CN215987798U - Modular cable laying sand table rehearsal outfit - Google Patents

Modular cable laying sand table rehearsal outfit Download PDF

Info

Publication number
CN215987798U
CN215987798U CN202122121817.2U CN202122121817U CN215987798U CN 215987798 U CN215987798 U CN 215987798U CN 202122121817 U CN202122121817 U CN 202122121817U CN 215987798 U CN215987798 U CN 215987798U
Authority
CN
China
Prior art keywords
cable laying
obstacle
module
dimensional
module group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122121817.2U
Other languages
Chinese (zh)
Inventor
马琳琦
丁楠
孙天硕
李季
朱立军
张宇
沈兴杰
吕爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202122121817.2U priority Critical patent/CN215987798U/en
Application granted granted Critical
Publication of CN215987798U publication Critical patent/CN215987798U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a combined cable laying sand table drilling tool which comprises an overground building module group, an underground pipeline and obstacle module group and a cable laying model module group, wherein the overground building module group, the underground pipeline and obstacle module group and the cable laying module group are connected in a matched mode, the overground building module group comprises a three-dimensional miniature module of an overground obstacle, and the underground pipeline and obstacle module group comprises a three-dimensional module of an underground pipeline and an obstacle. The combined type cable laying sand table drilling tool provided by the utility model enables engineering personnel to visualize the overall engineering, select the optimal construction path and laying mode, discover engineering construction difficulties in time, seek solution measures, control engineering construction progress in real time and improve communication efficiency.

Description

Modular cable laying sand table rehearsal outfit
Technical Field
The utility model belongs to the technical field of power cable line design, construction and acceptance, and particularly relates to a combined type cable laying sand table drilling rig.
Background
The urbanization process of China is continuously and rapidly developed, power cables gradually become the main body of power supply transmission, the construction amount of underground or even underwater construction is increased day by day, underground pipelines or other obstacles are detected at the beginning of design, an optimal construction path and a laying mode are selected, but the underground condition is often different from an investigation result in the actual construction process, so that the design scheme or the construction scheme in construction is adjusted, the problem of 'talking about on paper' often occurs, and a lot of inconvenience is brought to discussion schemes of all parties involved in engineering and engineering management.
In conclusion, the prior art has the defects that cable construction paths, underground pipeline distribution conditions, low working efficiency and the like cannot be visualized.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the defects of the prior art and provide a combined type cable laying sand table drilling tool, so that engineering personnel can visually observe the overall engineering, select an optimal construction path and a laying mode, find engineering construction difficulties in time, seek solution measures, control engineering construction progress in real time and improve communication efficiency.
The technical problem to be solved by the utility model is realized by adopting the following technical scheme:
a combined cable laying sand table rehearsal apparatus comprises an overground building module group, an underground pipeline and obstacle module group and a cable laying model module group, wherein the overground building module group, the underground pipeline and obstacle module group and the cable laying module group are matched and connected, the overground building module group comprises a three-dimensional miniature module of an overground obstacle, the underground pipeline and obstacle module group comprises a three-dimensional module of an underground pipeline and an obstacle, the cable laying model module group comprises a cable laying three-dimensional module, the edge of the cable laying three-dimensional module is provided with a concave-convex interface, and the cable laying three-dimensional module is spliced through the concave-convex interface;
preferably, the stereoscopic miniature module of the above-ground barrier comprises buildings, trees, lawns, roads, rivers;
preferably, the stereoscopic modules of the underground pipelines and the obstacles comprise power pipelines, tap water pipelines, sewage pipelines, communication pipelines and building foundations;
preferably, the cable laying three-dimensional module comprises a work well, a channel, a bridge, a pipe arrangement, a water bottom, a direct burial and a tunnel.
The utility model has the advantages and positive effects that:
compared with the prior art, the combined type cable laying sand table rehearsal harness provided by the utility model has the advantages that the ground building module group, the underground pipeline and obstacle module group and the cable laying model module group are made into three-dimensional modules through a 3D printing technology and can be randomly combined and connected to construct a three-dimensional panoramic display, so that cable construction paths, underground pipeline distribution conditions and laying modes are visually presented, the discussion and research scheme of design, construction, supervision and construction units is facilitated, the construction cost is reduced, the construction protection measures are perfected, and the working efficiency is improved.
Drawings
FIG. 1 is a schematic diagram of a connection structure of a cable laying model module set according to the present invention;
fig. 2 is a schematic diagram for dynamically demonstrating the cable laying process according to the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The utility model provides a combined type cable laying sand table drilling tool, which comprises an overground building module group, an underground pipeline and obstacle module group and a cable laying model module group as shown in figure 1, the above-ground building module group, the underground pipeline and barrier module group and the cable laying module group are connected in a matching way, the above-ground building module group comprises a three-dimensional miniature module of an above-ground obstacle, the underground pipeline and obstacle module group comprises three-dimensional modules of an underground pipeline and an obstacle, the cable laying model module group comprises a cable laying three-dimensional module, the edge of the cable laying three-dimensional module is provided with a concave-convex interface, the cable laying three-dimensional module is spliced through the concave-convex interface combination, and the cable laying three-dimensional module is spliced through any combination, so that the dynamic demonstration of the cable laying process in the model is presented, and the rationality of cable laying mode selection under different scenes is more visually distinguished.
In this embodiment, the three-dimensional miniature modules of the above-ground obstacles include buildings, trees, lawns, roads, rivers or other modules, so as to restore the above-ground original appearance of the cable line related area, and select an optimal cable construction path and laying mode design scheme by combining the conditions of cable line approaches and underground pipelines.
In this embodiment, the three-dimensional modules of the underground pipelines and the barriers include power pipelines, water pipelines, sewage pipelines, communication pipelines, building foundations or other modules, so that the underground pipelines in the whole cable path area are built, a reasonable cable laying mode and a feasible construction scheme are conveniently discussed, protective measures are determined in advance for important underground facilities, and adverse consequences caused by blind construction are avoided.
In this embodiment, the cable laying three-dimensional module includes a working well, a channel, a bridge, a pipe bank, a water bottom, a direct burial, a tunnel or other modules, and in actual operation, after a cable laying mode is determined, a longitudinal section module for cable laying is built in, and an optimal cable line design and construction scheme is planned to be used as a sand table model of a final project, so that real-time project management work can be performed among units of design, construction, supervision and construction in a later whole project cycle.
In this embodiment, the three-dimensional miniature module of the above-ground obstacle, the three-dimensional modules of the underground pipeline and the obstacle, and the three-dimensional modules of the cable laying are all printed by a 3D technology, and are printed by the 3D technology to be manufactured into modules with a specified size, and the modules are arbitrarily combined according to the specific conditions of different construction projects, so that 100% of the design scheme is three-dimensionally displayed, and the discussion and the drilling of the scheme and the project management of each stage of the project are facilitated.
In this embodiment, as shown in fig. 2, taking tunnel laying as an example, in a line segment of a laying mode in a harness, a cable shaft, a tractor and the like used for laying are manufactured by using a 3D printing technology, a cable is used for replacing a cable, a motor is added at a cable tractor part for transmitting the cable, and a cable laying process of the cable in the laying mode is simulated, so that teaching demonstration and on-site actual exercise are facilitated.
It can be clearly understood by those skilled in the art that, for convenience and brevity of description, the specific installation and working processes of the above-described apparatus may refer to the corresponding processes in the above-described embodiments, and are not described herein again.
It should be emphasized that the embodiments described herein are illustrative rather than restrictive, and thus the present invention is not limited to the embodiments described in the detailed description, but also includes other embodiments that can be derived from the technical solutions of the present invention by those skilled in the art.

Claims (4)

1. The utility model provides a modular cable laying sand table rehearsal outfit which characterized in that: the underground pipeline and obstacle module set comprises an overground building module set, an underground pipeline and obstacle module set and a cable laying module set, wherein the overground building module set, the underground pipeline and obstacle module set and the cable laying module set are matched and connected, the overground building module set comprises a three-dimensional miniature module of an overground obstacle, the underground pipeline and obstacle module set comprises three-dimensional modules of the underground pipeline and the obstacle, the cable laying module set comprises a cable laying three-dimensional module, concave-convex interfaces are arranged at the edges of the cable laying three-dimensional modules, and the cable laying three-dimensional module is spliced through the concave-convex interface combination.
2. The combined cable laying sand table practicing harness as claimed in claim 1, wherein: the stereoscopic miniature module of the ground barrier comprises buildings, trees, lawns, roads and rivers.
3. The combined cable laying sand table practicing harness as claimed in claim 1, wherein: the three-dimensional modules of the underground pipelines and the barriers comprise power pipelines, tap water pipelines, sewage pipelines, communication pipelines and building foundations.
4. The combined cable laying sand table practicing harness as claimed in claim 1, wherein: the cable laying three-dimensional module comprises a working well, a channel, a bridge, a pipe arrangement, a water bottom, a direct burial and a tunnel.
CN202122121817.2U 2021-09-03 2021-09-03 Modular cable laying sand table rehearsal outfit Active CN215987798U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122121817.2U CN215987798U (en) 2021-09-03 2021-09-03 Modular cable laying sand table rehearsal outfit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122121817.2U CN215987798U (en) 2021-09-03 2021-09-03 Modular cable laying sand table rehearsal outfit

Publications (1)

Publication Number Publication Date
CN215987798U true CN215987798U (en) 2022-03-08

Family

ID=80521753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122121817.2U Active CN215987798U (en) 2021-09-03 2021-09-03 Modular cable laying sand table rehearsal outfit

Country Status (1)

Country Link
CN (1) CN215987798U (en)

Similar Documents

Publication Publication Date Title
CN103279978B (en) Based on the Digital Campus method for building up of virtual reality technology
CN108256213B (en) Urban rail transit vehicle base modular construction simulation method based on VR and BIM
CN203849605U (en) Smart pipe network
CN106481881B (en) A kind of original pipe position no-dig technique splits the construction method that pipe repairs underground piping
CN102568293A (en) Rectangular tunnel boring machine teaching system
CN215987798U (en) Modular cable laying sand table rehearsal outfit
CN107219558A (en) A kind of quick electrode installation aiding device and method available for geophysical measurement
CN112685524A (en) BIM and GIS integration method for assisting in operation and maintenance of power tunnel
CN108550086A (en) A kind of recognition methods of Station construction speed and system
CN203924301U (en) A kind of propelling with volume rises cooperating type pipeline displacement prosthetic device
RU81830U1 (en) INTERACTIVE REMOTE AUTOMATED LEARNING SYSTEM
CN206053932U (en) A kind of directional drilling machine long distance control system
CN115587457A (en) Construction method for optimizing urban water supply pipeline based on unmanned aerial vehicle and BIM technology
CN102097019B (en) Optical cable line construction site simulation system
CN109033631A (en) A kind of power station optical cable or cable routing three-dimensional display method based on design information
Wen et al. The application of 3D design technology in the design of 220kV substation in Miluo Western
CN106815395A (en) The implementation method of distribution line shaft tower is built in three-dimensional emulation
Meng et al. Development of virtual TBM construction simulation teaching system based on Unity3D
CN218634952U (en) Demonstration training set based on open channel water supply intelligent monitoring and control equipment
Nie et al. Mechanized construction technology of transmission line based on 3d visualization
CN216287270U (en) Cable laying scene training facility for immersive learning
CN110636126A (en) 5g network-based rotary drilling rig remote control system
CN206960675U (en) A kind of quick electrode installation aiding device available for geophysical measurement
CN108590692A (en) Without foundation pit without pilot tunnel self-balancing pipe excavation method and device
CN109038640A (en) A kind of UPFC series side inverter constant volume method based on Phasor graphical method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant