CN206385911U - One kind construction anchoring temporarily fixing device and temporary protection railing fixing leg - Google Patents

One kind construction anchoring temporarily fixing device and temporary protection railing fixing leg Download PDF

Info

Publication number
CN206385911U
CN206385911U CN201621442280.2U CN201621442280U CN206385911U CN 206385911 U CN206385911 U CN 206385911U CN 201621442280 U CN201621442280 U CN 201621442280U CN 206385911 U CN206385911 U CN 206385911U
Authority
CN
China
Prior art keywords
anchoring
fixing device
horizontal part
temporarily fixing
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621442280.2U
Other languages
Chinese (zh)
Inventor
王福全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621442280.2U priority Critical patent/CN206385911U/en
Application granted granted Critical
Publication of CN206385911U publication Critical patent/CN206385911U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of construction anchoring temporarily fixing device and temporary protection railing fixing leg.Anchoring temporarily fixing device includes keeping flat horizontal part on the body construction, and anchor rod one end bends after being connected with horizontal part, makes to form the vertical screw mandrel that is spirally connected in the screw on acute angle, horizontal part between plane residing for anchor rod and horizontal part.Fixing leg includes anchoring temporarily fixing device, anchoring temporarily fixing device is fixedly connected with leg fixing component, leg fixing component includes by some vertical rods being connected between spaced at least two receivings frame up and down, all receiving frames and each vertical rod is fixed with horizontal part.In the utility model, anchoring fixing device can realize being fixedly secured for provisional protection facility and agent structure, and fixing leg can realize being fixedly secured for temporary protection railing, and good fixing effect, reliability is high, and easy removal can have enough to meet the need reuse.

