first connecting rod 502 and the second connecting rod 505 are rotatably connected through the tightening nuts 506 at the central positions of the first connecting rod 502 and the second connecting rod 505, the mounting rings 503 are arranged in four, two of the mounting rings 503 correspond to the bottom surfaces of the supporting plates 3 and are fixedly mounted on the top surfaces of the mounting blocks 501, the reinforcing mechanisms 5 are arranged in four positions and are respectively arranged on four side surfaces of the supporting plates 3, the positions of the supporting plates 3 can be fixed again by the reinforcing mechanisms 5, the protective effect is achieved, and impact force brought to the supporting plates 3 by external acting force is relieved.
In fig. 1: base 1 and stand 2 formula structure as an organic whole, the both sides of 1 top surface of base are provided with screw thread through-hole 6, and base 1 through with 6 assorted rag bolt fixed mounting on the earth's surface of screw thread through-hole, the utility model discloses a rag bolt connects on the earth's surface, makes things convenient for the staff right the utility model discloses an installation and dismantlement work have improved staff's work efficiency, have very high practicality and wide development space.
The utility model discloses a theory of operation is: when the utility model is used, firstly, the upright post 2 is fixedly arranged on the ground surface through the thread through hole 6 by using the foundation bolt, then the handle 402 is pulled to drive the limit block 403 to compress the spring 401, at this time, the two sides of the support plate 3 are correspondingly inserted into the second groove 202 at the top end of the upright post 2, so that the support plate 3 is just clamped in the second groove 202, the handle 402 is loosened, because of the elastic potential energy of the spring 401, the spring 401 pushes the limit block 403 to reset, the limit block 403 resets and simultaneously drives one end of the inserted bar 404 to be inserted into the third grooves 301 at the two side surfaces of the support plate 3, the locking mechanism 4 can fix the position of the support plate 3, the utility model is avoided that the support plate 3 slides down from the second groove 202 to hit other equipment or working personnel during the use process, thereby causing property loss of people and seriously endangering the life safety of, then rotate the both ends of head rod 502 and second connecting rod 505 through the bayonet lock respectively and connect in unthreaded through-hole 504 on collar 503, screw up the current angle of head rod 502 and second connecting rod 505, and reinforcing mechanism 5 can fix the position of backup pad 3 once more, plays the effect of protection simultaneously, slows down the impact force that external effort brought backup pad 3, the utility model discloses simple structure, convenient operation, it is lower to operating personnel's technical requirement, and has very high practicality and wide development space, and its stable in structure is high-efficient, the maintenance and the change in the later stage of being convenient for.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a steel construction for quick assembly disassembly for construction, includes base (1) and the top surface of base (1) is provided with stand (2), one side movable mounting on stand (2) top has backup pad (3), its characterized in that, the another side on stand (2) top is provided with locking mechanism (4), and a side of stand (2) bottom is provided with reinforcing mechanism (5), the central point department of putting of backup pad (3) both sides face corresponds and has seted up third recess (301), one side that stand (2) top is close to backup pad (3) has seted up second recess (202), the inside on stand (2) top is provided with first recess (201), the one end of locking mechanism (4) is provided with handle (402), handle (402) are close to central point department fixedly connected with inserted bar (404) of a side of stand (2), the inside of first recess (201) is provided with spring (401), and the inside one side of first recess (201) is provided with stopper (403), the both sides correspondence at reinforcing mechanism (5) top is provided with collar (503), and the both sides correspondence of reinforcing mechanism (5) bottom is provided with installation piece (501), the bottom of collar (503) is provided with unthreaded through-hole (504), the top of installation piece (501) is provided with head rod (502), the intermediate position department of head rod (502) is provided with elasticity nut (506), the below of collar (503) is provided with second connecting rod (505).
2. The steel structure for the rapid disassembly and assembly for the building construction as claimed in claim 1, wherein the handle (402) and the insertion rod (404) are of an integral structure, one end of the insertion rod (404) penetrates through the upright column (2) and is inserted into the third groove (301) on the side surface of the support plate (3), and the insertion rod (404) and the third groove (301) are matched with each other.
3. The steel structure for the rapid disassembly and assembly for building construction as claimed in claim 1, wherein one end of the spring (401) is connected to one side surface inside the first groove (201), and the other end of the spring (401) is connected to one side surface of the limiting block (403).
4. The steel structure for the rapid dismounting and mounting for the building construction as claimed in claim 1, wherein the mounting blocks (501) are provided in two, the two ends of the first connecting rod (502) and the second connecting rod (505) are respectively connected with the mounting ring (503) in a rotation manner at the unthreaded through hole (504) by means of clamping pins, and the first connecting rod (502) and the second connecting rod (505) are connected in a rotation manner by means of the loose nut (506) at the central position thereof.
5. The steel structure for the rapid dismounting and mounting for the building construction as claimed in claim 1 is characterized in that the number of the mounting rings (503) is four, two of the mounting rings (503) are correspondingly and fixedly mounted on the bottom surface of the supporting plate (3), the other two mounting rings (503) are correspondingly and fixedly mounted on the top surface of the mounting block (501), and the reinforcing mechanism (5) is provided with four positions which are respectively arranged on four side surfaces of the supporting plate (3).
6. The steel structure for the rapid disassembly and assembly for building construction as claimed in claim 1, wherein the central axes of the first groove (201), the second groove (202) and the third groove (301) are on the same straight line, and the second groove (202) and the support plate (3) are matched with each other.
7. The steel structure for the rapid disassembly and assembly for the building construction according to claim 1 is characterized in that the base (1) and the upright post (2) are of an integral structure, threaded through holes (6) are formed in two sides of the top surface of the base (1), and the base (1) is fixedly installed on the ground surface through foundation bolts matched with the threaded through holes (6).
CN201920784319.6U 2019-05-29 2019-05-29 A steel construction for quick assembly disassembly for construction Expired - Fee Related CN210562633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920784319.6U CN210562633U (en) 2019-05-29 2019-05-29 A steel construction for quick assembly disassembly for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920784319.6U CN210562633U (en) 2019-05-29 2019-05-29 A steel construction for quick assembly disassembly for construction

