CN215981140U - Pipeline construction auxiliary device - Google Patents

Pipeline construction auxiliary device Download PDF

Info

Publication number
CN215981140U
CN215981140U CN202121445402.4U CN202121445402U CN215981140U CN 215981140 U CN215981140 U CN 215981140U CN 202121445402 U CN202121445402 U CN 202121445402U CN 215981140 U CN215981140 U CN 215981140U
Authority
CN
China
Prior art keywords
plate
arc
pipeline
construction
solid fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121445402.4U
Other languages
Chinese (zh)
Inventor
董景方
郑晓通
赵建
郭洪硕
李征
施志领
刘猛
徐瑞勇
张�成
李凤勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202121445402.4U priority Critical patent/CN215981140U/en
Application granted granted Critical
Publication of CN215981140U publication Critical patent/CN215981140U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a pipeline construction auxiliary device, and belongs to the field of building construction auxiliary equipment. The technical scheme is as follows: including scissors lift and the pipeline supporting mechanism of setting on scissors lift lifter lift board, pipeline supporting mechanism is including setting up the base that puts at the lifter plate central point, the vertical rotation post that is provided with in the base, the fixed arc solid fixed splint that are provided with on the rotation post, the last articulated arc movable clamp that is provided with of arc solid fixed splint, arc movable clamp and the corresponding upper junction plate and the lower connecting plate that is provided with in arc solid fixed splint side, be provided with the screw hole down in the connecting plate, connect the via hole has been seted up on the upper junction plate, be provided with connecting bolt in connect the via hole and the screw hole. The utility model has the beneficial effects that: simple structure, convenient to use have promoted the construction quality when large-scale pipeline furred ceiling is installed greatly, guarantee workman construction safety, improve the efficiency of construction.