Description

One kind construction anchoring temporarily fixing device and temporary protection railing fixing leg
Technical field
The utility model is related to the anchoring temporarily fixing device used in a kind of construction and fixed based on the anchoring temporarily The temporary protection railing fixing leg that device Force principle is realized, consolidates technical field with belonging to construction temporary project.
Background technology
In construction, the application of expansion bolt is more and more extensive.At present, construction provisional protection facility is interim The fixation of guard rail etc. all can largely use expansion bolt.It can see from actual implement, expansion bolt in temporary project Application to be primarily present following both sides not enough:First, expansion bolt can not be used in turn, and there is the problem of waste is serious. Provisional protection facility needs to tear down and reconstruct at any time in formal engineering construction, is removed again after formal Practical Completion, but expansion bolt is It can not remove, it can only be disposable, therefore waste extremely serious.Second, it is impossible to the expanding screw removed and carried over Bolt is possible to that the construction of formal engineering can be hindered, therefore must carry out gas flame cuttiug dismounting to expansion bolt in practice, this Way wastes time and energy, and also there is the potential safety hazard for triggering fire.
Existing temporary protection railing is as shown in figure 1, the bottom of column 71 of guard rail 70 is provided with base 72, in actual fixation When guard rail 70, it is typically that expansion bolt 80 is installed on base 72, base 72 is passed through into expansion bolt 80 and main body Structure is mutually fixed, so that the fixation to realize guard rail 70.It can be found that the fixation of this guard rail from actual implement Mode, which exists to tear down and reconstruct, shifts the defect that inconvenient and expansion bolt is difficult to remove.
Utility model content
The purpose of this utility model is to provide a kind of construction anchoring temporarily fixing device and based on the anchoring temporarily The temporary protection railing fixing leg that fixing device is realized, the anchoring temporarily fixing device can realize that building site guard rail etc. is interim Being fixedly secured between protective equipment and agent structure, reliability is high, is prevented temporarily based on what the anchoring temporarily fixing device was realized Guard rail rod fixing leg, which has, is fixedly secured temporary protection railing, and reliability is high, tears down and reconstruct displacement conveniently, the advantages of economizing on resources.
To achieve these goals, the utility model employs following technical scheme:
Anchoring temporarily fixing device is used in one kind construction, it is characterised in that:It includes keeping flat horizontal part on the body construction, Bend after one end of anchor rod and the connection of horizontal part and make to form a sharp angle α between plane residing for anchor rod and horizontal part, put down Put the vertical screw mandrel that is spirally connected in the screw on part.
The horizontal part is flat board or nut, and the anchor rod is the column body of rod.
It is preferred that the top of the vertical screw mandrel is provided with square toes.
It is preferred that the vertical screw mandrel arranges and is bolted with nut.Further, anchoring temporarily fixing device is used in the construction Also include anchoring reinforcement, anchoring reinforcement includes flat board, and flat board one end is provided with recess, and one end of anchoring enhancing bar and flat board are another Bend after the connection of one end and strengthen anchoring and an acute angles beta is formed between bar and flat board plate face, the recess of flat board is supported described Be fixed on after on vertical screw mandrel by the nut on the horizontal part, make anchoring strengthen bar and plane residing for the horizontal part it Between be similarly formed acute angles beta, wherein:Anchor rod, anchoring enhancing bar are relative relative to the overbending direction of the horizontal part.
A kind of temporary protection railing fixing leg, it is characterised in that:It fixes dress with anchoring temporarily including described construction Put, the construction is fixedly connected with leg fixing component with anchoring temporarily fixing device, wherein:Above and below leg fixing component includes It is connected between spaced at least two receivings frame, all receiving frames by some vertical rods and each vertical rod connects with the horizontal part Connect fixation.
The vertical rod is the outside that threaded rod and threaded rod are welded in the receiving frame.
It is preferred that it is described accommodate on frame activity in the screwed hole that opens up and be equipped with support bolt.
The utility model has the advantages that:
1st, the utility model anchoring temporarily fixing device is realized and master using inclination and the mechanical force of vertical different directions Being connected between body structure, recycle vertical screw mandrel be spirally connected nut mode realize it is temporarily anti-to temporary protection railing etc. Being fixedly secured for shield facility, fixes reliability height, solid durable, tears down and reconstruct displacement convenient.Also, the utility model anchoring temporarily is consolidated Determine device and back out that vertical screw mandrel is i.e. dismountable, alignment type engineering does not influence, in the absence of the condition of a fire shape such as gas flame cuttiug, it is to avoid Fire occurs for scene, is conducive to safety in production.In addition, the utility model anchoring temporarily fixing device can have enough to meet the need reuse, drop Low construction cost, has saved resource, has protected environment.
