CN216007749U - Foldable walkway - Google Patents

Foldable walkway Download PDF

Info

Publication number
CN216007749U
CN216007749U CN202121546121.8U CN202121546121U CN216007749U CN 216007749 U CN216007749 U CN 216007749U CN 202121546121 U CN202121546121 U CN 202121546121U CN 216007749 U CN216007749 U CN 216007749U
Authority
CN
China
Prior art keywords
walkway
cantilever beam
plate
guardrail
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121546121.8U
Other languages
Chinese (zh)
Inventor
袁怡琳
余旦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanchang Mineral Systems Group Co Ltd
Original Assignee
Nanchang Mineral Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang Mineral Systems Co Ltd filed Critical Nanchang Mineral Systems Co Ltd
Priority to CN202121546121.8U priority Critical patent/CN216007749U/en
Application granted granted Critical
Publication of CN216007749U publication Critical patent/CN216007749U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a foldable walkway, which comprises a main beam frame, a walkway plate, a cantilever beam and a guardrail, wherein one end of the cantilever beam is hinged to one side of the main beam frame, the cantilever beam can be rotatably arranged along the horizontal direction of a hinge, the other end of the cantilever beam is hinged to the guardrail, the walkway plate is located on the cantilever beam, one end of the walkway plate is hinged to the main beam frame, and the walkway plate can be overturned along the vertical direction of the hinge to form a frame. The foldable walkway and guardrail of the utility model provide great convenience for equipment which needs to temporarily dismantle the walkway and guardrail and then install the walkway and guardrail, can easily fold and unfold the walkway and guardrail without investing excessive time, labor force and economic cost, and effectively improve the working efficiency.