Description

Pipeline construction auxiliary device
Technical Field
The utility model relates to the field of building construction auxiliary equipment, in particular to a pipeline construction auxiliary device.
Background
The installation degree of difficulty of large-scale no galvanized pipe construction furred ceiling is big in the work progress at present, and the construction is dangerous high, and the construction progress is slow and the construction once becomes the merit rate low, and the large-scale pipe construction furred ceiling installation degree of difficulty is big on the one hand, appears connecting easily not in the same direction directly the deviation appears and leads to the smooth silk scheduling problem of taking off, and on the other hand large-scale pipe construction is time-consuming, takes a lot of work, and the workman need ascend a height the operation and the dangerous is big in the construction of pipeline weight.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide the pipeline construction auxiliary device which is simple in structure and convenient to use, greatly improves the construction quality when a large-size pipeline suspended ceiling is installed, ensures the construction safety of workers and improves the construction efficiency.
The utility model is realized by the following measures:
a pipeline construction auxiliary device is characterized by comprising a scissor lift and a pipeline supporting mechanism arranged on a lifting plate of the scissor lift;
the scissor lift and the lifting function thereof are the prior art and are not described herein again;
the pipeline supporting mechanism is including setting up the base that lifter plate central point put, the vertical rotation post that is provided with in the base, the fixed arc solid fixed splint that is provided with on the rotation post, the articulated arc activity splint that is provided with on the arc solid fixed splint, the arc activity splint with the corresponding upper junction plate and the lower connecting plate that is provided with in arc solid fixed splint side, be provided with the screw hole down in the connecting plate, connecting hole has been seted up on the upper junction plate, connecting hole with be provided with connecting bolt in the screw hole.
The utility model has the following specific characteristics:
the rotary column is close to the fixed annular fagging that is provided with of base surface, annular fagging with be provided with the support bull's eye wheel between the lifter plate, it is fixed to set up to support the bull's eye wheel on the lifter plate.
A pair of fixed thread cylinders are arranged on the arc-shaped movable clamping plate, and fastening bolts are arranged in the fixed thread cylinders.
The annular supporting plate is provided with a limiting through hole, the lifting plate is provided with a limiting thread cylinder, and the limiting through hole and the limiting thread cylinder are internally provided with a limiting bolt.
During pipeline construction, will the scissors lift falls to minimumly, unscrews connecting bolt will arc movable clamp plate is opened, later will treat the pipeline of installation and put into in the arc solid fixed splint, will arc movable clamp plate resets and uses connecting bolt fastens arc solid fixed splint with arc movable clamp plate, further, screws up fastening bolt further carries on spacingly to the pipeline, and fixed completion back will auxiliary device removes to the position of treating the construction, goes up and down the scissors lift will simultaneously spacing bolt is unscrewed, rotates the post rotates, adjusts the angle, the position of pipeline and is under construction installation, and after the pipe connection was accomplished, opens arc movable clamp plate reduces the scissors lift accomplishes the pipe installation.
The utility model has the beneficial effects that: simple structure, convenient to use have promoted the construction quality when large-scale pipeline furred ceiling is installed greatly, guarantee workman construction safety, improve the efficiency of construction.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Fig. 2 is a partially enlarged view of a portion a in fig. 1.
Fig. 3 is a schematic structural diagram of an embodiment of the present invention.
Fig. 4 is a partially enlarged view of a portion B in fig. 3.
Fig. 5 is a partially enlarged view of a portion C in fig. 3.
Wherein the reference numerals are: 1. a scissor lift; 2. a lifting plate; 3. rotating the column; 4. an arc-shaped fixed splint; 401. a limiting sleeve; 5. an arc movable splint; 501. a rotating shaft; 502. fixing the threaded cylinder; 503. fastening a bolt; 6. an upper connecting plate; 7. a lower connecting plate; 8. a connecting bolt; 9. a ring-shaped supporting plate; 10. supporting the bull's eye wheel; 11. a limiting threaded cylinder; 12. and a limiting bolt.
Detailed Description
In order to clearly illustrate the technical features of the present solution, the present solution is explained below by way of specific embodiments.
Referring to fig. 1 to 5, a pipe construction assisting device includes a scissor lift 1 and a pipe supporting mechanism provided on a lifting plate 2 of the scissor lift 1;
the scissor lift 1 and the lifting function thereof are the prior art and are not described herein again;
pipeline supporting mechanism is including setting up the base that puts at lifter plate 2 central point, the vertical post 3 that rotates that is provided with in the base, rotate and fixedly on the post 3 be provided with arc solid fixed splint 4, the articulated arc movable clamp plate 5 that is provided with on the arc solid fixed splint 4, arc movable clamp plate 5 and arc solid fixed splint 4 side correspondence are provided with upper junction plate and lower connecting plate 7, be provided with the screw hole in the lower connecting plate 7, connect the via hole has been seted up on the upper junction plate, be provided with connecting bolt 8 in connect the via hole and the screw hole.
The rotary column 3 is provided with an annular supporting plate 9 close to the outer surface of the base, a supporting bull-eye wheel 10 is arranged between the annular supporting plate 9 and the lifting plate 2, and the supporting bull-eye wheel 10 is fixedly arranged on the lifting plate 2.
The arc-shaped movable clamping plate 5 is provided with a pair of fixed thread cylinders 502, and fastening bolts 6503 are arranged in the fixed thread cylinders 502.
Spacing through-hole has been seted up on the annular fagging 9, is provided with spacing screw thread section of thick bamboo 11 on the lifter plate 2, is provided with spacing bolt 12 in spacing through-hole and the spacing screw thread section of thick bamboo 11.
During pipeline construction, it is minimum to fall scissors lift 1, unscrew connecting bolt 8, open arc movable clamp plate 5, later put into arc solid fixed splint 4 with the pipeline of treating the installation, reset arc movable clamp plate 5, and use connecting bolt 8 fastening arc solid fixed splint 4 and arc movable clamp plate 5, furthermore, it is spacing further to screw up fastening bolt 6503 to carry out the pipeline, after fixed the completion, remove auxiliary device to the position of treating the construction, lift scissors lift 1, unscrew limit bolt 12 simultaneously, rotate rotation post 3, adjust the angle of pipeline, the position is under construction and is installed, after the pipe connection is accomplished, open arc solid movable splint 5, reduce scissors lift 1, accomplish the piping erection.
The technical features of the present invention which are not described in the above embodiments may be implemented by or using the prior art, and are not described herein again, of course, the above description is not intended to limit the present invention, and the present invention is not limited to the above examples, and variations, modifications, additions or substitutions which may be made by those skilled in the art within the spirit and scope of the present invention should also fall within the protection scope of the present invention.