2nd, the utility model temporary protection railing fixing leg realizes that it can be fixedly secured based on anchoring temporarily fixing device Temporary protection railing, good fixing effect, reliability is high, and easy removal can have enough to meet the need reuse, and construction cost is low, and it has There are above-mentioned all advantages that anchoring temporarily fixing device possesses, especially, temporary protection railing will not be by unloading process To damage, reuse can be had enough to meet the need.
Brief description of the drawings
Fig. 1 is the schematic diagram of existing temporary protection railing.
Fig. 2 is the structural representation of the utility model anchoring temporarily the first preferred embodiment of fixing device.
Fig. 3 is the structural representation of the utility model anchoring temporarily the second preferred embodiment of fixing device.
Fig. 4 is the structural representation of the preferred embodiment of the utility model anchoring temporarily fixing device the 3rd.
Fig. 5 is the structural representation of the utility model temporary protection railing fixing leg.
Fig. 6 is the use schematic diagram of the utility model temporary protection railing fixing leg.
Embodiment
As shown in Figures 2 and 3, the utility model construction anchoring temporarily fixing device is flat including lying in agent structure 50 Horizontal part on face, one end of anchor rod 12 after one end welding of horizontal part with bending, so that residing for anchor rod 12 and horizontal part A sharp angle α is formed between plane, sharp angle α is preferably smaller than equal to 45 degree, and horizontal part (does not show provided with least one screw in figure Go out), vertical screw mandrel 20 is bolted with screw.
In actual design, horizontal part can select bar shaped steel flat board 11 or steel nut 13, and anchor rod 12 can select steel The matter column body of rod, such as reinforcing bar.
Such as Fig. 2, when horizontal part selects flat board 11, sharp angle α, flat board 11 are formed between the plate face of anchor rod 12 and flat board 11 Plate face is plane residing for flat board 11.Such as Fig. 3, when horizontal part selects nut 13, plane etc. residing for itself cross section of nut 13 The plane of agent structure 50 is same as, then it is believed that forming sharp angle α between anchor rod 12 and the plane of agent structure 50.
In actual design, the top of vertical screw mandrel 20 can be provided with easy-to-dismount square toes 21.Such as Fig. 2, vertical screw mandrel 20 Arranging is bolted with nut 30.In actual design, the overall diameter of nut 13 can be equal to or more than the overall diameter of nut 30.
In actual design, horizontal part is solderable to be connected at least one reinforcing bar, and Fig. 2 is illustrated that flat board 11 is welded with a steel The situation of muscle.
During installation, inclined hole 51 and straight hole 52 are drilled in the appropriate location of agent structure 50, the angle of inclination of inclined hole 51 regards anchor Gu depending on the gradient of bar 12.Then the anchor rod 12 of the utility model anchoring temporarily fixing device is inserted into inclined hole 51, anchor rod 12 tilt with the surface of agent structure 50.Horizontal part is put on the surface of agent structure 50, the screw alignment straight hole 52 on horizontal part.Rotation Vertical screw mandrel 20 is twisted, the bottom of vertical screw mandrel 20 is stretched into straight hole 52 and holds out against the bottom of straight hole 52, so that vertical screw mandrel 20 is consolidated Live calmly, form steady status.In other words, the utility model anchoring temporarily fixing device is by bending downwards and agent structure The inclined anchor rod 12 in 50 (ground) and the vertical screw mandrel 20 vertical with agent structure 50 (ground) and be mounted in agent structure On 50, so as to realize that the anchoring with building body is fixed.Then be spirally connected the mode of nut 30 using vertical screw mandrel 20, just can be firm Ground will the provisional protection facility such as temporary protection railing via the utility model anchoring temporarily fixing device and agent structure 50 It is mutually fixed.
During dismounting, nut 30 is backed out, fixed provisional protection facility is removed, the square toes at the vertical top of screw mandrel 20 are then screwed 21, vertical screw mandrel 20 is exited straight hole 52, so as to along the direction of inclined hole 51 anchor rod 12 can be made to exit inclined hole 51, take out this practicality New anchoring temporarily fixing device.
In order to strengthen anchoring effect, such as Fig. 4, the utility model construction may also include anchoring with anchoring temporarily fixing device and increase Strong part.Anchoring reinforcement includes flat board 91, and the one end of flat board 91 is provided with recess 92, and one end of anchoring enhancing bar 93 and flat board 91 are another Bent after the connection of end, so as to form an acute angles beta between anchoring enhancing bar 93 and the plate face of flat board 91, acute angles beta, which is preferably smaller than, to be equal to 45 degree, the recess 92 of flat board 91 is compressed downwards to flat board 91 by screw on nut 30 after supporting on vertical screw mandrel 20 and makes flat board 91 mutually fix with horizontal part, so that acute angles beta is similarly formed between plane residing for anchoring enhancing bar 93 and horizontal part, wherein:Anchor Gu bar 12, anchoring enhancing bar 93 are relative relative to the overbending direction of horizontal part, in other words, from horizontal direction from the point of view of, anchor rod 12nd, overbending direction contrast of the anchoring enhancing bar 93 relative to horizontal part.When Fig. 4 is illustrated that horizontal part selects flat board 11, Increase accessory --- the situation of anchoring reinforcement.