Description

Foldable walkway
Technical Field
The utility model belongs to the field of machinery, and particularly relates to a foldable walkway.
Background
Walkways and guardrails are very common mechanical structures and are widely applied to various industries. For example, a movable crushing and screening station widely used in the industries of mines, gravel aggregates, construction wastes and the like is provided with a walkway and a guardrail required for maintenance. Because the portable crushing and screening station often needs to be shifted, there is the restriction to the size of crushing and screening station when considering the transportation, and its pavement and guardrail need demolish, hoist to the appointed place before shifting, and the pavement and guardrail hoist well during operation again. For the equipment which needs to be transferred frequently, the walking and the guard rails are disassembled and assembled frequently, so that the time, the labor and the financial resources are wasted, and the equipment is not economical and has low working efficiency.
Disclosure of Invention
The utility model aims to provide a foldable walkway, which can be directly folded with a guardrail when equipment is transferred without spending huge time and economic cost to disassemble and assemble the walkway and the guardrail.
In order to achieve the purpose, the utility model adopts the technical scheme that: the utility model provides a folding pavement, includes girder frame, pavement slab, cantilever beam and guardrail, and cantilever beam one end articulates in girder frame one side, and the cantilever beam can follow the rotatory setting of articulated department horizontal direction, and is articulated at the cantilever beam other end and guardrail, and the pavement slab is located on the cantilever beam, and pavement slab one end is articulated with girder frame, and the pavement slab can follow articulated department vertical direction upset and set up the frame.
Furthermore, the pneumatic track device further comprises a pneumatic spring, a first pneumatic spring connecting plate is welded on the main beam frame, a second pneumatic spring connecting plate is welded on the track plate, and two ends of the pneumatic spring are respectively connected and hinged with the first pneumatic spring connecting plate and the second pneumatic spring.
Further, the girder frame is formed by the welding of rectangular pipe, and the corresponding welding has first pin joint and second pin joint on the girder frame side, has seted up spacing hole on the first pin joint, and girder frame side upwards extends and is provided with the spacing locking plate of pavement.
Further, the hinge hole has been seted up to cantilever beam one end, and the hinge hole is connected with first pin joint through the round pin axle, and the welding of the cantilever beam other end has the guardrail sleeve pipe, and the welding of cantilever beam side has the pavement fixed plate, and the cantilever beam still welds the limiting plate near one side of hinge hole one side.
Furthermore, a positioning ring and a pin hole are sequentially arranged at the bottom of the guardrail, a split pin is arranged in the pin hole, and a distance for the guardrail sleeve to be matched and inserted is reserved between the positioning ring and the pin hole.
Furthermore, the bottom of the walkway plate is welded with a hinged circular pipe, the hinged circular pipe is connected with a second hinged point through a cylindrical pin, and a locking hole and a waist-shaped hole are correspondingly formed in the walkway plate at the positions corresponding to the walkway fixing plate and the walkway limiting locking plate respectively.
Compared with the prior art, the utility model has the following beneficial effects: can make the guidance tape overturn perpendicularly and fold on girder frame, and the cantilever beam that is used for supporting the guidance tape then can the rotatory folding messenger guardrail of horizontal direction laminate in girder frame one side, under the condition of proof strength and function, guarantee its folding performance, demolish guidance tape and guardrail temporarily to needs, after then provide very big facility with its equipment of installing, can pack up guidance tape and guardrail and open easily, need not drop into too much time, the labour, economic cost, and the work efficiency is effectively improved.
Drawings
FIG. 1 is a schematic illustration of the working state of the present invention;
FIG. 2 is a schematic view of the walkway plate of the utility model as folded;
FIG. 3 is a schematic illustration of the non-operational state of the present invention;
FIG. 4 is a schematic structural view of the main beam frame of the present invention
FIG. 5 is a schematic structural view of the cantilever beam of the present invention;
FIG. 6 is a schematic view of the construction of the guard rail of the present invention;
FIG. 7 is a schematic structural view of the walkway plate of the present invention;
in the figure: 1. the main beam comprises a main beam frame, 1-1 parts of a first hinge point, 1-2 parts of a second hinge point, 1-3 parts of a walkway limit locking plate, 1-4 parts of a first pneumatic spring connecting plate, 1-5 parts of a limit hole, 2 parts of a cantilever beam, 2-1 parts of a limit plate, 2-2 parts of a walkway fixing plate, 2-3 parts of a guardrail sleeve, 2-4 parts of a hinge hole, 3 parts of a guardrail, 3-1 parts of a positioning ring, 3-2 parts of a pin hole, 4 parts of a walkway plate, 4-1 parts of a second pneumatic spring connecting plate, 4-2 parts of a hinge pipe, 4-3 parts of a locking hole, 4-4 parts of a waist hole, 5 parts of a pneumatic spring, 6 parts of a cylindrical pin, 7 parts of a pin shaft, 8 parts of a split pin and 9 parts of a gasket.
Detailed Description
Referring to fig. 1-7, a foldable walkway comprises a girder frame 1, a walkway plate 4, a cantilever beam 2 and a guardrail 3, wherein one end of the cantilever beam 2 is hinged to one side of the girder frame 1, the cantilever beam 2 can be rotatably arranged along the horizontal direction of the hinged position, the other end of the cantilever beam 2 is hinged to the guardrail 3, the walkway plate 4 is located on the cantilever beam 2, one end of the walkway plate 4 is hinged to the girder frame 1, and the walkway plate 4 can be overturned along the vertical direction of the hinged position to form a frame. When the walking board 4 works, the walking board is overturned and positioned on the cantilever beam 2, so that the bearing capacity of the walking board can be enhanced, and the strength of the walking board is ensured. When the folding device is required, the walkway plates 4 are vertically turned and folded on the main beam frame 1, and the cantilever beams 2 for supporting the walkway plates 4 can be rotated and folded in the horizontal direction to enable the guardrails 3 to be attached to one side of the main beam frame 1, so that the device can be conveniently transported in a transition way.