Publications (1)

Publication Number Publication Date
CN210562633U true CN210562633U (en) 2020-05-19

Family

ID=70635354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920784319.6U Expired - Fee Related CN210562633U (en) 2019-05-29 2019-05-29 A steel construction for quick assembly disassembly for construction

Country Status (1)

Country Link
CN (1) CN210562633U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062463A (en) * 2021-03-24 2021-07-02 机械工业第九设计研究院有限公司 Truss for steel construction industry factory building convenient to dismouting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062463A (en) * 2021-03-24 2021-07-02 机械工业第九设计研究院有限公司 Truss for steel construction industry factory building convenient to dismouting

Similar Documents

Publication Publication Date Title
CN103696498B (en) Easily steel hetermorphiscal column-center support is repaired after a kind of shake
CN213897557U (en) Reinforced steel structure mounted in multiple ways
CN210562633U (en) A steel construction for quick assembly disassembly for construction
CN211369597U (en) Construction is with recoverable bearing diagonal structure
CN216142502U (en) Anti-overturning high-voltage line power transmission iron tower
CN216950221U (en) Staple bolt of high mound cat ladder attaches wall device
CN211949048U (en) Section steel concrete shear wall structure
CN211447732U (en) Attached lifting scaffold is with hoist and mount subassembly
CN208884983U (en) A kind of aluminum alloy mould plate device being easily installed
CN215803064U (en) Assembled operation platform that encorbelments of concatenation
CN218861917U (en) Building steel structure supporting beam
CN206385911U (en) One kind construction anchoring temporarily fixing device and temporary protection railing fixing leg
CN220081037U (en) Building construction safety guard rail
CN215519176U (en) Full-bolt connection assembled house steel structure
CN215886130U (en) Guardrail for tower crane convenient to carry out quick assembly disassembly
CN211226110U (en) Special hoisting tool of cantilever type
CN212153150U (en) Whole reinforcing apparatus of bridge
CN220705130U (en) Positioning conduction assembly for quick installation of overhanging scaffold
CN220621166U (en) Edge protection device for high-altitude operation
CN220058310U (en) Assembled steel structure frame
CN219754247U (en) Water conservancy rail guard
CN218758916U (en) Protective net convenient to assemble
CN216518050U (en) Tunnel tunnel face spouts concrete construction work platform in
CN217680739U (en) Building structure design beam column reinforced structure
CN217949122U (en) Tool type steel platform for tower crane foundation construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200519

Termination date: 20210529

CF01 Termination of patent right due to non-payment of annual fee