, just can be in vertical silk after anchor rod 12, vertical screw mandrel 20 are fixed in agent structure 50 in actual installation Anchoring reinforcement is installed on bar 20, anchoring is strengthened bar 93 and inserts in pre-drilled inclined hole, so that in anchor rod 12, vertical silk On the basis of inclination mechanical force that bar 20 is provided respectively, original anchor force of vertical mechanical power both different directions, add again The inclination mechanical force of the different directions provided by anchoring enhancing bar 93, then makes the anchor of the utility model anchoring temporarily fixing device Gu effect is greatly promoted.
Such as Fig. 5, based on above-mentioned construction anchoring temporarily fixing device, the utility model is consolidated also directed to temporary protection railing Surely a kind of temporary protection railing fixing leg is proposed, it includes the construction of above-mentioned the utility model and uses anchoring temporarily fixing device, Such as Fig. 5, construction is fixedly connected with leg fixing component 60 with the horizontal part of anchoring temporarily fixing device, wherein:Leg fixes structure Part 60 includes spaced at least two receivings frame 61 (Fig. 5 is illustrated that the situation for being designed with two receiving frames 61) up and down, It can be in hollow rectangular shape (without limitations) to accommodate frame 61, between all receiving frames 61 by some vertical rods 62 (shown in Fig. 5 It is the situation for being designed with three vertical rods 62) it is connected and each vertical rod 62 is welded and fixed with horizontal part.
When Fig. 5 is illustrated that horizontal part selects flat board 11, increase leg fixing component is fixed to constitute temporary protection railing The situation of leg.
Such as Fig. 5, vertical rod 62 can be threaded rod and threaded rod is welded in the outside for accommodating frame 61.
Such as Fig. 5, it is preferred that accommodating movable be equipped with the screwed hole opened up on frame 61 supports bolt 63.
Further, it is preferred that the screw thread hole site accommodated on frame 61 is correspondingly provided with firm nut 64, nut 64 is consolidated Effect is to make to support bolt 63 can the steady displacement of level on frame 61 is accommodated.
When installing and using, anchoring temporarily fixing device is fixed on the appropriate location of agent structure 50 (interim by such as Fig. 6 The installation process of fixing device is anchored referring to above-mentioned, is not repeated herein), the column 71 of temporary protection railing 70 is inserted into this reality In the vertical receiving space being collectively forming from each other with each receiving frame 61 of new fixing leg, then tighten and respectively support spiral shell Bolt 63, order supports bolt 63 and supports the column 71 of temporary protection railing 70 being placed in receiving space, so as to realize to interim anti- The strong fix of guard rail rod 70.
During dismounting, unscrew and support bolt 63, the column 71 of temporary protection railing 70 is taken out from receiving space, then torn open Except anchoring temporarily fixing device can (demolishing process of anchoring temporarily fixing device not be repeated herein referring to above-mentioned).
The utility model has the advantages that:
1st, the utility model anchoring temporarily fixing device is realized and master using inclination and the mechanical force of vertical different directions Being connected between body structure, recycle vertical screw mandrel be spirally connected nut mode realize it is temporarily anti-to temporary protection railing etc. Being fixedly secured for shield facility, fixes reliability height, solid durable, tears down and reconstruct displacement convenient.Also, the utility model anchoring temporarily is consolidated Determine device and back out that vertical screw mandrel is i.e. dismountable, alignment type engineering does not influence, in the absence of the condition of a fire shape such as gas flame cuttiug, it is to avoid Fire occurs for scene, is conducive to safety in production.In addition, the utility model anchoring temporarily fixing device can have enough to meet the need reuse, drop Low construction cost, has saved resource, has protected environment.
2nd, the utility model temporary protection railing fixing leg realizes that it can be fixedly secured based on anchoring temporarily fixing device Temporary protection railing, good fixing effect, reliability is high, and easy removal can have enough to meet the need reuse, and construction cost is low, and it has There are above-mentioned all advantages that anchoring temporarily fixing device possesses, especially, temporary protection railing will not be by unloading process To damage, reuse can be had enough to meet the need.
The technical principle described above for being preferred embodiment of the present utility model and its being used, for the technology of this area It is any to be based on technical solutions of the utility model base in the case of without departing substantially from spirit and scope of the present utility model for personnel Equivalent transformation, simple replacement on plinth etc. are obvious to be changed, and is belonged within the utility model protection domain.

Claims (8)

1. anchoring temporarily fixing device is used in one kind construction, it is characterised in that:It includes keeping flat horizontal part on the body construction, anchor Gu bend after one end of bar and the connection of horizontal part and make to form a sharp angle α, horizontal between plane residing for anchor rod and horizontal part Be spirally connected vertical screw mandrel in screw on part.
2. anchoring temporarily fixing device is used in construction as claimed in claim 1, it is characterised in that:
The horizontal part is flat board or nut, and the anchor rod is the column body of rod.
3. anchoring temporarily fixing device is used in construction as claimed in claim 1, it is characterised in that:
The top of the vertical screw mandrel is provided with square toes.
4. anchoring temporarily fixing device is used in construction as claimed in claim 1, it is characterised in that:
The vertical screw mandrel, which is arranged, is bolted with nut.
5. anchoring temporarily fixing device is used in construction as claimed in claim 4, it is characterised in that:
The construction also includes anchoring reinforcement with anchoring temporarily fixing device, and anchoring reinforcement includes flat board, and flat board one end is set There is bending behind recess, one end of anchoring enhancing bar and the connection of the flat board other end and anchoring is strengthened between bar and flat board plate face and formed One acute angles beta, the recess of flat board is fixed on the horizontal part after supporting on the vertical screw mandrel by the nut, makes anchor Admittedly acute angles beta is similarly formed between plane residing for enhancing bar and the horizontal part, wherein:Anchor rod, anchoring enhancing bar are relative to institute The overbending direction for stating horizontal part is relative.
6. a kind of temporary protection railing fixing leg, it is characterised in that:It includes applying any one of claim 1 to 5 Work anchoring temporarily fixing device, the construction is fixedly connected with leg fixing component with anchoring temporarily fixing device, wherein:Branch Pin fixing component includes by some vertical rods being connected and each between spaced at least two receivings frame up and down, all receiving frames Vertical rod is connected with the horizontal part.
7. temporary protection railing fixing leg as claimed in claim 6, it is characterised in that:
The vertical rod is the outside that threaded rod and threaded rod are welded in the receiving frame.
8. temporary protection railing fixing leg as claimed in claim 6, it is characterised in that:
Activity, which is equipped with, in the screwed hole opened up on the receiving frame supports bolt.
CN201621442280.2U 2016-12-26 2016-12-26 One kind construction anchoring temporarily fixing device and temporary protection railing fixing leg Expired - Fee Related CN206385911U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621442280.2U CN206385911U (en) 2016-12-26 2016-12-26 One kind construction anchoring temporarily fixing device and temporary protection railing fixing leg

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621442280.2U CN206385911U (en) 2016-12-26 2016-12-26 One kind construction anchoring temporarily fixing device and temporary protection railing fixing leg

Publications (1)

Publication Number Publication Date
CN206385911U true CN206385911U (en) 2017-08-08

Family

ID=59489789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621442280.2U Expired - Fee Related CN206385911U (en) 2016-12-26 2016-12-26 One kind construction anchoring temporarily fixing device and temporary protection railing fixing leg

Country Status (1)

Country Link
CN (1) CN206385911U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522654A (en) * 2016-12-26 2017-03-22 王福全 Temporary anchoring fixing device for construction and temporary protective barrier fixing supporting foot

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522654A (en) * 2016-12-26 2017-03-22 王福全 Temporary anchoring fixing device for construction and temporary protective barrier fixing supporting foot

Similar Documents

Publication Publication Date Title
CN105256913B (en) A kind of anti-buckling support of shape memory alloy twisted wire Self-resetting friction
CN106499202B (en) The portable edge protection column of box-type for safety management in construction site
CN202139833U (en) Cantilever scaffold for building construction
CN106760461B (en) A kind of installation method of full fabricated scaffold overhanging
CN201546435U (en) Bolted stayed cantilever scaffold
CN110439183A (en) Self- recoverage flush type consumes energy steel kind design after a kind of shake
CN104389419A (en) Cantilevered formwork platform installation structure and construction method
CN107939068A (en) A kind of foundation pit hangs lane device
CN209412683U (en) A kind of supporting system for aqueduct
CN206385911U (en) One kind construction anchoring temporarily fixing device and temporary protection railing fixing leg
CN106088136B (en) A kind of standoff generation power foundation of wind power of band and its construction technology
CN208183754U (en) A kind of foundation pit diagonal brace structure
CN109680915B (en) Scaffold with hemispherical structural surface and erection method thereof
CN110005203A (en) A kind of adaptive tool-type sloping core form bracing system and application method
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN207633795U (en) A kind of foundation pit suspension lane device
CN111519891A (en) Anchor ring buckling type rigid outer frame wall connecting piece and construction method thereof
CN207277365U (en) A kind of dismountable retaining wall
CN203347205U (en) Overhung scaffold
CN214940198U (en) Detachable temporary support for construction of constructional engineering
CN106522654A (en) Temporary anchoring fixing device for construction and temporary protective barrier fixing supporting foot
CN108240113A (en) Detachably across the support device at hole and method
CN202000649U (en) Movable strengthening device for bottom of upright stenshion of construction cantilevered frame
CN206376570U (en) A kind of temporary protection railing fixing leg
CN213297214U (en) Make things convenient for support frame for building engineering construction of dismouting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170808