The walking mechanism comprises a main beam frame 1, a walking plate 4, a first pneumatic spring 5 connecting plate 1-4, a second pneumatic spring 5 connecting plate 4-1, a pneumatic spring 5, a first pneumatic spring 5, a second pneumatic spring 5, a first pneumatic spring 5 connecting plate 1-4, a second pneumatic spring 5, a first pneumatic spring 5, a second pneumatic spring 5 and a pneumatic spring 5. According to the characteristics of the industrial accessories with the functions of supporting, buffering, braking, height adjusting, angle adjusting and the like of the pneumatic spring 5, the turning operation of the walkway plate 4 by workers can be facilitated.
The main beam frame 1 is formed by welding rectangular pipes, a first hinge point 1-1 and a second hinge point 1-2 are correspondingly welded on the side edge of the main beam frame 1, a limiting hole 1-5 is formed in the first hinge point 1-1, and a walkway limiting locking plate 1-3 extends upwards from the side edge of the main beam frame 1. The limiting holes 1-5 can fix the cantilever beam 2 through bolts after the cantilever beam 2 is rotated and opened, so that the cantilever beam is prevented from automatically rotating. And the spacing locking plate plays the role of fixing the walkway plate 4 after the walkway plate 4 is turned and folded, and prevents shaking and colliding during transition transportation.
The guardrail comprises a cantilever beam 2, a hinge hole 2-4, a guardrail 3 sleeve 2-3 welded at the other end of the cantilever beam 2, a walkway fixing plate 2-2 welded at the side edge of the cantilever beam 2, and a limiting plate 2-1 welded at one side of the cantilever beam 2 close to the hinge hole 2-4, wherein the hinge hole 2-4 is formed in one end of the cantilever beam 2, the hinge hole 2-4 is connected with a first hinge point 1-1 through a pin shaft 7. The limiting plate 2-1 can prevent the cantilever beam 2 from rotating by an angle which is too large and influences the adaptive installation of the later stage of the worker. The walkway fixing plate 2-2 mainly plays a role in fixing the cantilever beam 2 and the walkway plate 4 through bolts when the walkway plate 4 is located on the cantilever beam 2.
Wherein, the bottom of the guardrail 3 is sequentially provided with a positioning ring 3-1 and a pin hole 3-2, a cotter pin 8 is arranged in the pin hole 3-2, and a distance for the sleeve 2-3 of the guardrail 3 to be inserted in a matching way is reserved between the positioning ring 3-1 and the pin hole 3-2. The positioning ring 3-1 mainly plays a role in limiting the matching insertion distance of the guardrail 3 and the sleeve ring of the guardrail 3, and the pin hole 3-2 and the split pin 8 are matched to prevent the guardrail 3 from falling off from the sleeve 2-3 of the guardrail 3.
The bottom of the walkway plate 4 is welded with a hinged circular pipe 4-2, the hinged circular pipe 4-2 is connected with a second hinged point 1-2 through a cylindrical pin 6, and a locking hole 4-3 and a kidney-shaped hole 4-4 are correspondingly formed in the walkway plate 4 at the position corresponding to the walkway fixing plate 2-2 and the walkway limiting locking plate 1-3 respectively.
When the utility model is in a working state: the hinge holes 2-4 are connected with the first hinge structure through a pin shaft 7 and a cotter pin 8; the guardrail 3 is inserted into the sleeves 2-3 of the guardrail 3 and is fixed by a gasket 9 and a cotter pin 8; the walkway plate 4 falls on the cantilever beam 2, the walkway fixing plate 2-2 is connected with the locking hole 4-3 through a bolt, and the hinged circular pipe 4-2 is connected with the second hinged structure through a cylindrical pin 6. The pneumatic spring 5 is connected with a first pneumatic spring 5 connecting plate 1-4 and a second pneumatic spring 5 connecting plate 4-1. When folding: the bolts between the locking holes 4-3 and the walkway fixing plates 2-2 are taken down, the walkway plates 4 are turned over around the cylindrical pins 6 by means of the force of the pneumatic springs 5, the waist-shaped holes 4-4 and the walkway limiting locking plates 1-3 are connected through the bolts, the cantilever beams 2 are rotated to the side of the main beam frame 1, meanwhile, the guardrails 3 are rotated to one side, and then the bolts are inserted into the limiting holes 1-5, so that the cantilever beams 2 are limited. The folding process is reversed to open the walkway plates 4 and the guardrails 3 to the working state.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the utility model. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. A foldable walkway, characterized by: including girder frame, walk guidance tape, cantilever beam and guardrail, cantilever beam one end articulates in girder frame one side, and the cantilever beam can follow the rotatory setting of articulated department horizontal direction, and is articulated with the guardrail at the cantilever beam other end, walks the guidance tape and sits on the cantilever beam, walks guidance tape one end and is articulated with girder frame, walks the guidance tape and can follow the upset of articulated department vertical direction and set up the frame.
2. A collapsible walkway as defined in claim 1, wherein: the main beam frame is welded with a first pneumatic spring connecting plate, the walkway plate is welded with a second pneumatic spring connecting plate, and two ends of the pneumatic spring are respectively connected and hinged with the first pneumatic spring connecting plate and the second pneumatic spring.
3. A collapsible walkway as defined in claim 1, wherein: the girder frame is formed by the welding of rectangular pipe, and the corresponding welding has first pin joint and second pin joint on the girder frame side, has seted up spacing hole on the first pin joint, and girder frame side upwards extends and is provided with the spacing locking plate of pavement.
4. A collapsible walkway as defined in claim 3, wherein: the hinge hole has been seted up to cantilever beam one end, and the hinge hole is connected with first pin joint through the round pin axle, and the welding of the cantilever beam other end has the guardrail sleeve pipe, and the welding of cantilever beam side has the pavement fixed plate, and the cantilever beam still welds the limiting plate near one side of hinge hole one side.
5. A collapsible walkway as defined in claim 4, wherein: the bottom of the guardrail is sequentially provided with a positioning ring and a pin hole, a split pin is arranged in the pin hole, and a distance for the guardrail sleeve to be matched and inserted is reserved between the positioning ring and the pin hole.
6. A collapsible walkway as defined in claim 5, wherein: the bottom of the walkway plate is welded with a hinged circular pipe, the hinged circular pipe is connected with a second hinged joint through a cylindrical pin, and a locking hole and a waist-shaped hole are respectively and correspondingly formed in the walkway plate at the corresponding positions of the walkway fixing plate and the walkway limiting locking plate.
CN202121546121.8U 2021-07-08 2021-07-08 Foldable walkway Active CN216007749U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121546121.8U CN216007749U (en) 2021-07-08 2021-07-08 Foldable walkway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121546121.8U CN216007749U (en) 2021-07-08 2021-07-08 Foldable walkway

Publications (1)

Publication Number Publication Date
CN216007749U true CN216007749U (en) 2022-03-11

Family

ID=80529594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121546121.8U Active CN216007749U (en) 2021-07-08 2021-07-08 Foldable walkway

Country Status (1)

Country Link
CN (1) CN216007749U (en)

Similar Documents

Publication Publication Date Title
CN203334730U (en) Split mounting type steel-structure movable workshop in construction site
CN107152078B (en) Hinge device and construction method for releasing welding internal stress of steel gallery by using hinge device
CN206032726U (en) Modular pipe truss coal transporting trestle
CN216007749U (en) Foldable walkway
CN105773004B (en) Flexible equipment for manufacturing steel structure bridge and disassembling and assembling method thereof
CN108979198A (en) A kind of skyscraper tears building machine open and its tears building method open
CN206753105U (en) A kind of skyscraper tears building machine open
CN102041815A (en) Tower crane
CN211144522U (en) Snap-in connection for steel arch segments of tunnels
CN107724246A (en) The interim contraposition fixing device and its application method of a kind of steel box-girder segmented assembly
CN111119028A (en) Movable folding overbridge
CN212527505U (en) Baffle assemblage does not have sign indicating number and supports frock
CN213356779U (en) Overweight steel column translation transportation installation device
CN205421961U (en) A can change movable clamp plate for steel beam mounting
CN210756002U (en) High-efficiency protective shielding type fire receiving basin
CN205257791U (en) Quick assembly and disassembly formula gantry crane frame construction
JP2004132139A (en) Construction method for bridge, and superstructure work of bridge
CN201856816U (en) Vehicle frame used for relocation of towers
CN211313307U (en) Foldable scaffold arranged behind shield
CN212388383U (en) Cantilever construction continuous beam hogging moment stretch-draw support
CN101992804B (en) Frame for moving tower
CN214778587U (en) Foldable side adhesive tape machine of crawler belt screen moving and separating station
CN210041133U (en) Automatic combined crossing system
CN220203514U (en) Steel construction pin-connected panel platform ramp
CN204343171U (en) Railroad bridge prefabricated post stretching Simple T-Girders note concrete form support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 330004 No. 300, Hongwan Avenue, Wanli District, Nanchang City, Jiangxi Province

Patentee after: Nanchang Mining Machinery Group Co.,Ltd.

Address before: 330004 No. 300, Hongwan Avenue, Wanli District, Nanchang City, Jiangxi Province

Patentee before: NANCHANG MINERAL SYSTEMS Co.,Ltd.

CP01 Change in the name or title of a patent holder