Claims (4)

1. A pipeline construction auxiliary device is characterized by comprising a scissor lift and a pipeline supporting mechanism arranged on a lifting plate of the scissor lift;
the pipeline supporting mechanism is including setting up the base that lifter plate central point put, the vertical rotation post that is provided with in the base, the fixed arc solid fixed splint that is provided with on the rotation post, the articulated arc activity splint that is provided with on the arc solid fixed splint, the arc activity splint with the corresponding upper junction plate and the lower connecting plate that is provided with in arc solid fixed splint side, be provided with the screw hole down in the connecting plate, connecting hole has been seted up on the upper junction plate, connecting hole with be provided with connecting bolt in the screw hole.
2. The auxiliary device for pipeline construction according to claim 1, wherein the rotary column is fixedly provided with a ring-shaped supporting plate near the outer surface of the base, a supporting bull's eye wheel is arranged between the ring-shaped supporting plate and the lifting plate, and the supporting bull's eye wheel is fixedly arranged on the lifting plate.
3. The auxiliary device for pipeline construction according to claim 2, wherein a pair of fixed threaded cylinders are provided on the arc-shaped movable clamping plate, and fastening bolts are provided in the fixed threaded cylinders.
4. The auxiliary device for pipeline construction according to claim 3, wherein the annular supporting plate is provided with a limiting through hole, the lifting plate is provided with a limiting threaded cylinder, and the limiting through hole and the limiting threaded cylinder are provided with a limiting bolt.
CN202121445402.4U 2021-06-28 2021-06-28 Pipeline construction auxiliary device Active CN215981140U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121445402.4U CN215981140U (en) 2021-06-28 2021-06-28 Pipeline construction auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121445402.4U CN215981140U (en) 2021-06-28 2021-06-28 Pipeline construction auxiliary device

Publications (1)

Publication Number Publication Date
CN215981140U true CN215981140U (en) 2022-03-08

Family

ID=80578553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121445402.4U Active CN215981140U (en) 2021-06-28 2021-06-28 Pipeline construction auxiliary device

Country Status (1)

Country Link
CN (1) CN215981140U (en)

Similar Documents

Publication Publication Date Title
CN203247012U (en) Composite insulator hoisting fixture
CN206647287U (en) A kind of protection type industrial ceiling fan
CN215981140U (en) Pipeline construction auxiliary device
CN115465768A (en) Large-scale bearing hoisting device
CN211078298U (en) Hoisting accessory is used in thermal power plant's maintenance
CN204873690U (en) Pole is with hoist and mount ware
CN217580827U (en) Flat unipolar supporting device
CN203754331U (en) Hoisting device applied to telegraph pole top end
CN201266809Y (en) Transmission line sustained center chucking tool
CN210236938U (en) Control box convenient for adjusting and arranging angle and used for torque limiter
CN210763925U (en) Tire mold side plate hoisting and overturning support
CN220896204U (en) General ground wire lifter
CN206958386U (en) A kind of fire water-supply Pipe installing standpipe mounting bracket
CN207078915U (en) A kind of medium and small steel beam lifting special hanger
CN213356754U (en) Elevating gear for construction
CN216665534U (en) Novel automatic hydraulic pliers with induction device
CN213834248U (en) Adjustable steel beam connecting plate mounting frame body
CN212412640U (en) Wire clamp structure for scaffold
CN212671879U (en) Device for mounting steam turbine
CN220845123U (en) Building curtain wall hoisting clamping mechanism
CN216030286U (en) Water pipe fixing device for building construction
CN214653225U (en) Movable roof hoisting device
CN220117793U (en) Building steel structure supporting device
CN218950904U (en) Lifting device for auxiliary installation anchor bolt
CN109484974B (en) Method for mounting axial-flow propeller turbine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant